TRIP SHEET INSTRUCTIONS (SI Units)

Column 1: This is the stand list as numbered when racked in the derrick. Record single stands for the first 5
stands under normal circumstances. Then record every 5 stands.

Column 2: Note the trip tank gauge reading. The difference in reading after an increment will be the measured
amount of mud used to fill the hole for that increment.

Column 3: The displacement of the number of stands for one increment.

Column 4: Actual measured amount of mud used to fill the hole for that increment.

Column 5: Cumulative sum of numbers in column 4.

Column 6: Results of subtraction of column 3 from column 4. A negative number here may indicate the hole
did not take enough mud (possible swabbing). A positive number may indicate the hole took
too much mud (losses).

Column 7: Cumulative sum of the numbers in column 6. This column gives the total amount of fluid swabbed
into the hole or the total losses since the beginning of the trip.
TRIP SHEET (SI UNITS)

RIG: DATE:
WELL: TIME:
DRILLER: DEPTH:

REASON FOR THE TRIP:

Number of stands to have top of DC’s one stand below BOP’s:


Float: Ported Non Ported

PULL Tick Displacement: DC OTHER HWDP DP


ON:
 Size 4 3/4 6 3/4 8 1/4 9 1/2 3½ 4 5 5 1/2 4 5 5 1/2
TBG
Even Displacement 0.017 0.037 0.05809 0.07893 0.0103 0.0189 0.0172 0.006 0.0084 0.00907

Single Bbls/stand 1.5 3.4 5.4 7.2 1.0 1.7 1.6 0.6 0.8 0.85
Closed end
Double disp
0.0219 0.0443 0.0661 0.0876 0.0167 0.0276 0.0327 0.0163 0.0254 0.0305

Bbls/stand 2.0 4.0 6.0 8.0 1.5 2.5 3.0 1.5 2.4 2.9

Stand Trip Calculated Measured Discrepancy


No. Tank Hole Fill (bbls) Hole Fill (bbls) Remarks
Gauge per Increment per Cumulative per Cumulative
Increment Increment
1 2 3 4 5 6 7 8
Stand Trip Calculated Measured Discrepancy
No. Tank Hole Fill (bbls) Hole Fill (bbls) Remarks
Gauge per Increment per Cumulative per Cumulative
Increment Increment