Package : LOT 6 PRIGI - BTS. KAB.

TULUNGAGUNG - KLATAK - BRUMBUN


Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Production : 02 Juli 2022


Date of Test : 02 Juli 2022
HOT - BIN GRADING
Tipe of Mix : AC - BC
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV SEMEN
1
Weight 1129.8 Gram Weight 2588.5 Gram Weight 2571.3 Gram Weight 2600.9 Gram Weight Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
1" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0
3/4" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 275.2 10.6 89.4
1/2" 0.0 0.0 100.0 0.0 0.0 100.0 766.5 29.8 70.2 1909.0 73.4 26.6
3/8" 0.0 0.0 100.0 0.0 0.0 100.0 1347.2 52.4 47.6 2066.7 79.5 20.5
# 4. 190.4 16.9 83.1 744.8 28.8 71.2 1877.9 73.0 27.0 2336.8 89.8 10.2
# 8. 298.7 26.4 73.6 879.3 34.0 66.0 2257.0 87.8 12.2 2570.2 98.8 1.2
# 16. 448.9 39.7 60.3 1611.5 62.3 37.7 2540.9 98.8 1.2 2575.7 99.0 1.0
# 30. 620.1 54.9 45.1 2011.0 77.7 22.3 2546.0 99.0 1.0 2578.0 99.1 0.9
# 50. 739.0 65.4 34.6 2537.5 98.0 2.0 2548.7 99.1 0.9 2583.0 99.3 0.7
# 100. 822.1 72.8 27.2 2559.0 98.9 1.1 2552.0 99.2 0.8 2588.9 99.5 0.5
# 200. 940.4 83.2 16.8 2566.9 99.2 0.8 2555.5 99.4 0.6 2592.1 99.7 0.3
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV SEMEN
2
Weight 655.6 Gram Weight 2595.9 Gram Weight 2560.8 Gram Weight 2625.8 Gram Weight Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
1" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0
3/4" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 235.6 9.0 91.0
1/2" 0.0 0.0 100.0 0.0 0.0 100.0 755.7 29.5 70.5 1874.1 71.4 28.6
3/8" 0.0 0.0 100.0 0.0 0.0 100.0 1327.6 51.8 48.2 2039.8 77.7 22.3
# 4. 88.7 13.5 86.5 721.5 27.8 72.2 1869.9 73.0 27.0 2321.5 88.4 11.6
# 8. 146.9 22.4 77.6 870.9 33.5 66.5 2240.4 87.5 12.5 2566.0 97.7 2.3
# 16. 230.3 35.1 64.9 1653.0 63.7 36.3 2531.2 98.8 1.2 2570.1 97.9 2.1
# 30. 325.4 49.6 50.4 2010.8 77.5 22.5 2544.6 99.4 0.6 2575.7 98.1 1.9
# 50. 421.5 64.3 35.7 2541.0 97.9 2.1 2547.9 99.5 0.5 2578.4 98.2 1.8
# 100. 500.8 76.4 23.6 2558.9 98.6 1.4 2555.3 99.8 0.2 2579.7 98.2 1.8
# 200. 533.6 81.4 18.6 2569.0 99.0 1.0 2556.7 99.8 0.2 2590.0 98.6 1.4
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 02 Juli 2022


Date of Test : 02 Juli 2022
COMBINE GRADING CHART
Tipe of Mix : AC - BC
AVERAGE
HOT BIN
FILLER ASB
SIEVE I II III IV
200 100 50 30 16 8 4 3/8" 1/2" 3/4"
SIZE % PASS % PASS % PASS % PASS % PASS % PASS
100
2" 90 1"
1 1/2" 80
1" 100 100 100 100.0 100 70
3/4" 100 100 100 90.2 100
60
1/2" 100 100 70.3 27.6 100 SPECK
3/8" 100 100 47.9 21.4 100 50 HOT BIN
JMF
# 4. 84.8 71.7 27.0 10.9 100 40
# 8. 75.6 66.2 12.4 1.7 100 30
# 16. 62.6 37.0 1.2 1.5 100
20
# 30. 47.7 22.4 0.8 1.4 70.3
# 50. 35.1 2.0 0.7 1.2 47.2 10
# 100. 25.4 1.3 0.5 1.1 11.7 0
# 200. 17.7 0.9 0.4 0.9 2.4

HOT BIN AGGREGATE COMBINE


SIEVE SIZE 2½" 2" 1½" 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
HOT - BIN. I 30.0% 30.0 30.0 30.0 25.4 22.7 18.8 14.3 10.5 7.6 5.3
HOT - BIN. II 22.0% 22.0 22.0 22.0 15.8 14.6 8.1 4.9 0.4 0.3 0.2
HOT - BIN. III 30.0% 30.0 21.1 14.4 8.1 3.7 0.4 0.2 0.2 0.1 0.1
HOT - BIN. IV 18.0% 16.2 5.0 3.9 2.0 0.3 0.3 0.3 0.2 0.2 0.2
FILLER

COMBINE GRADING 100.0 98.2 78.1 70.2 51.3 41.3 27.5 19.7 11.4 8.3 5.8
JOB MIX FORMULA 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7

SPECIFICATION 100 90-100 75 ~ 90 66 ~ 82 46 ~ 64 30 ~ 49 18 ~ 38 12 ~ 28 7 ~ 20 5 ~13 4~8


Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 02 Juli 2022


Date of Test : 02 Juli 2022
ASPHALT EXTRACTION & SIEVE ANALYSIS
Tipe of Mix : AC - BC ASPHALT EXTRACTION
MIX MATERIAL EXTRACTION FILTER ( OVEN - DRIED )
CONTOH BITUMEN IN MIX
WEIGHT ( Gram ) WEIGHT ( Gram ) TOTAL
MATERIAL
BEFORE AFTER DIFFERENCE BEFORE AFTER DIFFERENCE WEIGHT % BIT IN MIX ( Gram )
I
A B C=A-B D E F=E-D G=C-F H = ( G / A )*100

1 567.4 535.2 32.2 4.5 4.9 0.4 31.8 5.605 535.6

2 559.7 527.9 31.8 4.5 5.0 0.5 31.3 5.592 528.4

Total 1127.1 1063.1 64.0 9 9.9 0.9 63.1

Average 5.598 532.0

SIEVE ANALYSIS

SIEVE SIZE 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.

Weight Retained 0.0 16.7 115.6 171.9 268.7 350.3 390.8 441.5 477.8 492.1 497.6

Percent Retained 0.0 3.1 21.7 32.3 50.5 65.8 73.5 83.0 89.8 92.5 93.5
I
Percent Passing 100.0 96.9 78.3 67.7 49.5 34.2 26.5 17.0 10.2 7.5 6.5

Job Mix Formula 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7

Surfase Area = 5.604

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 02 Juli 2022


Date of Test : 02 Juli 2022 PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Tipe of Mix : AC - BC
Penetration of Bitumen : Bulk Sp.Gr U : 2.558 Surfase Area : 5.604 Temperature : 155 ±1 ºC
Sp.Gr of Bitumen (T) : 1.03 Gmm Test V : 2.365 B.F.Taeknees : 10.171 Compaction : 75 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Stability Marshall Rasio
VIM V.M.A VFB
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Meas Adjust Flow Quotien Lolos
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm ) 200
A B C D E F G H I J K L M N O P Q S
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.598 2.562 0.057 6.099 2.365 1198.0 681.0 1201.2 520.2 2.303 2.61 15.01 82.60 115 1521 3.9 390.1
2 1203.4 685.7 1208.0 522.3 2.304 2.57 14.97 82.84 125 1654 3.3 501.1
3 1206.9 688.1 1211.5 523.4 2.306 2.48 14.90 83.33 94 1244 3.1 401.1

Average 2.304 2.57 14.96 82.83 1473 3.4 429.0 0.93

Average
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 02 Juli 2022


Date of Test : 02 Juli 2022
MAXIMUM SPECIFIC GRAVITY OF BITUMENOUS PAVING
Tipe of Mix : AC - BC ( AASHTO - T.209 )

No SAMPLE No. I II

A Weight of Sample and Bowl Gram 1381.8 1379.6

B Weight of Bowl Gram 823.4 815.6

C Weight of Sample (A-B) Gram 558.4 564

D Weight of Bowl and Sample in Water Gram 813.5 815.7

E Weight of Bowl in Water Gram 490.3 490.7

F Weight of Sample in Water (D-E) Gram 323.2 325.0

G Volume of Sample (C-F) Gram 235.2 239

H Max Specific Gravity (C/G) Gram/cc 2.374 2.360

I Temperature of Water ° C 29 28

J Corection of Temperature ° C 0.9989 0.9992

K Max Specific Gravity (HxJ) Gram/cc 2.372 2.358

L Average Gram/cc 2.365

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 02 Juli 2022


Date of Test : 02 Juli 2022
PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Tipe of Mix : AC - BC
Penetration of Bitumen : 60 - 70 Bulk Sp.Gr U : 2.558 Surfase Area : 5.604 Temp : 155 ±1 ºC Lolos 200 : 6.47
Sp.Gr of Bitumen (T) : 1.03 Gmm Test V : 2.365 B.F.Taeknees : 10.171 Comp : 75 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Stability Marshall Rasio
VIM V.M.A VFB
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Meas Adjust Flow Quotien Lolos
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm ) 200
A B C D E F G H I J K L M N O P Q S
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.598 2.562 0.057 6.099 2.365 1193.8 666.3 1196.4 530.1 2.252 4.77 16.9 82.6 98 1296.5 3.6
2 1197.6 667.9 1198.9 531.0 2.248 4.93 17.0 82.8 115 1521.3 3.1
3 1198.1 669.2 1199.9 530.7 2.257 4.57 16.7 83.3 114 1508.1 3.3
Average 2.252 4.76 16.9 71.8 1442.0 3.3 432.6 1.06
1 5.598 2.562 0.057 6.099 2.365 1193.2 665.6 1194.8 529.2 2.255 4.65 16.8 72.3 90 1190.6 3.4
2 1192.6 664.7 1194.5 529.8 2.251 4.81 16.9 71.6 105 1389.1 3.8
3 1192.7 666.2 1195.9 529.7 2.252 4.78 16.9 71.7 103 1362.6 4.0
2.252 4.75 16.9 71.9 1314.1 3.7 352.0 1.06

1314
Retained Marshalt Stability after 24 hours soaking at 60 C ( % ) 91.13 %
1442

SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc
: 02 Juli 2022
Date of Test
: 04 Juli 2002 FIELD DENSITY TEST AND THICKNESS CONTROL
Tipe of Mix : AC - BC BY CORE DRILL MACHINE
DATE THICKNESS WEIGHT ( Gram ) VOLUME DENSITY DEGREE OF COMPAC
NO.
( Cm ) STATION PASSING L/R IN IN S.S.D OF FIELD LAB ( %)
PAVING CORE
AIR WATER SPECIMEN (Gr/cm³ ) (Gr/cm³ ) RESULT
SPEC
A B C D=C-B E=A/D F G=(E/F)*100
,02/7/22 ,04/7/22 1 6.6 13 + 800 R 1168.5 647.4 1172.1 524.7 2.227 2.252 98.9 > 98
2 6.3 13 + 850 R 1095.1 606.6 1099.0 492.4 2.224 2.252 98.8
3 6.2 13 + 900 R 1110.9 614.3 1114.9 500.6 2.219 2.252 98.5
4 6.4 13 + 950 R 1322.9 730.5 1326.1 595.6 2.221 2.252 98.6

6.4 2.223 2.252 98.7

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Production : 4 Juli 2022


Date of Test : 4 Juli 2022
HOT - BIN GRADING
Tipe of Mix : AC - BC
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV SEMEN
1
Weight 1181.5 Gram Weight 2697.4 Gram Weight 2587.6 Gram Weight 2659.7 Gram Weight Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
1" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0
3/4" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 548.9 20.6 79.4
1/2" 0.0 0.0 100.0 0.0 0.0 100.0 823.1 31.8 68.2 2084.3 78.4 21.6
3/8" 0.0 0.0 100.0 0.0 0.0 100.0 1486.4 57.4 42.6 2179.9 82.0 18.0
# 4. 202.7 17.2 82.8 888.4 32.9 67.1 2055.5 79.4 20.6 2540.0 95.5 4.5
# 8. 358.9 30.4 69.6 1009.5 37.4 62.6 2349.0 90.8 9.2 2570.0 96.6 3.4
# 16. 556.3 47.1 52.9 1741.6 64.6 35.4 2565.4 99.1 0.9 2574.8 96.8 3.2
# 30. 717.8 60.8 39.2 2390.0 88.6 11.4 2569.0 99.3 0.7 2609.0 98.1 1.9
# 50. 821.7 69.5 30.5 2670.3 99.0 1.0 2571.6 99.4 0.6 2654.5 99.8 0.2
# 100. 952.3 80.6 19.4 2679.0 99.3 0.7 2578.3 99.6 0.4 2656.0 99.9 0.1
# 200. 990.1 83.8 16.2 2693.1 99.8 0.2 2584.3 99.9 0.1 2657.1 99.9 0.1
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV SEMEN
2
Weight 1136.2 Gram Weight 2766.7 Gram Weight 2586.3 Gram Weight 2701.5 Gram Weight Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
1" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0
3/4" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 483.2 17.9 82.1
1/2" 0.0 0.0 100.0 0.0 0.0 100.0 690.5 26.7 73.3 1980.5 73.3 26.7
3/8" 0.0 0.0 100.0 0.0 0.0 100.0 1465.7 56.7 43.3 2063.0 76.4 23.6
# 4. 187.9 16.5 83.5 858.8 31.0 69.0 2035.4 78.7 21.3 2479.7 91.8 8.2
# 8. 344.2 30.3 69.7 975.3 35.3 64.7 2289.0 88.5 11.5 2490.0 92.2 7.8
# 16. 567.9 50.0 50.0 1765.4 63.8 36.2 2471.8 95.6 4.4 2517.9 93.2 6.8
# 30. 699.8 61.6 38.4 2346.9 84.8 15.2 2486.3 96.1 3.9 2563.0 94.9 5.1
# 50. 821.3 72.3 27.7 2661.3 96.2 3.8 2492.0 96.4 3.6 2609.5 96.6 3.4
# 100. 874.5 77.0 23.0 2684.8 97.0 3.0 2510.4 97.1 2.9 2627.5 97.3 2.7
# 200. 899.3 79.1 20.9 2692.1 97.3 2.7 2517.0 97.3 2.7 2644.7 97.9 2.1
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 4 Juli 2022


Date of Test : 4 Juli 2022
COMBINE GRADING CHART
Tipe of Mix : AC - BC
AVERAGE
HOT BIN
FILLER ASB
SIEVE I II III IV
200 100 50 30 16 8 4 3/8" 1/2" 3/4"
SIZE % PASS % PASS % PASS % PASS % PASS % PASS
100
2" 90 1"
1 1/2" 80
1" 100 100 100 100.0 100 70
3/4" 100 100 100 80.7 100
60
1/2" 100 100 70.7 24.2 100 SPECK
3/8" 100 100 42.9 20.8 100 50 HOT BIN
JMF
# 4. 83.2 68.0 20.9 6.4 100 40
# 8. 69.7 63.7 10.4 5.6 100 30
# 16. 51.5 35.8 2.6 5.0 100
20
# 30. 38.8 13.3 2.3 3.5 70.3
# 50. 29.1 2.4 2.1 1.8 47.2 10
# 100. 21.2 1.8 1.6 1.4 11.7 0
# 200. 18.5 1.4 1.4 1.1 2.4

HOT BIN AGGREGATE COMBINE


SIEVE SIZE 2½" 2" 1½" 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
HOT - BIN. I 30.0% 30.0 30.0 30.0 24.9 20.9 15.4 11.6 8.7 6.4 5.6
HOT - BIN. II 22.0% 22.0 22.0 22.0 15.0 14.0 7.9 2.9 0.5 0.4 0.3
HOT - BIN. III 30.0% 30.0 21.2 12.9 6.3 3.1 0.8 0.7 0.6 0.5 0.4
HOT - BIN. IV 18.0% 14.5 4.3 3.8 1.1 1.0 0.9 0.6 0.3 0.3 0.2
FILLER

COMBINE GRADING 100.0 96.5 77.6 68.6 47.3 39.0 25.0 15.9 10.2 7.5 6.5
JOB MIX FORMULA 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7

SPECIFICATION 100 90-100 75 ~ 90 66 ~ 82 46 ~ 64 30 ~ 49 18 ~ 38 12 ~ 28 7 ~ 20 5 ~13 4~8


Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 4 Juli 2022


Date of Test : 4 Juli 2022
ASPHALT EXTRACTION & SIEVE ANALYSIS
Tipe of Mix : AC - BC ASPHALT EXTRACTION
MIX MATERIAL EXTRACTION FILTER ( OVEN - DRIED )
CONTOH BITUMEN IN MIX
WEIGHT ( Gram ) WEIGHT ( Gram ) TOTAL
MATERIAL
BEFORE AFTER DIFFERENCE BEFORE AFTER DIFFERENCE WEIGHT % BIT IN MIX ( Gram )
I
A B C=A-B D E F=E-D G=C-F H = ( G / A )*100

1 536.6 504.5 32.1 4.4 6.6 2.2 29.9 5.572 506.7

2 539.2 507.1 32.1 4.4 6.5 2.1 30.0 5.564 509.2

Total 1075.8 1011.6 64.2 8.8 13.1 4.3 59.9

Average 5.568 508.0

SIEVE ANALYSIS

SIEVE SIZE 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.

Weight Retained 0.0 26.8 103.4 158.9 249.5 317.6 369.9 412.3 452.1 458.7 477.3

Percent Retained 0.0 5.3 20.4 31.3 49.1 62.5 72.8 81.2 89.0 90.3 94.0
I
Percent Passing 100.0 94.7 79.6 68.7 50.9 37.5 27.2 18.8 11.0 9.7 6.0

Job Mix Formula 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7

Surfase Area = 5.844

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 4 Juli 2022


Date of Test : 4 Juli 2022 PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Tipe of Mix : AC - BC
Penetration of Bitumen : 60 - 70 Bulk Sp.Gr U : 2.558 Surfase Area : 5.844 Temperature : 155 ±1 ºC
Sp.Gr of Bitumen (T) : 1.03 Gmm Test V : 2.364 B.F.Taeknees : 9.748 Compaction : 75 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Stability Marshall Rasio
VIM V.M.A VFB
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Meas Adjust Flow Quotien Lolos
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm ) 200
A B C D E F G H I J K L M N O P Q S
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.568 2.560 0.027 6.093 2.364 1202.9 683.8 1206.1 522.3 2.303 2.59 14.98 82.72 110 1455 3.4 428.0
2 1207.0 687.0 1211.6 524.6 2.301 2.67 15.06 82.24 102 1349 4.0 337.3
3 1210.0 689.9 1214.6 524.7 2.306 2.46 14.87 83.44 98 1296 4.0 324.1

Average 2.303 2.59 14.97 82.70 1367 3.8 359.7 0.93

Average
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 4 Juli 2022


Date of Test : 4 Juli 2022
MAXIMUM SPECIFIC GRAVITY OF BITUMENOUS PAVING
Tipe of Mix : AC - BC ( AASHTO - T.209 )

No SAMPLE No. I II

A Weight of Sample and Bowl Gram 1386.9 1384.3

B Weight of Bowl Gram 823.4 819.5

C Weight of Sample (A-B) Gram 563.5 564.8

D Weight of Bowl and Sample in Water Gram 816.8 815.7

E Weight of Bowl in Water Gram 490.3 490.7

F Weight of Sample in Water (D-E) Gram 326.5 325.0

G Volume of Sample (C-F) Gram 237 239.8

H Max Specific Gravity (C/G) Gram/cc 2.378 2.355

I Temperature of Water ° C 29 28

J Corection of Temperature ° C 0.9989 0.9992

K Max Specific Gravity (HxJ) Gram/cc 2.375 2.353

L Average Gram/cc 2.364

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 4 Juli 2022


Date of Test : 4 Juli 2022
PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Tipe of Mix : AC - BC
Penetration of Bitumen : 60 - 70 Bulk Sp.Gr U : 2.558 Surfase Area : 5.844 Temp : 155 ±1 ºC Lolos 200 : 6.03
Sp.Gr of Bitumen (T) : 1.03 Gmm Test V : 2.364 B.F.Taeknees : 9.748 Comp : 75 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Stability Marshall Rasio
VIM V.M.A VFB
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Meas Adjust Flow Quotien Lolos
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm ) 200
A B C D E F G H I J K L M N O P Q S
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.568 2.560 0.027 6.093 2.364 1195.6 667.2 1198.1 530.9 2.252 4.7 16.9 71.9 112 1455 3.8
2 1194.7 666.3 1197.4 531.1 2.249 4.9 17.0 71.4 119 1349 3.0
3 1199.6 670.5 1203.1 532.6 2.252 4.7 16.9 71.9 118 1296 3.5
Average 2.251 4.8 16.9 71.7 1367 3.4 398.2 0.99
1 5.568 2.560 0.027 6.093 2.364 1198.3 668.6 1200.2 531.6 2.254 4.7 16.8 72.3 93 1230 3.8
2 1200.4 670.5 1204.0 533.5 2.250 4.8 16.9 71.5 94 1244 3.6
3 1197.7 667.4 1199.5 532.1 2.251 4.8 16.9 71.6 99 1310 4.0
2.252 4.8 16.9 71.8 1261 3.8 331.9 0.99

1261
Retained Marshalt Stability after 24 hours soaking at 60 C ( % ) 92.26 %
1367

SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc
: 4 Juli 2022
Date of Test
: 5 Juli 2022 FIELD DENSITY TEST AND THICKNESS CONTROL
Tipe of Mix : AC - BC BY CORE DRILL MACHINE
DATE THICKNESS WEIGHT ( Gram ) VOLUME DENSITY DEGREE OF COMPAC
NO.
( Cm ) STATION PASSING L/R IN IN S.S.D OF FIELD LAB ( %)
PAVING CORE
AIR WATER SPECIMEN (Gr/cm³ ) (Gr/cm³ ) RESULT
SPEC
A B C D=C-B E=A/D F G=(E/F)*100
,04/7/22 07/05/22 1 8.8 13 + 750 R 1686.1 936.5 1689.7 753.2 2.239 2.252 99.4 > 98
2 7.5 13 + 700 R 1157.2 634.1 1160.7 526.6 2.197 2.252 97.6
3 6.8 13 + 650 R 1136.4 627.1 1140.9 513.8 2.212 2.252 98.2
4 5.9 13 + 600 R 951.9 519.6 954.3 434.7 2.190 2.252 97.2
5 7.9 13 + 550 R 1340.4 740.7 1344.2 603.5 2.221 2.252 98.6

7.4 2.212 2.252 98.2

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Production : 05 Juli 2022


Date of Test : 05 Juli 2022
HOT - BIN GRADING
Tipe of Mix : AC - BC
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV SEMEN
1
Weight 1237.8 Gram Weight 2725.3 Gram Weight 2780.9 Gram Weight 2752.4 Gram Weight Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
1" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0
3/4" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 555.5 20.2 79.8
1/2" 0.0 0.0 100.0 0.0 0.0 100.0 655.6 23.6 76.4 2139.8 77.7 22.3
3/8" 0.0 0.0 100.0 0.0 0.0 100.0 1338.2 48.1 51.9 2282.1 82.9 17.1
# 4. 144.5 11.7 88.3 993.5 36.5 63.5 1899.9 68.3 31.7 2549.0 92.6 7.4
# 8. 399.3 32.3 67.7 1130.7 41.5 58.5 2356.7 84.7 15.3 2708.4 98.4 1.6
# 16. 576.4 46.6 53.4 1976.8 72.5 27.5 2755.4 99.1 0.9 2717.6 98.7 1.3
# 30. 711.6 57.5 42.5 2479.3 91.0 9.0 2729.9 98.2 1.8 2718.9 98.8 1.2
# 50. 870.1 70.3 29.7 2665.3 97.8 2.2 2731.5 98.2 1.8 2720.1 98.8 1.2
# 100. 949.0 76.7 23.3 2672.1 98.0 2.0 2733.3 98.3 1.7 2722.2 98.9 1.1
# 200. 1009.2 81.5 18.5 2677.4 98.2 1.8 2739.8 98.5 1.5 2726.8 99.1 0.9
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV SEMEN
2
Weight 1131.7 Gram Weight 2722.1 Gram Weight 2785.3 Gram Weight 2749.9 Gram Weight Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
1" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0
3/4" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 520.0 18.9 81.1
1/2" 0.0 0.0 100.0 0.0 0.0 100.0 650.4 23.4 76.6 2023.4 73.6 26.4
3/8" 0.0 0.0 100.0 0.0 0.0 100.0 1327.4 47.7 52.3 2218.0 80.7 19.3
# 4. 149.5 13.2 86.8 975.4 35.8 64.2 1890.9 67.9 32.1 2525.5 91.8 8.2
# 8. 405.2 35.8 64.2 1132.9 41.6 58.4 2344.7 84.2 15.8 2710.9 98.6 1.4
# 16. 579.8 51.2 48.8 1978.5 72.7 27.3 2755.6 98.9 1.1 2714.3 98.7 1.3
# 30. 720.1 63.6 36.4 2483.6 91.2 8.8 2761.8 99.2 0.8 2715.8 98.8 1.2
# 50. 807.3 71.3 28.7 2678.2 98.4 1.6 2769.7 99.4 0.6 2719.0 98.9 1.1
# 100. 883.5 78.1 21.9 2709.3 99.5 0.5 2772.2 99.5 0.5 2722.4 99.0 1.0
# 200. 916.3 81.0 19.0 2711.3 99.6 0.4 2775.4 99.6 0.4 2727.7 99.2 0.8
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 05 Juli 2022


Date of Test : 05 Juli 2022
COMBINE GRADING CHART
Tipe of Mix : AC - BC
AVERAGE
HOT BIN
FILLER ASB
SIEVE I II III IV
200 100 50 30 16 8 4 3/8" 1/2" 3/4"
SIZE % PASS % PASS % PASS % PASS % PASS % PASS
100
2" 90 1"
1 1/2" 80
1" 100 100 100 100.0 100 70
SPECK
3/4" 100 100 100 80.5 100 HOT BIN
60
1/2" 100 100 76.5 24.3 100 SPECK
JMF
3/8" 100 100 52.1 18.2 100 50 HOT BIN
JMF
# 4. 87.6 63.9 31.9 7.8 100 40
# 8. 66.0 58.4 15.5 1.5 100 30
# 16. 51.1 27.4 1.0 1.3 100
20
# 30. 39.4 8.9 1.3 1.2 70.3
# 50. 29.2 1.9 1.2 1.1 47.2 10
# 100. 22.6 1.2 1.1 1.0 11.7 0
# 200. 18.8 1.1 0.9 0.9 2.4

HOT BIN AGGREGATE COMBINE


SIEVE SIZE 2½" 2" 1½" 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
HOT - BIN. I 30.0% 30.0 30.0 30.0 26.3 19.8 15.3 11.8 8.8 6.8 5.6
HOT - BIN. II 22.0% 22.0 22.0 22.0 14.0 12.9 6.0 2.0 0.4 0.3 0.2
HOT - BIN. III 30.0% 30.0 23.0 15.6 9.6 4.7 0.3 0.4 0.4 0.3 0.3
HOT - BIN. IV 18.0% 14.5 4.4 3.3 1.4 0.3 0.2 0.2 0.2 0.2 0.2
FILLER

COMBINE GRADING 100.0 96.5 79.3 70.9 51.3 37.6 21.9 14.4 9.7 7.6 6.3
JOB MIX FORMULA 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7

SPECIFICATION 100 90-100 75 ~ 90 66 ~ 82 46 ~ 64 30 ~ 49 18 ~ 38 12 ~ 28 7 ~ 20 5 ~13 4~8


Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 05 Juli 2022


Date of Test : 05 Juli 2022
ASPHALT EXTRACTION & SIEVE ANALYSIS
Tipe of Mix : AC - BC ASPHALT EXTRACTION
MIX MATERIAL EXTRACTION FILTER ( OVEN - DRIED )
CONTOH BITUMEN IN MIX
WEIGHT ( Gram ) WEIGHT ( Gram ) TOTAL
MATERIAL
BEFORE AFTER DIFFERENCE BEFORE AFTER DIFFERENCE WEIGHT % BIT IN MIX ( Gram )
I
A B C=A-B D E F=E-D G=C-F H = ( G / A )*100

1 524.2 494.2 30.0 5.2 6.0 0.8 29.2 5.570 495.0

2 519.6 489.7 29.9 5.1 5.9 0.8 29.1 5.600 490.5

Total 1043.8 983.9 59.9 10.3 11.9 1.6 58.3

Average 5.585 492.8

SIEVE ANALYSIS

SIEVE SIZE 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.

Weight Retained 0.0 17.5 110.3 160.9 241.4 309.8 360.4 401.3 433.4 452.1 460.5

Percent Retained 0.0 3.6 22.4 32.7 49.0 62.9 73.1 81.4 88.0 91.8 93.5
I
Percent Passing 100.0 96.4 77.6 67.3 51.0 37.1 26.9 18.6 12.0 8.2 6.5

Job Mix Formula 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7

Surfase Area = 5.885

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 05 Juli 2022


Date of Test : 05 Juli 2022 PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Tipe of Mix : AC - BC
Penetration of Bitumen : Bulk Sp.Gr U : 2.558 Surfase Area : 5.885 Temperature : 155 ±1 ºC
Sp.Gr of Bitumen (T) : 1.03 Gmm Test V : 2.364 B.F.Taeknees : 9.715 Compaction : 75 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Stability Marshall Rasio
VIM V.M.A VFB
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Meas Adjust Flow Quotien Lolos
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm ) 200
A B C D E F G H I J K L M N O P Q S
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.585 2.560 0.025 6.114 2.364 1204.0 684.2 1207.2 523.0 2.302 2.60 15.03 82.67 95 1257 2.7 465.5
2 1205.2 687.2 1209.8 522.6 2.306 2.44 14.89 83.64 101 1336 3.1 431.0
3 1203.2 685.4 1207.8 522.4 2.303 2.56 15.00 82.91 110 1455 2.9 501.8

Average 2.304 2.52 14.97 83.17 1349 2.9 465.3 0.93

Average
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 05 Juli 2022


Date of Test : 05 Juli 2022
MAXIMUM SPECIFIC GRAVITY OF BITUMENOUS PAVING
Tipe of Mix : AC - BC ( AASHTO - T.209 )

No SAMPLE No. I II

A Weight of Sample and Bowl Gram 1370.7 1370.2

B Weight of Bowl Gram 823.4 815.6

C Weight of Sample (A-B) Gram 547.3 554.6

D Weight of Bowl and Sample in Water Gram 807.8 809.3

E Weight of Bowl in Water Gram 490.3 490.7

F Weight of Sample in Water (D-E) Gram 317.5 318.6

G Volume of Sample (C-F) Gram 229.8 236

H Max Specific Gravity (C/G) Gram/cc 2.382 2.350

I Temperature of Water ° C 29 28

J Corection of Temperature ° C 0.9989 0.9992

K Max Specific Gravity (HxJ) Gram/cc 2.379 2.348

L Average Gram/cc 2.364

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 05 Juli 2022


Date of Test : 05 Juli 2022
PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Tipe of Mix : AC - BC
Penetration of Bitumen : 60 - 70 Bulk Sp.Gr U : 2.558 Surfase Area : 5.885 Temp : 155 ±1 ºC Lolos 200 6.29
Sp.Gr of Bitumen (T) : 1.03 Gmm Test V : 2.364 B.F.Taeknees : 9.715 Comp : 75 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Stability Marshall Rasio
VIM V.M.A VFB
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Meas Adjust Flow Quotien Lolos
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm ) 200
A B C D E F G H I J K L M N O P Q S
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.585 2.560 0.025 6.114 2.364 1196.6 668.9 1200.3 531.4 2.252 4.7 16.9 72.0 128 1693.3 .3.6
2 1181.3 659.6 1184.2 524.6 2.252 4.7 16.9 72.0 120 1587.5 3.8
3 1195.0 667.0 1197.4 530.4 2.253 4.7 16.8 72.2 136 1799.2 3.5
Average 2.252 4.7 16.9 72.1 1693.3 3.7 463.9 1.1
1 5.585 2.560 0.025 6.114 2.364 1203.2 671.8 1205.8 534.0 2.253 4.7 16.8 72.3 119 1574.3 3.0
2 1202.2 674.1 1208.6 534.5 2.249 4.8 17.0 71.5 115 1521.3 3.1
3 1200.7 671.7 1204.4 532.7 2.254 4.6 16.8 72.4 121 1600.7 3.4
2.252 4.7 16.9 72.1 1565.4 3.2 494.4 1.1

1565
Retained Marshalt Stability after 24 hours soaking at 60 C ( % ) 92.45 %
1693

SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc
: 05 Juli 2022
Date of Test
: 07 Juli 2022 FIELD DENSITY TEST AND THICKNESS CONTROL
Tipe of Mix : AC - BC BY CORE DRILL MACHINE
DATE THICKNESS WEIGHT ( Gram ) VOLUME DENSITY DEGREE OF COMPAC
NO.
( Cm ) STATION PASSING L/R IN IN S.S.D OF FIELD LAB ( %)
PAVING CORE
AIR WATER SPECIMEN (Gr/cm³ ) (Gr/cm³ ) RESULT
SPEC
A B C D=C-B E=A/D F G=(E/F)*100
,05/7/22 ,08/7/22 1 6.0 13 + 500 R 957.9 530.7 961.3 430.6 2.225 2.252 98.8 > 98
2 6.8 13 + 450 R 1148.7 634.3 1154.3 520.0 2.209 2.252 98.1
3 7.0 13 + 400 R 1150.7 634.5 1154.8 520.3 2.212 2.252 98.2
4 8.4 13 + 350 R 1429.5 788.2 1433.0 644.8 2.217 2.252 98.4
5 6.4 13 + 300 R 1043.7 578.9 1047.8 468.9 2.226 2.252 98.8
6 8.3 13 + 250 R 1383.9 764.2 1387.8 623.6 2.219 2.252 98.5
7 7.3 13 + 200 R 1230.0 680.5 1234.0 553.5 2.222 2.252 98.7

7.2 2.218 2.252 98.5

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Production : 06 Juli 2022


Date of Test : 06 Juli 2022
HOT - BIN GRADING
Tipe of Mix : AC - BC
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV SEMEN
1
Weight 1139.5 Gram Weight 2635.9 Gram Weight 2662.8 Gram Weight 2651.5 Gram Weight Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
1" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0
3/4" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 199.8 7.5 92.5
1/2" 0.0 0.0 100.0 0.0 0.0 100.0 944.4 35.5 64.5 1872.4 70.6 29.4
3/8" 0.0 0.0 100.0 0.0 0.0 100.0 1467.3 55.1 44.9 2236.8 84.4 15.6
# 4. 209.4 18.4 81.6 856.4 32.5 67.5 1930.8 72.5 27.5 2371.0 89.4 10.6
# 8. 288.9 25.4 74.6 1055.5 40.0 60.0 2253.7 84.6 15.4 2621.0 98.8 1.2
# 16. 434.7 38.1 61.9 1762.7 66.9 33.1 2566.9 96.4 3.6 2625.0 99.0 1.0
# 30. 622.1 54.6 45.4 2218.3 84.2 15.8 2575.7 96.7 3.3 2633.0 99.3 0.7
# 50. 737.5 64.7 35.3 2587.4 98.2 1.8 2581.5 96.9 3.1 2638.3 99.5 0.5
# 100. 835.8 73.3 26.7 2591.0 98.3 1.7 2590.0 97.3 2.7 2640.9 99.6 0.4
# 200. 947.9 83.2 16.8 2621.3 99.4 0.6 2595.6 97.5 2.5 2642.1 99.6 0.4
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV SEMEN
2
Weight 1007.3 Gram Weight 2632.5 Gram Weight 2604.7 Gram Weight 2675.9 Gram Weight Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
1" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0
3/4" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 185.4 6.9 93.1
1/2" 0.0 0.0 100.0 0.0 0.0 100.0 942.1 36.2 63.8 1837.9 68.7 31.3
3/8" 0.0 0.0 100.0 0.0 0.0 100.0 1468.5 56.4 43.6 2241.3 83.8 16.2
# 4. 190.8 18.9 81.1 843.7 32.0 68.0 1920.1 73.7 26.3 2358.0 88.1 11.9
# 8. 265.4 26.3 73.7 1047.2 39.8 60.2 2253.2 86.5 13.5 2618.4 97.9 2.1
# 16. 377.6 37.5 62.5 1766.4 67.1 32.9 2566.0 98.5 1.5 2621.2 98.0 2.0
# 30. 529.7 52.6 47.4 2227.5 84.6 15.4 2575.7 98.9 1.1 2628.0 98.2 1.8
# 50. 640.9 63.6 36.4 2569.0 97.6 2.4 2579.4 99.0 1.0 2633.5 98.4 1.6
# 100. 739.5 73.4 26.6 2573.2 97.7 2.3 2585.0 99.2 0.8 2636.7 98.5 1.5
# 200. 856.2 85.0 15.0 2577.9 97.9 2.1 2599.5 99.8 0.2 2639.5 98.6 1.4
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 06 Juli 2022


Date of Test : 06 Juli 2022
COMBINE GRADING CHART
Tipe of Mix : AC - BC
AVERAGE
HOT BIN
FILLER ASB
SIEVE I II III IV
200 100 50 30 16 8 4 3/8" 1/2" 3/4"
SIZE % PASS % PASS % PASS % PASS % PASS % PASS
100
2" 90 1"
1 1/2" 80
1" 100 100 100 100.0 100 70
3/4" 100 100 100 92.8 100
60
1/2" 100 100 64.2 30.3 100 SPECK
3/8" 100 100 44.3 15.9 100 50 HOT BIN
JMF
# 4. 81.3 67.7 26.9 11.2 100 40
# 8. 74.1 60.1 14.4 1.6 100 30
# 16. 62.2 33.0 2.5 1.5 100
20
# 30. 46.4 15.6 2.2 1.2 70.3
# 50. 35.8 2.1 2.0 1.0 47.2 10
# 100. 26.6 2.0 1.7 0.9 11.7 0
# 200. 15.9 1.3 1.4 0.9 2.4

HOT BIN AGGREGATE COMBINE


SIEVE SIZE 2½" 2" 1½" 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
HOT - BIN. I 30.0% 30.0 30.0 30.0 24.4 22.2 18.7 13.9 10.7 8.0 4.8
HOT - BIN. II 22.0% 22.0 22.0 22.0 14.9 13.2 7.3 3.4 0.5 0.4 0.3
HOT - BIN. III 30.0% 30.0 19.3 13.3 8.1 4.3 0.8 0.7 0.6 0.5 0.4
HOT - BIN. IV 18.0% 16.7 5.5 2.9 2.0 0.3 0.3 0.2 0.2 0.2 0.2
FILLER

COMBINE GRADING 100.0 98.7 76.7 68.1 49.4 40.1 27.0 18.2 12.0 9.1 5.6
JOB MIX FORMULA 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7

SPECIFICATION 100 90-100 75 ~ 90 66 ~ 82 46 ~ 64 30 ~ 49 18 ~ 38 12 ~ 28 7 ~ 20 5 ~13 4~8


Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 06 Juli 2022


Date of Test : 06 Juli 2022
ASPHALT EXTRACTION & SIEVE ANALYSIS
Tipe of Mix : AC - BC ASPHALT EXTRACTION
MIX MATERIAL EXTRACTION FILTER ( OVEN - DRIED )
CONTOH BITUMEN IN MIX
WEIGHT ( Gram ) WEIGHT ( Gram ) TOTAL
MATERIAL
BEFORE AFTER DIFFERENCE BEFORE AFTER DIFFERENCE WEIGHT % BIT IN MIX ( Gram )
I
A B C=A-B D E F=E-D G=C-F H = ( G / A )*100

1 502.4 474.2 28.2 4.6 4.9 0.3 27.9 5.553 474.5

2 510.7 481.7 29.0 4.6 5.0 0.4 28.6 5.600 482.1

Total 1013.1 955.9 57.2 9.2 9.9 0.7 56.5

Average 5.577 478.3

SIEVE ANALYSIS

SIEVE SIZE 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.

Weight Retained 0.0 34.3 109.5 143.6 230.9 301.5 344.6 378.9 413.5 423.8 450.5

Percent Retained 0.0 7.2 22.9 30.0 48.3 63.0 72.0 79.2 86.5 88.6 94.2
I
Percent Passing 100.0 92.8 77.1 70.0 51.7 37.0 28.0 20.8 13.5 11.4 5.8

Job Mix Formula 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7

Surfase Area = 6.206

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 06 Juli 2022


Date of Test : 06 Juli 2022 PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Tipe of Mix : AC - BC
Penetration of Bitumen : Bulk Sp.Gr U : 2.558 Surfase Area : 6.206 Temperature : 155 ±1 ºC
Sp.Gr of Bitumen (T) : 1.03 Gmm Test V : 2.366 B.F.Taeknees : 9.132 Compaction : 75 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Stability Marshall Rasio
VIM V.M.A VFB
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Meas Adjust Flow Quotien Lolos
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm ) 200
A B C D E F G H I J K L M N O P Q S
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.577 2.562 0.065 6.067 2.366 1208.9 688.4 1213.2 524.8 2.304 2.63 14.97 82.40 120 1587 3.1 512.1
2 1200.4 686.9 1207.5 520.6 2.306 2.54 14.89 82.94 102 1349 2.8 481.9
3 1210.4 692.4 1218.0 525.6 2.303 2.66 14.99 82.24 95 1257 3.0 418.9

Average 2.304 2.62 14.95 82.50 1398 3.0 471.2 0.93

Average
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 06 Juli 2022


Date of Test : 06 Juli 2022
MAXIMUM SPECIFIC GRAVITY OF BITUMENOUS PAVING
Tipe of Mix : AC - BC ( AASHTO - T.209 )

No SAMPLE No. I II

A Weight of Sample and Bowl Gram 1370.7 1370.2

B Weight of Bowl Gram 823.4 815.6

C Weight of Sample (A-B) Gram 547.3 554.6

D Weight of Bowl and Sample in Water Gram 806.1 811.5

E Weight of Bowl in Water Gram 490.3 490.7

F Weight of Sample in Water (D-E) Gram 315.8 320.8

G Volume of Sample (C-F) Gram 231.5 233.8

H Max Specific Gravity (C/G) Gram/cc 2.364 2.372

I Temperature of Water ° C 29 28

J Corection of Temperature ° C 0.9989 0.9992

K Max Specific Gravity (HxJ) Gram/cc 2.362 2.370

L Average Gram/cc 2.366

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 06 Juli 2022


Date of Test : 06 Juli 2022
PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Tipe of Mix : AC - BC
Penetration of Bitumen : 60 - 70 Bulk Sp.Gr U : 2.558 Surfase Area : 6.206 Temp : 155 ±1 ºC Lolos 200 5.81
Sp.Gr of Bitumen (T) : 1.03 Gmm Test V : 2.366 B.F.Taeknees : 9.132 Comp : 75 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Stability Marshall Rasio
VIM V.M.A VFB
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Meas Adjust Flow Quotien Lolos
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm ) 200
A B C D E F G H I J K L M N O P Q S
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.577 2.562 0.065 6.067 2.366 1205.7 673.4 1208.8 535.4 2.252 4.8 16.9 71.5 122 1614.0 3.1
2 1203.2 671.9 1206.9 535.0 2.249 4.9 17.0 70.9 128 1693.3 2.8
3 1195.1 668.0 1198.2 530.2 2.254 4.7 16.8 71.9 105 1389.1 3.0
Average 2.252 4.8 16.9 71.4 1565.4 3.0 527.7 1.0
1 5.577 2.562 0.065 6.067 2.366 1203.4 670.3 1204.7 534.4 2.252 4.8 16.9 71.4 108 1428.7 4.0
2 1199.0 667.5 1200.4 532.9 2.250 4.9 16.9 71.1 115 1521.3 3.8
3 1192.8 667.8 1196.8 529.0 2.255 4.7 16.8 72.0 97 1283.2 4.0
2.252 4.8 16.9 71.5 1411.1 3.9 358.8 1.0

1411
Retained Marshalt Stability after 24 hours soaking at 60 C ( % ) 90.14 %
1565

SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc
: 06 Juli 2022
Date of Test
: 07 Juli 2022 FIELD DENSITY TEST AND THICKNESS CONTROL
Tipe of Mix : AC - BC BY CORE DRILL MACHINE
DATE THICKNESS WEIGHT ( Gram ) VOLUME DENSITY DEGREE OF COMPAC
NO.
STATION PASSING L/R IN IN S.S.D OF FIELD LAB ( %)
PAVING CORE ( Cm )
AIR WATER SPECIMEN (Gr/cm³ ) (Gr/cm³ ) RESULT
SPEC
A B C D=C-B E=A/D F G=(E/F)*100
,06/7/22 ,07/7/22 1 6.8 13 + 150 R 1127.1 622.2 1131.0 508.8 2.215 2.252 98.4 > 98
2 7.2 13 + 100 R 1144.2 631.8 1147.7 515.9 2.218 2.252 98.5
3 6.7 13 + 050 R 1070.7 592.8 1074.0 481.2 2.225 2.252 98.8
4 6.7 13 + 000 R 1180.6 651.9 1183.5 531.6 2.221 2.252 98.6
5 8.0 12 + 950 R 1373.3 758.0 1376.9 618.9 2.219 2.252 98.5
6 6.1 12 + 900 R 959.9 531.8 963.0 431.2 2.226 2.252 98.9

6.9 2.221 2.252 98.6

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Production : 12 Juli 2022


Date of Test : 12 Juli 2022
HOT - BIN GRADING
Tipe of Mix : AC - BC
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV SEMEN
1
Weight 1191.9 Gram Weight 2660.6 Gram Weight 2683.7 Gram Weight 2678.7 Gram Weight Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
1" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0
3/4" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 245.3 9.2 90.8
1/2" 0.0 0.0 100.0 0.0 0.0 100.0 769.8 28.7 71.3 1928.0 72.0 28.0
3/8" 0.0 0.0 100.0 0.0 0.0 100.0 1355.4 50.5 49.5 2106.5 78.6 21.4
# 4. 209.1 17.5 82.5 739.8 27.8 72.2 1916.7 71.4 28.6 2369.5 88.5 11.5
# 8. 303.9 25.5 74.5 865.3 32.5 67.5 2328.1 86.7 13.3 2613.7 97.6 2.4
# 16. 462.1 38.8 61.2 1630.1 61.3 38.7 2610.9 97.3 2.7 2615.6 97.6 2.4
# 30. 644.5 54.1 45.9 2218.7 83.4 16.6 2611.3 97.3 2.7 2617.0 97.7 2.3
# 50. 762.8 64.0 36.0 2580.4 97.0 3.0 2617.4 97.5 2.5 2618.1 97.7 2.3
# 100. 909.7 76.3 23.7 2598.3 97.7 2.3 2618.2 97.6 2.4 2619.5 97.8 2.2
# 200. 972.6 81.6 18.4 2606.5 98.0 2.0 2622.6 97.7 2.3 2621.2 97.9 2.1
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV SEMEN
2
Weight 1041.5 Gram Weight 2619.8 Gram Weight 2653.1 Gram Weight 2645.50 Gram Weight Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
1" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0
3/4" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 180.5 6.8 93.2
1/2" 0.0 0.0 100.0 0.0 0.0 100.0 737.7 27.8 72.2 1927.1 72.8 27.2
3/8" 0.0 0.0 100.0 0.0 0.0 100.0 1340.4 50.5 49.5 2086.7 78.9 21.1
# 4. 197.8 19.0 81.0 722.7 27.6 72.4 1910.9 72.0 28.0 2344.6 88.6 11.4
# 8. 298.9 28.7 71.3 846.5 32.3 67.7 2317.4 87.3 12.7 2615.7 98.9 1.1
# 16. 370.1 35.5 64.5 1625.4 62.0 38.0 2612.2 98.5 1.5 2617.9 99.0 1.0
# 30. 546.7 52.5 47.5 2225.8 85.0 15.0 2617.8 98.7 1.3 2621.3 99.1 0.9
# 50. 670.9 64.4 35.6 2566.6 98.0 2.0 2621.2 98.8 1.2 2626.6 99.3 0.7
# 100. 812.4 78.0 22.0 2571.2 98.1 1.9 2624.5 98.9 1.1 2633.4 99.5 0.5
# 200. 887.5 85.2 14.8 2594.3 99.0 1.0 2637.5 99.4 0.6 2639.8 99.8 0.2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 12 Juli 2022


Date of Test : 12 Juli 2022
COMBINE GRADING CHART
Tipe of Mix : AC - BC
AVERAGE
HOT BIN
FILLER ASB
SIEVE I II III IV
200 100 50 30 16 8 4 3/8" 1/2" 3/4"
SIZE % PASS % PASS % PASS % PASS % PASS % PASS
100
2" 90 1"
1 1/2" 80
1" 100 100 100 100.0 100 70
3/4" 100 100 100 92.0 100
60
1/2" 100 100 71.8 27.6 100 SPECK
3/8" 100 100 49.5 21.2 100 50 HOT BIN
JMF
# 4. 81.7 72.3 28.3 11.5 100 40
# 8. 72.9 67.6 13.0 1.8 100 30
# 16. 62.8 38.3 2.1 1.7 100
20
# 30. 46.7 15.8 2.0 1.6 70.3
# 50. 35.8 2.5 1.8 1.5 47.2 10
# 100. 22.8 2.1 1.8 1.3 11.7 0
# 200. 16.6 1.5 1.4 1.2 2.4

HOT BIN AGGREGATE COMBINE


SIEVE SIZE 2½" 2" 1½" 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
HOT - BIN. I 30.0% 30.0 30.0 30.0 24.5 21.9 18.9 14.0 10.7 6.9 5.0
HOT - BIN. II 22.0% 22.0 22.0 22.0 15.9 14.9 8.4 3.5 0.6 0.5 0.3
HOT - BIN. III 30.0% 30.0 21.5 14.8 8.5 3.9 0.6 0.6 0.6 0.5 0.4
HOT - BIN. IV 18.0% 16.6 5.0 3.8 2.1 0.3 0.3 0.3 0.3 0.2 0.2
FILLER

COMBINE GRADING 100.0 98.6 78.5 70.7 51.0 40.9 28.2 18.4 12.1 8.1 6.0
JOB MIX FORMULA 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7

SPECIFICATION 100 90-100 75 ~ 90 66 ~ 82 46 ~ 64 30 ~ 49 18 ~ 38 12 ~ 28 7 ~ 20 5 ~13 4~8


Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 12 Juli 2022


Date of Test : 12 Juli 2022
ASPHALT EXTRACTION & SIEVE ANALYSIS
Tipe of Mix : AC - BC ASPHALT EXTRACTION
MIX MATERIAL EXTRACTION FILTER ( OVEN - DRIED )
CONTOH BITUMEN IN MIX
WEIGHT ( Gram ) WEIGHT ( Gram ) TOTAL
MATERIAL
BEFORE AFTER DIFFERENCE BEFORE AFTER DIFFERENCE WEIGHT % BIT IN MIX ( Gram )
I
A B C=A-B D E F=E-D G=C-F H = ( G / A )*100

1 524.5 494.8 29.7 4.5 4.9 0.4 29.3 5.586 495.2

2 521.3 491.8 29.5 4.5 5.0 0.5 29.0 5.563 492.3

Total 1045.8 986.6 59.2 9.0 9.9 0.9 58.3

Average 5.575 493.8

SIEVE ANALYSIS

SIEVE SIZE 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.

Weight Retained 0.0 19.9 115.4 159.5 249.1 321.3 377.0 409.5 441.4 457.8 465.6

Percent Retained 0.0 4.0 23.4 32.3 50.5 65.1 76.4 82.9 89.4 92.7 94.3
I
Percent Passing 100.0 96.0 76.6 67.7 49.5 34.9 23.6 17.1 10.6 7.3 5.7

Job Mix Formula 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7

Surfase Area = 5.305

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 12 Juli 2022


Date of Test : 12 Juli 2022 PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Tipe of Mix : AC - BC
Penetration of Bitumen : Bulk Sp.Gr U : 2.558 Surfase Area : 5.305 Temperature : 155 ±1 ºC
Sp.Gr of Bitumen (T) : 1.03 Gmm Test V : 2.365 B.F.Taeknees : 10.716 Compaction : 75 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Stability Marshall Rasio
VIM V.M.A VFB
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Meas Adjust Flow Quotien Lolos
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm ) 200
A B C D E F G H I J K L M N O P Q S
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.575 2.561 0.045 6.084 2.365 1201.3 684.3 1205.3 521.0 2.306 2.50 14.89 83.20 100 1323 3.2 413.4
2 1197.1 682.8 1202.6 519.8 2.303 2.62 14.99 82.53 97 1283 3.6 356.5
3 1200.2 685.2 1206.6 521.4 2.302 2.67 15.03 82.26 95 1257 3.3 380.8

Average 2.304 2.58 14.97 82.79 1288 3.4 382.5 0.93

Average
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 12 Juli 2022


Date of Test : 12 Juli 2022
MAXIMUM SPECIFIC GRAVITY OF BITUMENOUS PAVING
Tipe of Mix : AC - BC ( AASHTO - T.209 )

No SAMPLE No. I II

A Weight of Sample and Bowl Gram 1370.7 1370.2

B Weight of Bowl Gram 823.4 815.6

C Weight of Sample (A-B) Gram 547.3 554.6

D Weight of Bowl and Sample in Water Gram 806.8 810.6

E Weight of Bowl in Water Gram 490.3 490.7

F Weight of Sample in Water (D-E) Gram 316.5 319.9

G Volume of Sample (C-F) Gram 230.8 234.7

H Max Specific Gravity (C/G) Gram/cc 2.371 2.363

I Temperature of Water ° C 29 28

J Corection of Temperature ° C 0.9989 0.9992

K Max Specific Gravity (HxJ) Gram/cc 2.369 2.361

L Average Gram/cc 2.365

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 12 Juli 2022


Date of Test : 12 Juli 2022
PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Tipe of Mix : AC - BC
Penetration of Bitumen : 60 - 70 Bulk Sp.Gr U : 2.558 Surfase Area : 5.305 Temp : 155 ±1 ºC Lolos 200 5.95
Sp.Gr of Bitumen (T) : 1.03 Gmm Test V : 2.365 B.F.Taeknees : 10.716 Comp : 75 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Stability Marshall Rasio
VIM V.M.A VFB
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Meas Adjust Flow Quotien Lolos
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm ) 200
A B C D E F G H I J K L M N O P Q S
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.575 2.561 0.045 6.084 2.365 1204.0 678.5 1213.7 535.2 2.250 4.9 17.0 71.3 97 1283.2 3.3
2 1198.2 675.8 1207.5 531.7 2.254 4.7 16.8 72.0 90 1190.6 3.6
3 1210.4 683.5 1220.6 537.1 2.254 4.7 16.8 72.0 99 1309.7 3.1
Average 2.252 4.8 16.9 71.7 1261.2 3.3 378.4 1.1
1 5.575 2.561 0.045 6.084 2.365 1200.9 678.6 1212.3 533.7 2.250 4.9 16.9 71.3 85 1124.5 3.9
2 1207.3 679.6 1215.2 535.6 2.254 4.7 16.8 72.1 92 1217.1 3.6
3 1199.3 671.9 1204.3 532.4 2.253 4.7 16.8 71.8 91 1203.8 4.0
2.252 4.8 16.9 71.8 1181.8 3.8 308.3 1.1

1182
Retained Marshalt Stability after 24 hours soaking at 60 C ( % ) 93.71 %
1261

SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc
: 12 Juli 2022
Date of Test
: 13 Juli 2022 FIELD DENSITY TEST AND THICKNESS CONTROL
Tipe of Mix : AC - BC BY CORE DRILL MACHINE
DATE THICKNESS WEIGHT ( Gram ) VOLUME DENSITY DEGREE OF COMPAC
NO.
( Cm ) STATION PASSING L/R IN IN S.S.D OF FIELD LAB ( %)
PAVING CORE
AIR WATER SPECIMEN (Gr/cm³ ) (Gr/cm³ ) RESULT
SPEC
A B C D=C-B E=A/D F G=(E/F)*100
,12/7/22 ,13/7/22 1 6.9 13 + 800 L 1216.8 670.1 1220.4 550.3 2.211 2.252 98.2 > 98
2 6.0 13 + 850 L 1003.2 554.1 1006.4 452.3 2.218 2.252 98.5
3 7.1 13 + 900 L 1214.2 670.5 1217.2 546.7 2.221 2.252 98.6
4 7.6 13 + 940 L 1290.5 709.8 1294.0 584.2 2.209 2.252 98.1

6.9 2.215 2.252 98.35

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Production : 14 Juli 2022


Date of Test : 14 Juli 2022
HOT - BIN GRADING
Tipe of Mix : AC - BC
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV SEMEN
1
Weight 1162.7 Gram Weight 1175.3 Gram Weight 1348.2 Gram Weight 1984.2 Gram Weight Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
1" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0
3/4" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 482.4 24.3 75.7
1/2" 0.0 0.0 100.0 0.0 0.0 100.0 193.7 14.4 85.6 1742.2 87.8 12.2
3/8" 0.0 0.0 100.0 0.0 0.0 100.0 545.1 40.4 59.6 1974.1 99.5 0.5
# 4. 0.0 0.0 100.0 317.4 27.0 73.0 1309.7 97.1 2.9 1976.0 99.6 0.4
# 8. 1.5 0.1 99.9 914.9 77.8 22.2 1340.6 99.4 0.6 1976.0 99.6 0.4
# 16. 179.5 15.4 84.6 1139.3 96.9 3.1 1345.6 99.8 0.2 1976.0 99.6 0.4
# 30. 489.1 42.1 57.9 1171.9 99.7 0.3 1346.3 99.9 0.1 1976.0 99.6 0.4
# 50. 683.8 58.8 41.2 1172.9 99.8 0.2 1346.8 99.9 0.1 1976.0 99.6 0.4
# 100. 911.6 78.4 21.6 1173.4 99.8 0.2 1346.8 99.9 0.1 1976.0 99.6 0.4
# 200. 938.0 80.7 19.3 1173.7 99.9 0.1 1346.8 99.9 0.1 1976.0 99.6 0.4
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV SEMEN
2
Weight 1102.5 Gram Weight 1112.7 Gram Weight 1281.3 Gram Weight 1931.9 Gram Weight Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
1" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0
3/4" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 331.2 17.1 82.9
1/2" 0.0 0.0 100.0 0.0 0.0 100.0 189.4 14.8 85.2 1621.8 83.9 16.1
3/8" 0.0 0.0 100.0 0.0 0.0 100.0 524.0 40.9 59.1 1928.8 99.8 0.2
# 4. 0.0 0.0 100.0 306.7 27.6 72.4 1254.1 97.9 2.1 1929.7 99.9 0.1
# 8. 1.9 0.2 99.8 864.1 77.7 22.3 1275.4 99.5 0.5 1929.7 99.9 0.1
# 16. 158.2 14.3 85.7 1075.4 96.6 3.4 1278.4 99.8 0.2 1929.7 99.9 0.1
# 30. 441.1 40.0 60.0 1109.5 99.7 0.3 1278.4 99.8 0.2 1929.7 99.9 0.1
# 50. 624.5 56.6 43.4 1110.3 99.8 0.2 1278.4 99.8 0.2 1929.7 99.9 0.1
# 100. 852.0 77.3 22.7 1110.9 99.8 0.2 1278.4 99.8 0.2 1929.7 99.9 0.1
# 200. 908.9 82.4 17.6 1111.5 99.9 0.1 1278.4 99.8 0.2 1929.7 99.9 0.1
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 14 Juli 2022


Date of Test : 14 Juli 2022
COMBINE GRADING CHART
Tipe of Mix : AC - BC
AVERAGE
HOT BIN
FILLER ASB
SIEVE I II III IV
200 100 50 30 16 8 4 3/8" 1/2" 3/4"
SIZE % PASS % PASS % PASS % PASS % PASS % PASS
100
2" 90 1"
1 1/2" 80
1" 100 100 100 100.0 100 70
3/4" 100 100 100 79.3 100
60
1/2" 100 100 85.4 14.1 100 SPECK
3/8" 100 100 59.3 0.3 100 50 HOT BIN
JMF
# 4. 100.0 72.7 2.5 0.3 100 40
# 8. 99.8 22.2 0.5 0.3 100 30
# 16. 85.1 3.2 0.2 0.3 100
20
# 30. 59.0 0.3 0.2 0.3 70.3
# 50. 42.3 0.2 0.2 0.3 47.2 10
# 100. 22.2 0.2 0.2 0.3 11.7 0
# 200. 18.4 0.1 0.2 0.3 2.4

HOT BIN AGGREGATE COMBINE


SIEVE SIZE 2½" 2" 1½" 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
HOT - BIN. I 30.0% 30.0 30.0 30.0 30.0 30.0 25.5 17.7 12.7 6.6 5.5
HOT - BIN. II 22.0% 22.0 22.0 22.0 16.0 4.9 0.7 0.1 0.0 0.0 0.0
HOT - BIN. III 30.0% 30.0 25.6 17.8 0.7 0.2 0.1 0.1 0.0 0.0 0.0
HOT - BIN. IV 18.0% 14.3 2.5 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FILLER

COMBINE GRADING 100.0 96.3 80.2 69.9 46.8 35.1 26.3 17.9 12.8 6.8 5.7
JOB MIX FORMULA 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7

SPECIFICATION 100 90-100 75 ~ 90 66 ~ 82 46 ~ 64 30 ~ 49 18 ~ 38 12 ~ 28 7 ~ 20 5 ~13 4~8


Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 14 Juli 2022


Date of Test : 14 Juli 2022
ASPHALT EXTRACTION & SIEVE ANALYSIS
Tipe of Mix : AC - BC ASPHALT EXTRACTION
MIX MATERIAL EXTRACTION FILTER ( OVEN - DRIED )
CONTOH BITUMEN IN MIX
WEIGHT ( Gram ) WEIGHT ( Gram ) TOTAL
MATERIAL
BEFORE AFTER DIFFERENCE BEFORE AFTER DIFFERENCE WEIGHT % BIT IN MIX ( Gram )
I
A B C=A-B D E F=E-D G=C-F H = ( G / A )*100

1 544.1 513.6 30.5 4.6 4.9 0.3 30.2 5.550 513.9

2 542.7 512.0 30.7 4.6 5.1 0.5 30.2 5.565 512.5

Total 1086.8 1025.6 61.2 9.2 10.0 0.8 60.4

Average 5.558 513.2

SIEVE ANALYSIS

SIEVE SIZE 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.

Weight Retained 0.0 17.7 114.2 169.7 248.9 328.4 380.5 424.7 457.8 471.2 486.3

Percent Retained 0.0 3.4 22.3 33.1 48.5 64.0 74.1 82.8 89.2 91.8 94.8
I
Percent Passing 100.0 96.6 77.7 66.9 51.5 36.0 25.9 17.2 10.8 8.2 5.2

Job Mix Formula 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7

Surfase Area = 5.319

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 14 Juli 2022


Date of Test : 14 Juli 2022 PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Tipe of Mix : AC - BC
Penetration of Bitumen : Bulk Sp.Gr U : 2.558 Surfase Area : 5.319 Temperature : 155 ±1 ºC
Sp.Gr of Bitumen (T) : 1.03 Gmm Test V : 2.366 B.F.Taeknees : 10.617 Compaction : 75 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Stability Marshall Rasio
VIM V.M.A VFB
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Meas Adjust Flow Quotien Lolos
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm ) 200
A B C D E F G H I J K L M N O P Q S
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.558 2.562 0.064 6.047 2.366 1203.5 684.0 1206.5 522.5 2.303 2.67 14.96 82.17 80 1058 3.5 302.4
2 1198.7 682.0 1202.7 520.7 2.302 2.72 15.01 81.87 102 1349 3.3 408.9
3 1196.0 681.7 1199.9 518.2 2.308 2.47 14.79 83.29 78 1032 3.9 264.6

Average 2.304 2.64 14.92 82.31 1147 3.6 321.5 0.94

Average
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 14 Juli 2022


Date of Test : 14 Juli 2022
MAXIMUM SPECIFIC GRAVITY OF BITUMENOUS PAVING
Tipe of Mix : AC - BC ( AASHTO - T.209 )

No SAMPLE No. I II

A Weight of Sample and Bowl Gram 1370.7 1370.2

B Weight of Bowl Gram 823.4 815.6

C Weight of Sample (A-B) Gram 547.3 554.6

D Weight of Bowl and Sample in Water Gram 807.1 810.6

E Weight of Bowl in Water Gram 490.3 490.7

F Weight of Sample in Water (D-E) Gram 316.8 319.9

G Volume of Sample (C-F) Gram 230.5 234.7

H Max Specific Gravity (C/G) Gram/cc 2.374 2.363

I Temperature of Water ° C 29 28

J Corection of Temperature ° C 0.9989 0.9992

K Max Specific Gravity (HxJ) Gram/cc 2.372 2.361

L Average Gram/cc 2.366

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 14 Juli 2022


Date of Test : 14 Juli 2022
PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Tipe of Mix : AC - BC
Penetration of Bitumen : 60 - 70 Bulk Sp.Gr U : 2.558 Surfase Area : 5.319 Temp : 155 ±1 ºC Lolos 200 5.66
Sp.Gr of Bitumen (T) : 1.03 Gmm Test V : 2.366 B.F.Taeknees : 10.617 Comp : 75 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Stability Marshall Rasio
VIM V.M.A VFB
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Meas Adjust Flow Quotien Lolos
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm ) 200
A B C D E F G H I J K L M N O P Q S
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.558 2.562 0.064 6.047 2.366 1198.6 673.1 1205.2 532.1 2.253 4.81 16.83 71.41 99 1309.7 3.5
2 1201.0 674.7 1208.2 533.5 2.251 4.87 16.89 71.15 101 1336.1 3.2
3 1202.1 675.3 1208.8 533.5 2.253 4.78 16.81 71.54 102 1349.4 3.4
Average 2.252 4.82 16.84 71.37 1331.7 3.4 395.6 1.1
1 5.558 2.562 0.064 6.047 2.366 1196.2 668.2 1199.8 531.6 2.250 4.91 16.92 70.97 87 1150.9 3.4
2 1205.8 673.8 1209.3 535.5 2.252 4.85 16.87 71.25 92 1217.1 3.8
3 1193.3 667.6 1197.0 529.4 2.254 4.75 16.78 71.69 93 1230.3 4.0
2.252 4.84 16.86 71.30 1199.4 3.7 321.3 1.1

1199
Retained Marshalt Stability after 24 hours soaking at 60 C ( % ) 90.07 %
1332

SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc
: 14 Juli 2022
Date of Test
: 15 Juli 2022 FIELD DENSITY TEST AND THICKNESS CONTROL
Tipe of Mix : AC - BC BY CORE DRILL MACHINE
DATE THICKNESS WEIGHT ( Gram ) VOLUME DENSITY DEGREE OF COMPAC
NO.
( Cm ) STATION PASSING L/R IN IN S.S.D OF FIELD LAB ( %)
PAVING CORE
AIR WATER SPECIMEN (Gr/cm³ ) (Gr/cm³ ) RESULT
SPEC
A B C D=C-B E=A/D F G=(E/F)*100
,14/7/22 ,15/7/22 1 5.9 13 + 750 L-L 1007.2 560.2 1012.9 452.7 2.225 2.252 98.8 > 98
2 5.8 13 + 700 L-R 929.3 513.7 932.5 418.8 2.219 2.252 98.5
3 7.2 13 + 650 L-T 1185.6 656.6 1189.0 532.4 2.227 2.252 98.9
4 7.4 13 + 600 L-L 1330.5 734.1 1337.0 602.9 2.207 2.252 98.0
5 7.0 13 + 550 L-T 1148.6 634.0 1152.1 518.1 2.217 2.252 98.4
6 9.0 13 + 500 L-L 1501.4 831.3 1504.5 673.2 2.230 2.252 99.0
7 6.6 13 + 450 L-R 1120.6 624.2 1124.4 500.2 2.240 2.252 99.5

7.0 2.224 2.252 98.74

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Production : 15 Juli 2022


Date of Test : 15 Juli 2022
HOT - BIN GRADING
Tipe of Mix : AC - BC
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV SEMEN
1
Weight 1268.9 Gram Weight 2740.4 Gram Weight 2669.8 Gram Weight 2720.9 Gram Weight Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
1" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0
3/4" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 238.9 8.8 91.2
1/2" 0.0 0.0 100.0 0.0 0.0 100.0 744.5 27.9 72.1 1880.8 69.1 30.9
3/8" 0.0 0.0 100.0 0.0 0.0 100.0 1323.3 49.6 50.4 2093.1 76.9 23.1
# 4. 213.5 16.8 83.2 681.4 24.9 75.1 1850.6 69.3 30.7 2399.9 88.2 11.8
# 8. 384.1 30.3 69.7 971.9 35.5 64.5 2341.7 87.7 12.3 2640.7 97.1 2.9
# 16. 525.5 41.4 58.6 1933.3 70.5 29.5 2587.6 96.9 3.1 2647.0 97.3 2.7
# 30. 668.4 52.7 47.3 2248.5 82.1 17.9 2618.0 98.1 1.9 2655.6 97.6 2.4
# 50. 799.8 63.0 37.0 2679.0 97.8 2.2 2626.9 98.4 1.6 2669.8 98.1 1.9
# 100. 1030.3 81.2 18.8 2688.3 98.1 1.9 2634.7 98.7 1.3 2672.3 98.2 1.8
# 200. 1087.5 85.7 14.3 2692.3 98.2 1.8 2637.5 98.8 1.2 2674.5 98.3 1.7
HOT BIN. I HOT BIN. II HOT BIN. III HOT BIN. IV SEMEN
2
Weight 1090.9 Gram Weight 2768.9 Gram Weight 2645.7 Gram Weight 2693.7 Gram Weight Gram
SIEVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE CUMULATIVE
SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS
1" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0
3/4" 0.0 0.0 100.0 0.0 0.0 100.0 0.0 0.0 100.0 199.9 7.4 92.6
1/2" 0.0 0.0 100.0 0.0 0.0 100.0 730.5 27.6 72.4 1857.2 68.9 31.1
3/8" 0.0 0.0 100.0 0.0 0.0 100.0 1319.4 49.9 50.1 2077.1 77.1 22.9
# 4. 209.4 19.2 80.8 670.9 24.2 75.8 1849.6 69.9 30.1 2378.2 88.3 11.7
# 8. 351.5 32.2 67.8 860.4 31.1 68.9 2342.1 88.5 11.5 2637.9 97.9 2.1
# 16. 527.6 48.4 51.6 1633.6 59.0 41.0 2588.6 97.8 2.2 2646.4 98.2 1.8
# 30. 619.0 56.7 43.3 2248.7 81.2 18.8 2622.2 99.1 0.9 2657.5 98.7 1.3
# 50. 702.1 64.4 35.6 2675.0 96.6 3.4 2630.0 99.4 0.6 2664.0 98.9 1.1
# 100. 833.4 76.4 23.6 2688.3 97.1 2.9 2637.8 99.7 0.3 2669.8 99.1 0.9
# 200. 880.7 80.7 19.3 2695.4 97.3 2.7 2641.7 99.8 0.2 2674.5 99.3 0.7
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 15 Juli 2022


Date of Test : 15 Juli 2022
COMBINE GRADING CHART
Tipe of Mix : AC - BC
AVERAGE
HOT BIN
FILLER ASB
SIEVE I II III IV
200 100 50 30 16 8 4 3/8" 1/2" 3/4"
SIZE % PASS % PASS % PASS % PASS % PASS % PASS
100
2" 90 1"
1 1/2" 80
1" 100 100 100 100.0 100 70
3/4" 100 100 100 91.9 100
60
1/2" 100 100 72.3 31.0 100 SPECK
3/8" 100 100 50.3 23.0 100 50 HOT BIN
JMF
# 4. 82.0 75.5 30.4 11.8 100 40
# 8. 68.8 66.7 11.9 2.5 100 30
# 16. 55.1 35.2 2.6 2.2 100
20
# 30. 45.3 18.4 1.4 1.9 70.3
# 50. 36.3 2.8 1.1 1.5 47.2 10
# 100. 21.2 2.4 0.8 1.3 11.7 0
# 200. 16.8 2.2 0.7 1.2 2.4

HOT BIN AGGREGATE COMBINE


SIEVE SIZE 2½" 2" 1½" 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.
HOT - BIN. I 30.0% 30.0 30.0 30.0 24.6 20.6 16.5 13.6 10.9 6.4 5.0
HOT - BIN. II 22.0% 22.0 22.0 22.0 16.6 14.7 7.7 4.0 0.6 0.5 0.5
HOT - BIN. III 30.0% 30.0 21.7 15.1 9.1 3.6 0.8 0.4 0.3 0.2 0.2
HOT - BIN. IV 18.0% 16.5 5.6 4.1 2.1 0.5 0.4 0.3 0.3 0.2 0.2
FILLER

COMBINE GRADING 100.0 98.5 79.2 71.2 52.4 39.3 25.5 18.4 12.1 7.4 5.9
JOB MIX FORMULA 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7

SPECIFICATION 100 90-100 75 ~ 90 66 ~ 82 46 ~ 64 30 ~ 49 18 ~ 38 12 ~ 28 7 ~ 20 5 ~13 4~8


Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 15 Juli 2022


Date of Test : 15 Juli 2022
ASPHALT EXTRACTION & SIEVE ANALYSIS
Tipe of Mix : AC - BC ASPHALT EXTRACTION
MIX MATERIAL EXTRACTION FILTER ( OVEN - DRIED )
CONTOH BITUMEN IN MIX
WEIGHT ( Gram ) WEIGHT ( Gram ) TOTAL
MATERIAL
BEFORE AFTER DIFFERENCE BEFORE AFTER DIFFERENCE WEIGHT % BIT IN MIX ( Gram )
I
A B C=A-B D E F=E-D G=C-F H = ( G / A )*100

1 524.0 494.2 29.8 4.6 5.1 0.5 29.3 5.592 494.7

2 544.6 514.0 30.6 4.6 5.0 0.4 30.2 5.545 514.4

Total 1068.6 1008.2 60.4 9.2 10.1 0.9 59.5

Average 5.568 504.6

SIEVE ANALYSIS

SIEVE SIZE 1" 3/4" 1/2" 3/8" # 4. # 8. # 16. # 30. # 50. # 100 # 200.

Weight Retained 0.0 17.9 101.2 170.7 251.6 325.4 380.9 415.3 456.6 469.0 474.3

Percent Retained 0.0 3.5 20.1 33.8 49.9 64.5 75.5 82.3 90.5 93.0 94.0
I
Percent Passing 100.0 96.5 79.9 66.2 50.1 35.5 24.5 17.7 9.5 7.0 6.0

Job Mix Formula 100.0 95.8 77.0 66.0 49.7 35.5 25.1 17.2 10.5 7.0 5.7

Surfase Area = 5.338

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 15 Juli 2022


Date of Test : 15 Juli 2022 PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Tipe of Mix : AC - BC
Penetration of Bitumen : Bulk Sp.Gr U : 2.558 Surfase Area : 5.338 Temperature : 155 ±1 ºC
Sp.Gr of Bitumen (T) : 1.03 Gmm Test V : 2.364 B.F.Taeknees : 10.668 Compaction : 75 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Stability Marshall Rasio
VIM V.M.A VFB
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Meas Adjust Flow Quotien Lolos
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm ) 200
A B C D E F G H I J K L M N O P Q S
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.568 2.560 0.030 6.091 2.364 1203.5 684.8 1207.3 522.5 2.303 2.58 14.97 82.76 80 1058 3.5 302.4
2 1198.7 680.9 1200.7 519.8 2.306 2.47 14.87 83.42 102 1349 3.3 408.9
3 1196.0 679.3 1199 519.7 2.301 2.67 15.04 82.28 78 1032 3.9 264.6

Average 2.304 2.55 14.96 82.94 1147 3.6 321.5 0.93

Average
SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min 250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 15 Juli 2022


Date of Test : 15 Juli 2022
MAXIMUM SPECIFIC GRAVITY OF BITUMENOUS PAVING
Tipe of Mix : AC - BC ( AASHTO - T.209 )

No SAMPLE No. I II

A Weight of Sample and Bowl Gram 1370.7 1370.2

B Weight of Bowl Gram 823.4 815.6

C Weight of Sample (A-B) Gram 547.3 554.6

D Weight of Bowl and Sample in Water Gram 806.1 811.2

E Weight of Bowl in Water Gram 490.3 490.7

F Weight of Sample in Water (D-E) Gram 315.8 320.5

G Volume of Sample (C-F) Gram 231.5 234.1

H Max Specific Gravity (C/G) Gram/cc 2.364 2.369

I Temperature of Water ° C 29 28

J Corection of Temperature ° C 0.9989 0.9992

K Max Specific Gravity (HxJ) Gram/cc 2.362 2.367

L Average Gram/cc 2.364

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc : 15 Juli 2022


Date of Test : 15 Juli 2022
PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD
Tipe of Mix : AC - BC
Penetration of Bitumen : 60 / 70 Bulk Sp.Gr U : 2.558 Surfase Area : 5.338 Temp : 155 ±1 ºC Lolos 200 5.94
Sp.Gr of Bitumen (T) : 1.03 Gmm Test V : 2.364 B.F.Taeknees : 10.668 Comp : 75 Blows
Bitumen Eff Sp.Gr Absorbed Effective Max Sp.gr Weight ( Gram ) Volume Bulk SpGr Stability Marshall Rasio
VIM V.M.A VFB
No. Content Total agg Bitumen Bitumen Combine In In Of Combine Meas Adjust Flow Quotien Lolos
Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm ) 200
A B C D E F G H I J K L M N O P Q S
100 - a A- 100 100 -
100 - a B-U 100X (100-A)C A + 100-A LAB LAB LAB H - G F (E-J)100 (100-A)J (L-K)100 LAB LAB LAB O
Gmm T BxU 100 T B I E U L P
1 5.568 2.560 0.030 6.091 2.364 1193.3 665.1 1194.1 529.0 2.256 4.59 16.73 72.54 125 1653.6 3.4
2 1193.7 665.3 1196.2 530.9 2.248 4.90 17.00 71.15 99 1309.7 2.9
3 1199.7 668.9 1201.9 533.0 2.251 4.80 16.91 71.60 115 1521.3 3.1
Average 2.252 4.77 16.88 71.76 1494.9 3.1 477.1 1.1
1 5.568 2.560 0.030 6.091 2.364 1196.3 667.6 1198.9 531.3 2.252 4.77 16.88 71.75 118 1561.0 3.3
2 1192.7 666.7 1196.7 530.0 2.250 4.82 16.92 71.52 86 1137.7 3.9
3 1193.3 667.6 1197.2 529.6 2.253 4.70 16.82 72.05 107 1415.5 4.0
2.252 4.76 16.87 71.77 1371.4 3.7 367.3 1.1

1371
Retained Marshalt Stability after 24 hours soaking at 60 C ( % ) 91.74 %
1495

SPECIFICATION < 1.2 > 4.0 3.0 - 5.0 Min 14 Min 65 Min 800 2-4 Min250 0,6~1,2
Acknolaged by: Checked and Approved by: Submitted by:
PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )

Date of Produc
: 15 Juli 2022
Date of Test
: 16 Juli 2022 FIELD DENSITY TEST AND THICKNESS CONTROL
Tipe of Mix : AC - BC BY CORE DRILL MACHINE
DATE THICKNESS WEIGHT ( Gram ) VOLUME DENSITY DEGREE OF COMPAC
NO.
( Cm ) STATION PASSING L/R IN IN S.S.D OF FIELD LAB ( %)
PAVING CORE
AIR WATER SPECIMEN (Gr/cm³ ) (Gr/cm³ ) RESULT
SPEC
A B C D=C-B E=A/D F G=(E/F)*100
,15/7/22 ,,16/7/22 1 5.9 13 + 405 L 1013.3 557.2 1014.8 457.6 2.214 2.252 98.3 > 98
2 7.9 13 + 350 L 1464.8 821.6 1466.4 644.8 2.272 2.252 100.9
3 7.8 13 + 300 L 1375.3 764.4 1378.9 614.5 2.238 2.252 99.4
4 8.8 13 + 250 L 1634.8 913.4 1637.6 724.2 2.257 2.252 100.2
5 8.3 13 + 200 L 1415.1 784.5 1425.0 640.5 2.209 2.252 98.1
6 6.8 13 + 150 L 1207.5 675.7 1208.4 532.7 2.267 2.252 100.7

7.6 2.243 2.252 99.60

Acknolaged by: Checked and Approved by: Submitted by:


PPK 2,6 Provinsi Jawa Timur (Pansela 1) Supervision Consultant Contractor
Package : LOT 6 PRIGI - BTS. KAB. TULUNGAGUNG - KLATAK - BRUMBUN
Contractor : PT. PP ( Persero ) Tbk.
Consultant : PT. VIRAMA KARYA ( Persero )
REKAPITULASI LAPORAN HARIAN AC - BC

Tanggal Kadar Extraksi Marshall Aspal Partikel


GMM
No. Aspal CA FA FF VIM VMA VFB Density Stabilitas Flow Effektif Ratio
Produksi
(%) (%) (%) (%) ( Gr/cc ) (%) (%) (%) ( gr/cc ) ( Kg ) ( mm ) (%) (%)
1 02 Juli 22 5.598 50.5 43.0 6.5 2.365 4.76 16.88 71.83 2.252 1442.0 3.3 6.10 1.06
2 04 Juli 22 5.568 49.1 44.8 6.0 2.364 4.78 16.89 71.72 2.251 1367.0 3.4 6.09 0.99
3 05 Juli 22 5.585 49.0 44.5 6.5 2.364 4.71 16.87 72.07 2.252 1693.3 3.7 6.11 1.10
4 06 Juli 22 5.577 48.3 45.9 5.8 2.366 4.83 16.88 71.41 2.252 1565.4 3.0 6.07 0.96
5 12 Juli 22 5.575 50.5 43.8 5.7 2.365 4.76 16.86 71.74 2.252 1261.2 3.3 6.08 1.10
6 14 Juli 22 5.558 48.5 46.3 5.2 2.366 4.82 16.84 71.37 2.252 1331.7 3.4 6.05 1.10
7 15 Juli 22 5.568 49.9 44.1 6.0 2.364 4.77 16.88 71.76 2.252 1494.9 3.1 6.09 1.10

Acknolaged by : Checked and Approved by : Submitted by :


PPK.2.6 Provinsi Jatim ( Pansela 1 ) Supervision Consultant Contractor
KALIBRASI PEMAKAIAN ASPAL LAPIS RESAP PENGIKAT ( PRIME COAT )
Tanggal : 01 Juli 2022
UKURAN KERTAS UKURAN BERAT
PANJANG LEBAR LUAS BERAT KERTAS + BERAT PEMAKAIAN BERAT PEMAKAIAN
No. KERTAS P.COAT P.COAT JENIS
(M) (M) ( M² )
( Kg ) ( Kg ) ( Kg ) ( Kg/m² ) ( L TR/m² )
A B C=AXB D E F=E-D G=F/C H I=G/H
1 0.250 0.250 0.0625 0.055 0.118 0.063 1.008 0.9263 1.088

2 0.250 0.250 0.0625 0.056 0.116 0.060 0.960 0.9623 0.998

Rata - Rata 1.043

Acknolaged by : Checked & Approved by : Submitted by :


PPK.2.6 Prov Jatim ( Pansela 1 ) Supervision Consultant Contractor
KALIBRASI PEMAKAIAN ASPAL LAPIS RESAP PENGIKAT ( PRIME COAT )
Tanggal : 03 Juli 2022
UKURAN KERTAS UKURAN BERAT
PANJANG LEBAR LUAS BERAT KERTAS + BERAT PEMAKAIAN BERAT PEMAKAIAN
No. KERTAS P.COAT P.COAT JENIS
(M) (M) ( M² )
( Kg ) ( Kg ) ( Kg ) ( Kg/m² ) ( L TR/m² )
A B C=AXB D E F=E-D G=F/C H I=G/H
1 0.250 0.250 0.0625 0.057 0.119 0.062 0.992 0.9263 1.071

2 0.250 0.250 0.0625 0.055 0.117 0.062 0.992 0.9623 1.031

Rata - Rata 1.051

Acknolaged by : Checked & Approved by : Submitted by :


PPK.2.6 Prov Jatim ( Pansela 1 ) Supervision Consultant Contractor
KALIBRASI PEMAKAIAN ASPAL LAPIS RESAP PENGIKAT ( PRIME COAT )
Tanggal : 04 Juli 2022
UKURAN KERTAS UKURAN BERAT
PANJANG LEBAR LUAS BERAT KERTAS + BERAT PEMAKAIAN BERAT PEMAKAIAN
No. KERTAS P.COAT P.COAT JENIS
(M) (M) ( M² )
( Kg ) ( Kg ) ( Kg ) ( Kg/m² ) ( L TR/m² )
A B C=AXB D E F=E-D G=F/C H I=G/H
1 0.250 0.250 0.0625 0.053 0.115 0.062 0.992 0.9263 1.071

2 0.250 0.250 0.0625 0.054 0.116 0.062 0.992 0.9623 1.031

Rata - Rata 1.051

Acknolaged by : Checked & Approved by : Submitted by :


PPK.2.6 Prov Jatim ( Pansela 1 ) Supervision Consultant Contractor
KALIBRASI PEMAKAIAN ASPAL LAPIS RESAP PENGIKAT ( PRIME COAT )
Tanggal : 05 Juli 2022
UKURAN KERTAS UKURAN BERAT
PANJANG LEBAR LUAS BERAT KERTAS + BERAT PEMAKAIAN BERAT PEMAKAIAN
No. KERTAS P.COAT P.COAT JENIS
(M) (M) ( M² )
( Kg ) ( Kg ) ( Kg ) ( Kg/m² ) ( L TR/m² )
A B C=AXB D E F=E-D G=F/C H I=G/H
1 0.250 0.250 0.0625 0.054 0.118 0.064 1.024 0.9263 1.105

2 0.250 0.250 0.0625 0.056 0.117 0.061 0.976 0.9623 1.014

Rata - Rata 1.060

Acknolaged by : Checked & Approved by : Submitted by :


PPK.2.6 Prov Jatim ( Pansela 1 ) Supervision Consultant Contractor
KALIBRASI PEMAKAIAN ASPAL LAPIS RESAP PENGIKAT ( PRIME COAT )
Tanggal : 11 Juli 2022
UKURAN KERTAS UKURAN BERAT
PANJANG LEBAR LUAS BERAT KERTAS + BERAT PEMAKAIAN BERAT PEMAKAIAN
No. KERTAS P.COAT P.COAT JENIS
(M) (M) ( M² )
( Kg ) ( Kg ) ( Kg ) ( Kg/m² ) ( L TR/m² )
A B C=AXB D E F=E-D G=F/C H I=G/H
1 0.250 0.250 0.0625 0.058 0.119 0.061 0.976 0.9263 1.054

2 0.250 0.250 0.0625 0.059 0.118 0.059 0.944 0.9623 0.981

Rata - Rata 1.017


Acknolaged by : Checked & Approved by : Submitted by :
PPK.2.6 Prov Jatim ( Pansela 1 ) Supervision Consultant Contractor

KALIBRASI PEMAKAIAN ASPAL LAPIS RESAP PENGIKAT ( PRIME COAT )


Tanggal : 13 Juli 2022
UKURAN KERTAS UKURAN BERAT
PANJANG LEBAR LUAS BERAT KERTAS + BERAT PEMAKAIAN BERAT PEMAKAIAN
No. KERTAS P.COAT P.COAT JENIS
(M) (M) ( M² )
( Kg ) ( Kg ) ( Kg ) ( Kg/m² ) ( L TR/m² )
A B C=AXB D E F=E-D G=F/C H I=G/H
1 0.250 0.250 0.0625 0.054 0.115 0.061 0.976 0.9263 1.054

2 0.250 0.250 0.0625 0.054 0.113 0.059 0.944 0.9623 0.981


Rata - Rata 1.017

Acknolaged by : Checked & Approved by : Submitted by :


PPK.2.6 Prov Jatim ( Pansela 1 ) Supervision Consultant Contractor

KALIBRASI PEMAKAIAN ASPAL LAPIS RESAP PENGIKAT ( PRIME COAT )


Tanggal : 14 Juli 2022
UKURAN KERTAS UKURAN BERAT
PANJANG LEBAR LUAS BERAT KERTAS + BERAT PEMAKAIAN BERAT PEMAKAIAN
No. KERTAS P.COAT P.COAT JENIS
(M) (M) ( M² )
( Kg ) ( Kg ) ( Kg ) ( Kg/m² ) ( L TR/m² )
A B C=AXB D E F=E-D G=F/C H I=G/H
1 0.250 0.250 0.0625 0.056 0.116 0.060 0.960 0.9263 1.036

2 0.250 0.250 0.0625 0.058 0.117 0.059 0.944 0.9623 0.981


Rata - Rata 1.009

Acknolaged by : Checked & Approved by : Submitted by :


PPK.2.6 Prov Jatim ( Pansela 1 ) Supervision Consultant Contractor
bj. Aspal 1.03
bj M.T 0.887

100
60 40
1.03 0.887