Professional Documents
Culture Documents
Trip
Trip
Trip
Column 1: This is the stand list as numbered when racked in the derrick. Record single stands for the first 5
stands under normal circumstances. Then record every 5 stands.
Column 2: Note the trip tank gauge reading. The difference in reading after an increment will be the measured
amount of mud used to fill the hole for that increment.
Column 4: Actual measured amount of mud used to fill the hole for that increment.
Column 6: Results of subtraction of column 3 from column 4. A negative number here may indicate the hole
did not take enough mud (possible swabbing). A positive number may indicate the hole took
too much mud (losses).
Column 7: Cumulative sum of the numbers in column 6. This column gives the total amount of fluid swabbed
into the hole or the total losses since the beginning of the trip.
TRIP SHEET (SI UNITS)
RIG: DATE:
WELL: TIME:
DRILLER: DEPTH:
Single Bbls/stand 1.5 3.4 5.4 7.2 1.0 1.7 1.6 0.6 0.8 0.85
Closed end
Double disp
0.0219 0.0443 0.0661 0.0876 0.0167 0.0276 0.0327 0.0163 0.0254 0.0305
Bbls/stand 2.0 4.0 6.0 8.0 1.5 2.5 3.0 1.5 2.4 2.9