Harian AC - BC Juli
Harian AC - BC Juli
Harian AC - BC Juli
COMBINE GRADING 100.0 98.2 78.1 70.2 51.3 41.3 27.5 19.7 11.4 8.3 5.8
JOB MIX FORMULA 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7
SIEVE ANALYSIS
SIEVE SIZE 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
Weight Retained 0.0 16.7 115.6 171.9 268.7 350.3 390.8 441.5 477.8 492.1 497.6
Percent Retained 0.0 3.1 21.7 32.3 50.5 65.8 73.5 83.0 89.8 92.5 93.5
I
Percent Passing 100.0 96.9 78.3 67.7 49.5 34.2 26.5 17.0 10.2 7.5 6.5
Job Mix Formula 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7
Average
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
No SAMPLE No. I II
I Temperature of Water ° C 29 28
1314
Retained Marshalt Stability after 24 hours soaking at 60 C ( % ) 91.13 %
1442
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Date of Produc
: 02 Juli 2022
Date of Test
: 04 Juli 2002 FIELD DENSITY TEST AND THICKNESS CONTROL
Tipe of Mix : AC - BC BY CORE DRILL MACHINE
DATE THICKNESS WEIGHT ( Gram ) VOLUME DENSITY DEGREE OF COMPAC
NO.
( Cm ) STATION PASSING L/R IN IN S.S.D OF FIELD LAB ( %)
PAVING CORE
AIR WATER SPECIMEN (Gr/cm³ ) (Gr/cm³ ) RESULT
SPEC
A B C D=C-B E=A/D F G=(E/F)*100
,02/7/22 ,04/7/22 1 6.6 13 + 800 R 1168.5 647.4 1172.1 524.7 2.227 2.252 98.9 > 98
2 6.3 13 + 850 R 1095.1 606.6 1099.0 492.4 2.224 2.252 98.8
3 6.2 13 + 900 R 1110.9 614.3 1114.9 500.6 2.219 2.252 98.5
4 6.4 13 + 950 R 1322.9 730.5 1326.1 595.6 2.221 2.252 98.6
COMBINE GRADING 100.0 96.5 77.6 68.6 47.3 39.0 25.0 15.9 10.2 7.5 6.5
JOB MIX FORMULA 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7
SIEVE ANALYSIS
SIEVE SIZE 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
Weight Retained 0.0 26.8 103.4 158.9 249.5 317.6 369.9 412.3 452.1 458.7 477.3
Percent Retained 0.0 5.3 20.4 31.3 49.1 62.5 72.8 81.2 89.0 90.3 94.0
I
Percent Passing 100.0 94.7 79.6 68.7 50.9 37.5 27.2 18.8 11.0 9.7 6.0
Job Mix Formula 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7
Average
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
No SAMPLE No. I II
I Temperature of Water ° C 29 28
1261
Retained Marshalt Stability after 24 hours soaking at 60 C ( % ) 92.26 %
1367
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Date of Produc
: 4 Juli 2022
Date of Test
: 5 Juli 2022 FIELD DENSITY TEST AND THICKNESS CONTROL
Tipe of Mix : AC - BC BY CORE DRILL MACHINE
DATE THICKNESS WEIGHT ( Gram ) VOLUME DENSITY DEGREE OF COMPAC
NO.
( Cm ) STATION PASSING L/R IN IN S.S.D OF FIELD LAB ( %)
PAVING CORE
AIR WATER SPECIMEN (Gr/cm³ ) (Gr/cm³ ) RESULT
SPEC
A B C D=C-B E=A/D F G=(E/F)*100
,04/7/22 07/05/22 1 8.8 13 + 750 R 1686.1 936.5 1689.7 753.2 2.239 2.252 99.4 > 98
2 7.5 13 + 700 R 1157.2 634.1 1160.7 526.6 2.197 2.252 97.6
3 6.8 13 + 650 R 1136.4 627.1 1140.9 513.8 2.212 2.252 98.2
4 5.9 13 + 600 R 951.9 519.6 954.3 434.7 2.190 2.252 97.2
5 7.9 13 + 550 R 1340.4 740.7 1344.2 603.5 2.221 2.252 98.6
COMBINE GRADING 100.0 96.5 79.3 70.9 51.3 37.6 21.9 14.4 9.7 7.6 6.3
JOB MIX FORMULA 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7
SIEVE ANALYSIS
SIEVE SIZE 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
Weight Retained 0.0 17.5 110.3 160.9 241.4 309.8 360.4 401.3 433.4 452.1 460.5
Percent Retained 0.0 3.6 22.4 32.7 49.0 62.9 73.1 81.4 88.0 91.8 93.5
I
Percent Passing 100.0 96.4 77.6 67.3 51.0 37.1 26.9 18.6 12.0 8.2 6.5
Job Mix Formula 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7
Average
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
No SAMPLE No. I II
I Temperature of Water ° C 29 28
1565
Retained Marshalt Stability after 24 hours soaking at 60 C ( % ) 92.45 %
1693
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Date of Produc
: 05 Juli 2022
Date of Test
: 07 Juli 2022 FIELD DENSITY TEST AND THICKNESS CONTROL
Tipe of Mix : AC - BC BY CORE DRILL MACHINE
DATE THICKNESS WEIGHT ( Gram ) VOLUME DENSITY DEGREE OF COMPAC
NO.
( Cm ) STATION PASSING L/R IN IN S.S.D OF FIELD LAB ( %)
PAVING CORE
AIR WATER SPECIMEN (Gr/cm³ ) (Gr/cm³ ) RESULT
SPEC
A B C D=C-B E=A/D F G=(E/F)*100
,05/7/22 ,08/7/22 1 6.0 13 + 500 R 957.9 530.7 961.3 430.6 2.225 2.252 98.8 > 98
2 6.8 13 + 450 R 1148.7 634.3 1154.3 520.0 2.209 2.252 98.1
3 7.0 13 + 400 R 1150.7 634.5 1154.8 520.3 2.212 2.252 98.2
4 8.4 13 + 350 R 1429.5 788.2 1433.0 644.8 2.217 2.252 98.4
5 6.4 13 + 300 R 1043.7 578.9 1047.8 468.9 2.226 2.252 98.8
6 8.3 13 + 250 R 1383.9 764.2 1387.8 623.6 2.219 2.252 98.5
7 7.3 13 + 200 R 1230.0 680.5 1234.0 553.5 2.222 2.252 98.7
COMBINE GRADING 100.0 98.7 76.7 68.1 49.4 40.1 27.0 18.2 12.0 9.1 5.6
JOB MIX FORMULA 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7
SIEVE ANALYSIS
SIEVE SIZE 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
Weight Retained 0.0 34.3 109.5 143.6 230.9 301.5 344.6 378.9 413.5 423.8 450.5
Percent Retained 0.0 7.2 22.9 30.0 48.3 63.0 72.0 79.2 86.5 88.6 94.2
I
Percent Passing 100.0 92.8 77.1 70.0 51.7 37.0 28.0 20.8 13.5 11.4 5.8
Job Mix Formula 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7
Average
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
No SAMPLE No. I II
I Temperature of Water ° C 29 28
1411
Retained Marshalt Stability after 24 hours soaking at 60 C ( % ) 90.14 %
1565
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Date of Produc
: 06 Juli 2022
Date of Test
: 07 Juli 2022 FIELD DENSITY TEST AND THICKNESS CONTROL
Tipe of Mix : AC - BC BY CORE DRILL MACHINE
DATE THICKNESS WEIGHT ( Gram ) VOLUME DENSITY DEGREE OF COMPAC
NO.
STATION PASSING L/R IN IN S.S.D OF FIELD LAB ( %)
PAVING CORE ( Cm )
AIR WATER SPECIMEN (Gr/cm³ ) (Gr/cm³ ) RESULT
SPEC
A B C D=C-B E=A/D F G=(E/F)*100
,06/7/22 ,07/7/22 1 6.8 13 + 150 R 1127.1 622.2 1131.0 508.8 2.215 2.252 98.4 > 98
2 7.2 13 + 100 R 1144.2 631.8 1147.7 515.9 2.218 2.252 98.5
3 6.7 13 + 050 R 1070.7 592.8 1074.0 481.2 2.225 2.252 98.8
4 6.7 13 + 000 R 1180.6 651.9 1183.5 531.6 2.221 2.252 98.6
5 8.0 12 + 950 R 1373.3 758.0 1376.9 618.9 2.219 2.252 98.5
6 6.1 12 + 900 R 959.9 531.8 963.0 431.2 2.226 2.252 98.9
COMBINE GRADING 100.0 98.6 78.5 70.7 51.0 40.9 28.2 18.4 12.1 8.1 6.0
JOB MIX FORMULA 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7
SIEVE ANALYSIS
SIEVE SIZE 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
Weight Retained 0.0 19.9 115.4 159.5 249.1 321.3 377.0 409.5 441.4 457.8 465.6
Percent Retained 0.0 4.0 23.4 32.3 50.5 65.1 76.4 82.9 89.4 92.7 94.3
I
Percent Passing 100.0 96.0 76.6 67.7 49.5 34.9 23.6 17.1 10.6 7.3 5.7
Job Mix Formula 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7
Average
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
No SAMPLE No. I II
I Temperature of Water ° C 29 28
1182
Retained Marshalt Stability after 24 hours soaking at 60 C ( % ) 93.71 %
1261
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Date of Produc
: 12 Juli 2022
Date of Test
: 13 Juli 2022 FIELD DENSITY TEST AND THICKNESS CONTROL
Tipe of Mix : AC - BC BY CORE DRILL MACHINE
DATE THICKNESS WEIGHT ( Gram ) VOLUME DENSITY DEGREE OF COMPAC
NO.
( Cm ) STATION PASSING L/R IN IN S.S.D OF FIELD LAB ( %)
PAVING CORE
AIR WATER SPECIMEN (Gr/cm³ ) (Gr/cm³ ) RESULT
SPEC
A B C D=C-B E=A/D F G=(E/F)*100
,12/7/22 ,13/7/22 1 6.9 13 + 800 L 1216.8 670.1 1220.4 550.3 2.211 2.252 98.2 > 98
2 6.0 13 + 850 L 1003.2 554.1 1006.4 452.3 2.218 2.252 98.5
3 7.1 13 + 900 L 1214.2 670.5 1217.2 546.7 2.221 2.252 98.6
4 7.6 13 + 940 L 1290.5 709.8 1294.0 584.2 2.209 2.252 98.1
COMBINE GRADING 100.0 96.3 80.2 69.9 46.8 35.1 26.3 17.9 12.8 6.8 5.7
JOB MIX FORMULA 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7
SIEVE ANALYSIS
SIEVE SIZE 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
Weight Retained 0.0 17.7 114.2 169.7 248.9 328.4 380.5 424.7 457.8 471.2 486.3
Percent Retained 0.0 3.4 22.3 33.1 48.5 64.0 74.1 82.8 89.2 91.8 94.8
I
Percent Passing 100.0 96.6 77.7 66.9 51.5 36.0 25.9 17.2 10.8 8.2 5.2
Job Mix Formula 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7
Average
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
No SAMPLE No. I II
I Temperature of Water ° C 29 28
1199
Retained Marshalt Stability after 24 hours soaking at 60 C ( % ) 90.07 %
1332
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Date of Produc
: 14 Juli 2022
Date of Test
: 15 Juli 2022 FIELD DENSITY TEST AND THICKNESS CONTROL
Tipe of Mix : AC - BC BY CORE DRILL MACHINE
DATE THICKNESS WEIGHT ( Gram ) VOLUME DENSITY DEGREE OF COMPAC
NO.
( Cm ) STATION PASSING L/R IN IN S.S.D OF FIELD LAB ( %)
PAVING CORE
AIR WATER SPECIMEN (Gr/cm³ ) (Gr/cm³ ) RESULT
SPEC
A B C D=C-B E=A/D F G=(E/F)*100
,14/7/22 ,15/7/22 1 5.9 13 + 750 L-L 1007.2 560.2 1012.9 452.7 2.225 2.252 98.8 > 98
2 5.8 13 + 700 L-R 929.3 513.7 932.5 418.8 2.219 2.252 98.5
3 7.2 13 + 650 L-T 1185.6 656.6 1189.0 532.4 2.227 2.252 98.9
4 7.4 13 + 600 L-L 1330.5 734.1 1337.0 602.9 2.207 2.252 98.0
5 7.0 13 + 550 L-T 1148.6 634.0 1152.1 518.1 2.217 2.252 98.4
6 9.0 13 + 500 L-L 1501.4 831.3 1504.5 673.2 2.230 2.252 99.0
7 6.6 13 + 450 L-R 1120.6 624.2 1124.4 500.2 2.240 2.252 99.5
COMBINE GRADING 100.0 98.5 79.2 71.2 52.4 39.3 25.5 18.4 12.1 7.4 5.9
JOB MIX FORMULA 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7
SIEVE ANALYSIS
SIEVE SIZE 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
Weight Retained 0.0 17.9 101.2 170.7 251.6 325.4 380.9 415.3 456.6 469.0 474.3
Percent Retained 0.0 3.5 20.1 33.8 49.9 64.5 75.5 82.3 90.5 93.0 94.0
I
Percent Passing 100.0 96.5 79.9 66.2 50.1 35.5 24.5 17.7 9.5 7.0 6.0
Job Mix Formula 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7
Average
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
No SAMPLE No. I II
I Temperature of Water ° C 29 28
1371
Retained Marshalt Stability after 24 hours soaking at 60 C ( % ) 91.74 %
1495
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Date of Produc
: 15 Juli 2022
Date of Test
: 16 Juli 2022 FIELD DENSITY TEST AND THICKNESS CONTROL
Tipe of Mix : AC - BC BY CORE DRILL MACHINE
DATE THICKNESS WEIGHT ( Gram ) VOLUME DENSITY DEGREE OF COMPAC
NO.
( Cm ) STATION PASSING L/R IN IN S.S.D OF FIELD LAB ( %)
PAVING CORE
AIR WATER SPECIMEN (Gr/cm³ ) (Gr/cm³ ) RESULT
SPEC
A B C D=C-B E=A/D F G=(E/F)*100
,15/7/22 ,,16/7/22 1 5.9 13 + 405 L 1013.3 557.2 1014.8 457.6 2.214 2.252 98.3 > 98
2 7.9 13 + 350 L 1464.8 821.6 1466.4 644.8 2.272 2.252 100.9
3 7.8 13 + 300 L 1375.3 764.4 1378.9 614.5 2.238 2.252 99.4
4 8.8 13 + 250 L 1634.8 913.4 1637.6 724.2 2.257 2.252 100.2
5 8.3 13 + 200 L 1415.1 784.5 1425.0 640.5 2.209 2.252 98.1
6 6.8 13 + 150 L 1207.5 675.7 1208.4 532.7 2.267 2.252 100.7
100
60 40
1.03 0.887