Routine/

Sr. No.

Non Hazard / Potential


Activity Sub - Activities
Routine hazard Identified
(N/R)

Tower crane
Erection - R Contact with
Foundation Excavation underground utilities

Biological risk of snake


or scorpion
fire in gas /electrical
utilities
ERRECTION & Mobilization of R Hit to person
OPERATION OF mobile cranes and
TOWER CRANE Farana

Toppling of crane
Alignment of mobile R Tilting / collapse of
crane (above 15 Ton) crane

Jib Boom released R Caught in between


from crane by Farana

Hit to person

Person falling from


height

Jib Boom extension R Caught in between/


pinching

Material shifting by R Hit to person


farana.

Fall of Material
Toppling of farana

Erection of first mast R Fall of material from


height while lifting

R Hit to person

R Fall of person , caught


in between when
alignment & resting of
mast.
Erection of further
Masts

Fall of material ( pins ,


R hammer, tommy ) on
person
Fall of person

Erection of cadet R Fall of person from


height

Fall of lifted material


(cadet)
R Fall of person

Erection of Cabin

Fall of lifted material


(cabin)

Erection of Counter R Hit to person


Jib

Hit to temporary
structure ( scaffolding/
existing structure
Desling/ Remove the R Fall of person/ D-
slings shackle

Placing R Fall of counterweight/


counterweight struck to structure

Erection of Main R Hit to person


boom/ jib

Hit to temporary
structure ( scaffolding/
existing structure

Caught in between
Desling/ Remove the R Fall of person/ D-
slings and guide shackle
ropes.

Load Test Fixing the Slings R Caught in between

Collapse of crane

Fall of material

Operation of crane Rig down , Rig up , R Hit to person


Swing
Hit to structure/
obstruction

Fall of lifted object

R Electric Shock / fire


Rope damage

Collision of tower
cranes, Fall of boom,
Tower crane collapse
Exisiting Control Status (As per hirarchy
Probable Causes - (Technical/ Human/
Consequences Behavioral)

Preventative incident control

Fire Extiniguisher

Electrical Shock Absensce of Index Plan


Medical aid centre, Hospital tie up.
Anti-venom kept with hospitals.
Training to workers

Medical treatment case Absensce of Index Plan


Fire Extiniguisher, Training to
burn injuries Absensce of Index Plan workers
Body Injury/ Temporary Unauthorised operator, absence Competency of operator is
/Permanent disability/ of signal man, access not ascertained, authorised signalman
Fatality defined, unfit vehicle/failure of available, vehicle fitness checked
vehicle. as per available checklist, TPC of
lifting tools and tackles

Body Injury/ Temporary Uneven / waterlogged access, Levelled and firm access ensured,
/Permanent disability/ rash driving, tyre conditions, communication regarding access
Fatality unfit crane (brake) confirmed, Driver competency
checked, Crane tyre and brakes
checked, maintain speed limit,
signages followed
Body Injury/ Temporary Base not firm, excavation nearby, Levelled and firm access ensured,
/Permanent disability/ authorised signal man not Driver and operator competency
Fatality /Multiple fatality. available, miscommunication, checked, Outriggers fully extended
Lack of supervision.Incompetent and open, maintain speed limit,
operator , Rash operation, signages followed, Close
Failure of outrigger, Over supervision
confidence.

Cut injury, Pinching Wrong tools, Unskilled, Right tool to rightjob, engage the
untrained worker, Work trained workers, authoried
pressure, overconfidence, Mis signalman, mandatory PPEs with
communication between farana cut resistant gloves.
operator and signalman

Body Injury/ Temporary Pendulum effect of jib boom, Guide ropes tied to jib, Effective
disability Miscommunication communication

Body Injury/ Temporary Harness not used, anchorage Harness used, anchorage point
disability point not available available

Body Injury Secured Platform not used, Secured platform provided,


Overconfidence, negligence Mandatory PPEs with cut resistant
handgloves

Body Injury /Temporary Unauthorised operator, rash Authorised operator , Signal man
/permanent disability/ operation, absence of signal present,defined and clear access,
fatality man, access not defined, guide rope for load, restricted
Pendulum effect entry

Body Injury/ Temporary Failure of tools and tackle, Tools and tackle fitness checked
/permanent disability Material not secured and inspected,Secured material,
clear access.
Body Injury/ Temporary Uneven / waterlogged access, Levelled and firm access ensured,
/Permanent disability/ rash driving, tyre conditions, communication regarding access
Fatality unfit crane (brake) confirmed, Driver competency
checked, Crane tyre and brakes
checked, maintain speed limit,
signages followed

Body Injury/ Temporary Lifting tool and tackle not Inspection of lifting tool and tackle
/Permanent disability/ inspected by competent person. done. Authorised operator,
Fatality Unauthorised operator, authorised riggers, entry
unathorised rigger, entry not restricted.
restricted.

Body Injury/ Temporary Unauthorised signal man, Trained,competent operator and


/Permanent disability/ Miscommunication. signal man , Walky talky in good
Fatality Rash operator, Failure of walky condition.
talky

Body Injury/ Temporary 1. In built ladder not used for 1. Do not use the member being
disability. alignment of the Mast Erection installed for the tie of safety
Dare devil attitude harness.
Untrained , unskilled workers Ladder is used.
Lack of supervision. Trained, skilled workers
2. Full body safety harness with Close supervision.
double lanyard (FBSH) for fall
protection
Unsecured not used. , without
materials
Body Injury, fatality tagline Tagline system and tool kit used
Body injury. Fatality Untrained worker, Harness not Ensure harness worn and
anchored , Negligence, Over anchored by the trained worker,
confidence, Dare devil attitude, close supervision.
Lack of supervision. Work stopped in heavy rain or high
Work during high wind and wind condition.
heavy rain condition

Body injury/ temporary or Hit object to mast Trained operators , signal man,
permanent disability, Harness not anchored competent supervision, walky talky
fatality, Untrained person, medically in good condition,medically fit and
unfit person trained workers, Stop work in
Lack of supervision adverse weather. Reliever
Mis communication , available.
Unauthorised signal man
High wind pressure./ Rain.
Rash / overconfident operation.
Fatigue.

Body Injury/ Permanent Imbalance if Cadet not secured Secured cadet anchoring point,
disability, Fatality by four slings . Inspection of slings done and D-
Failure of sling. shackle,
Rash operator and workers, Lack Ensure authorised operator and
of supervision, Mis signalman , close supervision,
communication, Distraction by Communication gadgets in good
talking on mobile whle operating condition/ substitute
communication arrangement. Use
of mobile during operation is
prohibited.
Body injury/ temporary or Hit object to mast/ person/ Use guide ropes to make cabin
permanent disability, cabindue to pendulum effect and stable, Trained operators , signal
fatality, rash operation. man, competent supervision,
Harness not anchored walky talky in good
Untrained person, medically condition,medically fit and trained
unfit person workers, Stop work in adverse
Lack of supervision weather. Reliever available.
Mis communication ,
Unauthorised signal man
High wind pressure./ Rain.
Rash / overconfident operation.
Fatigue.

Body Injury/ Permanent Imbalance if cabin not secured Secured cabin anchoring point,
disability, Fatality by four slings . Inspection of slings done and D-
Failure of sling. shackle,
Rash operator and workers, Lack Ensure authorised operator and
of supervision, Mis signalman , close supervision,
communication, Distraction by Communication gadgets in good
talking on mobile whle operating condition/ substitute
communication arrangement is
available. Use of mobile during
operation is prohibited.
Body Injury/ Permanent Imbalance if jib is not secured by Maintain CG prior to lifting the
disability, Fatality slings and guide ropes not used material .Secured jib anchoring
on both sides . CG not point, provide guide ropes on both
maintained. ends, Inspection of slings and D-
Failure of sling. shackle done,
Rash operator and workers, Lack Ensure authorised operator and
of supervision, Mis signalman , close supervision,
communication, Distraction by Communication gadgets in good
talking on mobile whle operating condition/ substitute
communication arrangement
available. Use of mobile during
Body Injury/ Permanent Imbalance if jib not secured by C operation is prohibited.
G is maintained, Secured by 2
disability, Fatality two slings and two guide ropes. slings and 2 guide ropes at two
Failure of sling. ends. Tools and tackle inspection
Rash operator and workers, Lack done.Authorised operator ,
of supervision, Mis signalman and trained workers.
communication, Distraction by Stop works on adjacent structures
talking on mobile whle operating coming in the range of movement.
Operator and signalman informed
about locations of
obstructions.Competent
supervision.
Body Injury/ Permanent Dare devil attitude, Authorised workers
disability, Fatality Overconfidence, Medically unfit deployed, ,Right tools to right
and untrained workers, Wrong job,Competent supervison,Harness
tools used, Lack of supervision, anchored, Ensure Tightening of D-
Harness not anchored.Removed Shackle, Provision of water and
D-shackle not tightened properly sugar and salt supplement./
with sling. Fatigue/ dehydration. snacks.

Body Injury/ Permanent Failure of slings, Rash operation, Tools and tackles inspected before
disability, Fatality Miscommunication, use, Authorised operator and
Unauthorised signalman, Lack of signalman, competent supervision,
supervision Overconfidence, Harness anchored.
Harness not anchored.

Body Injury/ Permanent Imbalance if jib is not secured by Maintain CG prior to lifting the
disability, Fatality slings and guide ropes not used material .Secured jib anchoring
on both sides . CG not point, provide guide ropes on both
maintained. ends, Inspection of slings and D-
Failure of sling. shackle done,
Rash operator and workers, Lack Ensure authorised operator and
of supervision, Mis signalman , close supervision,
communication, Distraction by Communication gadgets in good
talking on mobile whle operating condition/ substitute
communication arrangement
available. Use of mobile during
Body Injury/ Permanent Imbalance if jib not secured by C operation is prohibited.
G is maintained, Secured by 2
disability, Fatality two slings and two guide ropes. slings and 2 guide ropes at two
Failure of sling. ends. Tools and tackle inspection
Rash operator and workers, Lack done.Authorised operator ,
of supervision, Mis signalman and trained workers.
communication, Distraction by Stop works on adjacent structures
talking on mobile whle operating coming in the range of movement.
Operator and signalman informed
Pinching/ cut injury Mis alignment of two partial Ensure tommy for
about locations of aligning or
booms to be joined. matching the holes.
obstructions.Competent
Cut resistant hand gloves not Use cut resistant hand gloves.
supervision.
used Trained workers on the job.
Body Injury/ Permanent Dare devil attitude, Authorised workers
disability, Fatality Overconfidence, Medically unfit deployed, ,Right tools to right
and untrained workers, Wrong job,Competent supervison,Harness
tools used, Lack of supervision, anchored, Ensure Tightening of D-
Harness not anchored.Removed Shackle, Provision of water and
D-shackle not tightened properly sugar and salt supplement./
with sling. Fatigue/ dehydration. snacks.

Cut Injury /Pinching Negligence, Miscommunication Trained Workers, Authorised


operator and signalman
Body Injury/ temporary Fixing of pins not done securely, All pins fitment ensured before
or permanent disability / foundation bolt failure. going for load test.
fatality Overloading. Load not exceeding capacity is
Failure of limit switch/ bypassed ensured.
limit switch. Lifting to be done to few inches
Unauthorised operator. initially.
Ensure the functioning of limit
switches.Authorised operator.

Body Injury/ temporary Failure of slings, Rash operation, Inspection of sling


disability / Miscommunication, done,Authorised operator and
Unauthorised signalman, Lack of signal man, Competent
supervision Overconfidence supervision.
Body Injury,Temporary or Miscommunication, Lack of TPC valid.Authorised operator
permanent diability, supervision, Unauthorised and signalman, Path defined ,
fatality . operator and signalman, Path Rigging plan available and
not defined , absence of rigging communicated to all crew
plan. members.
Body Injury,Temporary or Miscommunication, Lack of TPC valid.Authorised operator
permanent diability, supervision, Unauthorised and signalman, Path defined ,
fatality . operator and signalman, Path Rigging plan available and
not defined , absence of rigging communicated to all crew
plan.Failure of limit switch. members.

Body Injury,Temporary or Failure of tools and tackles, Inspected tools and tackles, CG
permanent diability, CG( Centre of Gravity) not maintained, Rigging plan available,
fatality . maintained causing imbalance of Trained riggers, guide ropes
load, , guide ropes not used, used.Authorised operator and
wrong rigging practice.Absence signalman.
of rigging plan.

Body Injury,Temporary or HT line near the crane. Limit switch prohibiting the crane
permanent diability, Voltage Fluctuation . Short circuit nearness to HT Line is checked for
fatality . due to overheating of inferior/ good condition periodically. Ensure
damaged cables. that overload tripping devices is
operatable, by periodical
checks.Fire extinguisher provided.
Body Injury,Temporary or Rope TPI not done, Failure of TPI done, Visulal check of rope,
permanent diability, hoist limt switch, overload, load Periodic check of limit switches
fatality , due to fall of suspended for a long time done . Load within allowed
load. capacity

Multiple fatality Anti collission system not Anti collision system implemented,
defined,limit switch not operation logistic plan
operating, horse play, communicated.
overconfidence.
Risk Calculation

Risk Quantum
ntrol Status (As per hirarchy) Any Legal
Risk Obligation
Likelih Risk
ood Scale Severity Duration to the risk
Assessment
Consequences Control

First Aid , Ambulance , Shifting


patient to hosptial HUL
1 2 3 6

First Aid , Ambulance , Shifting


patient to hosptial

L 1 6 1 8

First Aid , Ambulance , Shifting


patient to hosptial HUL 1 1 3 5
First aid with first aider, tie up
with near by hospital,
emergency vehicle available.

HUL 1 4 2 L 7

First aid with first aider, tie up


with near by hospital,
emergency vehicle available.

HUL 1 4 2 L 7
First aid with first aider, tie up
with near by hospital,
emergency vehicle available.

HUL 1 4 2 7

First aid with first aider

HUL 1 1 2 4

First aid with first aider, tie up


with near by hospital,
emergency vehicle available.
HUL 1 3 2 6

First aid with first aider, tie up


with near by hospital,
emergency vehicle available. HUL 1 3 2 6

First aid with first aider


HUL 1 1 2 4

First Aid , Ambulance , Tie up


with nearby hospital

HUL 1 4 2 7

First Aid , Ambulance , Tie up


with nearby hospital
HUL 1 4 2 7
First aid with first aider, tie up
with near by hospital,
emergency vehicle available.

HUL 1 4 2 L 7

First Aid , Ambulance , Tie up


with hosptial , Emergency
vehicle.

HUL 1 4 2 L 7

First Aid with first aider,


Emergency vehicle /
Ambulance , Tie up with
hosptial
HUL 1 4 2 7

First Aid , Ambulance , Shifting


patient to hosptial
HUL 1 3 2 6

First Aid with first aider,


Emergency vehicle ,Tie upwith
hospital.

HUL 1 4 2 7
First Aid with first aider,
Emergency vehicle ,Tie upwith
hospital.

HUL 1 4 2 7

First Aid with first aider,


Emergency vehicle ,Tie upwith
hospital.

HUL 1 4 2 7

First Aid with first aider,


Emergency vehicle ,Tie upwith
hospital.

HUL 1 4 2 L 7
First Aid with first aider,
Emergency vehicle ,Tie upwith
hospital.

HUL 1 4 2 7

First Aid with first aider,


Emergency vehicle ,Tie upwith
hospital.

HUL 1 4 2 L 7

First Aid with first aider,


Emergency vehicle ,Tie upwith
hospital.

HUL 1 4 2 L 7

First Aid with first aider,


Emergency vehicle ,Tie upwith
hospital.
HUL 1 4 2 L 7
First Aid with first aider,
Emergency vehicle ,Tie upwith
hospital.

HUL 1 4 2 7

First Aid with first aider,


Emergency vehicle ,Tie upwith
hospital.
HUL 1 4 2 L 7

First Aid with first aider,


Emergency vehicle ,Tie upwith
hospital.

HUL 1 4 2 L 7

First Aid with first aider,


Emergency vehicle ,Tie upwith
hospital.
HUL 1 4 2 L 7

First Aid with first aider

HUL 1 2 2 - 5
First Aid with first aider,
Emergency vehicle ,Tie upwith
hospital.

HUL 1 4 2 7

First aid kit and first aider


UL 1 2 1 3
First Aid with first aider,
Emergency vehicle ,Tie upwith
hospital.

HUL 1 4 2 L 7

First Aid with first aider,


Emergency vehicle ,Tie upwith
hospital. HUL 1 3 2 L 6

First Aid with first aider,


Emergency vehicle ,Tie upwith
hospital.

HUL 1 4 2 L 7
First Aid with first aider,
Emergency vehicle ,Tie upwith
hospital.

HUL 1 4 2 L 7

First Aid with first aider,


Emergency vehicle ,Tie upwith
hospital.

HUL 1 4 2 L 7

First Aid with first aider,


Emergency vehicle ,Tie upwith
hospital. ERP

HUL 1 4 2 7
First Aid with first aider,
Emergency vehicle ,Tie upwith
hospital. ERP
HUL 1 4 2 L 7

First Aid with first aider,


Emergency vehicle ,Tie upwith
hospital. ERP

HUL 1 4 2 7
Risk Acceptable / Revised risk rating based on proposed action for
Non Acceptable mitigation
For Non
Actions as per hirarchy of
acceptable risk control
No. of person

Duration
Severity
(Refer Guidework)

Scale
belived to be
affected

Acceptable
Not
Acceptable

Engineering control:-
Index plan.
Administrative control :- (a)
Vigilant supervision, (b) Job 1 3 2
specific training, (c) First aid
training (d) full body clothes e)
Pest control , which is sprayed in
the area to keep away snakes
and scorpion

Single

Acceptable
Not Single Engineering control:- (a) Safe
Acceptable working platforms.
Administrative control :- (a)
Vigilant supervision, b) Job
specific training
OCP for Tower crane erection 1 2 2
and dismantling operation to be
followed. (SJCPL-OCP-17)

Not Single Engineering Control:-


Acceptable Adherence with manufacturing
guidelines for lifting works .
Administrative control :-
OCP for Tower crane erection
and dismantling operation to be
followed. (SJCPL-OCP-17) 1 2 2
OCP for Mechanical Material
handling to be followed. (SJCPL-
OCP-11)
Not Multiple Engineering Control:-Certified
Acceptable and safety inspected tools and
tackles to be used.
Administrative control :-
OCP for Tower crane erection
and dismantling operation to be 1 2 2
followed. (SJCPL-OCP-17)

Acceptable

Acceptable

Acceptable

Acceptable

Not Single Administrative control :-


Acceptable OCP for Mobile crane operation
to be followed.
(SJCPL-OCP-19)
OCP for Mechanical Material 1 3 2
handling to be followed. (SJCPL-
OCP-11)

Not Single Administrative Control :-


Acceptable Removal of loose material .
OCP for Mechanical Material
handling to be followed. 1 2 2
(SJCPL-OCP-11)
Not Single Engineering Control:-
Acceptable Adherence with manufacturing
guidelines for lifting works.
Administrative control :-
OCP for Mobile crane operation 1 2 2
to be followed. (SJCPL-OCP-19)

Not Single Administrative control :-


Acceptable Use tool kit. Follow safety
instruction.Removal of loose
material . OCP for Tower crane
erection and dismantling 1 2 2
operation to be followed.
(SJCPL-OCP-17)

Not Single Engineering Control:


Acceptable Inspection of obstructing
structure before crane
placement .
Restricted unauthorized entry.
OCP for Tower crane erection 1 2 2
and dismantling operation to be
followed. (SJCPL-OCP-17)

Acceptable

Not Single Administrative control :-


Acceptable Use too kit. Follow safety
instruction.Removal of loose
material .OCP for Tower crane
erection and dismantling 1 2 2
operation to be followed.
(SJCPL-OCP-17)
Not Single Engineering control:- (a) Safe
Acceptable means of access and egress (b)
Safe working platforms
(c) Protected edges
Administrative control :- Skill
development training for the
workers. Competent workers
and mechanical team . OCP for 1 2 2
Tower crane erection and
dismantling operation to be
followed. (SJCPL-OCP-17)

Not Single Engineering control:- (a) Safe


Acceptable means of access and egress (b)
Safe working platforms
(c) Protected edges
Administrative control :- Skill
development training for the
workers. Competent workers 1 2 2
and mechanical team

Not Single Administrative control :-


Acceptable Use tool kit. Follow safety
instruction.Removal of loose
material .OCP for Tower crane
erection and dismantling
operation to be followed.
(SJCPL-OCP-17)
Not Single Engineering control:- (a) Safe
Acceptable means of access and egress (b)
Safe working platforms
(c) Protected edges
Administrative control :- Skill
development training for the
workers. Competent workers
and mechanical team . OCP for 1 2 2
Tower crane erection and
dismantling operation to be
followed. (SJCPL-OCP-17)

Not Single Administrative control :-


Acceptable Use tool kit. Follow safety
instruction.Removal of loose
material .
Administrative control :- Skill
development training for the 1 2 2
workers. Competent workers
and mechanical team . OCP for
Tower crane erection and
dismantling operation to be
followed. (SJCPL-OCP-17)
Not Single Administrative control :- (a)
Acceptable Vigilant supervision, b) Job
specific training
Signage :- (a) Display of general
awareness signage,
Tower crane erection and 1 2 2
dismantling operation to be
followed. (SJCPL-OCP-17)

Not Single Administrative control :- (a)


Acceptable Vigilant supervision, b) Job
specific training
Signage :- (a) Display of general 1 2 2
awareness signage,
Tower crane erection and
dismantling operation to be
followed. (SJCPL-OCP-17)
Not Single Engineering control:- (a) Safe
Acceptable means of access and egress (b)
Safe working platforms
(c) Protected edges
Administrative control :- Skill
development training for the 1 2 2
workers. Competent workers
and mechanical team

Not Single Administrative control:


Acceptable Load as per approved capacity
only. Supervision of job, Remove
loose material. 1 2 2

Not Single Administrative control :- (a)


Acceptable Vigilant supervision, b) Job
specific training
Signage :- (a) Display of general
awareness signage,
Tower crane erection and 1 2 2
dismantling operation to be
followed. (SJCPL-OCP-17)

Not Single Administrative control :- (a)


Acceptable Vigilant supervision, b) Job
specific training
Signage :- (a) Display of general 1 2 2
awareness signage,

Acceptable
Not Single Engineering control:- (a) Safe
Acceptable means of access and egress (b)
Safe working platforms
(c) Protected edges
Administrative control :- Skill
development training for the
workers. Competent workers 1 2 2
and mechanical team
Tower crane erection and
dismantling operation to be
followed. (SJCPL-OCP-17)

Acceptable

Not Multiple Engineering control:- (a)


Acceptable Competent operators
(b) Certified and safety
inspected tools and tackles
Administrative control :- (a)
OCP for Tower crane erection 1 2 2
and dismantling operation to be
followed. (SJCPL-OCP-17)

Acceptable

Not Single Engineering control:- (a)


Acceptable Restricted unauthorized entry
(c) Cordoned off the area

4.Administrative control :-
1 2 2
(a) Vigilant supervision,
b) Job specific training,
OCP for Tower crane erection
and dismantling operation to be
followed. (SJCPL-OCP-17)
Not Single Engineering control:- (a)
Acceptable Inspection of obstructing
structure before crane
placement (b) Restricted
unauthorized entry (c) Cordoned
off the area
4.Administrative
control :- 1 2 2
(a) Vigilant supervision,
b) Job specific training,
(c) Material handling and
certified lifting equipment

Not Single Engineering control:-


Acceptable (a) Certified equipment and
safety inspected available (b)
Competent operators and
riggers (c) Well protected load
(d) Certified lifting tools and
tackles
Administrative control :- (a) 1 2 2
Vigilant supervision, (b) Job
specific training
Removal of loose material

Not Single Engineering control:- (a)


Acceptable Electrical certified equipment
(b) Competent operators and
workers (c) Inspected electrical
connections (d) Availability of
ELCB/RCCB at the electrical
panel board (f) Body earth to
the electrical distribution board

Administrative control :- (a)


Vigilant supervision, b) Job 1 2 2
specific training (c) Safe distance
as per MSEB gov Norms to be
maintained all time.
Not Single Engineering control:-
Acceptable (a) Competent operators
(b) Well protected load
(c) Certified lifting tools and 1 2 2
tackles.

Not Multiple Engineering control:-


Acceptable (a) Competent operators (b)
Well protected load (c) Certified
lifting tools and tackles.
Administrative control :- (a)
Vigilant supervision, (b) Job 1 3 2
specific training . OCP to be
followed.(SJCPL-OCP-17)
g based on proposed action for risk
mitigation
Risk Quantum

Acceptable /
Acceptable
Non
Risk

6 Acceptable

5 Acceptable

5 Acceptable
5 Acceptable

6 Acceptable

5 Acceptable
5 Acceptable

5 Acceptable

5 Acceptable

5 Acceptable
5 Acceptable

5 Acceptable

0 Acceptable
5 Acceptable

5 Acceptable

5 Acceptable

5 Acceptable
5 Acceptable

5 Acceptable

5 Acceptable

5 Acceptable
5 Acceptable

5 Acceptable

5 Acceptable
5 Acceptable

5 Acceptable

5 Acceptable
5 Acceptable

6 Acceptable

You might also like