PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
- 1 x MCCB 25 A, 3 P, 18 kA 1.00
- 3 x MCB 10 A, 3 P, 10 kA 3.00
- 3 x CT 40/5A 3.00
- 2 x Direct on Line Starter 1,5 kW 2.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 2 x A/O/M selector switch 2.00
- 2 x push button ON 4.00
- 2 x push button OFF 4.00
- 4 x indikator lamp 4.00
- 1 x Phase Failure Relay 1.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot control wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot pentanahan 1.00
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 7 x MCB 6 A, 1 P, 6 kA 7.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
-10 x MCB 6 A, 1 P, 6 kA 10.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot pentanahan 1.00
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
-7 x MCB 10 A, 1 P, 6 kA 7.00
-7 x MCB 6 A, 1 P, 6 kA 7.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 20 x MCB 6 A, 1 P, 6 kA 20.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) (Rp)
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 26 x MCB 6 A, 1 P, 6 kA 26.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 16 x MCB 6 A, 1 P, 6 kA 16.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
- 1 x MCCB 16 A, 3 P, 10 kA 1.00
- 5 x MCB 6 A, 1 P, 6 kA 5.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot control wiring + aksesori 1.00
- 1 lot panel 25 (L) x 20 (D) x 25 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
- 20 x MCB 16 A, 1 P, 6 kA 20.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 1 lot busbar 60 A full neutral, 5 bus 1.00
- 1 lot internal wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 5 x MCB 6 A, 3 P, 10 kA 5.00
- 2 x MCB 6 A, 1 P, 6 kA 2.00
- 2 x Y-D starter 37 kW 2.00
- 9 x Direct on Line Starter 1,5 kW 3.00
- 9 x CT 40/5A 9.00
- 9 x A-meter 0 - 20 A 9.00
- 9 x fuse 2 A + fuse holder 9.00
- 3 x pilot lamp 3.00
- 1 x MCCB 25 A, 3 P, 10 kA 1.00
- 3 x MCB 6 A, 3 P, 10 kA 3.00
- 9 x Direct on Line Starter 1,5 kW 3.00
- 1 x Phase Failure Relay 1.00
- 3 x fuse 2 A + fuse holder 3.00
- 3 x pilot lamp 3.00
- 2 x A/O/M selector switch 2.00
- 2 x push button ON 2.00
- 2 x push button OFF 2.00
- 2 x indikator lamp 2.00
- 1 lot busbar 40 A full neutral, 5 bus 1.00
- 1 lot control wiring + aksesori 1.00
- 1 lot panel 50 (L) x 25 (D) x 60 (T) cm 1.00
- 1 lot instalasi kabel grounding 1.00
SUB TOTAL I
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) (Rp)
SUB TOTAL II
3.2 Lantai - 2
3.2 Lantai - 3
j Instalasi stop kontak 1 fasa, 200 VA, 220 V + out let stop 16.00 ttk
di bawahlantaimenggunakan konduit high impact
n Saklar tunggal 17.00 bh
Sakla ganda 6.00 bh
Saklar hotel tunggal 2.00 bh
HARGA JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) (Rp)
3.3 Lantai - 4
4.1 Lantai 2
4.2 Lantai 3
4.1 Lantai 4
c Elbow 40 cm 3.00 bh
d Elbow 30 cm 2.00 bh
g Outside Riser 40 cm 2.00 bh
h Outside Riser 30 cm 1.00 bh
i Alat bantu (mur-baut, hanger rod, hinge fish 1.00 ls
plate dll.)
SUB TOTAL IV
5.1 Lantai 1
5.2 Lantai 2
5.2 Lantai 3
SUB TOTAL V
SUB TOTAL VI
VII PENYAMBUNGAN DAYA PLN
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)
a.2 Lantai - 1
1 Instalasi titik outlet telepon lkp dgn telephone 5.00 ttk
receptacle outlet(dinding)
2 Analog DTMF hand set 5.00 unit
3 Terminal Box kap. 40 prs 1.00 unit
a.3 Lantai - 2
1 Instalasi titik outlet telepon lkp dgn telephone 8.00 ttk
receptacle outlet(dinding)
2 Analog DTMF hand set 8.00 unit
3 Terminal Box kap. 40 prs 1.00 unit
a.4 Lantai - 3
1 Instalasi titik outlet telepon lkp dgn telephone 12.00 ttk
receptacle outlet(dinding)
2 Analog DTMF hand set 12.00 unit
3 Terminal Box kap. 10 prs 1.00 unit
a.5. Lantai - 4
1 Instalasi titik outlet telepon lkp dgn telephone 1.00 ttk
receptacle outlet(dinding)
2 Analog DTMF hand set 1.00 unit
Sub Total
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN ( Rp) JUMLAH HARGA (Rp)
Sub Total
Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)
(Rp)
2 Ground floor
- ROR & fixed temperature detector 8.00 bh
- Smoke temperature detector 1.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 10.00 ttk
- Instalasi alarm dan bell 1.00 ttk
3 Lantai 1
- ROR & fixed temperature detector 6.00 bh
- Fixed temperature detector 1.00 bh
- Smoke temperature detector 1.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 9.00 ttk
- Instalasi alarm dan bell 2.00 ttk
- ROR & fixed temperature detector 4.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
4 Lantai 2
- ROR & fixed temperature detector 9.00 bh
- Fixed temperature detector 1.00 bh
- Smoke temperature detector 1.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 12.00 ttk
- Instalasi alarm dan bell 2.00 ttk
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)
(Rp)
5 Lantai 3
- ROR & fixed temperature detector 10.00 bh
- Fixed temperature detector 1.00 bh
- Smoke temperature detector 3.00 bh
- Manual call point / MCP 2.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 16.00 ttk
- Instalasi alarm dan bell 2.00 ttk
6 Lantai 4
- ROR & fixed temperature detector 9.00 bh
- Fixed temperature detector 1.00 bh
- Manual call point / MCP 1.00 bh
- Alarm bell dia. 4" 1.00 bh
- Alarm lamp 1.00 bh
- Terminal box 1.00 unit
- Instalasi detektor dan MCP 11.00 ttk
- Instalasi alarm dan bell 2.00 ttk
Sub Total
Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
a Lantai 1
c Lantai 2
d Lantai 3
e Kabel Penghubung
Sub Total
Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)
(Rp)
a.2.1 Lantai 1
1 20 cm Ceiling Speaker 6W / 100 V 7.00 bh
Ex : TOA Seri PC 34 RW
2 30 W Attenuator Ex TOA Seri - 311 4.00 bh
3 Instalasi Ceiling Speaker 7.00 ttk
4 Instalasi Attenuator 4.00 ttk
5 Terminal Box ( TB-SS-1 ) 1.00 bh
Mezanin
1 20 cm Ceiling Speaker 6W / 100 V 4.00 bh
Ex : TOA Seri PC 34 RW
2 30 W Attenuator Ex TOA Seri - 311 3.00 bh
a.2.1 Lantai 2
1 20 cm Ceiling Speaker 6W / 100 V 11.00 bh
Ex : TOA Seri PC 34 RW
2 30 W Attenuator Ex TOA Seri - 311 7.00 bh
3 Instalasi Ceiling Speaker 11.00 ttk
4 Instalasi Attenuator 7.00 ttk
5 Terminal Box ( TB-SS-2 ) 1.00 bh
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)
(Rp)
a.2.2 Lantai 3
1 20 cm Ceiling Speaker 6W / 100 V 13.00 bh
Ex : TOA Seri PC 34 RW
2 30 W Attenuator Ex TOA Seri - 311 7.00 bh
3 Instalasi Ceiling Speaker 13.00 ttk
4 Instalasi Attenuator 7.00 ttk
5 Terminal Box ( TB-SS-3 ) 1.00 bh
a.2.3 Lantai 4
1 20 cm Ceiling Speaker 6W / 100 V 10.00 bh
Ex : TOA Seri PC 34 RW
2 30 W Attenuator Ex TOA Seri - 311 5.00 bh
3 Instalasi Ceiling Speaker 10.00 ttk
4 Instalasi Attenuator 5.00 ttk
5 Terminal Box ( TB-SS-3 ) 1.00 bh
Sub Total
Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
b PEKERJAAN PEMIPAAN
1 Pemipaan Bahan Bakar 1 ls
Pemipaan bahan bakar antara fuel daily tank
dengan mesin dan antara weekly tank dgn
daily tank, pemipaan BSP sch. 30, penyam -
bungan dengan flange, termasuk klem pipa
dan pengecatan
2 Pemipaan Exhaust Gas
Pemipaan exhaust gas di dalam ruang DGS 1 ls
pemipaan dgn. BSP sch 30 dilapis tali asbes
dan alumunium jacketing.
Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN ELEKTRIKAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) HARGA (Rp)
1 Lantai 2 5 ttk
Kabel coaxial 5C-2V, 75 ohm ex YURI Japan,
di dlm konduit PVC high impact-heavy gauge
ex EGA/CLIPSAL termasuk F-connector dan
outlet TV.
2 Lantai 3 10 ttk
Kabel coaxial 5C-2V, 75 ohm ex YURI Japan,
di dlm konduit PVC high impact-heavy gauge
ex EGA/CLIPSAL termasuk F-connector dan
outlet TV.
Total
RENCANA ANGGARAN BIAYA
PEKERJAAN AIR BERSIH
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
b INSTALASI PEMIPAAN
b.4 Lantai 1
1 Pipa tegak dia. 3" 8.00 m
Pipa dia. 1 1/2" 12.00 m
Pipa dia. 1" 26.00 m
Pipa dia. 3/4" 8.00 m
Pipa dia. 1/2" 76.00 m
2 Tee dia. 3" x 1 1/2" x 3" 1.00 bh
Tee dia. 1 1/2" x 1" x 1 1/2" 2.00 bh
Tee dia. 1" x 1" x 1" 1.00 bh
Tee dia. 1" x 3/4" x 1" 1.00 bh
Tee dia. 1" x 1/2" x 1" 8.00 bh
Tee dia. 3/4" x 3/4" x 3/4" 1.00 bh
Tee dia. 3/4" x 1/2" x 3/4" 2.00 bh
Tee dia. 1/2" x 1/2" x 1/2" 6.00 bh
3 Elbow dia. 1 1/2" 3.00 bh
Elbow dia. 1" 3.00 bh
Elbow dia. 3/4" 1.00 bh
Elbow dia. 1/2" 20.00 bh
4 Reducer dia. 1 1/2" x 3/4" 1.00 bh
Reducer dia. 1" x 1/2" 2.00 bh
Reducer dia. 3/4" x 1/2" 2.00 bh
5 Gate valve dia. 1 1/2" (125 psi-screwed) 1.00 bh
6 Material bantu (support,klem , socket dll) 1.00 ls
b.5 Lantai 2
1 Pipa tegak dia. 3" 8.00 m
Pipa dia. 1 1/2" 16.00 m
Pipa dia. 1" 12.00 m
Pipa dia. 3/4" 26.00 m
Pipa dia. 1/2" 48.00 m
2 Tee dia. 3" x 1 1/2" x 3" 1.00 bh
Tee dia. 1 1/2" x 1" x 1 1/2" 1.00 bh
Tee dia. 1 1/2" x 3/4" x 1 1/2" 2.00 bh
Tee dia. 1" x 1/2" x 1" 4.00 bh
Tee dia. 3/4" x 1/2" x 3/4" 6.00 bh
Tee dia. 1/2" x 1/2" x 1/2" 5.00 bh
3 Elbow dia. 1 1/2" 4.00 bh
Elbow dia. 1" 2.00 bh
Elbow dia. 3/4" 2.00 bh
Elbow dia. 1/2" 19.00 bh
4 Reducer dia. 1 1/2" x 3/4" 1.00 bh
Reducer dia. 1" x 1/2" 1.00 bh
Reducer dia. 3/4" x 1/2" 2.00 bh
5 Gate valve dia. 1 1/2" (125 psi-screwed) 1.00 bh
6 Material bantu (support,klem , socket dll) 1.00 ls
b.6 Lantai 3
1 Pipa tegak dia. 3" 8.00 m
Pipa tegak dia. 2" 2.00 m
Pipa dia. 1 1/2" 16.00 m
Pipa dia. 1" 12.00 m
Pipa dia. 3/4" 28.00 m
Pipa dia. 1/2" 36.00 m
2 Tee dia. 2" x 1 1/2" x 2" 1.00 bh
Tee dia. 1 1/2" x 1" x 1 1/2" 1.00 bh
Tee dia. 1 1/2" x 3/4" x 1 1/2" 3.00 bh
Tee dia. 1" x 1/2" x 1" 2.00 bh
Tee dia. 3/4" x 1/2" x 3/4" 5.00 bh
Tee dia. 1/2" x 1/2" x 1/2" 7.00 bh
3 Elbow dia. 1 1/2" 4.00 bh
Elbow dia. 1" 2.00 bh
Elbow dia. 3/4" 3.00 bh
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
b.7 Lantai 4
1 Pipa tegak dia. 3" 8.00 m
Pipa tegak dia. 2" 2.00 m
Pipa dia. 1 1/2" 6.00 m
Pipa dia. 1" 22.00 m
Pipa dia. 3/4" 18.00 m
Pipa dia. 1/2" 24.00 m
2 Tee dia. 2" x 1 1/2" x 2" 1.00 bh
Tee dia. 1 1/2" x 1" x 1 1/2" 2.00 bh
Tee dia. 1 1/2" x 3/4" x 1 1/2" 1.00 bh
Tee dia. 1" x 3/4" x 1" 1.00 bh
Tee dia. 1" x 1/2" x 1" 6.00 bh
Tee dia. 3/4" x 1/2" x 3/4" 6.00 bh
Tee dia. 1/2" x 1/2" x 1/2" 4.00 bh
3 Elbow dia. 1 1/2" 4.00 bh
Elbow dia. 1" 2.00 bh
Elbow dia. 3/4" 5.00 bh
Elbow dia. 1/2" 12.00 bh
4 Reducer dia. 1 1/2" x 1" 1.00 bh
Reducer dia. 1" x 1/2" 2.00 bh
5 Gate valve dia. 1 1/2" (125 psi-screwed) 1.00 bh
6 Material bantu (support,klem , socket dll) 1.00 ls
Tegangan : 380/660 V
Starter : DOL
Daya poros : 750 VA (min)
Kopling direct, base skid mounted
Kecepatan putar : 1450 rpm
Pengadaan pompa lengkap dgn panel kontrol
dan kabel power
3 Pressure Tank kap. 500 liter, 10 kg/cm2 1.00 bh
(1 unit)
b.8.3 INSTALASI PENYAMBUNGAN METER AIR PDAM / PALIJA 3" 1.00 unit
Sub Total
Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN AIR KOTOR
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
a Ground floor
1 Pipa
- dia. 6" 36.00 m
- dia. 4" 40.00 m
- dia. 2" 10.00 m
2 Pipa Tegak
- dia. 6" 4.00 m
- dia. 4" 4.00 m
3 Tee-Wye
- dia. 6" x 6" x 6" 1.00 bh
- dia. 6" x 2" x 6" 1.00 bh
- dia. 4" x 4" x 4" 1.00 bh
- dia. 4" x 2" x 4" 1.00 bh
- dia. 2" x 2" x 2" 1.00 bh
4 Elbow
- dia. 6" 4.00 bh
- dia. 4" 2.00 bh
- dia. 2" 3.00 bh
6 Septictank Biotech model RCX 10 (10m3) 1.00 unit
Pekerjaan sudah termasuk penggalian dan
pengurugan, pondasi struktur.
b Lantai - 1
1 Pipa
- dia. 4" 34.00 m
- dia. 3" 8.00 m
- dia. 2" 36.00 m
- dia.11/2" 64.00 m
2 Pipa Tegak
- dia. 6" 4.00 m
- dia. 4" 4.00 m
- dia. 3" 4.00 m
- dia. 2" 4.00 m
3 Tee-Wye
- dia. 6" x 4" x 6" 1.00 bh
- dia. 4" x 4" x 4" 6.00 bh
- dia. 4" x 3" x 4" 1.00 bh
- dia. 4" x 2" x 4" 1.00 bh
- dia. 3" x 2" x 3" 5.00 bh
- dia. 3" x 1 1/2" x 3" 1.00 bh
- dia. 2" x 2" x 2" 5.00 bh
- dia. 2" x 1 1/2" x 2" 3.00 bh
- dia. 1 1/2" x 1 1/2" x 1 1/2" 3.00 bh
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
4 Elbow
- dia. 4" 6.00 bh
- dia. 2" 12.00 bh
- dia. 1 1/2" 14.00 bh
5 Floor drain dia 2" 6.00 bh
6 Material bantu (socker, klem, lem dll.) 1.00 ls
c Lantai 2
1 Pipa
- dia. 4" 18.00 m
- dia. 3" 12.00 m
- dia. 2" 50.00 m
- dia.1 1/2" 46.00 m
2 Pipa Tegak
- dia. 6" 4.00 m
- dia. 4" 4.00 m
- dia. 3" 4.00 m
- dia. 2" 4.00 m
3 Tee-Wye
- dia. 6" x 4" x 6" 1.00 bh
- dia. 4" x 4" x 4" 5.00 bh
- dia. 4" x 3" x 4" 1.00 bh
- dia. 4" x 2" x 4" 1.00 bh
- dia. 4" x 1 1/2" x 4" 1.00 bh
- dia. 3" x 2" x 3" 7.00 bh
- dia. 3" x 1 1/2" x 3" 2.00 bh
- dia. 2" x 2" x 2" 4.00 bh
- dia. 2" x 1 1/2" x 2" 5.00 bh
- dia. 1 1/2" x 1 1/2" x 1 1/2" 4.00 bh
4 Elbow
- dia. 4" 5.00 bh
- dia. 2" 16.00 bh
- dia. 1 1/2" 20.00 bh
5 Floor drain dia 2" 5.00 bh
6 Material bantu (socker, klem, lem dll.) 1.00 ls
d Lantai 3
1 Pipa
- dia. 4" 18.00 m
- dia. 3" 12.00 m
- dia. 2" 42.00 m
- dia.1 1/2" 20.00 m
2 Pipa Tegak
- dia. 6" 4.00 m
- dia. 4" 4.00 m
- dia. 3" 4.00 m
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
3 Tee-Wye
- dia. 6" x 4" x 6" 1.00 bh
- dia. 4" x 4" x 4" 5.00 bh
- dia. 4" x 3" x 4" 1.00 bh
- dia. 4" x 2" x 4" 1.00 bh
- dia. 4" x 1 1/2" x 4" 1.00 bh
- dia. 3" x 2" x 3" 7.00 bh
- dia. 3" x 1 1/2" x 3" 2.00 bh
- dia. 2" x 2" x 2" 2.00 bh
- dia. 2" x 1 1/2" x 2" 3.00 bh
- dia. 1 1/2" x 1 1/2" x 1 1/2" 6.00 bh
4 Elbow
- dia. 4" 5.00 bh
- dia. 2" 16.00 bh
- dia. 1 1/2" 17.00 bh
5 Floor drain dia 2" 5.00 bh
6 Material bantu (socker, klem, lem dll.) 1.00 ls
e Lantai 4
1 Pipa
- dia. 4" 18.00 m
- dia. 3" 12.00 m
- dia. 2" 48.00 m
- dia.1 1/2" 46.00 m
2 Pipa Tegak
- dia. 6" 4.00 m
- dia. 4" 4.00 m
- dia. 3" 4.00 m
3 Tee-Wye
- dia. 6" x 4" x 6" 1.00 bh
- dia. 4" x 4" x 4" 5.00 bh
- dia. 4" x 3" x 4" 1.00 bh
- dia. 4" x 2" x 4" 1.00 bh
- dia. 4" x 1 1/2" x 4" 1.00 bh
- dia. 3" x 2" x 3" 5.00 bh
- dia. 3" x 1 1/2" x 3" 2.00 bh
- dia. 2" x 2" x 2" 3.00 bh
- dia. 2" x 1 1/2" x 2" 6.00 bh
- dia. 1 1/2" x 1 1/2" x 1 1/2" 6.00 bh
4 Elbow
- dia. 4" 5.00 bh
- dia. 2" 17.00 bh
- dia. 1 1/2" 18.00 bh
5 Floor drain dia 2" 5.00 bh
6 Material bantu (socker, klem, lem dll.) 1.00 ls
Sub Total
Sub Total
Jumlah Total
RENCANA ANGGARAN BIAYA
PEKERJAAN INSTALASI AC
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)
(Rp)
a Lantai 1
b Lantai 2
c Lantai 3
d Lantai 4
Total
RENCANA ANGGARAN BIAYA
PEKERJAAN FRE HYDRANT
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
Jl. Proklamasi No 70, Jakarta
SUB TOTAL I
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
II INSTALASI PEMIPAAN
f Check Valve
- dia. 4" (150 psi - flanged) 2.00 bh
- dia. 2 1/2" (150 psi-flanged) 1.00 bh
g Double Sphere Flexible Joint
- dia. 5" (flanged) 2.00 bh
- dia. 4" (flanged) 2.00 bh
- dia. 2 1/2" (flanged) 1.00 bh
- dia. 2" (flanged) 1.00 bh
h Strainer
- dia. 5" (flanged) 2.00 bh
- dia. 2 1/2" (flanged) 1.00 bh
i Foot valve dia. 6" (flanged) 2.00 bh
j Pressure gauge 0 - 15 kg/cm2 4.00 bh
k Pressure switch 3.00 bh
l Savety valve 12 kg/cm2 dia. 2" (flanged) 1.00 bh
m Pressure tank 1000 lt, 15 kg/cm2 lengkap dgn. 1.00 unit
accessories
n Air Relase Valve (ARV) dia. 2" 1.00 bh
o Material bantu (mur-baut,flens,support,klem , 1.00 ls
fitting dll)
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
a Pipa
- dia. 6" (Pipa Tegak) 4.00 m
- dia. 2 1/2" 24.00 m
b Elbow
- dia 2 1/2" 3.00 bh
c Tee
- dia 6" x 2 1/2" x 6" 1.00 bh
c Indoor hydrant box lengkap 1.00 bh
f Multipurpose dry chemical fire extinguisher 4.00 bh
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
g Material bantu (mur-baut, flange, socket dll.) 1.00 ls
2.3 Lantai 1
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)
a Pipa
- dia. 6" (Pipa Tegak) 4.00 m
- dia. 2 1/2" 18.00 m
b Elbow
- dia 2 1/2" 3.00 bh
c Tee
- dia 6" x 2 1/2" x 6" 1.00 bh
e Indoor hydrant box lengkap 1.00 bh
f Multipurpose dry chemical fire extinguisher 4.00 bh
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
g Material bantu (mur-baut, flange, socket dll.) 1.00 ls
2.4 Lantai 2
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)
a Pipa
- dia. 6" (Pipa Tegak) 4.00 m
- dia. 2 1/2" 24.00 m
b Elbow
- dia 2 1/2" 3.00 bh
c Tee
- dia 6" x 2 1/2" x 6" 1.00 bh
e Indoor hydrant box lengkap 1.00 bh
f Multipurpose dry chemical fire extinguisher 4.00 bh
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
g Material bantu (mur-baut, flange, socket dll.) 1.00 ls
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
(Rp) (Rp)
2.5 Lantai 3
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)
a Pipa
- dia. 4" (Pipa Tegak) 4.00 m
- dia. 2 1/2" 22.00 m
b Elbow
- dia 2 1/2" 3.00 bh
c Tee
- dia 4" x 2 1/2" x 4" 1.00 bh
d Reducer dia 6" x 4" 1.00 bh
e Indoor hydrant box lengkap 1.00 bh
f Multipurpose dry chemical fire extinguisher 4.00 bh
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
g Material bantu (mur-baut, flange, socket dll.) 1.00 ls
2.6 Lantai 4
Pemipaan dan fitting menggunakan BSP sch. 40
ASTM A-120, di dalam bangunan (dicat merah)
a Pipa
- dia. 2 1/2" 22.00 m
b Elbow
- dia. 4" 1.00 bh
- dia 2 1/2" 10.00 bh
c Tee
- dia 4" x 2 1/2" x 4" 1.00 bh
e Air release valve dia. 4" 1.00 bh
f Indoor hydrant box lengkap 1.00 bh
g Multipurpose dry chemical fire extinguisher 4.00 bh
kap. 6 kg lengkap dengan bracket dan nozzle
(portable type)
h Material bantu (mur-baut, flange, socket dll.) 1.00 ls
SUB TOTAL II
NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
a Pipa Distribusi
- dia. 2 1/2" m 8.00
- dia. 2" m 4.00
- dia. 1 1/2" m 40.00
- dia. 1 1/4" m 6.00
- dia. 1" m 38.00
b Pipa Tegak
- dia. 6" (flanged setiap 3 batang) m 4.00
- dia. 2" (flanged setiap 3 batang) m 4.00
c Tee
- dia. 6" x 2 1/2" x 6" (flanged) bh 1.00
- dia. 2 1/2" x 2 1/2" x 2 1/2" bh 2.00
- dia. 2 1/2" x 1 1/2" x 2 1/2" bh 1.00
- dia. 2 1/2" x 1 1/4" x 2 1/2" bh 1.00
- dia. 2" x 1 1/2" x 2" bh 1.00
- dia. 1 1/2" x 1 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" x 1 1/2" bh 6.00
- dia. 1 1/4" x 1" x 1 1/4" bh 1.00
- dia. 1" x 1" x 1" bh 4.00
d Elbow
- dia. 1 1/2" bh 2.00
- dia. 1" bh 6.00
e Reducer
- dia. 2 1/2" x 2" bh 1.00
- dia. 2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" bh 3.00
- dia. 1 1/4" x 1" bh 1.00
f Red bulb pendant sprinkler head dia. 1/2" bh 15.00
Ex Viking atau setara
g Gate Valve
- dia. 2 1/2" (150 psi-screwed) bh 2.00
- dia. 1 1/2" (150 psi-screwed) bh 1.00
h Flow switch dia. 2 1/2", termasuk penarikan bh 1.00
kabel ke zona fire alarm terdekat
Ex Viking atau setara
i Material bantu ( hanger, flens, mur-baut dll.) ls 1.00
NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
1.2 Lantai 1
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah
a Pipa Distribusi
- dia. 1 1/2" m 24.00
- dia. 1" m 16.00
b Pipa Tegak
- dia. 6" (flanged setiap 3 batang) m 4.00
- dia. 2" (flanged setiap 3 batang) m 4.00
c Tee
- dia. 6" x 2 1/2" x 6" (flanged) bh 1.00
- dia. 2 1/2" x 2 1/2" x 2 1/2" bh 2.00
- dia. 2 1/2" x 1 1/2" x 2 1/2" bh 1.00
- dia. 2 1/2" x 1 1/4" x 2 1/2" bh 1.00
- dia. 2" x 1 1/2" x 2" bh 1.00
- dia. 1 1/2" x 1 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" x 1 1/2" bh 6.00
- dia. 1 1/4" x 1" x 1 1/4" bh 1.00
- dia. 1" x 1" x 1" bh 4.00
d Elbow
- dia. 1 1/2" bh 2.00
- dia. 1" bh 3.00
e Reducer
- dia. 1 1/2" x 1" bh 1.00
f Red bulb pendant sprinkler head dia. 1/2" bh 5.00
Ex Viking atau setara
g Gate Valve
- dia. 1 1/2" (150 psi-screwed) bh 3.00
h Flow switch dia. 1 1/2", termasuk penarikan bh 1.00
kabel ke zona fire alarm terdekat
Ex Viking atau setara
i Material bantu ( hanger, flens, mur-baut dll.) ls 1.00
NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
1.3 Lantai 2
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah
a Pipa Distribusi
- dia. 2 1/2" m 14.00
- dia. 2" m 4.00
- dia. 1 1/2" m 44.00
- dia. 1 1/4" m 6.00
- dia. 1" m 42.00
b Pipa Tegak
- dia. 6" (flanged setiap 3 batang) m 4.00
- dia. 2" (flanged setiap 3 batang) m 4.00
c Tee
- dia. 6" x 2 1/2" x 6" (flanged) bh 1.00
- dia. 2 1/2" x 2 1/2" x 2 1/2" bh 2.00
- dia. 2 1/2" x 1 1/2" x 2 1/2" bh 3.00
- dia. 2" x 1 1/2" x 2" bh 1.00
- dia. 1 1/2" x 2 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" x 1 1/2" bh 8.00
- dia. 1 1/4" x 1" x 1 1/4" bh 1.00
- dia. 1" x 1" x 1" bh 4.00
d Elbow
- dia. 2 1/2" bh 2.00
- dia. 1 1/2" bh 4.00
- dia. 1" bh 9.00
e Reducer
- dia. 2 1/2" x 2" bh 1.00
- dia. 2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/4" bh 1.00
- dia. 1 1/2" x 1" bh 3.00
- dia. 1 1/4" x 1" bh 1.00
f Red bulb pendant sprinkler head dia. 1/2" bh 17.00
Ex Viking atau setara
g Gate Valve
- dia. 2 1/2" (150 psi-screwed) bh 2.00
- dia. 1 1/2" (150 psi-screwed) bh 1.00
h Flow switch dia. 2 1/2", termasuk penarikan bh 1.00
kabel ke zona fire alarm terdekat
Ex Viking atau setara
i Material bantu ( hanger, flens, mur-baut dll.) ls 1.00
NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
1.4 Lantai 3
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah
a Pipa Distribusi
- dia. 2 1/2" m 14.00
- dia. 2" m 4.00
- dia. 1 1/2" m 46.00
- dia. 1 1/4" m 18.00
- dia. 1" m 32.00
b Pipa Tegak
- dia. 4" (flanged setiap 3 batang) m 8.00
c Tee
- dia. 4" x 2 1/2" x 4" (flanged) bh 1.00
- dia. 4" x 1 1/2" x 4" (flanged) bh 1.00
- dia. 2 1/2" x 2 1/2" x 2 1/2" bh 2.00
- dia. 2 1/2" x 1 1/2" x 2 1/2" bh 2.00
- dia. 2" x 1 1/2" x 2" bh 1.00
- dia. 2 1/2" x 1 1/4" x 2 1/2" bh 1.00
- dia. 1 1/2" x 2 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" x 1 1/2" bh 4.00
- dia. 1 1/4" x 1" x 1 1/4" bh 5.00
- dia. 1" x 1" x 1" bh 5.00
d Elbow
- dia. 2 1/2" bh 2.00
- dia. 1 1/2" bh 7.00
- dia. 1" bh 6.00
e Reducer
- dia. 2 1/2" x 2" bh 1.00
- dia. 2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/4" bh 4.00
- dia. 1 1/4" x 1" bh 5.00
f Red bulb pendant sprinkler head dia. 1/2" bh 23.00
Ex Viking atau setara
g Gate Valve
- dia. 2 1/2" (150 psi-flanged) bh 2.00
- dia. 1 1/2" (150 psi-flanged) bh 1.00
h Flow switch dia. 2 1/2", termasuk penarikan bh 1.00
kabel ke zona fire alarm terdekat
Ex Viking atau setara
i Material bantu ( hanger, flens, mur-baut dll.) ls 1.00
NO. URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
1.5 Lantai 4
Pemipaan dan fitting menggunakan BSP Sch. 40
ASTM A-120, dicat warna merah
a Pipa Distribusi
- dia. 2 1/2" m 10.00
- dia. 2" m 4.00
- dia. 1 1/2" m 36.00
- dia. 1 1/4" m 16.00
- dia. 1" m 30.00
b Pipa Tegak
- dia. 4" (flanged setiap 3 batang) m 8.00
c Tee
- dia. 4" x 2 1/2" x 4" (flanged) bh 1.00
- dia. 4" x 1 1/2" x 4" (flanged) bh 1.00
- dia. 2 1/2" x 2 1/2" x 2 1/2" bh 2.00
- dia. 2 1/2" x 1 1/2" x 2 1/2" bh 2.00
- dia. 2" x 1 1/2" x 2" bh 1.00
- dia. 2 1/2" x 1 1/4" x 2 1/2" bh 1.00
- dia. 1 1/2" x 2 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1" x 1 1/2" bh 4.00
- dia. 1 1/4" x 1" x 1 1/4" bh 5.00
- dia. 1" x 1" x 1" bh 5.00
d Elbow
- dia. 2 1/2" bh 2.00
- dia. 1 1/2" bh 8.00
- dia. 1" bh 6.00
e Reducer
- dia. 2 1/2" x 2" bh 1.00
- dia. 2" x 1 1/2" bh 1.00
- dia. 1 1/2" x 1 1/4" bh 4.00
- dia. 1 1/4" x 1" bh 5.00
f Red bulb pendant sprinkler head dia. 1/2" bh 23.00
Ex Viking atau setara
g Gate Valve
- dia. 2 1/2" (150 psi-flanged) bh 2.00
- dia. 1 1/2" (150 psi-flanged) bh 1.00
h Flow switch dia. 2 1/2", termasuk penarikan bh 1.00
kabel ke zona fire alarm terdekat
Ex Viking atau setara
i Material bantu ( hanger, flens, mur-baut dll.) ls 1.00
SUB TOTAL I
SUB TOTAL II
TOTAL
RENCANA ANGGARAN BIAYA
PEKERJAAN PERSIAPAN, STRUKTUR DAN ARSITEKTURAL
PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KANTOR KEMENTERIAN PPN/BAPPENAS JAKARTA
LOKASI : JL. PROKLAMASI NO.70 JAKARTA PUSAT
I. PEKERJAAN PERSIAPAN
1 Biaya Administrasi & Dokumentasi 1 ls
2 Pek. Mobilisasi dan Demobilisasi 1 ls
3 Pembuatan Gambar As-Built Drawing 1 ls
4 Pek. Kantor Direksi 2 Lantai 36 m2
5 Pek. Pagar Pengaman (seng gelombang tinggi 2 m) 20 m'
6 Pek. Papan Proyek 1 ls
7 Pek. Keamanan Proyek 4 bln
8 Pek. Pembersihan Site (buang puing, semak2 & Tebang Pohon) 745 m2
9 Pek. Penyediaan Lift barang 1 ls
10 Pekerjaan Pengukuran & Bouwplank 110 m'
11 Tower Crane (sewa) 4 bln
PEKERJAAN PERSIAPAN
II PEKERJAAN STRUKTUR
A PEKERJAAN PONDASI TIANG PANCANG
1 Mobilisasi de mobilisasi tiang pancang 1 ls
2 Pondasi Tiang Pancang Ø40 Type P-1 144 m1
3 Pondasi Tiang Pancang Ø40 Type P-3 720 m1
4 Pondasi Tiang Pancang Ø40 Type P-4 192 m1
5 Pondasi Tiang Pancang Ø40 Type P-9 216 m1
6 Sambungan Tiang Pancang 53 ttk
7 Bobokan Tiang Pancang 53 ttk
8 Loading Test 2 ttk
PEKERJAAN PONDASI
PEKERJAAN PILE
CAP PONDASI DAN
DINDING PIT LIFT
PEKERJAAN
STRUKTUR
LANTAI GROUND
PEKERJAAN
STRUKTUR LANTAI
DUA
PEKERJAAN
STRUKTUR
LANTAI TIGA
PEKERJAAN
STRUKTUR
LANTAI EMPAT
PEKERJAAN
STRUKTUR RING
BALOK
I LANTAI GROUND
A Pekerjaan lantai
1 Floor hardener 326 m²
2 Pekerjaan granito tile 60 x 60 26 m²
3 Pekerjaan plin granito tile 10 x 60 17 m¹
4 Pekerjaan keramik tile 40 x 40 19 m²
5 Pekerjaan step nosing tangga keramik tile 10 x 40 19 m¹
6 Pekerjaan keramik tile anti slip 20 x 20 4 m²
7 Urugan pasir peninggian lantai bangunan 2 m³
8 Beton tumbuk 1 : 3 : 5 2 m³
9 Waterproofing bitutine sheet area taman 57 m²
10 Screeding 57 m²
Sub Total
B Pekerjaan dinding
1 Pekerjaan Pasangan bata 1:5, 1/2 batu 7 m²
2 Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar) 326 m²
3 Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam) 79 m²
4 Pekerjaan Plesteran Prime Mortar & acian (dinding) 654 m²
5 Pekerjaan Plesteran Prime Mortar & acian (beton) 81 m²
6 Pekerjaan dinding keramik 20 x 25 Toilet 14 m2
7 Kolom praktis 111 m¹
8 Ring balok praktis 27 m¹
9 Pengecatan dinding interior 459 m²
10 Pengecatan dinding eksterior 305 m²
Sub Total
D Pekerjaan Plafond
1 Plafond ekspose beton 252 m²
2 Pengecatan plafond 377 m²
Sub Total
E Pekerjaan Sanitary
1 Kran air 2 Bh.
2 Floor drain 1 Bh.
3 Closed Jongkok 1 Bh.
Sub Total
F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 14 m¹
2 Hand rail hollow 5/5 finnish cat duco 21 m¹
Sub Total
II LANTAI 1
A Pekerjaan lantai
1 Pekerjaan granito tile 60 x 60 235 m²
2 Pekerjaan plin granito tile 10 x 60 116 m¹
3 Pekerjaan keramik tile anti slip 20 x 20 25 m²
4 Pekerjaan keramik tile 40 x 40 19 m²
5 Pekerjaan step nosing tangga keramik tile 10 x 40 18 m¹
6 Waterproofing coating area toilet 35 m²
7 Waterproofing bitutine sheet dak beton 127 m²
8 Screeding dak beton 127 m²
9 Pekerjaan dinding keramik 20 x 25 Tilet & Janitor 60 m2
Sub Total
B Pekerjaan dinding
1 Pekerjaan Pasangan bata 1:5, 1/2 batu 73 m²
2 Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar) 398 m²
3 Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam) 47 m²
4 Pekerjaan Plesteran Prime Mortar & acian (dinding) 942 m²
5 Pekerjaan Plesteran Prime Mortar & acian (beton) 79 m²
6 Pekerjaan dinding keramik 20 x 25 60 m²
7 Kolom praktis 143 m¹
8 Ring balok praktis 30 m¹
9 Pengecatan dinding interior 647 m²
10 Pengecatan dinding eksterior +Beton kolom 307 m²
11 Pekerjaan Glass block 28 m2
12 Pekerjaan batu andesit abu-abu 26 m2
Sub Total
D Pekerjaan Plafond
1 Plafond Gypsum t = 9 mm + rangka Metal Furing 279 m²
2 Plafond GRC t = 4 mm + rangka Metal Furing (Toilet) 23 m²
3 List Plafond 5 cm 142 m¹
4 Plafond ekspose beton 127 m²
5 Pengecatan Plafond 303 m²
Sub Total
E Pekerjaan Sanitary
1 Kloset duduk 5 Bh.
2 Jetwasher 5 Bh.
3 Wastafel 3 Bh.
4 Urinoir 3 Bh.
5 Sekat urinoir 2 Bh.
6 Kitchen zink 1 Bh.
7 Kran dinding 1 Bh.
8 Floor drain 4 Bh.
9 Meja beton + keramik 5 m²
10 Cermin 5 mm 4 m²
Sub Total
F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 20 m¹
2 Hand rail hollow 5/5 finnish cat duco 28 m¹
Sub Total
LANTAI 1
III LANTAI 2
A Pekerjaan lantai
1 Pekerjaan granito tile 60 x 60 10 m²
2 Pekerjaan plin granito tile 10 x 60 13 m¹
3 Pekerjaan keramik tile 30 x 30 5 m²
4 Pekerjaan plin keramik tile 10 x 30 9 m¹
5 Pekerjaan keramik tile anti slip 20 x 20 28 m²
6 Pekerjaan keramik tile 40 x 40 21 m²
7 Pekerjaan step nosing tangga keramik tile 10 x 40 26 m¹
8 Waterproofing coating area toilet 40 m²
9 Screeding lantai 283 m²
10 Acian lantai 283 m²
11 Lantai vynil Tarket Sports T. 3.5 mm 233 m²
12 Waterproofing bitutine sheet dak beton 92 m²
13 Screeding dak beton 92 m²
14 Keramik Dinding KM / WC 20/25 72 m2
Sub Total
B Pekerjaan dinding
1 Pekerjaan Pasangan bata 1:5, 1/2 batu 73 m²
2 Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar) 284 m²
3 Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam) 68 m²
4 Pekerjaan Plesteran Prime Mortar & acian (dinding) 713 m²
5 Pekerjaan Plesteran Prime Mortar & acian (beton) 84 m²
6 Pekerjaan dinding keramik 20 x 25 81 m²
7 Kolom praktis 143 m¹
7 Ring balok praktis 7 m¹
8 Pengecatan dinding interior 440 m²
9 Pengecatan dinding eksterior 250 m²
10 Pengecatan dinding partisi 225 m²
11 Pekerjaan Glass block 21 m2
Sub Total
D Pekerjaan Plafond
1 Plafond Gypsum t = 9 mm + rangka Metal Furing 247 m²
2 Plafond GRC t = 4 mm + rangka Metal Furing (Toilet) 23 m²
3 List Plafond 5 cm 150 m¹
4 Plafond ekspose beton 19 m²
5 Pengecatan Plafond 282 m²
6 Skylight kaca 6 + 6 mm 4 m²
Sub Total
E Pekerjaan Sanitary
1 Kloset duduk 6 Bh.
2 Jetwasher 6 Bh.
3 Wastafel 4 Bh.
4 Urinoir 2 Bh.
5 Sekat urinoir 1 Bh.
6 Kitchen zink 1 Bh.
7 Kran dinding 2 Bh.
8 Floor drain 4 Bh.
9 Meja beton + keramik 5 m²
10 Cermin 5 mm 4 m²
Sub Total
F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 12 m¹
2 Hand rail hollow 5/5 finnish cat duco 24 m¹
3 Rambatan bunga besi beton Ø10 mm, Ø19 mm & plat besi 12 mm 20 m¹
Sub Total
LANTAI 2
IV LANTAI 3
A Pekerjaan lantai
1 Pekerjaan granito tile 60 x 60 9 m²
2 Pekerjaan plin granito tile 10 x 60 12 m¹
3 Pekerjaan keramik tile 30 x 30 7 m²
4 Pekerjaan plin keramik tile 10 x 30 9 m¹
5 Pekerjaan keramik tile anti slip 20 x 20 25 m²
6 Pekerjaan keramik tile 40 x 40 20 m²
7 Pekerjaan step nosing tangga keramik tile 10 x 40 24 m¹
8 Waterproofing coating area toilet 30 m²
9 Screeding lantai 251 m²
10 Acian lantai 251 m²
11 Lantai vynil Tarket Sports T. 3.5 mm 251 m²
12 Waterproofing bitutine sheet dak beton 19 m²
13 Screeding dak beton 19 m²
Sub Total
B Pekerjaan dinding
1 Pekerjaan Pasangan bata 1:5, 1/2 batu 73 m²
2 Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar) 293 m²
3 Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam) 77 m²
4 Pekerjaan Plesteran Prime Mortar & acian (dinding) 731 m²
5 Pekerjaan Plesteran Prime Mortar & acian (beton) 84 m²
6 Pekerjaan dinding keramik 20 x 25 64 m²
7 Kolom praktis 143 m¹
7 Ring balok praktis 32 m¹
8 Pengecatan dinding interior 440 m²
9 Pengecatan dinding eksterior 250 m²
10 Pengecatan dinding partisi 280 m²
11 Pekerjaan Glass block 21 m2
Sub Total
D Pekerjaan Plafond
1 Plafond Gypsum t = 9 mm + rangka Metal Furing 244 m²
2 Plafond GRC t = 4 mm + rangka Metal Furing (Toilet) 32 m²
3 List Plafond 5 cm 150 m¹
4 Plafond ekspose beton 18 m²
5 Pengecatan Plafond 294 m²
Sub Total
E Pekerjaan Sanitary
1 Kloset duduk 6 Bh.
2 Jetwasher 6 Bh.
3 Wastafel 3 Bh.
4 Urinoir 2 Bh.
5 Sekat urinoir 1 Bh.
6 Kitchen zink 1 Bh.
7 Kran dinding 2 Bh.
8 Floor drain 3 Bh.
9 Meja beton + keramik 1 m²
10 Cermin 5 mm 4 m²
Sub Total
F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 12 m¹
2 Hand rail hollow 5/5 finnish cat duco 25 m¹
3 Rambatan bunga besi beton Ø10 mm, Ø19 mm & plat besi 12 mm 20 m¹
Sub Total
LANTAI 3
V LANTAI 4
A Pekerjaan lantai
1 Pekerjaan granito tile 60 x 60 12 m²
2 Pekerjaan plin granito tile 10 x 60 14 m¹
3 Pekerjaan keramik tile anti slip 20 x 20 31 m²
4 Pekerjaan keramik tile 40 x 40 20 m²
5 Pekerjaan step nosing tangga keramik tile 10 x 40 24 m¹
6 Waterproofing coating area toilet 37 m²
7 Screeding lantai 262 m²
8 Acian lantai 262 m²
9 Lantai vynil Tarket Sports T. 3.5 mm 262 m²
10 Waterproofing bitutine sheet dak beton 36 m²
11 Screeding dak beton 36 m²
Sub Total
B Pekerjaan dinding
1 Pekerjaan Pasangan bata 1:5, 1/2 batu 73 m²
2 Pekerjaan Pasangan bata Ringan/Hebel, T. 10 cm (Dinding Luar) 270 m²
3 Pekerjaan Pasangan bata Ringan/Hebel, T. 7,5 cm (Dinding Dalam) 32 m²
4 Pekerjaan Plesteran Prime Mortar & acian (dinding) 686 m²
5 Pekerjaan Plesteran Prime Mortar & acian (beton) 84 m²
6 Pekerjaan dinding keramik 20 x 25 73 m²
7 Kolom praktis 114 m¹
7 Ring balok praktis 25 m¹
8 Pengecatan dinding interior 630 m²
9 Pengecatan dinding eksterior 271 m²
10 Pengecatan dinding partisi 68 m²
11 Pekerjaan Glass block 21 m2
Sub Total
D Pekerjaan Plafond
1 Plafond Gypsum t = 9 mm + rangka Metal Furing 256 m²
2 Plafond GRC t = 4 mm + rangka Metal Furing (Toilet) 30 m²
3 List Plafond 5 cm 150 m¹
4 Plafond ekspose beton 15 m²
5 Pengecatan Plafond 302 m²
Sub Total
E Pekerjaan Sanitary
1 Kloset duduk 6 Bh.
2 Jetwasher 6 Bh.
3 Wastafel 3 Bh.
4 Urinoir 3 Bh.
5 Sekat urinoir 2 Bh.
6 Kitchen zink 1 Bh.
7 Kran dinding 5 Bh.
8 Floor drain 4 Bh.
9 Meja beton + keramik 5 m²
10 Cermin 5 mm 4 m²
Sub Total
F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 13 m¹
2 Hand rail hollow 5/5 finnish cat duco 25 m¹
3 Rambatan bunga besi beton Ø10 mm, Ø19 mm & plat besi 12 mm 20 m¹
Sub Total
LANTAI 4
B Pekerjaan dinding
1 Pekerjaan Pasangan bata Ringan, T. 10 cm (Dinding Luar) 76 m²
2 Pekerjaan Plesteran Prime Mortar & acian (dinding) 152 m²
3 Kolom praktis 15 m¹
4 Ring balok praktis 82 m¹
5 Pengecatan dinding interior 100 m²
6 Pengecatan dinding eksterior 100 m²
F Pekerjaan Railing
1 Railling tangga hollow 2/2 & 5/5 finnish cat duco 2 m¹
LANTAI ATAP
LANTAI LUAR
BANGUNAN
1 Galian tanah 15 m3
2 Urugan kembali 7 m3
3 Pasir urug 2 m3
4 Lantai kerja 0 m3
5 Pondasi batu kosong 2 m3
6 Pondasi batu belah 4 m3
7 Beton tumbuk 1 : 3 : 5 1 m3
8 Sloof beton 0 m3
9 Pasangan dinding 7 m2
10 Plesteran dan acian 18 m2
11 Kolom beton 15 x 30 0 m3
12 Balok beton 0 m3
13 Plat dak beton 1 m3
14 Lantai keramik 9 m2
15 Kusen kaca depan ( kaca tempered) 1 bh
16 Kusen pintu (kaca tempered) 1 bh
17 Kusen jendela samping ( kaca tempered) 1 bh
18 meja kayu 2 bh
19 Cat dinding interior 13 m2
20 Cat dinding exterior 6 m2
POS JAGA
PAGAR BANGUNAN
PEKERJAAN LANSEKAP
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN GEDUNG PUSBINDIKLATREN
KEMENTERIAN PERENCANAAN PEMBANGUNAN NASIONAL/BAPPENAS
JL. PROKLAMASI NO. 70
JAKARTA PUSAT
NILAI TOTAL
NO. URAIAN PEKERJAAN SUBJUMLAH JUMLAH
(Rp) (Rp)
I. PEKERJAAN PERSIAPAN
II PEKERJAAN STRUKTUR
I LANTAI GROUND
II LANTAI 1
III LANTAI 2
IV LANTAI 3
V LANTAI 4
VI LANTAI ATAP
VII PEKERJAAN LANSEKAP
HARGA-SAT MATERIAL
JENIS PEKERJAAN VOLUME ( Rp ) ( Rp )
12,750.00
11,400.00
1,725.00
1,950.00 27,825.00
Jumlah 116,575.00
Jasa 10 % 11,657.50
Juml.Harga 128,232.50 156,425.50 1.22 %
12,750.00
11,400.00
1,725.00
1,950.00 27,825.00
Jumlah 96,175.00
Jasa 10 % 9,617.50
Juml.Harga 105,792.50 0.00 0.00 %
12,750.00
14,250.00
2,645.00
2,990.00 32,635.00
Jumlah 63,890.00
Jasa 10 % 6,389.00
Juml.Harga 70,279.00 0.00 0.00 %
12,750.00
9,500.00
1,150.00
1,040.00
Jumlah 28,210.00
Jasa 10 % 2,821.00
Juml.Harga 31,031.00
17,850.00
19,950.00
2,530.00
2,860.00
Jumlah 70,060.39
Jasa 10 % 7,006.04
Juml.Harga 77,066.42
25,500.00
9,500.00
1,150.00
1,950.00 38,100.00
Jumlah 98,859.32
Jasa 10 % 9,885.93
Juml.Harga 108,745.25
22,950.00
16,150.00
2,875.00
3,250.00 45,225.00
Jumlah 159,992.99
Jasa 10 % 15,999.30
Juml.Harga 175,992.28 #REF! #REF! %
22,950.00
16,150.00
2,875.00
3,250.00 45,225.00
Jumlah 169,992.99
Jasa 10 % 16,999.30
Juml.Harga 186,992.28 0.00 0.00 %
22,950.00
16,150.00
2,875.00
3,250.00 45,225.00
Jumlah 295,092.99
Jasa 10 % 29,509.30
Juml.Harga 324,602.28 0.00 0.00 %
22,950.00
16,150.00
2,875.00
3,250.00 45,225.00
Jumlah 148,492.99
Jasa 10 % 14,849.30
Juml.Harga 163,342.28 0.00 0.00 %
28,050.00
25,650.00
2,875.00
3,250.00 59,825.00
Jumlah 168,592.99
Jasa 10 % 16,859.30
Juml.Harga 185,452.28 157,058.13 0.85 %
5,025.00
Jumlah 37,595.00
Jasa 10 % 3,759.50
Juml.Harga 41,354.50
5,653.13
Jumlah 37,893.19
Jasa 10 % 3,789.32
Juml.Harga 41,682.51
5,653.13
Jumlah 59,844.69
Jasa 10 % 5,984.47
Juml.Harga 65,829.16
12,750.00
11,400.00
1,380.00
975.00
Jumlah 95,186.00
Jasa 10 % 9,518.60
Juml.Harga 104,704.60
12,750.00
11,400.00
1,380.00
975.00
Jumlah 102,368.00
Jasa 10 % 10,236.80
Juml.Harga 112,604.80
850.00
4,000.00
360.00
390.00 5,600.00
Jumlah 26,930.00 19,000.00
Jasa 10 % 2,693.00
Juml.Harga 29,623.00
850.00
4,000.00
360.00
390.00 5,600.00
Jumlah 19,540.00 14,000.00
Jasa 10 % 1,954.00
Juml.Harga 21,494.00
12,000,000.00
100,000.00
102,600,000.00 50,000.00
Jumlah 322,200,000.00
Jasa 10 % 32,220,000.00
Juml.Harga 354,420,000.00
11,500,000,000 7,025,046 1,835,000
0.01
5973.5952
2425
ANALISA HARGA SATUAN PEKERJAAN
PEKERJAAN STRUKTUR
#REF!
355000
10000
90000
#REF!
12000000
100000
50000
3.54E+08
ANALISA KUSEN
sat volume harga satuan jumlah
1 PJ1
Alumunium U m1 25.032 20,000 500,640
Kaca tempered 12 mm m2 21.756 600,000 13,053,600
Engsel atas PT 20 bh 2 150,000 300,000
Engsel bawah PT 10 bh 2 150,000 300,000
Kunci US 10 bh 1 850,000 850,000
Handle stainless 100 cm bh 2 1,000,000 2,000,000
Floor hinge ex. Dorma B bh 2 2,500,000 5,000,000
Upah kerja m2 21.756 50,000 1,087,800
Jumlah 1 23,092,040
Jasa 10% 2,309,204
Jumlah 2 25,401,244
Pembulatan 25,401,240
1 PJ5
Alumunium U m1 16.905 20,000 338,100
Kaca tempered 12 mm m2 13.24008 600,000 7,944,048
Engsel atas PT 20 bh 2 150,000 300,000
Engsel bawah PT 10 bh 2 150,000 300,000
Kunci US 10 bh 1 850,000 850,000
Handle stainless 100 cm bh 2 1,000,000 2,000,000
Floor hinge ex. Dorma B bh 2 2,500,000 5,000,000
Upah kerja m2 13.24008 50,000 662,004
Jumlah 1 17,394,152
Jasa 10% 1,739,415
Jumlah 2 19,133,567
Pembulatan 19,133,560
1 PJ4
Alumunium U m1 16.905 20,000 338,100
Kaca tempered 12 mm m2 13.24008 600,000 7,944,048
Engsel atas PT 20 bh 1 150,000 150,000
Engsel bawah PT 10 bh 1 150,000 150,000
Kunci US 10 bh 1 850,000 850,000
Handle stainless 100 cm bh 1 1,000,000 1,000,000
Floor hinge ex. Dorma B bh 1 2,500,000 2,500,000
Upah kerja m2 13.24008 50,000 662,004
Jumlah 1 13,594,152
Jasa 10% 1,359,415
Jumlah 2 14,953,567
Pembulatan 14,953,560
1 PJ3
Alumunium U m1 17.01 20,000 340,200
Kaca tempered 12 mm m2 8.61 600,000 5,166,000
Engsel atas PT 20 bh 2 150,000 300,000
Engsel bawah PT 10 bh 2 150,000 300,000
Kunci US 10 bh 2 850,000 1,700,000
Handle stainless 100 cm bh 2 1,000,000 2,000,000
Floor hinge ex. Dorma B bh 2 2,500,000 5,000,000
Upah kerja m2 8.61 50,000 430,500
Jumlah 1 15,236,700
Jasa 10% 1,523,670
Jumlah 2 16,760,370
Pembulatan 16,760,370
1 PJ2
Alumunium U m1 24.738 20,000 494,760
Kaca tempered 12 mm m2 34.0326 600,000 20,419,560
Engsel atas PT 20 bh 2 150,000 300,000
Engsel bawah PT 10 bh 2 150,000 300,000
Kunci US 10 bh 2 850,000 1,700,000
Handle stainless 100 cm bh 2 1,000,000 2,000,000
Floor hinge ex. Dorma B bh 2 2,500,000 5,000,000
Upah kerja m2 34.0326 50,000 1,701,630
Jumlah 1 31,915,950
Jasa 10% 3,191,595
Jumlah 2 35,107,545
Pembulatan 35,107,540
1 P6
Alumunium U m1 10.92 20,000 218,400
Kaca tempered 12 mm m2 6.780375 600,000 4,068,225
Engsel atas PT 20 bh 2 150,000 300,000
Engsel bawah PT 10 bh 2 150,000 300,000
Kunci US 10 bh 2 850,000 1,700,000
Handle stainless 100 cm bh 2 1,000,000 2,000,000
Floor hinge ex. Dorma B bh 2 2,500,000 5,000,000
Upah kerja m2 6.780375 50,000 339,019
Jumlah 1 13,925,644
Jasa 10% 1,392,564
Jumlah 2 15,318,208
Pembulatan 15,318,200
1 J2
Alumunium U m1 15.645 20,000 312,900
Kaca tempered 12 mm m2 11.6235 600,000 6,974,100
Upah kerja m2 11.6235 50,000 581,175
Jumlah 1 7,868,175
Jasa 10% 786,818
Jumlah 2 8,654,993
Pembulatan 8,654,990
1 J1
Alumunium U m1 17.4825 20,000 349,650
Kaca tempered 12 mm m2 17.73188 600,000 10,639,125
Upah kerja m2 17.73188 50,000 886,594
Jumlah 1 11,875,369
Jasa 10% 1,187,537
Jumlah 2 13,062,906
Pembulatan 13,062,900
1 PT7
Partisi PVC m2 1.4175 1,250,000 1,771,875
Engsel pintu bh 4 35,000 140,000
Upah kerja m2 1.4175 50,000 70,875
Jumlah 1 1,982,750
Jasa 10% 198,275
Jumlah 2 2,181,025
Pembulatan 2,181,020
1 PT6
Partisi PVC m2 4.9665 1,250,000 6,208,125
Engsel pintu bh 4 35,000 140,000
Upah kerja m2 4.9665 50,000 248,325
Jumlah 1 6,596,450
Jasa 10% 659,645
Jumlah 2 7,256,095
Pembulatan 7,256,090
1 J5
Alumunium U m1 96.306 20,000 1,926,120
Kaca tempered 12 mm m2 48.27113 600,000 28,962,675
Engsel jendela bh 12 20,000 240,000
Upah kerja m2 48.27113 50,000 2,413,556
Jumlah 1 33,542,351
Jasa 10% 3,354,235
Jumlah 2 36,896,586
Pembulatan 36,896,580
1 J4
Alumunium U m1 6.678 20,000 133,560
Kaca tempered 12 mm m2 2.432325 600,000 1,459,395
Upah kerja m2 2.432325 50,000 121,616
Jumlah 1 1,714,571
Jasa 10% 171,457
Jumlah 2 1,886,028
Pembulatan 1,886,020
1 J3
Alumunium U m1 10.605 20,000 212,100
Kaca tempered 12 mm m2 6.4575 600,000 3,874,500
Upah kerja m2 6.4575 50,000 322,875
Jumlah 1 4,409,475
Jasa 10% 440,948
Jumlah 2 4,850,423
Pembulatan 4,850,420
1 PJP2
Alumunium 4" powder coam1 19.95 105,000 2,094,750
Kaca tempered 12 mm m2 8.526 600,000 5,115,600
Sticker sandblast m2 8.526 150,000 1,278,900
Engsel atas PT 20 bh 1 150,000 150,000
Engsel bawah PT 10 bh 1 150,000 150,000
Kunci US 10 bh 1 850,000 850,000
Handle stainless 100 cm bh 1 1,000,000 1,000,000
Floor hinge ex. Dorma B bh 1 2,500,000 2,500,000
Upah kerja m2 8.526 50,000 426,300
Jumlah 1 13,565,550
Jasa 10% 1,356,555
Jumlah 2 14,922,105
Pembulatan 14,922,100
1 PJP4
Alumunium 4" powder coam1 29.1375 105,000 3,059,438
Kaca tempered 12 mm m2 14.3325 600,000 8,599,500
Sticker sandblast m2 14.3325 150,000 2,149,875
Engsel atas PT 20 bh 2 150,000 300,000
Engsel bawah PT 10 bh 2 150,000 300,000
Kunci US 10 bh 2 850,000 1,700,000
Handle stainless 100 cm bh 2 1,000,000 2,000,000
Floor hinge ex. Dorma B bh 2 2,500,000 5,000,000
Upah kerja m2 14.3325 50,000 716,625
Jumlah 1 23,825,438
Jasa 10% 2,382,544
Jumlah 2 26,207,981
Pembulatan 26,207,980
1 PP1
Alumunium 4" powder coam1 10.794 105,000 1,133,370
Kaca tempered 12 mm m2 5.5272 600,000 3,316,320
Sticker sandblast m2 5.5272 150,000 829,080
Engsel atas PT 20 bh 2 150,000 300,000
Engsel bawah PT 10 bh 2 150,000 300,000
Kunci US 10 bh 2 850,000 1,700,000
Handle stainless 100 cm bh 2 1,000,000 2,000,000
Floor hinge ex. Dorma B bh 2 2,500,000 5,000,000
Upah kerja m2 5.5272 50,000 276,360
Jumlah 1 14,855,130
Jasa 10% 1,485,513
Jumlah 2 16,340,643
Pembulatan 16,340,640
1 PJP3
Alumunium 4" powder coam1 17.1675 105,000 1,802,588
Kaca tempered 12 mm m2 9.9225 600,000 5,953,500
Sticker sandblast m2 9.9225 150,000 1,488,375
Engsel atas PT 20 bh 2 150,000 300,000
Engsel bawah PT 10 bh 2 150,000 300,000
Kunci US 10 bh 2 850,000 1,700,000
Handle stainless 100 cm bh 2 1,000,000 2,000,000
Floor hinge ex. Dorma B bh 2 2,500,000 5,000,000
Upah kerja m2 9.9225 50,000 496,125
Jumlah 1 19,040,588
Jasa 10% 1,904,059
Jumlah 2 20,944,646
Pembulatan 20,944,640
1 JP1
Alumunium 4" powder coam1 25.7775 105,000 2,706,638
Kaca tempered 12 mm m2 11.3925 600,000 6,835,500
Sticker sandblast m2 11.3925 150,000 1,708,875
Upah kerja m2 11.3925 50,000 569,625
Jumlah 1 11,820,638
Jasa 10% 1,182,064
Jumlah 2 13,002,701
Pembulatan 13,002,700
1 PT5
Partisi PVC m2 6.388725 1,250,000 7,985,906
Engsel pintu bh 6 35,000 210,000
Upah kerja m2 6.388725 50,000 319,436
Jumlah 1 8,515,343
Jasa 10% 851,534
Jumlah 2 9,366,877
Pembulatan 9,366,870
1 J7
Alumunium U m1 96.306 20,000 1,926,120
Kaca tempered 12 mm m2 48.27113 600,000 28,962,675
Engsel jendela bh 12 20,000 240,000
Upah kerja m2 48.27113 50,000 2,413,556
Jumlah 1 33,542,351
Jasa 10% 3,354,235
Jumlah 2 36,896,586
Pembulatan 36,896,580
1 PJP1
Alumunium 4" powder coam1 37.9575 105,000 3,985,538
Kaca tempered 12 mm m2 17.2725 600,000 10,363,500
Sticker sandblast m2 17.2725 150,000 2,590,875
Engsel atas PT 20 bh 1 150,000 150,000
Engsel bawah PT 10 bh 1 150,000 150,000
Kunci US 10 bh 1 850,000 850,000
Handle stainless 100 cm bh 1 1,000,000 1,000,000
Floor hinge ex. Dorma B bh 1 2,500,000 2,500,000
Upah kerja m2 17.2725 50,000 863,625
Jumlah 1 22,453,538
Jasa 10% 2,245,354
Jumlah 2 24,698,891
Pembulatan 24,698,890
1 J6
Alumunium U m1 87.5385 20,000 1,750,770
Kaca tempered 12 mm m2 48.27113 600,000 28,962,675
Engsel jendela bh 12 20,000 240,000
Upah kerja m2 48.27113 50,000 2,413,556
Jumlah 1 33,367,001
Jasa 10% 3,336,700
Jumlah 2 36,703,701
Pembulatan 36,703,700
1 PB2
Pintu besi + accessories m2 3.273375 1,000,000 3,273,375
Jalusi plat besi m2 0.39375 500,000 196,875
Cat besi m2 3.667125 35,000 128,349
Upah kerja m2 3.667125 100,000 366,713
Jumlah 1 3,965,312
Jasa 10% 396,531
Jumlah 2 4,361,843
Pembulatan 4,361,840
1 P6
Pintu besi + accessories m2 3.83775 1,000,000 3,837,750
Cat besi m2 3.83775 35,000 134,321
Upah kerja m2 3.83775 100,000 383,775
Jumlah 1 4,355,846
Jasa 10% 435,585
Jumlah 2 4,791,431
Pembulatan 4,791,430
1 P1 & P1'
Pintu besi + accessories m2 2.48325 1,750,000 4,345,688
Cat besi m2 2.48325 35,000 86,914
Upah kerja m2 2.48325 100,000 248,325
Jumlah 1 4,680,926
Jasa 10% 468,093
Jumlah 2 5,149,019
Pembulatan 5,149,010
1 P2
Alumunium 4" powder coam1 7.77 105,000 815,850
Daun pintu kayu m2 1.89 750,000 1,417,500
Kaca polos 5 mm m2 0.6615 100,000 66,150
Handle + kunci bh 1 150,000 150,000
Kunci tanam bh 1 50,000 50,000
Engsel pintu bh 3 35,000 105,000
Finnishing melamik daun m2 1.89 90,000 170,100
Upah kerja m2 2.646 50,000 132,300
Jumlah 1 2,906,900
Jasa 10% 290,690
Jumlah 2 3,197,590
Pembulatan 3,197,590
1 PP2
Alumunium 4" powder coam1 7.77 105,000 815,850
Daun pintu kayu m2 1.9845 750,000 1,488,375
Kaca polos 5 mm m2 0.6615 100,000 66,150
Handle + kunci bh 1 150,000 150,000
Kunci tanam bh 1 50,000 50,000
Engsel pintu bh 3 35,000 105,000
Finnishing melamik daun m2 1.9845 90,000 178,605
Upah kerja m2 2.646 50,000 132,300
Jumlah 1 2,986,280
Jasa 10% 298,628
Jumlah 2 3,284,908
Pembulatan 3,284,900
1 PP3
Alumunium 4" powder coam1 5.46 105,000 573,300
Daun pintu kayu m2 2.03175 750,000 1,523,813
Handle + kunci bh 1 150,000 150,000
Kunci tanam bh 1 50,000 50,000
Engsel pintu bh 3 35,000 105,000
Finnishing melamik daun m2 2.03175 90,000 182,858
Upah kerja m2 2.03175 50,000 101,588
Jumlah 1 2,686,558
Jasa 10% 268,656
Jumlah 2 2,955,213
Pembulatan 2,955,210
1 PJ7
Alumunium 4" powder coam1 16.38 105,000 1,719,900
Daun pintu kayu m2 1.764 750,000 1,323,000
Daun jendela alumunium m1 6.93 120,000 831,600
Kaca polos 5 mm m2 3.1815 100,000 318,150
Handle + kunci bh 1 150,000 150,000
Kunci tanam bh 1 50,000 50,000
Engsel pintu bh 3 35,000 105,000
Engsel jendela bh 4 20,000 80,000
Finnishing melamik daun m2 1.764 90,000 158,760
Upah kerja m2 4.9455 50,000 247,275
Jumlah 1 4,983,685
Jasa 10% 498,369
Jumlah 2 5,482,054
Pembulatan 5,482,050
1 PJ8
Alumunium 4" powder coam1 12.1275 105,000 1,273,388
Daun pintu kayu m2 1.764 750,000 1,323,000
Daun jendela alumunium m1 3.465 120,000 415,800
Kaca polos 5 mm m2 2.0055 100,000 200,550
Handle + kunci bh 1 150,000 150,000
Kunci tanam bh 1 50,000 50,000
Engsel pintu bh 3 35,000 105,000
Engsel jendela bh 2 20,000 40,000
Finnishing melamik daun m2 1.764 90,000 158,760
Upah kerja m2 3.7695 50,000 188,475
Jumlah 1 3,904,973
Jasa 10% 390,497
Jumlah 2 4,295,470
Pembulatan 4,295,460
1 P3
Alumunium 4" powder coam1 7.77 105,000 815,850
Daun pintu kayu m2 1.89 750,000 1,417,500
Kaca polos 5 mm m2 0.6615 100,000 66,150
Handle + kunci bh 1 150,000 150,000
Kunci tanam bh 1 50,000 50,000
Engsel pintu bh 3 35,000 105,000
Finnishing melamik daun m2 1.89 90,000 170,100
Upah kerja m2 2.5515 50,000 127,575
Jumlah 1 2,902,175
Jasa 10% 290,218
Jumlah 2 3,192,393
Pembulatan 3,192,390
1 P4 & P4'
Alumunium 4" powder coam1 7.56 105,000 793,800
Daun pintu kayu m2 1.68 750,000 1,260,000
Kaca polos 5 mm m2 0.588 100,000 58,800
Handle + kunci bh 1 150,000 150,000
Kunci tanam bh 1 50,000 50,000
Engsel pintu bh 3 35,000 105,000
Finnishing melamik daun m2 1.68 90,000 151,200
Upah kerja m2 2.268 50,000 113,400
Jumlah 1 2,682,200
Jasa 10% 268,220
Jumlah 2 2,950,420
Pembulatan 2,950,420
1 PB1
Alumunium 4" powder coam1 9.765 105,000 1,025,325
Daun pintu kayu m2 1.806 750,000 1,354,500
Kaca polos 5 mm m2 0.7875 100,000 78,750
Handle + kunci bh 1 150,000 150,000
Kunci tanam bh 1 50,000 50,000
Engsel pintu bh 3 35,000 105,000
Finnishing melamik daun m2 1.806 90,000 162,540
Upah kerja m2 2.5935 50,000 129,675
Jumlah 1 3,055,790
Jasa 10% 305,579
Jumlah 2 3,361,369
Pembulatan 3,361,360
1 P5
Alumunium 4" powder coam1 5.355 105,000 562,275
Daun pintu kayu m2 1.806 750,000 1,354,500
Handle + kunci bh 1 150,000 150,000
Kunci tanam bh 1 50,000 50,000
Engsel pintu bh 3 35,000 105,000
Finnishing melamik daun m2 1.806 90,000 162,540
Upah kerja m2 1.806 50,000 90,300
Jumlah 1 2,474,615
Jasa 10% 247,462
Jumlah 2 2,722,077
Pembulatan 2,722,070
1 Ps
Alumunium 4" powder coam1 5.25 105,000 551,250
Daun pintu kayu m2 1.93725 750,000 1,452,938
Handle + kunci bh 1 150,000 150,000
Kunci tanam bh 1 50,000 50,000
Engsel pintu bh 3 35,000 105,000
Finnishing melamik daun m2 1.93725 90,000 174,353
Upah kerja m2 1.93725 50,000 96,863
Jumlah 1 2,580,403
Jasa 10% 258,040
Jumlah 2 2,838,443
Pembulatan 2,838,440
1 BV3
Alumunium 4" powder coam1 10.08 105,000 1,058,400
Kaca polos 5 mm m2 2.24175 100,000 224,175
Upah kerja m2 2.24175 50,000 112,088
Jumlah 1 1,394,663
Jasa 10% 139,466
Jumlah 2 1,534,129
Pembulatan 1,534,120
1 BV4
Alumunium 4" powder coam1 7.77 105,000 815,850
Kaca polos 5 mm m2 1.6905 100,000 169,050
Upah kerja m2 1.6905 50,000 84,525
Jumlah 1 1,069,425
Jasa 10% 106,943
Jumlah 2 1,176,368
Pembulatan 1,176,360
1 BV5
Alumunium 4" powder coam1 5.46 105,000 573,300
Kaca polos 5 mm m2 1.13925 100,000 113,925
Upah kerja m2 1.13925 50,000 56,963
Jumlah 1 744,188
Jasa 10% 74,419
Jumlah 2 818,606
Pembulatan 818,600
1 BV6
Alumunium 4" powder coam1 3.15 105,000 330,750
Kaca polos 5 mm m2 0.588 100,000 58,800
Upah kerja m2 0.588 50,000 29,400
Jumlah 1 418,950
Jasa 10% 41,895
Jumlah 2 460,845
Pembulatan 460,840
1 BV1'
Alumunium 4" powder coam1 6.93 105,000 727,650
Kaca polos 5 mm m2 1.2075 100,000 120,750
Upah kerja m2 1.2075 50,000 60,375
Jumlah 1 908,775
Jasa 10% 90,878
Jumlah 2 999,653
Pembulatan 999,650
1 BV1
Jalusi besi m2 1.2075 500,000 603,750
Cat besi m2 1.2075 35,000 42,263
Upah kerja m2 1.2075 100,000 120,750
Jumlah 1 766,763
Jasa 10% 76,676
Jumlah 2 843,439
Pembulatan 843,430
1 BV2'
Alumunium 4" powder coam1 15.33 105,000 1,609,650
Kaca polos 5 mm m2 0.81375 100,000 81,375
Upah kerja m2 0.81375 50,000 40,688
Jumlah 1 1,731,713
Jasa 10% 173,171
Jumlah 2 1,904,884
Pembulatan 1,904,880
1 BV2
Jalusi besi m2 0.81375 500,000 406,875
Cat besi m2 0.81375 35,000 28,481
Upah kerja m2 0.81375 100,000 81,375
Jumlah 1 516,731
Jasa 10% 51,673
Jumlah 2 568,404
Pembulatan 568,400
1 P7
Alumunium 4" powder coam1 6.3 105,000 661,500
Daun pintu kayu m2 3.83775 750,000 2,878,313
Handle + kunci bh 2 150,000 300,000
Kunci tanam bh 1 50,000 50,000
Engsel pintu bh 6 35,000 210,000
Finnishing melamik daun m2 3.83775 90,000 345,398
Upah kerja m2 3.83775 50,000 191,888
Jumlah 1 4,637,098
Jasa 10% 463,710
Jumlah 2 5,100,807
Pembulatan 5,100,800
1 PP4
Partisi gypsum m2 26.565 120,000 3,187,800
Rel gantung unit 1 350,000 350,000
Kunci tanam bh 1 50,000 50,000
Engsel pintu bh 27 35,000 945,000
Cat partisi m2 53.13 75,000 3,984,750
Upah kerja m2 26.565 25,000 664,125
Jumlah 1 9,181,675
Jasa 10% 918,168
Jumlah 2 10,099,843
Pembulatan 10,099,840
1 PT1
Partisi gypsum m2 3.15 120,000 378,000
Kusen alumunium 4" powm1 5.1 120,000 612,000
Kaca polos 5 mm m2 1.05 350,000 367,500
Upah kerja m2 3.15 25,000 78,750
Jumlah 1 1,436,250
Jumlah 2 (per m2) 341,964
Jasa 10% 34,196
Jumlah 2 376,161
Pembulatan 376,160
1 Railing tangga
Hollow 5/5 kg 16.9708 15,000 254,562
Hollow 2/2 kg 3.696 15,000 55,440
Plat strip 5/5 kg 1.2936 15,000 19,404
Base plat 6 mm kg 1.069444 15,000 16,042
Angkur bh 4 5,000 20,000
Catbesi kg 23.02984 2,500 57,575
Upah kerja m1 1 50,000 50,000
Jumlah 1 473,022
Jasa 10% 47,302
Jumlah 2 520,325
Pembulatan 520,320
1 Hand rail
Hollow 5/5 kg 6.061 15,000 90,915
Hollow 2/2 kg 0.4928 15,000 7,392
Base plat 6 mm kg 1.069444 15,000 16,042
Angkur bh 4 5,000 20,000
Catbesi kg 7.623244 2,500 19,058
Upah kerja m1 1 25,000 25,000
Jumlah 1 178,407
Jasa 10% 17,841
Jumlah 2 196,247
Pembulatan 196,240
20.72
16.2 8 8.2
8.2 8.2
0
0
0
0
0
8.2
23.56 14.8 8.76
32.412 32.412
0
0
0
0
0
32.412
1.35 1.35
1.35
4.73 4.73
4.73
45.9725
10.1 6 4.1
6.15
6.15
19 5.8 -0.8 14
8.12 8.12
0
0
0
0
0
8.12
27.75 8.15 19.6
13.65 13.65
0
0
0
0
0
13.65
0
0
0
0
0
5.264
0
0
0
0
0
9.45
10.85
6.0845 6.0845
6.0845
45.9725
0
0
0
0
0
16.45
45.9725
3.1175 3.1175
0.375 0.375
3.4925
3.655 3.655
2.365 2.365
2.52
2.52
9.3 4 4.3 1
1.72 1.72
0.75 0.75
2.52
5 0.9 4.1
1.845 1.72
2.52
9.6 6.1 3.5
2.135
2.135
3 1.6 1.4
0.56
0.56
6.6 4.6 2
1.15
1.15
1.15 1.15
0
1.15
14.6 3.1 11.5
0.775
0.775
0.775 0.775
0
0.775
6 1.7 4.3
3.655 3.655
3.655
25.3 21 4.3
3.655 3.655
3.655
1
#REF!
3.15 3.15
5.1 3 2.1
1.05 1.05
0
8.316 8.316
7.7 7.7
1.356454 1.356454
1
6.061 6.061
0.4928 0.4928
1.0694444444 1.069444
0
1
1.Unit Pasang Pintu Type.PJ.1
18.84 m' Aluminium U @ Rp. 45,000
14.7 m2 Kaca Tempered 12mm @ Rp. 850,000
2 bh Daun Pintu Kaca Tempered 12mm @ Rp. 2,500,000
5.85 m' Gawangan Pintu @ Rp. 685,000
2 set Konci Pintu dan Phat piting @ Rp. 2,150,000
2 bh Floor Hing Dorma BTS 84 @ Rp. 1,350,000
2 set Handel Pintu @ Rp. 650,000
70 m' Sealant kaca Tempered @ Rp. 16,500
Sub total :
Jasa.
Total Harga
1.Unit Pasang Pintu Type.PJ.7 ( Aluminium )
15.5 m' Kusen Aluminium 4" @ Rp. 132,500
7.4 m' Frame jendela @ Rp. 105,000
1.68 m2 Daun Pintu Triplek @ Rp. 750,000
3.36 m2 Cat Daun Pintu DUCO @ Rp. 160,000
1 bh Konci Pintu ( Setara Dekson ) @ Rp. 475,000
3 bh Engsel Pintu @ Rp. 48,750
4 bh Engsel Jendela @ Rp. 48,500
2 bh Grendel Jendela @ Rp. 33,500
3.35 m2 Kaca 5 mm @ Rp. 125,000
19 m' Sealant kusen @ Rp. 7,500
32.8 m' Sealant kaca @ Rp. 6,500
Sub total :
Jasa.
Total Harga
= Rp 2,053,750
= Rp 777,000
= Rp 1,260,000
= Rp 537,600
= Rp 475,000
= Rp 146,250
= Rp 194,000
= Rp 67,000
= Rp 418,750
= Rp 142,500
= Rp 213,200
= Rp 6,285,050
= Rp 628,505
= Rp 6,913,555 6913555 1
= Rp 1,517,125
= Rp 388,500
= Rp 1,260,000
= Rp 537,600
= Rp 475,000
= Rp 146,250
= Rp 97,000
= Rp 33,500
= Rp 246,250
= Rp 120,000
= Rp 127,400
= Rp 4,948,625
= Rp 494,863
= Rp 5,443,488 5443488 1
= Rp 1,219,000
= Rp 1,290,000
= Rp 550,400
= Rp 475,000
= Rp 146,250
= Rp 93,750
= Rp 123,000
= Rp 58,500
= Rp 3,955,900
= Rp 395,590
= Rp 4,351,490 4351490 1
= Rp 5,143,875
= Rp 600,000
= Rp 261,095
= Rp 250,000
= Rp 6,254,970
= Rp 625,497
= Rp 6,880,467 6880467 1
= Rp 3,902,250
= Rp 756,800
= Rp 225,000
= Rp 4,884,050
= Rp 488,405
= Rp 5,372,455 5372455 1
= Rp 980,500
= Rp 1,417,500
= Rp 604,800
= Rp 475,000
= Rp 146,250
= Rp 78,750
= Rp 97,500
= Rp 41,600
= Rp 3,841,900
= Rp 384,190
= Rp 4,226,090 4226090 1
= Rp 980,500
= Rp 1,417,500
= Rp 604,800
= Rp 475,000
= Rp 146,250
= Rp 78,750
= Rp 97,500
= Rp 41,600
= Rp 3,841,900
= Rp 384,190
= Rp 4,226,090 4226090 1
= Rp 954,000
= Rp 1,260,000
= Rp 537,600
= Rp 475,000
= Rp 146,250
= Rp 70,000
= Rp 96,000
= Rp 39,000
= Rp 3,577,850
= Rp 357,785
= Rp 3,935,635 3935635 1
= Rp 675,750
= Rp 1,290,000
= Rp 550,400
= Rp 475,000
= Rp 146,250
= Rp 76,500
= Rp 3,213,900
= Rp 321,390
= Rp 3,535,290 3535290 1
= Rp 662,500
= Rp 1,380,000
= Rp 588,800
= Rp 475,000
= Rp 146,250
= Rp 78,000
= Rp 3,330,550
= Rp 333,055
= Rp 3,663,605 3663605 1
= Rp 6,030,750
= Rp 288,745
= Rp 325,000
= Rp 6,644,495
= Rp 664,450
= Rp 7,308,945 7308945 1
= Rp 795,000
= Rp 2,737,500
= Rp 1,168,000
= Rp 475,000
= Rp 292,500
= Rp 90,000
= Rp 5,558,000
= Rp 555,800
= Rp 6,113,800 6113800 1
= Rp 609,500
= Rp 96,250
= Rp 61,500
= Rp 66,300
= Rp 833,550
= Rp 83,355
= Rp 916,905 568400 0.619912
= Rp 1,272,000
= Rp 266,250
= Rp 112,500
= Rp 152,100
= Rp 1,802,850
= Rp 180,285
= Rp 1,983,135 1983135 1
= Rp 689,000
= Rp 135,000
= Rp 67,500
= Rp 76,700
= Rp 968,200
= Rp 96,820
= Rp 1,065,020 1065020 1
= Rp 397,500
= Rp 70,000
= Rp 45,000
= Rp 39,000
= Rp 551,500
= Rp 55,150
= Rp 606,650 606650 1
= Rp 731,250
= Rp 13,753,000
= Rp 998,250
= Rp 15,482,500
= Rp 1,548,250
= Rp 17,030,750 17030750 1
= Rp 0
= Rp 40,132,750
= Rp 660,000
= Rp 201,000
= Rp 0
= Rp 40,993,750
= Rp 4,099,375
= Rp 45,093,125 40878950
= Rp 0
= Rp 40,132,750
= Rp 660,000
= Rp 201,000
= Rp 0
= Rp 40,993,750
= Rp 4,099,375
= Rp 45,093,125
= Rp 0
= Rp 40,132,750
= Rp 660,000
= Rp 201,000
= Rp 0
= Rp 40,993,750
= Rp 4,099,375
= Rp 45,093,125
ANALISA HARGA SATUAN PEKERJAAN
7 1 M2 DIREKSI KEET
Seng gelomlbr 1.1 22500 24750 24750
Kayu Born m3 0.1 2500000 250000 250000
Paku 5-7 kg 0.25 12500 3125 3125
Tripleks 3 lbr 0.5 60000 30000 30000
PC zak 0.1 56500 5650 5650
Pasir pasa m3 0.25 160000 40000 40000
Bata mera bh 70 600 42000 42000
Peralatan ls 1 5000 5000 5000
Ongkos pals 1 25000 25000 25000
Total… ………….. Rp. 375775 25000 425525
Keuntu ………….. Rp. 0 4700 2500 42552.5 0.1
Total ………….. Rp. 380475 27500 468077.5
Dibulatkan 468077
16 1 M2 WIREMESH U. 50
Wiremesh m2 1.01 32500 32825 32825
Kawat Bet kg 0.1 14500 1450 1450
Pekerja org 0.1 35000 3500 3500
Tk. Besi B org 0.075 50000 3750 3750
Mandor org 0.01 75000 750 750
Total… ………….. Rp. 34275 8000 42275
Keuntu ……………Rp. 0 0 800 4227.5 0.1
Total ………….. Rp. 34275 8800 46502.5
Dibulatkan 46502
18 1 M2 BEKISTING MULTIPLEK 9 MM
Multiplek 9 m2 0.347 120000 41640 41640
Kaso 5/7 Bm3 0.017 2500000 42500 42500
Paku kg 0.4 12500 5000 5000
Pekerja org 0.12 35000 4200 4200
Kp. Tukan org 0.15 65000 9750 9750
Mandor org 0.05 75000 3750 3750
Tk. Kayu 1 org 0.12 50000 6000 6000
Total… ………….. Rp. 89140 23700 112840
Keuntun ………….. Rp. 0 0 2370 11284 0.1
Total ………….. Rp. 89140 26070 124124
Dibulatkan 124124
20 1 M2 BEKISTING BONDEKS
Bondek m2 1.01 85000 85850 85850
Kawat las kg 0.1 15000 1500 1500
Pekerja org 0.05 35000 1750 1750
Tk. Besi B org 0.09 60000 5400 5400
Mandor org 0.01 75000 750 750
Total… ………….. Rp. 87350 7900 95250
Keuntun ………….. Rp. 0 0 790 9525 0.1
Total ………….. Rp. 87350 8690 104775
Dibulatkan 104775
21 1 M2 BEKISTING BATA
Bata mera bh 70 600 42000 42000
PC kg 0.2074 56500 11718.1 11718.1
Pasir pasa org 0.058 160000 9280 9280
Pekerja org 0.3218 35000 11263 11263
Tk. Batu org 0.1805 50000 9025 9025
Kep. Tukaorg 0.0158 65000 1027 1027
Mandor org 0.0083 75000 622.5 622.5
Total… ………….. Rp. 62998.1 21937.5 84935.6 7857.143
Keuntun ………….. Rp. 0 0 2193.75 8493.56 0.1
Total ………….. Rp. 62998.1 24131.25 93429.16
Dibulatkan 93429
DAFTAR HARGA SATUAN UPAH DAN BAHAN
Hal. 1
1 2 3 4 5
I. UPAH
1 PEKERJA Rp. 40000 1 orang/hari
2 TUKANG BATU Rp. 55000 1 orang/hari
3 KEPALA TUKANG BATU Rp. 60000 1 orang/hari
4 TUKANG KAYU Rp. 55000 1 orang/hari
5 KEPALA TUKANG KAYU Rp. 60000 1 orang/hari
6 TUKANG CAT/PLITUR Rp. 55000 1 orang/hari
7 KEPALA TUKANG CAT/PLITUR Rp. 60000 1 orang/hari
8 TUKANG BESI BETON Rp. 55000 1 orang/hari
9 KEPALA TUKANG BESI BETONRp. 60000 1 orang/hari
10 TUKANG BESI PROFIL Rp. 55000 1 orang/hari
11 KEPALA TUKANG BESI PROFILRp. 60000 1 orang/hari
12 PEMBANTU OPERATOR Rp. 45000 1 orang/hari
13 OPERATOR TERLATIH Rp. 70000 1 orang/hari
14 SUPIR TERAMPIL Rp. 70000 1 orang/hari
15 PEMBANTU SUPIR Rp. 45000 1 orang/hari
16 MANDOR Rp. 70000 1 orang/hari
II. BAHAN
A. BAHAN AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA
1 PASIR URUG Rp. 80000 m3
2 PASIR PASANG Rp. 140000 m3
3 PASIR BETON Rp. 160000 m3
4 BATU PECAH 1-2 CM Rp. 170000 m3
5 BATU PECAH MESIN 2/3 Rp. 160000 m3
6 BATU PECAH MESIN 3/5 Rp. 150000 m3
7 BATU PECAH 5-7 CM Rp. 130000 m3
8 BATU PECAH 7-10 CM Rp. 120000 m3
9 BATU BELAH UNTUK PONDASIRp. 125000 m3
10 BATU KALI Rp. 105000 m3
11 BATU ANDESIT Rp. 140000 m2
12 BATU TEMPEL HITAM Rp. 130000 m2
13 BATA MERAH BAKAR KEAS I Rp. 500 bh
14 BATA MERAH BAKAR KELAS II Rp. 425 bh
15 BATA CONBLOCK 40x20x10 C Rp. 3000 bh
16 BATA RINGAN HEBEL T. 10 CMRp. 1000000 m3
17 PM 100-THIN BED MORTAR (U Rp. 2250 kg
18 PM 200-RENDER MORTAR (BA Rp. 1175 kg
19 PM 310-ACIAN PRIME MORTARRp. 1750 kg
20 SEMEN PC (TIGA RODA - 50 K Rp. 55000 zak
21 SEMEN WARNA (DUA GUNUNGRp. 4000 kg
22 SEMEN WARNA (MITZUBISHI) Rp. 5000 kg
23 BETON READY MIX K-175 Rp. 675000 m3
24 BETON READY MIX K-225 Rp. 700000 m3
25 BETON READY MIX K-250 Rp. 710000 m3
B. BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA
26 ALKALI (CAT DASAR ICI) Rp. 47500 ltr
27 PLAMIR TEMBOK (SANLEX) Rp. 11700 kg
28 CAT TEMBOK (VINILEX) Rp. 14000 kg
29 CAT TEMBOK (ICI) Rp. 30000 kg
30 ROL CAT TEMBOK Rp. 32000 bh
31 KAPE TEMBOK Rp. 9600 bh
32 KAPE KAYU Rp. 8500 bh
33 ML 131 CLEAR DANAGLOS Rp. 40000 kg
34 KWAS 3" Rp. 12500 bh
35 KWAS 4" Rp. 15000 bh
36 OKER (MATAHARI) Rp. 17100 kg
37 OYAN Rp. 4000 bks
38 OTEM (PEWARNA PLITUR) Rp. 6000 bks
39 SPIRTUS Rp. 6900 ltr
Hal. 2
1 2 3 4 5
Hal. 3
1 2 3 4 5
Hal. 4
1 2 3 4 5
J. BAHAN PERPIPAAN
162 CLOSET DUDUK LENGKAP ASSRp. 1600000 set
163 CLOSET JONGKOK TOTO Rp. 350000 bh
164 WASTAFEL LENGKAP ASSESOR Rp. 1200000 bh
165 URINOIR MUSLIM LENGKAP A Rp. 1450000 bh
166 SEKAT URINOIR LENGKAP AS Rp. 725000 bh
167 KITCHEN ZINK Rp. 900000 bh
168 TEMPAT SABUN STAINLESS Rp. 150000 bh
169 BAK FIBREGLASS STANDAR Rp. 250000 bh
170 JET WASHER SEK. TOTO Rp. 110000 set
171 HAND SHOWER SEK. TOTO Rp. 250000 set
172 KRAN TEMBOK SEK. TOTO Rp. 170000 set
173 KRAN GANDA SEK. TOTO Rp. 175000 set
174 KRAN BEBEK SEK. TOTO Rp. 275000 set
175 FLOOR DRAIN SEK. TOTO Rp. 150000 bh
176 CLEAN OUT 4" Rp. 160000 bh
177 ROOF DRAIN STAINLESS Rp. 150000 bh
178 KACA CERMIN (DIBOVLE) DI A Rp. 275000 set
K. BAHAN ALAT PENGGANTUNG
179 KUNCI TANAM 2 PUTARAN Rp. 200000 bh
180 KUNCI KM BULAT (ALFA) Rp. 40000 bh
181 ENGSEL PINTU (UNILON) Rp. 15000 bh
182 ENGSEL JENDELA (UNILON) Rp. 12000 bh
183 ENGSEL ANGIN Rp. 30000 bh
184 GRENDEL PINTU KAYU Rp. 30000 bh
185 RAMBUNCIS Rp. 15000 set 1 set 2 bh
186 ENGSEL CASEMENT 16" Rp. 45000 set 1 set 2 bh
187 HANDLE/PEGANGAN PINTU STRp. 350000 set
188 KUNCI PINTU ALUMINIUM Rp. 180000 set
189 FLOORHING Rp. 600000 set
190 GRENDEL PINTU ALUMINIUM Rp. 125000 set
Hal. 5
1 2 3 4 5
124 PIPA GSP MEDIUM Ø 1/2 " Rp. 24000 m'
125 PIPA GSP MEDIUM Ø 3/4 " Rp. 32000 m'
126 PIPA GSP MEDIUM Ø 1 " Rp. 40000 m'
127 PIPA GSP MEDIUM Ø 1 1/4 " Rp. 52000 m'
128 PIPA GSP MEDIUM Ø 1 1/2" Rp. 65000 m'
129 PIPA GSP MEDIUM Ø 2" Rp. 80000 m'
130 GATE VALVE Ø 2" Rp. 950000 bh
131 GATE VALVE Ø 1 1/2" Rp. 800000 bh
132 GATE VALVE Ø 1 1/4" Rp. 420000 bh
133 GATE VALVE Ø 1" Rp. 280000 bh
134 CHECK VALVE Ø 2" Rp. 1100000 bh
135 FLEXIBLE JOINT Ø 2" Rp. 320000 bh
136 Y STAINER Ø 2" Rp. 780000 bh
137 Y STAINER Ø 1 1/4" Rp. 290000 bh
138 FLOAT VALVE Ø 1" Rp. 250000 bh
139 FLOAT VALVE Ø 2" Rp. 420000 bh
140 WLC, TERMASUK KABEL KON Rp. 760000 bh
141 PRESSURE GAUGE Rp. 95000 bh
142 HEADER 3" Rp. 1200000 bh
L. BAHAN ELEKTRIKAL
191 Lampu Baret Persegi TL Bulat Rp. 190000 bh OK
192 Downlight PLE 14 w (E27) Rp. 115000 bh OK
193 Lampu Roset PLE 11 W (E27) Rp. 54000 bh OK
194 Armature 2 x 18 W (RM) Rp. 320000 bh OK
195 Armature 2 x 36 W (RM 300) A Rp. 520000 bh OK
196 Saklar Tunggal 10 A, 1 Phasa Rp. 20000 bh OK
197 Saklar Ganda 10 A, 1 Phasa Rp. 30000 bh OK
198 Saklar Hotel Tunggal 10 A, 1 Ph Rp. 22000 bh
199 Saklar Hotel Ganda 10 A, 1 Pha Rp. 40000 bh OK
200 Saklar Grid 4 Gang 10 A, 1 Phas Rp. 220000 bh OK
201 Saklar Grid 6 Gang 10 A, 1 Phas Rp. 320000 bh OK
202 Stop Kontak 16 A, 1 Phasa Rp. 23000 bh OK
203 Kabel NYY 4Cx10 Sqmm Rp. 67000 m' OK
204 Kabel NYY 4Cx6 Sqmm Rp. 42000 m' OK
205 Kabel NYM 3Cx2,5 Sqmm Rp. 11000 m' OK
206 Kabel NYA 1 x 4 mm Rp. 4000 m' OK
207 Kabel NYA 1Cx6 Sqmm Rp. 7200 m' OK
208 Conduit dia 20 mm (3/4") Rp. 2200 m'
209 Pipa Konduit dia 20 mm2 (3/4") Rp. 2200 m'
210 Kabel Tray 200 x 100 Sqmm Rp. 140000 m' OK
211 Kabel Tray 300 x 100 Sqmm Rp. 210000 m' OK
212 Kabel Ladder 300 x 100 Sqmm Rp. 160000 m' OK
213 Kabel Ladder 200 x 100 Sqmm Rp. 130000 m' OK
214 Tee 300 x 100 Sqmm Rp. 280000 bh
215 Elbow 300 x 100 Sqmm Rp. 240000 bh
216 Cross 300 x 100 Sqmm Rp. 340000 bh
217 Tee 200 x 100 Sqmm Rp. 240000 bh
218 Elbow 200 x 100 Sqmm Rp. 190000 bh
219 Cross 200 x 100 Sqmm Rp. 280000 bh
220 MCCB 100 A, 3 phasa Rp. 680000 bh
221 MCCB 50 A, 3 phasa Rp. 660000 bh
222 MCB 40 A, 3 phasa Rp. 440000 bh
223 MCB 32 A, 3 phasa Rp. 420000 bh
224 MCB 16 A, 1 phasa Rp. 56000 bh
225 MCB 10 A, 1 phasa Rp. 56000 bh
226 MCB 6 A, 1 phasa Rp. 56000 bh
227 Indicator Lamp Rp. 65000 bh
228 Fuse 4 A Rp. 22000 bh
229 Amper meter Rp. 200000 bh
230 Volt meter Rp. 220000 bh
231 Selector switch Rp. 85000 bh
232 Cosphi meter Rp. 1400000 bh
233 CT 63 / 5A Rp. 80000 bh
234 Box Panel 600 x 500 x 250 Rp. 900000 unit
235 Box Panel 1200 x800 x 400 Rp. 3200000 unit
236 Outlet Telephone Rp. 30000 bh
237 Kabel Stel K - 011 2 x 2 x 0,6 m Rp. 2700 m'
238 Kabel Stel K - 011 10 x 2 x 0,6 Rp. 5200 m'
239 TB - T 10 pairs Rp. 620000 unit
240 Photo Electric Smoke Detector Rp. 580000 bh
241 Rate of Rise Heat Detector Rp. 310000 bh
242 Fixed Temperatur Heat Detector Rp. 270000 bh
243 Alarm Bell Rp. 240000 bh
244 Manual Push Button Rp. 340000 bh
245 MCFA 4 Zone Rp. 26800000 unit
246 Anunciator Rp. 8500000 unit
247 Kabel NYY 4Cx25 Sqmm Rp. 106000 m'
248 Kabel NYA 1Cx16 Sqmm Rp. 16000 m'
249 Kabel NYFGBY 4Cx50 Sqmm Rp. 210000 m' OK
250 TB - TP 20 pairs Rp. 780000 bh
251 MDF - TP 80 pairs Rp. 1100000 bh
252 PABX 6 / 36 Rp. 45500000 bh
253 Kabel Stel - K 20 x 2 x 0,6 mm2 Rp. 8400 bh
254 Lampu Indicator Rp. 680000 bh
255 Kabel NYM 3 x 2,5 mm Rp. 11000 m'
Hal. 6
1 2 3 4 5
95000
3000
8000
85000
ANALISA HARGA SATUAN
#REF!