Eco-Action Plan 2022
SUCCESS
OBJECTIVES TASKS TIMEFRAME RESOURCES
CRITERIA
Clean up areas
Discover
(mountains, rivers,
significant Cooperate with
drainage systems
improvement local authorities
etc.) that have 3-6
RESTORE in oveall in charge of the
been polluted and
appearance weeks maintenance of
restore them to the said areas.
and quality in
their most optimal
the area
state.
Consult electrical
engineers and/or
Lighting electricians to
Install solar- provided create a plan and
powered lamp during the canvas needed
posts for a nighttime was 3-6 materials.
REPOWER renewable energy able to serve a weeks
source lighting in purpose to the Ask donations
the nighttime people in the from local
stakeholders to
area.
contribute for the
project.
✅ collected
tree seedlings
Tree June 6-10
REFOREST Brgy. San seedlings c/o
✅ assessed
tree planting
✅identified
areas to
conduct
project Brgy. Brgy. June 13-17,2022
RESTORE ✅studied Agtatacay, Agtatacay
✅contacted
electrical
engineers to
Prepared By:
create plans for
lamp posts
Ayesha Belle Patches
(incluing the
identification
areas needing
Muyco June 27-
a solar- Brgy.
powered Street Brgy. 30,2022
REPOWER lamposts)
Population
PopulationD
officials
✅canvased ingle (1/6 weeks)
materials and
formulated
budget
proposal