ENHANCED
SCHOOL
IMPROVEMENT
PLAN
Awards this
Certificate of
Acceptance
to
for having successfully complied and met the requirements and standards of
the Department of Education Mandated by DepEd Order 44. S. 2015
i
TABLE OF CONTENTS
Page
Certificate of Acceptance ......................................................................... i
Table of Content ...................................................................................... ii
List of Acronyms.......................................................................................iii
List of Tables and Illustrations..................................................................iv
Chapter 1.
Department of Education’s Vision, Mission,
and Core Values Statement ........................................................ 1-2
Result of VMV Sharing ............................................................................ 3
Roles and Function of SPT.......................................................................4-5
SPT Time Table .......................................................................................6
Chapter 2. Assess
School’s Current Situation ....................................................................... 7-9
Gap Analysis………………………………………………………………….. 10-15
List of PIAs ............................................................................................... 16-19
Planning Work sheet ............................................................................... 20-34
Chapter 3. Plan
Project Work Plan and Budget Matrix ..................................................... 35-52
Annual Implementation Plan .................................................................... 53-70
Chapter 4. Monitoring and Evaluation ..................................................... 71-81
AIP Evaluation Form…………………………………………………………. 82-83
Process Map……………………………………………………………………84-90
Annexes …………………………………………………………………….. 91-137
Glossary ...................................................................................................
ii
LIST OF ACRONYMS
iii
LIST OF TABLES AND ILLUSTRATIONS
Tables
Illustrations
iv
CHAPTER 1
Department of Education’s Vision, Mission, and Core Values Statement
This chapter present the documentation of matters that transpired
during the Vision sharing activity. These include the list of the School Planning
Team’s (SPT’s) aspirations for the school and learners, their commitments
based on these understanding
Another important document included here is the list of roles and
responsibilities of all SPT members, as discussed and agreed upon during the
brainstorming session.
Lastly, the SPT timetable in the preparation, implementation, and
monitoring of the SIP and AIP to serve as guide to all SPT members and the
school community at large.
OUR VISION
We dream of Filipinos who passionately love their country and whose
values and competencies enable them to realize their full potential and
contribute meaningfully to building the nation.
As a learner-centered public institution the school continuously
improves itself to better serve its stakeholders.
OUR MISSION
To protect and promote the right of every Filipino to quality, equitable,
Cultured-based and complete basic education where:
GUIDING PRINCIPLES
We are guided by the following Core Values Statement
Maka-Diyos, Maka-Tao, Makabayan, Makakalikasan
1
Result of VMV sharing
The DepEd vision is not just a vision of the department; rather, it is also
the vision of every parents for their children. Each parent wants their child to
be an asset in nation building, thus as stakeholders of the school, it is but right
to envision the learners as leaders of the community/ country. And for this to
be achieved there is a need to invest in them; investing for the welfare of the
children means investing for the welfare of the nation as a whole. One of the
best investment the stakeholders can do is to give a concrete and need based
plans for the learners
To achieve this the following should be carried out:
2
development of the school, each stakeholder plays a vital role in growing as a
school.
Children are integral part of the community, this was the gist of the
discussion during the vision and mission sharing held at Sadanga Central
School. The school together with the different stakeholders dream of learners
who will be passionate, globally competitive, productive and responsible
citizens.
To help in the attainment of the Vision and Mission, the School
Planning Team came up with:
3
SADANGA CENTRAL SCHOOL
4
evacuation plans;
Commit available resource in the implementation of
the plan
5.Student Share insights about their learning experiences-
Representative what they enjoy doing, what the feel uncomfortable
(Je Anne A. Keya) with in school or school task where they find difficult
in and participate in setting goals, strategies, and
priorities of the school
6.BLGU Share valuable information on the interest and
representative concerns of the community in school improvement
(Fannayo Ampak) and participate in setting goals, strategies and
priorities of the school
Commit available resources in the implementation
of the plan
5
SPT Timetable
This Table presented the schedule in the preparation, implementation
and monitoring of the activities, programs and project to serve as guide to all
SPT members and the school community at large.
Scheduling
Activities Schedule
Preparatory Activities Suggested Time frame for this phase
is 1 month
Data Gathering June 2019 (1st week)
Organizing Data using the community June 2019 (3rd week)
Data Template June 2019 (4th week)
Conduct meeting for VMC sharing
PHASE 1 ASSESS Suggested Time frame for this phase
is 1 month
Conduct FGD or Meeting July 2019 (2nd week)
PHASE 2 PLAN Suggested Time frame for this phase
is 1 ½ month
Develop Project Work Plan and July 18 to September 3, 2019
Prioritized solution
Write the AIP
Write the SIP
PHASE 3 ACT Suggested Time frame for this phase
is will depend on the projects to be
implemented and is spread out
within the SY
Implement the activities January 2020 to March 2021
Monitor the progress of implementation 1st Quarter (2nd week of April 2020)
of the activities 2nd Quarter (2nd week of July 2020)
3rd Quarter ( 2nd Week of October
2020)
4th Quarter (2nd week of January
2021)
6
CHAPTER 2. School’s Current Situation
Assess
This chapter presents a brief discussion on the school and community
data that were gathered, organized, and assessed using the templates
provided in the ESIP Guidebook. The school must ensure that these data are
accurate and updated to be able to capture the school’s current needs. In the
discussion, emphasize the connection of these data with the school’s current
situation.
It has five (5) sections, namely: school’s current situation, priority
improvement areas, general objectives, targets, and root causes
School’s Current Situation
During the assessment of the School Planning Team, they studied the
situation of the school in terms of;
Access
The overall enrolment for the past three years is in a downward trend.
This due mainly to the opening of the intermediate grades in an adjacent
barangay to complete Demang Elementary School which had been the long
clamor of parents of Barangay Demang to bring the school nearer to their
children. There were also some children who enrolled in other places due to
the change of the occupation and residence of their parents. Another factor
also is the decrease of the Kindergarten enrolment due to birth control
especially the young couples. With regards to the dropout rate the school did
not maintain the zero-dropout rate. Two pupils drop due to transfer of
residence for SY- 2018-2019.
Quality
Just like other schools, Sadanga Central School is also faced with
challenges that need a unified action of all stakeholders to be able to address
these problems. One of the priority improvement areas is the poor reading
comprehension and non-numerates of most pupils. This is attributed to poor
vocabulary skills and insufficient language ability of pupils both in English and
Filipino. Related hereto is the low contextualized learning materials in all
learning areas in all grade level coupled with lack of advance ICT skills of
some teachers. It also surfaced that some teachers have poor facilitating skills
in the delivery of the lessons which greatly affects the strategy of the teacher.
7
Another concern is the poor involvement of clubs/organizations in school
activities, projects, and programs of the school. Less participation of pupils in
various competition is another need to be addressed. One area also is the
incomplete SBM documentation of School programs, activities, projects and
policies due to time constraint of teachers and school heads to produce hard
copies for filing.
The GWA gradually increased for the past three years from 78.68 to
82.43% and 86.52% last school year 2018-2019. This still challenged the
school head & the teachers to double their efforts in giving interventions
during weekends. The concerted effort in the 3rd year was evident resulting to
a leap increase from 82.43% to 86.52%. The result continues to be our
challenged and inspiration to still do better. For the reading literacy and
numeracy, the school has to strengthen the Reading and Numeracy Program
to improve the reading and numeracy level and comprehension of the pupils.
Governance
Though there is a strong support of the Municipal and Barangay
government to the school. Parents support still need to be strengthened
especially in the involvement of their children in higher level competitions
where more financial counterpart is expected from them. The Homeroom PTA
meetings attendance is also fairly poor in some grades because some parents
could hardly spare time for their children’s concern. As to the Physical
facilities of the school there are two old buildings that need replacement and
because the school is situated in a sloppy area, its surroundings need
riprapping in some portion to prevent further erosion that may lead to
destruction of school buildings.
School governance entails great responsibility pursuing greater
responsibilities of improvement. Due to the collaborative efforts of the different
stakeholders, the school’s SBM assessment level increased from 2.0 to 2.08
with a qualitative interpretation of maturing. The school was adjudged as
the1st in child friendly school competition within the municipality for the 2 nd
time but the school has not yet met the needed documents and facilities to
become a child-friendly and conducive learning environment.
8
GAP ANALYSIS TEMPLATE
9
Division: Schools Division of Mountain Province
Municipality: Sadanga _____
Barangay: Poblacion
School: Sadanga Central School___________
This table identify the gaps that need to be prioritized for improvement and how these affect the performance of school
and learners.
B. SCHOOL PERFORMANCE
B2. CURRENTLY B5.
A. DIVISION CONTRIBUTING GROUPS
B3. INHIBITING B4. PROJECTS
TARGETS DATA NEEDED THAT
YES FACTORS IMPLEMENTED
EXPLANATION REQUIRE
/NO
ATTENTION
Barangay
population of
school age Campaigned/
The movement of
children convinced learner Disadvantag
learners due to
Maintain 100% 2019-2020- All school age -conduct early ed/
Yes transfer of residence
enrolment rate 193/193 children enrolled registration Neglected
to seek greener
2018-2019- -Oplan Balik pupils
pasture
192/192 eskwela
2017-2018-
202/202
10
-Strategized
monitoring tool in
SY-2016-2017 – 2 dropout rates due
0% dropout rate tracking pupil’s
0% to the following:
over the last two performance Learners at
SY-2017-2018 – - learning needs and
Zero Dropout years was - Teacher risk of
0% No styles of children are
rate maintained except on counseling of dropping out
SY- 2018-2019– not met
the third year pupils and home (PARDOS)
1.04% -poor monitoring
with 1.04% visitation
Average = 0.35% system to PARDOs
- Regular Home
visits
Possible factors of
failure would be the
-Remedial
following:
instruction
Zero pupils failed at - Learning needs and
-implementation of
Maintain the the end of the school styles of children are 5 Slow
School Programs
Zero Failure 100% promotion Yes year as reflected in not met learners in
such as:
rate rate for 3 years SF 5 & 6. - lax implementation grade II to IV
* Aragak
of reading programs
*invivinnadang
and remedial classes
*Home visitation
11
percentage gain in
Low results in the pretest and Reading levels of
Filipino
performance task posttest scores with some pupils are
in reading skills only 37% behind their expected
level
-193/193 normal
Health &
Nutritional Profile,
Height & Weight
Records
Malnourishment
data for the
Sustain the Presence of 2 Taknang Feeding
following year: No improvement of
health & undernourished and Program
Year 1- 1 severely school’s children’s Misguided
Nutritional No stunted pupils
wasted health status children
Status of school Regular wellness
Year 2- 4 wasted
children dance
20-
stunted
5 - obese
Year 3 – 2 obese
5 OW
5 wasted
26-
stunted
12
Develop
contextualized Only 5 out of 12
List of IMs Minimal submission
learning teachers submitted
Submitted as of of IMs for Quality
materials in the IMs for school
last year: Assurance
different No evaluation SLAC and INSET Teachers &
*School Level -5 Low motivation and
learning areas School Head
IMs confidence of
and grade
*Division Level teachers in IM
levels
-1 IMs development
Quarterly
- The School was a
Search for Child
consistent awardee
Friendly Class &
CFSC survey of the Most Child
Not all the child Teacher School
results reflects that Friendly School
Sustain Child friendly factors in the personnel,
CFSS Goal # 2 Yes during the annual
Friendly school CFSC goal 2 and 3 learners and
and 3 indicators municipal search but
are met. Participation to stakeholders
are not met have not yet met
Annual Search for
indictors in CFSC
Most Child
goal 2 and 3
Friendly School
Improve Division- 3 pupils No a) lack of functional Assigned focal All teachers
participation to participated in the -Limited awards and clubs to develop person/coordinator and pupils
curricular and Academic Festival recognition received potential learners s/coaches
co-curricular Division- 14 pupils -Some activities were
activities in the participated in the not attended
different levels co-curricular
13
activities
District- 68%
participation of
pupils in curricular
and non-curricular
activities
- no established
Strengthen Stakeholders
The school has not partnership with all -HPTA/PTA
partnership to participation 2016- Parents,
yet attained 100% the possible assembly/meeting
increase 2017-86% No teachers &
participation of stakeholders within s
stakeholders’ 2017-2018-85% stakeholders
stakeholders and outside the
participation 2018-2019-87%
community
SBM level
assessment result:
SY 2016-2017- -Designation of
1.86 The school SBM SBM Coordinator
Teachers,
Improve SBM SY 2017-2018- level is maturing - quarterly review
No Undocumented PAPs school head,
level rating 2.02 (level 2) of SBM
Stakeholders
SY 2018-2019- implementation
2.08
Meet the 2016-2017- No The school did not 81% GWA in Math, -supervision and Slow learners
division target 78.65% meet the 85% GWA Science and English technical
of 85% General 2017-2018- target in Math, in Grade 5 which is assistance by the
14
Weighted Science and English master teacher
79.50%
Average (GWA) in grade V and school head
2018-2019-
in Math, below division target -Remedial
81.25%
Science and instruction
Ave. 79.8%
English
Promote
-Training needs
teachers’ Of the 12 teachers,
analysis - List of observed All school
instructional only 1 met
&Individual - Low IPCRF strengths/weaknes personnel
competence Outstanding;
Professional No average of ses of personnel
and
Development Plan teacher -SLAC Sessions
effectiveness in average of IPCRF
(IPDP) -School-Based
curriculum ratings for SY 2018-
-IPCRF/OPRF INSET
delivery 2019 was 3.872
ratings
Fund-raising
Source
Fiscal through search for
out/Generate The school has Possible fund
Management Mr. and Ms. PTA,
other funds for Yes undertaken fund- sources not
School operating Sadanga Central learners
school projects/ raising activities maximized
budget School ( A parent-
programs
led project)
15
List of Priority Improvement Areas (PIAS)
16
IDENTIFY PRIORITY IMPROVEMENT AREAS
Instruction: Using the matrix on the next page, please rate each improvement
area on five criteria using a 5-point scale as described below.
17
PRIORITY IMPROVEMENT AREAS
Based from the sharing and analysis of the data gathered, it surfaced that
the following are the Priority Improvement areas of the school. In this section,
present the list of Priority Areas (PIAs) as a result of the 5-point scale ranking
provided in the ESIP Guidebook. Attached the listing of priority improvement areas
as a result of prioritization using the rubric.
Priority Strategic
Urgenc Magnitud Feasibilit Averag Interpretati
Improvement Importanc
y e y e on
Areas e
Rating
1.High dropout 5 5 5 5 5 Very high
rate Priority
2. Low 5 5 5 5 5 Very
percentage of High
LM Priority
development
3. Poor reading 5 5 5 5 5 Very high
comprehension Priority
of pupils in
grade IV to VI
4. Low 5 5 5 5 5 Very high
participation of Priority
pupils in
curricular and
non-curricular
activities and
competitions
5. Low CFSS 5 5 5 5 5 Very high
score in goal #2 priority
and 3
6. Low 5 5 5 4 4.75 Very high
participation of priority
stakeholders in
school
18
programs,
activities and
projects
7.Low SBM 5 4 5 3 4.25 High
rating priority
19
PLANNING WORKSHEET for K to 6
This planning worksheet is the outgrowth of the endeavor and will serve as a starting point, channel, and anchor for the realization
of all the programs of the school from this year onwards. Hopefully, this will serve its purpose as a guide in achieving a dream – the total
improvement of the school in general and enhanced and higher academic performance of the pupils as well as the teachers in particular.
This section also presents the priority improvement areas with the general objective and the time frame to address the PIAs.
20
IO2: Learners
access programs Low participation of To increase participation
responsive to their pupils in curricular of pupils in academic and Skills and talents of
needs and and non-curricular non-academic competition pupils are not fully 90% 95% 100%
consistent with their activities and from 65% to 100% in three developed/maximized
interests and competitions years
aptitudes
IO3: Learners enjoy Low CFSS score in
learner-friendly goal #2 and 3 due to
environment the following factors:
Eroded area within To make an initial riprap to No permanent 70% 85% 90%
21
prevent major erosion by
the school parameter the end of school year drainage canal
2020 to 2021
To construct at least 50%
Incomplete school permanent concrete
No funds available 30% 40% 50%
perimeter fence perimeter school fence
within 3 years
Absence of common
To provide at least 2 Built-in comfort rooms
separate CR for boys 0
separate CR for boys and are commonly used (Fund 1 1
and girls consisting
girls 2 years by boys and girls sourcing)
urinals and lavatories
To replace old/defective
water pipes Defective water
To separate school pipelines, unsteady
No steady supply of
pipeline from the supply of water due to
clean and safe 85% 95% 100%
secondary to ensure common pipeline with
drinking water
steady supply of clean and the secondary &
safe drinking water facility community
in year 1
Presence of To repair electrical Defective electrical 80% 90% 100%
22
uncovered outlets facilities by replacing
and defective unserviceable outlets and wires and outlets
electrical wires electrical wires
Incomplete cemented
To establish 3 permanent
permanent drainage Lack of funds 75% 85% 100%
drainage canals in 3 years
canal
Incomplete/Poor To designate and train Lack of knowledge & 90% 95% 100%
documentation of teachers in the skills in proper
school programs, preparation of reports & documenting and
projects & activities proper documentation preparing/making of
such as proposals, reports
resolutions and other
documents.
23
No watchman to
Rehab of window
To replace broken watch the school
panes of some
windows in the 8 during Saturdays, 8
classrooms including
classrooms Sundays and holidays
the office
and vacation
Lack of working
To procure 6 tables at the Not included in the
tables and chairs at
end of school year 2020- APP/Priority last 3 3
the ICT rooms and
2022 school year
library
Establish a functional
School functional Material Poor implementation
Material Recovery 1
Recovery Facility of waste management
Facility
24
vandalism.
IO4: Learners To organize 7 functional/
Inactive/Not
actively participate active student No regular meetings
Functional pupils’ 4 6 7
in their learning clubs/organizations in 2 conducted
clubs/organization
environment years
IO5: Learners attain - Poor
To improve the reading
learning standards Poor reading vocabulary and
comprehension of 23
comprehension of 23 comprehension
pupils from frustration to 23
pupils in grade IV to skills
instructional/independent
VI - poor reading
in year 1
habits
Low GWA in Math, To increase the GWA in -Lack of instructional 85% 86% 87%
Science and English Math, Science and materials
English, from 79.8% to -Teaching strategy of
85% in year 1 teachers
-Non-mastery of the
competencies
25
Planning Worksheet for Governance
K t0 6 101: Education
leaders and
managers practice
participative and
inclusive
management
processes
a. Leadership To increase the SBM -limited knowledge on
and score from 2.08 to 2.25 in documentation/record 2.25 2.40 2.50
management,
governance Low SBM score year 1 and 2.40 for the preparing resolutions,
2nd year and 2.50 for the proposals and others;
3rd year
Insufficient trainings To conduct 2 INSET Lack of trainings of 2 2 2
INSET INSET INSET
and technical trainings a year on newly hired teachers
8-14 8-14 8-14
assistance to teaching strategies and Poor exposure and
SLACs SLACs SLACs
teachers conduct 8-14 of SLACs initiatives of teachers
26
every year to seek TA/mentoring
Limited funds to To source out funds and
finance school maintain a school Poor linkages with
activities, programs, operating budget to other agencies / / /
projects, and school implement programs,
banner activities and projects
School site To process the titling of Private individuals are
ownership is only a the school site at the end trying to encroach the /
tax declaration of school year 2020-2021 school site
b. Curriculum To develop at least 2
8 out of 12 teachers
and Low % of IMs contextualize IMs in the
have limited
instruction development core learning areas per
knowledge on
teacher in all grade levels 26 26 26
contextualization and
at the end of each school
basic illustration
year and submit for quality
(manual and digital)
assurance
102. Internal
systems and
processes needed
for continuous
27
improvement place
103. Growing Low participation of To increase stakeholders’
number for stakeholders in participation from 87% to Lack of IEC on
stakeholders school programs, at least 95% to 100% in 2 parental roles and 95% 100% 100%
accountability
actively participate activities and years and maintained
and collaborate in projects. through the next years
convergence at all
levels Poor implementation Lack of funds 85% 95% 100%
To fully implement other
of other stakeholders’
stakeholders’ plans,
plans, projects, Nature of work of
projects and activities
projects and activities stakeholders
28
1. Why-why Diagram
PIA: High Dropout rate ( 2 out of 4 PARDOS complied in remedial but not consistent )
2. Why-why Diagram
PIA: Low percentage of LM development
Why 8 out 12
teachers have low
Why no trainings & Training on
Why is there limited knowledge on
motivation and
knowledge guidelines in LMs
confidence to prepare
IMs
developing IMs development
29
3. PIA: Poor reading comprehension of pupils in grade IV to V
Teachers Lack of
Student
contact time contextualized Teaching
interaction
with students supplemental methods
with teacher is
is limited and reading not varied
limited
not interactive materials
Review
Teachers are
sessions
unprepared
are limited
Students
have a lot of
household
chores
30
4. Why-why Diagram
No regular
7/9 organized monitoring and
clubs have no evaluation of plan
7/9 clubs end in the concrete plans are implementation
organizing stage established /plan visitation
5. Why-why Diagram
CapB on
Proposal,
why Only 60 % of the resolution
why only 3/8
PAPs were why lack of funds?
implemented
proposal.resolution writing and
strengthening
linkages
6. Why-why Diagram
9/12 teachers have no
Only selected
9/12 teachers no skills and knowledge in trainings on documentation
participants to
documentation & records management & record management
attend the training
why no training
why no skills and
on Training on
Why only 78% of the PAPs knowledge in
documentation record
documented record
& record management
manangement
management
31
7. Problem Tree
Instructional Home/family
Subject Matter Teacher Factor
Materials factors factor
factor
Lack of
limited Poor guidance
Activities are reference
So many teaching at home/
not varied / books and
assignments strategies follow up at
differentiated contextualized
materials home
Teachers does
Learning Lack of Unregulated
not use varied
competencies contextualize used of TV and
and interesting
not mastered d materials gadgets
devices
Contextualization
of learning Intensive SLAC
materials and on pedagogies
retooling on and intensives
pedagogies classroom
observation
32
8. Why-why Diagram
school to come
Why 6 intervening up with
Why 8/12 teachers
Why only 12/20 activities hinder the
did not meet their
SLACs conducted? implementation of comprehensive
development needs and flexible HRD
plans
plan
33
Chapter 3. Plan
Project Work Plan and Budget Matrix
This Chapter lays down specific interventions or solutions for the
identified root causes that Sadanga Central School with the help of its
stakeholders, undertakes within a period of three consecutive school years
(SY 2020 – 2021, SY 2021 – 2022 and SY 2022 - 2023. It aims to improve the
three Key Result Areas (KRAs) in Basic education: access, quality and
governance. It is evidenced – based, results – based and child or learner
centered. The SIP is central in School – based Management (SBM) and is
prepared by the School Planning Team (SPT). It is the basis for the school’s
Annual Implementation Plan.
Attached copies of the Project Work Plan and Budget Matrix prepared
for the identified solutions. One project work plan per solution, which contains
the following information: problem statement, project objective statement,
activities and output.
34
Strategy: Implementing of the school Drop-out Reduction Program
Problem Statement: The school has two cases of drop-out during school
year 2018-2019
Project Objective Statement: To have 0% drop out rate
Root Cause: Lack of varied classroom activities and learning resources
Solution: Retooling of teacher’s pedagogy
35
strategies and
activity based and established
manipulative IMs remedial IMs teachers
for remedial portfolio
teaching
Conduct of
Remedial Classes
Remedial log
and counseling Teachers
Progress report Whole
Scheduling of and None
Counseling Log year
remedial learners
classes
Tasking
Classroom Master
Technical
observation and Whole teachers /
assistance given
monitoring of year School None None
and improved
remedial teaching round head /
learning output
activities Supervisor
Conduct sitio Competencies
Whole
visitation and taught despite the Teachers None None
year
module tutorials pandemic
Accomplishmen
t Report
Evaluation of Evaluation
School
Activities result reflecting Quarterly None
head
conducted the result of the
activities
conducted
36
Strategy: Capability-building for teachers on LMs Development
Problem Statement: Only 8 out of 12 teachers have low motivation and
confidence to prepare LM
Project Objective Statement: To develop 2 contextualized LMs per grade
level per learning areas at the end of school year
2020-2021 and reproduce quality assured LMs
Date of
Person Budget
Activity Output Implementatio Budget
Responsible Source
n
All teachers
Attend School
have attended June – August
Webinars on LM Head and None None
CapB on LM 2020
Development Teachers
development
Quality assured
Draft Modules June to July
modules in the Teachers 15,000 MOOE
per grade level 2020
division
Use quality
LMs utilized by August
assured LMs in Teachers None None
the learners onwards
teaching
Monitoring and
evaluation on Evaluation and Teachers
August
the use of the monitoring and school none none
onwards
modules report head
37
Strategy: Improving/Enhancing Reading comprehension of pupils in grade
IV to VI
Problem Statement: 60 – 70% of pupils got passing score in Post
Assessment Reading and only 47% of the pupils could response correctly to
questions
Project Objective Statement: To increase the percentage of pupils’
passing rate in Reading assessment test from 60-70% to 80% in year 1, 85%
in year 2 and 90% in year 3
Root Cause: No developed contextualized reading materials and
assessment feedback not analyzed
38
9 Speed and
5. Conduct comprehension
monthly speed test using
July 2020 to
and contextualized Teachers None
March 2021
comprehension reading materials
test conducted with
progress report
10 organized
6. Continue classes
July 2020 to Teachers and
implement implemented None
March 2021 school head
reading program School Reading
program
7. Digitization of One story per
contextualized grade level Nov. 2020 Teachers 5000 MOOE
reading materials digitized
39
Strategy: Improving/Enhancing participation of pupils in Curricular and non-
curricular activities
Problem Statement: 12% of the pupils were not involved in any of the
curricular and non-curricular activities
Project Objective Statement: To increase participation rate of pupils in
curricular and non-curricular activities and competitions from 88% to 100%
Root Cause: No regular monitoring and evaluation of plan implementation
Solution: Establish planning and evaluation system to monitor plan
implementation
Project Work Plan and Budget Matrix
Date of
Person Budget
Activity Output Implemen Budget
Responsible Source
tation
Assigning of faculty club
Teachers School
advisers to handle
tasked as club Sept. 2020 head and None
curricular and co-
advisors teachers
curricular clubs
Pupils signed School
IEC on club membership
membership Sept. 2020 head and None
and activities
forms teachers
Integration of online Organizational
challenges on on line Nov. 2020- Advisers
None
organizational plans and challenges March 2021 and pupils
activities conducted
Teachers
Implemented
Plan implementation Whole year and school
PAPs
heads
Plan Regular plan Timely Bi-monthly Teachers
visitation for monitoring implementatio and club
40
and evaluation
implementation and n of plans advisers
evaluation
Strategy: Establishing a child-friendly school, safe and conducive learning
environment, document all PAPs implemented
Problem Statement: The school has a low score in SBM and did not yet met
the needed requirements for Outstanding child-friendly School, safe and
conducive learning environment under (CFSF Goal # 2 and 3),
Project Objective Statement: To increase the SBM rating to second level
and to provide the needed documents and facilities to become outstanding
child-friendly school safe and conducive learning environment at the end of
school year 2020-2021
Root Cause: Poor linkages and partnership for fund sourcing and lack of
knowledge/skills on documentation and record management
Solution: Conduct training on documentation (resolution & proposal),
records management; establish and strengthen partnership and linkages
41
funding
Follow-up and
Proponent
presentation of
and school None None
project proposal
head
for funding
Construction of 1 learning park
Teachers
Learning park in in Math and MOOE
August 2020 and school 12,000
Math and Science LGU
head
Science constructed
Installed partial LGU,
2 initial riprap to School head,
riprap of the May 2020 to School
prevent major teachers and 200,00
eroded portion April 2021 fund, and
erosion installed stakeholders
of the school donation
Installation of 10m concrete
School head,
concrete permanent May 2020 to BLGU
teachers and 25,000
permanent fence of the December 2020 MOOE
PTA
fence school installed
Construct 1 1 constructed
common common PTA and 100,00 LGU
August 2020
separate CR for separate CR for Stakeholders 0 PTA
boys and girls boys and girls
10 defective
water pipes and
5 faucet
Repair water replaced and 12 School head, LGU,
June 2020 to
and electrical uncovered teachers and 30,000 MOOE,
May 2021
facilities outlets and stakeholders PTA
defective
electrical wires
replaced
Purchase 2 functional May 2020 to PTA, 15,000 PTA
needed brushing June 2020 stakeholders funds,
materials for the through , teachers MOOE
42
rehab of the
toothbrush
through
School
Head, PTA,
Construction of
Construct IPED May 2020 to Teachers, 450,00 School
IPED learning
learning center December 2020 PTA officers, 0 funds,
center started
and donations
stakeholders
Construct 15m drainage LGU,
May 2020 to PTA, 350,00
cemented permanent BLGU
July 2020 stakeholders 0
drainage canal canal cemented donations
Produce 100% of the
documents documents for a School head,
June 2020 to
needed for a child friendly teachers and 5,000 MOOE
March 2021
child-friendly school system stakeholders
school system produced
BLGU,
Implement 18 PAPs stated School head,
LGU,
school banner in the project June 2020 to Teachers 250,00
school
(Project ARAGAK May 2021 and 0
fund and
ARAGAK) implemented stakeholders
donation
Rehab of
windows panes 15 broken
PTA and
of some window glass May 2020 4,000 MOOE
teachers
classrooms and replaced
office
6 tables
Purchased/
purchased/ Teachers,
procured tables September MOOE
procured for the and school 15,000
for ICT and 2020 donations
ICT and library head
library rooms
rooms
Establishment 1 functional July 2020 to School head, 10,000 MOOE,
43
of a functional Material
Material Recovery teachers and School
December 2020
Recovery Facility stakeholders fund, PTA
Facility established
Teachers, LGU,
School BLGU,
Construct sports 1 sports facility May 2020 to 250,00
Head, PTA, AND
facilities constructed December 2020 0
and DONATIO
stakeholders NS
School Head
Have 1 May 2020-
Hire watchman and 20,000 LGU
watchman August 2020
Teachers
44
Problem Statement: 0nly 78% of the stakeholders participated regularly in
school programs, activities and projects
Project Objective Statement: To increase stakeholders’ participation from
78% to at least 95%
Root Cause: Lack of IEC on parental roles and accountability
Solution: Empowerment of parents through parenting sessions
45
participation and
contribution
SH,
Assign certain Stakeholders
June 2020 to Teachers
tasks to given certain None
May 2021 and PTA
stakeholders tasks
officers
Conduct
monitoring and
evaluation on the Accomplishment October 2020 Monitoring
None
stakeholders report To March 2020 Team
plans
implementation
46
Problem Statement: Only 78% of the activities, programs, projects
documented
Project Objective Statement: To increase SBM score from 2.08 to 2.25 at
the end of SY-2020-2021
Root Cause: - Limited knowledge on documentation especially in
preparing resolutions, proposals and others
Solution: Training on preparation of resolutions, proposal, documentation
and record management
47
Strategy: Improving GWA of grade V pupils in Math, Science and English.
Problem Statement: The GWA in Math, Science, and English is 79.8%
which is below 85% target
Project Objective Statement: To improve GWA in Math, Science, and
English from 79.8% to 85% at the end of school 2020- 2021
Root Cause: Lack of contextualized IMs; Limited use of varied
teaching strategies
Solution: Contextualization of learning materials and retooling on
pedagogies; Intensive classroom observation
48
mastery of
mastered month
competencies
Parents of
pupils at risk of
Capacity Building failing are
November PTA
of parents on oriented on PTA 20,000.00
2020 funds
home schooling home
schooling and
remedial
All learners are
Every last
Conduct monthly assessed
Friday of the Teachers None
assessment showing
month
improvement
Analyze
All learning Teachers
assessment result Every after
competencies and school None
and feedback assessment
mastered head
giving
49
Strategy: Improving teachers’ instructional competence and effectiveness
in curriculum delivery
Problem Statement: 8 out of 12 teachers poorly implemented their IPDP and
development plan
Project Objective Statement: To train and strengthen the facilitating skills of
the 8 teachers.
Root Cause: No synchronized calendar of activities
Solution: School to come up with comprehensive and flexible HRD plan
embracing the IPDP of teachers
50
the
application of learning
the activities delivery
conducted
51
Annual Implementation Plan (AIP)
Another important document is the Annual Implementation Plan (AIP). It contains specific projects that will be undertaken by
the school in a particular year, which include the following: outputs, activities, schedule, required resources, source of fund and
individuals accountable for the conduct of these projects. It also includes operational cost such as but not limited to utilities,
supplies, materials, etc. that are considered eligible in the existing MOOE guidelines. The member of the SIP/AIP School Planning
Team, other members of the parent organization, and the staff, hand – in – hand prepared this plan after a thorough examination of
the necessities of the school with regards to pupils, academic performance, teachers, competence, school’s physical outlook, and
fiscal management on the part of the school head.
ANNUAL IMPLEMENTATION PLAN – FY- 2020
Budget
Persons Schedule/ Budget
Strategy Objective Output for the Year Activities per
Responsible Venue Source
Activity
1. Implementing To have 0% drop PARDOS identified Identify PARDOS Teachers August None None
School drop-out out rate onwards
reduction 2020
52
Orientation of
teachers on
August
Learning styles and assessment on the
Teachers Onwards None None
needs identified learning styles and
2020
needs of the
PARDOs
Revisiting and re
Drafted a School planning on school
School Head, October
Drop-out Reduction Drop-out None MOOE
MTs and teachers 2020
program Program Reduction
Program
Teachers acquired
new teaching CapB on teaching
pedagogies which pedagogies which October
Master teachers 10,000 MOOE
are suited for are best suited for 2020
different learning remedial teaching
styles
Varied activities used SLACs on activity Master teachers October None None
in conducting based remedial and teachers onwards
53
teaching strategies
remedial teaching and activity based
and established manipulative IMs
remedial IMs portfolio for remedial
teaching
Conduct of
Remedial Classes
Remedial log
and counseling
Progress report Teachers and
Scheduling of Whole year None
Counseling Log learners
remedial
classes
Tasking
Classroom
Technical assistance observation and Master teachers /
Whole year
given and improved monitoring of School head / None None
round
learning output remedial teaching Supervisor
activities
54
Conduct sitio
Competencies taught
visitation and Teachers Whole year None None
despite the pandemic
module tutorials
Monitoring and
Evaluation and Teachers and August
evaluation on the none none
monitoring report school head onwards
use of the modules
To increase 100% of grade 3 to 1. Reproduction & Teachers and July 2020 5,000 MOOE
55
3.Improving/ participation rate VI pupils took PHIL- administration of
and March
enhancing of pupils in IRI pre-test and post PHIL-IRI pre and pupils
2021
participation of curricular and test post test
pupils in non-curricular
2. Analyze results
curricular and activities and 23 pupils in grade 3 July 2020
and develop School head and
non- curricular competitions to 6 given appropriate to March None
appropriate teachers
activities from 65% to intervention 2021
intervention
100%
3. SLAC on July to
Contextualized Teachers and
contextualizing August None
reading materials school head
reading materials 2020
4. School quality
July to
Quality assured assurance of School head and
September None
reading materials contextualized teachers
2020
reading materials
56
conducted with
progress report
7. Digitization of
One story per grade Teachers and
contextualized Nov. 2020 5000 MOOE
level digitized school head
reading materials
57
on organizational
2021
plans and activities
58
implemented friendly school following projects
safe and for funding
conducive
Follow-up and
learning
presentation of Proponent and
environment at None None
project proposal school head
the end of school
for funding
year 2020-2021
1 learning park in Construction of
Teachers and August MOOE
Math and Science Learning park in 12,000
school head 2020 LGU
constructed Math and Science
May 2020
10m concrete Installation of
School head, to BLGU
permanent fence of concrete 25,000
teachers and PTA December MOOE
the school installed permanent fence
2020
59
common separate
common separate
CR for boys and Stakeholders 2020 PTA
CR for boys and girls
girls
10 defective water
pipes and 5 faucet
replaced and 12 School head, June 2020 LGU,
Repair water and
uncovered outlets teachers and to May 30,000 MOOE,
electrical facilities
and defective stakeholders 2021 PTA
electrical wires
replaced
Purchase needed
PTA, May 2020 PTA
2 functional brushing materials for the
stakeholders, to June 15,000 funds,
through rehab of the
teachers 2020 MOOE
toothbrush through
Construction of IPED Construct IPED School Head, May 2020 450,000 PTA,
learning center learning center Teachers, PTA to School
started officers, and December funds,
stakeholders 2020 donations
60
15m drainage Construct May 2020 LGU,
PTA,
permanent canal cemented to July 350,000 BLGU
stakeholders
cemented drainage canal 2020 donations
Produce
100% of the June 2020
documents School head,
documents for a child to
needed for a child- teachers and 5,000 MOOE
friendly school March
friendly school stakeholders
system produced 2021
system
BLGU,
18 PAPs stated in the Implement school School head, June 2020 LGU,
project ARAGAK banner (Project Teachers and to 250,000 school
implemented ARAGAK) stakeholders May 2021 fund and
donation
Rehab of windows
15 broken window panes of some
PTA and teachers May 2020 4,000 MOOE
glass replaced classrooms and
office
61
procured tables for
procured for the ICT
ICT and library school head 2020 donations
and library rooms
rooms
July 2020
1 functional Material Establishment of a School head, MOOE,
to
Recovery Facility functional Material teachers and 10,000 School
December
established Recovery Facility stakeholders fund, PTA
2020
LGU,
May 2020
Teachers, School BLGU,
1 sports facility Construct sports to
Head, PTA, and 250,000 AND
constructed facilities December
stakeholders DONATIO
2020
NS
May 2020-
School Head and
Have 1 watchman Hire watchman August 20,000 LGU
Teachers
2020
6. Strengthening Minutes of the Conduct meeting PTA officers, 1st week of None
Partnership and meetings and with the School head, June 2020
linkages with attendance sheet stakeholders to teachers and
62
stakeholders assess the
activities,
stakeholders
programs project
implemented
PTA Officers
Organizing of
Alumni and
Alumni and SGC officers January
Stakeholders
Stakeholders 20221
association organized Faculty and
Association
school head
Monitor
Attendance of attendance of
June 2020
stakeholders in all stakeholders in all None
SH, teachers to May
activities regularly activities,
2021
monitored programs, and
projects
Stakeholders given Provide due School head, June 2020 5,000 PTA fund
due recognition recognition and/or teachers to May
incentives to 2021
stakeholders with
63
active and
exemplary
participation and
contribution
Conduct
October
monitoring and
Accomplishment 2020
evaluation on the Monitoring Team None
report To March
stakeholders plans
2020
implementation
7. Improving To increase Action plan and MOA Meeting with the School head, June 2020-
School Based SBM score from for school year 2020- teachers and teachers, and March None
Management 2.08 to 2.25 at 2021 stakeholders stakeholders 2021
(SBM) the end of SY-
Designation of Assigned/ School Head June 2020 None
Score/level 2020-2021
different committees designate focal
person
64
100% of the Sept. 2020
Monitoring and
activities, projects,
evaluation on the Dec. 2020
and programs Monitoring Team None
implementation of
implemented and March
Plans
monitored on time 2021
During
15 Certificate of Awards and School head,
graduation 500 PTA fund
Recognition recognition teachers
ceremony
65
Development &
Reproduction of
Utilized
contextualized IMs Every after
contextualized IMs in
for the least Teachers quarterly 4,000 MOOE
Math, Science and
learned skills in test
English
Math, Science and
English
Conduct remedial
100% of the Every last
classes for
competencies Teachers Friday of None
mastery of
mastered the month
competencies
Parents of pupils at
risk of failing are Capacity Building
November
oriented on home of parents on PTA 20,000 PTA funds
2020
schooling and home schooling
remedial
66
Analyze
All learning Every after
assessment result Teachers and
competencies assessmen None
and feedback school head
mastered t
giving
67
Monitoring and
January
7 teachers improved evaluation on the
School head, 2021 to
their teaching application of the None
Master teachers March
learning delivery activities
2021
conducted
68
CHAPTER 4.
Monitoring and Evaluation
This chapter ensure that all school projects, activities, and programs outlined in the School Improvement Plan (SIP) and
annual Implementation Plan (AIP) are carried out, regular monitoring and evaluation sessions are held, so that gaps and problems
can be identified and given corresponding solutions.
Monitoring and evaluation shall be conducted by the school head, teachers and stakeholders quarterly to documents all
implemented school activities, programs, and projects implemented and not implemented for the Project Team to implement for the
next quarter until all activities, programs, and projects implemented within the school year.
Strategy Objectives & Targets Activity Status of Date of Proposed Dates
Accomplishment monitoring of Monitoring
1.Implementing School To reduce the drop-out Identify PARDOS
drop-out reduction rate from 1.04% to 0% Orientation of teachers on
program assessment on the learning
styles and needs of the
PARDOs
Revisiting and re planning
on school Drop-out
Reduction Program
CapB on teaching
pedagogies which are best
69
suited for remedial teaching
SLACs on activity based
remedial teaching strategies
and activity based
manipulative IMs for
remedial teaching
Conduct of Remedial
Classes and counseling
Scheduling of remedial
classes
Tasking
Classroom observation and
monitoring of remedial
teaching activities
Conduct sitio visitation and
module tutorials
2. Capability-building To develop 2
for teachers on LMs contextualized IMs per Attend Webinars on LM
Development grade level per learning Development
Draft Modules per grade
70
level
Use quality assured LMs in
teaching
areas at the end of
Monitoring and evaluation
school year
on the use of the modules
2020-2021 and
3.Improving/enhancing To decrease the number 1. Reproduction &
Reading of pupils under poor administration of PHIL-IRI
comprehension of 23 reading pre and post test
pupils in grade IV to VI comprehension from 23 2. Analyze results and
to 5 in one year develop appropriate
intervention
3. SLAC on contextualizing
reading materials
4. School quality assurance
of contextualized reading
materials
5. Conduct monthly speed
and comprehension test
71
6. Continue implement
reading program
7. Digitization of
contextualized reading
materials
Assigning of faculty club
advisers to handle curricular
and co-curricular clubs
IEC on club membership
To increase participation and activities
4.Improving/enhancing rate of pupils in curricular Integration of online
participation of pupils and non-curricular challenges on
in curricular and non- activities and organizational plans and
curricular competitions from 65% to activities
activities 100% Plan implementation
Plan Regular plan visitation
for monitoring and
evaluation implementation
and evaluation
72
To provide the needed CapB on Proposal writing,
5. Establishing a child- documents and facilities resolution drafting, and
friendly school, safe to become outstanding records management
and conducive learning child-friendly school safe Drafting and submission of
environment and proposals for the following
conducive learning projects for funding
environment at the end of Follow-up and presentation
school of project proposal for
year 2020-2021 funding
Construction of Learning
park in Math and Science
Installed partial riprap of the
eroded portion of the school
Installation of concrete
permanent fence
Construct 1 common
separate CR for boys and
girls
73
Repair water and electrical
facilities
Purchase needed materials
for the rehab of the
toothbrush through
Construct IPED learning
center
Construct cemented
drainage canal
Produce documents needed
for a child-friendly school
system
Implement school banner
(Project ARAGAK)
Rehab of windows panes of
some classrooms and office
Purchased/procured tables
for ICT and library rooms
Establishment of a
functional Material
74
Recovery Facility
Construct sports facilities
Hire watchman
To increase stakeholders’ Conduct meeting with the
6. Strengthening participation from 87% to stakeholders to assess the
Partnership and at least 95% activities, programs project
linkages with implemented
stakeholders Organizing of Alumni and
Stakeholders Association
Monitor attendance of
stakeholders in all activities,
programs, and projects
Provide due recognition
and/or incentives to
stakeholders with active and
exemplary participation and
contribution
Assign certain tasks to
stakeholders
75
Conduct monitoring and
evaluation on the
stakeholders plans
implementation
Meeting with the teachers
and stakeholders
To increase SBM score Assigned/designate focal
7. Improving School
from 2.08 to 2.25 at the person
Based Management
end of SY Monitoring and evaluation
(SBM) Score/level
2020-2021 on the implementation of
Plans
Awards and recognition
76
English
Conduct remedial classes
for mastery of competencies
Conduct monthly
assessment
Analyze assessment result
for feedback
Assessment and
consolidation of training
needs
9. Improving teachers’ Planning and scheduling of
instructional To train and strengthen activities
competence and the facilitating skills of the Conduct INSET and SLACs
effectiveness in 8 teachers on teachers
curriculum delivery Provide TA/Coaching to
teachers
Monitoring and evaluation
on the application of the
activities conducted
77
Scheduled Dates of Monitoring
Strategy Objectives & Activity Status of Date of Issues/ Recommendati Signature of
Targets Accomplishment monitoring problems/ ons/action SPT &
challenge points Project
Team Leader
78
AIP Evaluation Form
Date of Submission: ________________________
Strategy Activities Target Physical Financial
output of Actual % of Target Actual Reason for
the accomplishment the
79
activities difference
1.Implementing
School drop-out
reduction program
2. Capability-building
for teachers on LMs
Development
3.Improving/enhancing
Reading
comprehension of 23
pupils in grade IV to VI
4.Improving/enhancing
participation of pupils
in curricular and non-
curricular
activities
5. Establishing a child-
friendly school, safe
and conducive
80
learning environment
7. Improving School
Based Management
(SBM) Score/level
8. Improving academic
performance of grade
V pupils in Math,
Science and
English
9.Capability building
for teachers on
teaching strategies
4 parents of PARDOS do
4 out of 192 pupils are at 4 parents of PARDOS
not attend the HPTA
risk of dropping out did not respond to the
meeting
invitation
81
Sending out Letter of Invitation Home visitation by Class
Identifying PARDOs Advisers
to Parents
8 out of 12 teachers
Item analysis and frequency of have low motivation and
errors on written works / confidence to prepare
examination not conducted LMs 5 out of 12 teachers submitted
their LMs for school validation
82
Identification of Least Draft Learning material like
Learned Competencies Submit to school for quality
SIM, modules, activity sheets
and noting of Most assurance
and manipulatives
Essential Competencies
Use in classroom
Submit for Division Quality
instruction Returned for revision
assurance
PIA: Poor reading comprehension of pupils in English & Filipino 4/26 pupils
Improper pausing
and stopping 6/26 Pupils stay long
2/26 did not participate 5/26 pupils in grade IV
while reading. on unfamiliar words.
during reading lesson could hardly attack the
words
83
Reading Proper
Presentation of
Reading Lesson (Silent and Oral Reading)
Discussion and Comprehension
Check-up
Setting of purpose
wasn’t established
8% only of pupils in
10% only of the pupils in each class are present
Most pupils are tapped
each class are interested during traing
in 2 or more events
Information and
dissemination of
communications 84
Identification of Participants Training/ Coaching of Pupils
85
Process Map on Stakeholders’ Participation, CFSS & SBM Implementation
PIA: Low Participation of stakeholders in school PAPs; Low Scores in CFSS & SBM
only 78% of the PAPs 58% PPAs not 4 out of 7 big projects
documented No mechanism in
done within the lack of funds
place to empower
target time frame
parents
86
Process Map on Pupils’ Performance
Test Preparation
Test proper Checking of test result
Analysis of test
results Recording of test result
87
Professional Development Process
Evaluation
Review of IPDP SLAC
88
Student-led School Watching and Hazard Mapping
(Lifted from DO. No. 23 s. 2015)
PROCEDURES
90
School Watching Checklist
Broken window
Slippery pathway
Blocked corridor
Heavy objects mounted on top of cabinets/shelves
Flooded area
Busted plugs/light bulbs/electrical facilities
Exposed electrical wires
Protruding nails in chairs and tables
Broken door knobs
Warning sign: Slippery pathways/corridors
Plants mounted on the building railings
Flooding
Exposed chemicals and liquids
Lack/absence of storage for equipment
Unlabeled chemicals
Dripping ceiling
Open pit
Stagnant water
Unpruned trees/bushes/shrubs
Open/clogged canals
No ramps for elevated school buildings or other facilities
Swing-in doors
Broken/dilapidated ceiling
Open/incomplete perimeter fence
Presence of stray animals inside the school campus
Presence of electrical post/transformer near or within the school perimeter
No system of release to parents during emergencies
No posted emergency hotlines around the school
Garbage area (segregation of biodegradable and non-biodegradable)
Detached or peeled off GI sheet
Broken toilet bowl and/or sinks
Broken chairs/desks/tables
91
Blocked/no emergency exits
Unmounted cabinets/shelves
Medical kits in every classroom
Bells/alarms
Condemnable building (i.e. very old structure, collapsing building and/or
prominent cracks on classroom walls)
Others (List as many as possible)
92
School-Based Child Protection/Anti-Bullying Policy Implementation
Checklist
93
care for teacher’s children while in school;
c. Relating with children in private for personal matters like /
student-teacher as “text mates” or face book friends;
d. Going out with students after school such as watching /
movies;
e. Using green jokes or jokes with double meaning in the /
class;
f. Cultural Beliefs (marrying children because it is acceptable /
based on one’s culture/religion, amicable settlement on
child abuse cases).
4. Promotion or information dissemination of the school-based child
protection and/or anti-bullying policies is done during school
opening for:
Students /
Teachers /
Non-Teaching personnel /
Parents /
5. There are written procedures to guide in conducting disciplinary /
proceedings in cases of offenses committed by pupils, students,
or learners.
6. The school has adopted a conflict resolution mechanism that /
respects the rights of indigenous peoples, provided that they
conform to child’s rights and the Department issuances on child
protection.
7. There is an established system for identifying students who may /
be suffering from significant harm based on physical, emotional,
or behavioral signs.
8. Has developed and implemented a school-based referral and /
monitoring system to address child abuse and bullying cases.
9. There is an existing record of all proceedings related to bullying /
and child abuse cases using the Intake Sheet (Annex B of DO 40,
s. 2012 or Appendix B or DO 18, s. 2015) as appropriate.
10. Records related to complex cases of child abuse and bullying /
94
using the Intake Sheets (Annex A of DO 40, s. 2012 or Appendix
B of DO 18, s. 2015) are well-kept and separate from simple
cases.
11. The school has submitted its consolidated reports on bullying and /
child abuse cases to the Division Office a week after the opening
of each school year.
12. Has mapped out available resources in their community for /
possible linkages or networking for cases needing referrals etc.
13. Has an active coordination with WCPD, DSWD, and other /
government and Non-Government Organizations (NGO).
14. Has a clear policy on the use of positive and non-violent discipline /
for children.
15. There is an organized Child Protection Committee (CPC) in the /
school.
16. There is an annual capacity building activity for the members of /
the CPC: Guidance Counselor/Designated Guidance Teacher
Representative of the Students /
Representative of the Parents /
Representative of the Barangay /
Representative of the Teachers /
17. The CPC is meeting regularly to discuss appropriate interventions /
and/or responses to school problems on bullying and child abuse
cases and other concerns.
18. The school with its CPC has initiated information dissemination /
programs and organized activities for the protection of children
from abuse, exploitation, violence, harm, and bullying.
19. There is a strong student participation in the promotion of child /
protection and anti-bullying policies of the school.
20. There is a feedback mechanism in the school to monitor the /
implementation of the Child Protection and/or Anti-Bullying
policies.
(Total Number of P and A multiplied the total number of items divided 27 10
by 100)
95
Overall Scores 72.97 37.03
General Description:
Recommendation:
Prepared by:
ARTHUR S. TAYA-AN
Signature over Printed Name
School Principal
Designation
Date
Received by:
_____________________________
Signature over Printed Name
_____________________________
Designation
__________________
Date
CONTENTS
INTRODUCTION
96
How did you like school?
What is a school?
What makes up a school?
Who provides the learning environment?
When can a school be called a ‘Child-friendly School’?
What exactly is a Child-friendly School and how can our school become one?
What should a Child-friendly School aim to achieve?
SELF-ASSESSMENT TOOL
How should our school go about achieving the goals of the Child-friendly
school?
Accomplishing specific targets
How our school scored
So, is our school Child-friendly?
How did you like school?
Many of us look at school as a place for serious learning but rarely as a place
for one to enjoy learning activities and have a say in what one needs and
wants to learn.
When you were in school, were you ever consulted as to what you wanted to
learn and how you wanted to learn them? If you were lucky enough to have
been asked, were you able to freely suggest ways and activities by which you
could learn more effectively?
Rights and enjoyment are perhaps words often left out of any student
handbook or school circular. Now that you are a teacher, principal or parent,
are you the type who believes that being ‘soft’ on children will only make them
learn or study less? Or that giving them ‘choices’ and allowing them to
express themselves freely will only diminish discipline – discipline to make
them sit up and listen to their lessons?
Each of us probably has his or her own idea or approach to education and
how we can make children ‘learn’. Regardless of the differences in our
opinions, many of us would probably agree that SCHOOL IS FOR
CHILDREN. Perhaps, we could further firm up this agreement by coming up
with some common definitions...
97
What is a school?
Let us consult our dictionaries. Do you have one in your school? All
dictionaries would probably contain any or some of the following definitions: 1)
an institution devoted primarily to imparting knowledge or developing certain
skills; 2) the building or buildings in which instruction is given; 3) any sphere
or means of instruction.
98
themselves support each other in creating and enhancing the ‘learning
environment’.
When can a school be called a ‘Child-friendly School’?
A Child-friendly School is more than just a place for formal learning.
Foremost, it is an institution that recognizes and respects the range of rights
of children, and not just their right to be educated. These rights also include
their rights to be healthy, to be given opportunities for play and leisure, to be
protected from harm and abuse, to express their views freely, and to
participate in decision-making according to their evolving capacities.
While upholding children’s rights, a Child-friendly School also instills in
children the responsibilities that go with their rights. Among these are to
respect the rights of others, respect diversity, practice equality, and resolve
differences without resorting to violence.
Just as important, a Child-friendly School takes the lead in shaping a learning
environment that enables children to learn as much as their intellectual
faculties could take. It is a kind of environment that allows them to grow
healthy, equips them with knowledge and skills that they can use throughout
life, and enables them to become responsible and productive members of
their community and society.
What exactly is a ‘Child-friendly School’ and how can our school
become one?
A ‘Child-friendly School’ has the following five traits:
A Child-friendly School is inclusive, gender-sensitive, and non-
discriminating.
It is said to be inclusive, gender-sensitive, and non-discriminating when it...
does not turn away any child from enrolling and attending classes for
whatever reason
gives boys and girls equal learning opportunities
treats all children equally, regardless of gender, social status, cultural origin or
religious belief.
99
has the best interest of the child in mind in all its learning activities?
has a curriculum that addresses the child’s learning needs as well as those of
the community and society
employs teaching methods that are suited to the child’s age, abilities, and
ways of learning
encourages children to think and decide for themselves, ask questions, and
express their opinions promotes quality learning
makes sure that children master the basic skills of writing, reading, speaking
(and listening), mathematics, and the necessary skills that they can use
through life
encourages children to learn by doing and by doing things with others
makes sure that teachers are qualified to teach and continue to become better
teachers
makes sure that teachers and other staff are physically fit, adequately paid,
and highly motivated.
100
helps defend and protect children from harm and abuse
encourages children to care for each other
does not tolerate physical punishment on children
has clear guidelines for conduct between students and does not allow bullying
101
How should our school go about achieving these goals?
The following checklist contains action items that will guide you through what
you need to have or need to do towards accomplishing the seven goals of the
Child-friendly School.
See how many of the action items listed under each goal you have
accomplished or are doing on a regular basis. Tick the box before each
action item if you have accomplished this. Add up and write your total in the
box after each goal. By checking what your school already has and what it is
doing regularly, you will be able to track your progress towards becoming a
Child-friendly School.
You may already be well along the way to becoming a Child-friendly School!
Remember though that you have to be honest with your answers!
Here’s one other advice... Please accomplish this checklist first before moving
on to the next section.
GOAL #1: Encourage children’s participation in school and community
What your school should have or should be doing:
Your school has a working student government.
Your school involves students in meetings and planning sessions that
concern their well-being.
Your school involves students in the organizing, planning, and
execution of the disaster preparedness and response plan.
Your school encourages its students to get involved in community
work.
Your school has a mechanism or mechanisms – such as a school
publication, students’ bulletin board, or opinion box – for pupils to
express their opinions about school and community issues.
4
Total number of action items checked for this goal
102
Your school maintains and regularly updates a health record of each
pupil.
Your school holds annual weighing and health examination of your
pupils.
Your school holds annual dental examination of your pupils.
Your school treats or refers pupils with health problems.
Your school treats pupils with decayed teeth.
Your school has a feeding program for malnourished children.
Your school serves or sells healthy and nutritious food in your
premises.
Your school practices proper waste disposal.
Your school has a steady supply of clean and safe drinking water.
Your school has separate toilet facilities for boys and girls consisting of
urinals and lavatories that are regularly maintained and kept clean.
Your school has a functional clinic.
103
Your school has identified and prepared alternative learning spaces in
cases of emergencies.
Your school has adequate emergency/first aid kits that are readily
available.
Your school conducts regular evacuation drills for earthquake, fire,
flooding, or tsunami.
Your school has a library for reading and for study.
Your school has facilities and equipment for recreation and sports.
Your school has sufficient lawn space and vegetation.
Your school has duly assigned personnel in charge of securing its
premises, its properties, and those of its pupils and teachers.
Your school coordinates with the barangay and local authorities to
ensure the safety and protection of your pupils.
Your school has a policy against discrimination with regard to gender,
cultural origin, social status, religious belief, and others.’
Your school has a program for children with special needs.
Your teachers use non-threatening styles of discipline.
Total 4 number of action items checked for this goal.
4
Total number of action items checked for this goal.
104
What your school should have or should be doing:
Your school has a clear vision/mission statement that is prominently
displayed and adequately explained to all school personnel.
The principal and teachers are familiar with child-centered and child-
friendly principles.
Your school provides each student a complete set of textbooks.
Teachers regularly prepare their lesson plans.
Your school encourages and promotes cooperative and “hands-on”
learning (“learning by doing”).
The principal has data on the school’s past three years performance in
the division, regional or national tests for the purpose of improving its
current year performance.
Teachers regularly monitor and assess their pupils’ academic
performance, with the view of improving their performance.
The school provides students access to ADM, ALS, and/or other
learning materials for their use during emergencies.
105
Your school provides annual medical examination to your teachers and
other staff.
106
But take heart (pardon the expression), there are still six goals to assess and
you might just do better with the next ones.
(Note: If you do not have crayons or color pens or pencils, you can just mark
the inside of the heart with a B for Blue, P for Purple, or R for Red)
107
Color this heart!
108
must also ensure that our actions are effective enough to help us realize
desired outcomes for children in the context of the Child-friendly School
System.
We may also call these desired outcomes ‘targets.’ The following are the
targets set for itself by the Department of Education (DepEd). The ideal, of
course, is to aim for universal coverage or 100% attainment of these targets.
All school-age children in your community are served by the school (ages 5-
11 in ES, 12-15 in JHS, 16-17 in SHS).
All children in your school who enrolled in Kinder six years ago finish Grade 6/
enrolled in Grade 7 three years ago finish Grade 10/ enrolled in Grade 11
finish Grade 12.
All your Grade 6 pupils/Grade 10/Grade 12 students pass the division,
regional, or national tests or assessments.
In addition are targets relating to the promotion of proper health and nutrition
among schoolchildren and school personnel. This follows the principle that a
healthy and well-nourished child is more ready for learning than a sickly one.
The additional targets are as follows:
All schoolchildren are well nourished.
All schoolchildren are healthy.
All schoolchildren have good dental health.
109
All children in your school who enrolled in Kinder six years ago finish Grade 6/
enrolled in Grade 7 three years ago finish Grade 10/ enrolled in Grade 11
finish Grade 12.
(Please check)
Less than 77% Poor 0 point
77-79% Fair 1 point
80-90% Good 2 points
91-100% Outstanding 3 points
Your Score: ____2______point/s
All your Grade 6 pupils/Grade 10/Grade 12 students pass the division,
regional, or national tests or assessments.
(Please check)
Less than 50% Poor 0 point
50-74% Fair 1 point
75-90% Good 2 points
91-100% Outstanding 3 points
Your Score: ____1______point/s
Health and nutrition targets:
All your pupils/students are well nourished.
(Please check)
Less than 70% Poor 0 point
70-80% Fair 1 point
81-90% Good 2 points
91-100% Outstanding 3 points
Your Score: ____2______point/s
All your pupils/students are healthy.
(Please check)
Less than 75% Poor 0 point
75-80% Fair 1 point
81-90% Good 2 points
91-100% Outstanding 3 points
Your Score: ____2______point/s
110
(Please check)
Less than 75% Poor 0 point
75-80% Fair 1 point
81-90% Good 2 points
91-100% Outstanding 3 points
Your Score: _____2_____point/s
111
Enter and add up your scores for Accomplishing Specific Targets (pages __)
here.
Progress toward specific targets Points
All school-age children in your community are served by 3
the school (ages 5-11 in ES, 12-15 in JHS, 16-17 in
SHS).
All children in your school who enrolled in Kinder six 2
years ago finish Grade 6/ enrolled in Grade 7 three years
ago finish Grade 10/ enrolled in Grade 11 finish Grade 12.
All your Grade 6 pupils/Grade 10/Grade 12 students pass 1
the division, regional, or national tests or assessments.
All your pupils are well nourished. 2
All your pupils are healthy. 2
All your pupils have good dental health. 2
SCORE 12`
If you got a total of at least 25 points but lower than 30 points, you are a
CHILD-FRIENDLY SCHOOL!
If you got at least 30 points but lower that 35 points, you are an
OUTSTANDING CHILD-FRIENDLY SCHOOL!!
If you got 35 points or higher, you are indeed a VERY OUTSTANDING
CHILD-FRIENDLY SCHOOL!!!
To all of you who made it, CONGRATULATIONS!!! To those who didn’t, you
can try to do better next school year.
Now make sure that you do this every school year to see if you are keeping
with or improving your performance.
112
Thank you for answering this little test. Until next time when we include other
action items and targets in our list! Becoming a Child-friendly School is easy,
don’t you agree?
Sadanga Central School
(name of your school) is a
CHILD-FRIENDLY SCHOOL!!!
113
Annexes
1A, 2A, 2B, and 2C
Picture of documentations during VMV
Glossary
114
Voice of the Customer
Pupils at Risk of Dropping
115
Stakeholders’ Participation
Teacher : What are the reasons why some parents do not attend
conferences/meetings?
Parent : Lack of time.
Teacher : Meetings/conferences are sometimes scheduled at night but some
still do not attend.
Parent : Sometimes my child does not tell the exact time of the meeting.
Teacher: Meetings are scheduled to meet the convenience of the parents but
we rarely have 100% attendance. What could be some reasons?
Parent: Sometimes parents do not attend because they do not fell the
importance of attending such meeting. I myself sometimes prefer to
pay for my absences.
116
Reading Comprehension
117
118
119
120
121
122
123
124
125
126
127
128
Republic of the Philippines
Cordillera Administrative Region
DIVISION OF MOUNTAIN PROVINCE
SADANGA DISTRICT
Sadanga Central School
BUSINESS PROPER:
Mr. Arthur Taya-an, started the first agenda by presenting the roles and
function of the School Planning team and the composition of the School
Planning Team.
Hon. Daniel Dawadeo – SGC Chairperson
Hon. Ruben Atiwen- SB member in charge of Education
Mr. Arthur Taya-an – School Principal
Mrs. Agnes Wanawan – Elders Representative
Je Anne A. Keya – SPGO President
Mrs. Criselda L. Chulosen – DRRM Coordinator
Mrs. Janet G. Coria-en – CPC Chairperson
Fannayo Ampac – Barangay Kagawad – DRRM
Nida N. Orowan- Faculty Representative
129
After the presentation of the roles, functions and members of the
School Planning Team, Hon. Daniel G. Dawadeo, the presiding officer, asked
Je Anne Keya, the SPGO president to start the discussion of the Second
agenda through reading the vision.
After the sharing on vision, Ms. Je Anne Keya continued reading the
Mission before it was opened for sharing and discussion. Highlights on the
sharing about the Mission.
130
religiously the curriculum and be sincere in integrating it to the
culture.
Sir Arthur Taya-an: The school really wanted to attain culture based
education that is why we have elected Mrs. Agnes Wanawan, as a
member of the SPT and SGC because the parents acknowledges
that she can help especially in evaluating the instructional materials
of the teachers being submitted for quality assurance.
Mrs. Agnes Wanawan: Yes and I thank the parents for selecting
me. And I do believe that for us to achieve quality and equitable
education we have to make it culture based in a way that the
teacher materials should undergo culture content quality assurance
to ensure the correctness and genuine culture-based knowledge
being injected to the curriculum.
132
The proposal to realign the Child friendly school price from IPED
house to ground extension is unanimously approved.
133
chairman, PTA President for how many years and now our SB
member Sir Daniel, and Mam Agnes, even she retired she still visits
us and ask how are the children going, the BLGU and MLGU also
are very supportive, however, we have low participation among
parents. This is evident during general PTA meeting and
Homeroom meeting. I think we need to include this in our plan. How
to increase our parents’ participation and even our alumni.
Noted by:
ARTHUR S. TAYA-AN
School Head
134
From left to right (Je Anne Keya (SPGO President), Criselda Chulosen
(DRRM Coordinator), Mrs. Janet G. Coria-en ( SPGO adviser, CPC) Sir
Arthur Taya-an, School Head), Mrs. Agnes Wanawan (council of elders)
Hon. Daniel Dawadeo ( SGC Chair) Photo taken by Nida N. Orowan, SGC
Secretary
135
The Student Pupils Organization President Jean Keya present the result of
student mapping to the SPT president
136
137
138