SUSTENTO DE METRADOS: CORTE Y RELLENO - MOVIMIENTO DE TIERRAS

ENTIDAD : PROYECTO ESPECIAL HUALLAGA CENTRAL Y BAJO MAYO

EXP. TEC. PIP : MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE POLVORA, PROVINCIA DE TOCACHE, DEPARTAMENTO DE SAN MARTÍN

UBICACIÓN : VISTA ALEGRE - SANTA ROSA DE MISHOLLO DEL DISTRITO DEL POLVORA - TOCACHE - SAN MARTIN

FECHA : 10/19/2022

RESIDENTE
RESPONS. : ING. CARLOS NICOLAS REYNA FLORES

RESUMEN VOLUMEN DE CORTE Y RELLENO

PROGRESIVA INICIAL PROGRESIVA FINAL VOLUMEN CORTE(m3) VOLUMEN RELLENO(m3)


0+000.00 1+000.00 1,689.85 751.20

1+000.00 2+000.00 1,034.62 1,565.44

2+000.00 3+000.00 282.80 1,743.65

3+000.00 4+000.00 8,304.49 720.27

4+000.00 4+743.45 3,302.75 876.43

TOTAL 14614.51 m3 5656.99 m3


SUSTENTO DE METRADOS: VOLUMENES DE CORTE Y RELLENO - MOVIMIENTO DE
TIERRAS

ENTIDAD : PROYECTO ESPECIAL HUALLAGA CENTRAL Y BAJO MAYO

MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE
EXP. TEC. PIP :
POLVORA, PROVINCIA DE TOCACHE, DEPARTAMENTO DE SAN MARTÍN

UBICACIÓN : VISTA ALEGRE - SANTA ROSA DE MISHOLLO DEL DISTRITO DEL POLVORA - TOCACHE - SAN MARTIN

FECHA : JUNIO DEL 2022

RESIDENTE
RESPONS. : ING. CARLOS NICOLAS REYNA FLORES

EST. AC AR D VC VCms VCrs VCrf VR ms rs rf


0+000.00 5.25 0
0+020.00 4.13 0 20.00 93.80 93.80 0.00 0.00 0.00 1.00 0.00 0.00
0+030.00 6.9 0 10.00 55.15 55.15 0.00 0.00 0.00 1.00 0.00 0.00
0+040.00 8.3 0 10.00 76.00 76.00 0.00 0.00 0.00 1.00 0.00 0.00
0+050.00 9.82 0 10.00 90.60 90.60 0.00 0.00 0.00 1.00 0.00 0.00
0+060.00 6.31 0 10.00 80.65 80.65 0.00 0.00 0.00 1.00 0.00 0.00
0+080.00 6.88 0 20.00 131.90 131.90 0.00 0.00 0.00 1.00 0.00 0.00
0+100.00 10.74 0 20.00 176.20 176.20 0.00 0.00 0.00 1.00 0.00 0.00
0+110.00 8.58 0 10.00 96.60 96.60 0.00 0.00 0.00 1.00 0.00 0.00
0+120.00 5.23 0 10.00 69.05 69.05 0.00 0.00 0.00 1.00 0.00 0.00
0+130.00 4.15 0 10.00 46.90 46.90 0.00 0.00 0.00 1.00 0.00 0.00
0+140.00 3.32 0 10.00 37.35 37.35 0.00 0.00 0.00 1.00 0.00 0.00
0+150.00 2.86 0 10.00 30.90 30.90 0.00 0.00 0.00 1.00 0.00 0.00
0+160.00 3.1 0 10.00 29.80 29.80 0.00 0.00 0.00 1.00 0.00 0.00
0+170.00 3.34 0 10.00 32.20 32.20 0.00 0.00 0.00 1.00 0.00 0.00
0+180.00 3.2 0 10.00 32.70 32.70 0.00 0.00 0.00 1.00 0.00 0.00
0+200.00 2.96 0 20.00 61.60 61.60 0.00 0.00 0.00 1.00 0.00 0.00
0+220.00 1.79 0.04 20.00 47.50 47.50 0.00 0.00 0.40 1.00 0.00 0.00
0+230.00 0.56 0.32 10.00 11.75 11.75 0.00 0.00 1.80 1.00 0.00 0.00
0+240.00 0 1.47 10.00 2.80 2.80 0.00 0.00 8.95 1.00 0.00 0.00
0+260.00 0 2.18 20.00 0.00 0.00 0.00 0.00 36.50 1.00 0.00 0.00
0+270.00 0 1.12 10.00 0.00 0.00 0.00 0.00 16.50 1.00 0.00 0.00
0+280.00 0.21 1.06 10.00 1.05 1.05 0.00 0.00 10.90 1.00 0.00 0.00
0+290.00 0.12 1.37 10.00 1.65 1.65 0.00 0.00 12.15 1.00 0.00 0.00
0+300.00 0 1.88 10.00 0.60 0.60 0.00 0.00 16.25 1.00 0.00 0.00
0+320.00 0 1.35 20.00 0.00 0.00 0.00 0.00 32.30 1.00 0.00 0.00
0+340.00 2.02 0 20.00 20.20 20.20 0.00 0.00 13.50 1.00 0.00 0.00
0+360.00 3.43 0.01 20.00 54.50 54.50 0.00 0.00 0.10 1.00 0.00 0.00
0+370.00 3.7 0.04 10.00 35.65 35.65 0.00 0.00 0.25 1.00 0.00 0.00
0+380.00 2.86 0.03 10.00 32.80 32.80 0.00 0.00 0.35 1.00 0.00 0.00
0+400.00 2.6 0 20.00 54.60 54.60 0.00 0.00 0.30 1.00 0.00 0.00
0+420.00 2.54 0 20.00 51.40 51.40 0.00 0.00 0.00 1.00 0.00 0.00
0+440.00 0.59 0.45 20.00 31.30 31.30 0.00 0.00 4.50 1.00 0.00 0.00
0+450.00 0.1 1.54 10.00 3.45 3.45 0.00 0.00 9.95 1.00 0.00 0.00
0+460.00 0 2.46 10.00 0.50 0.50 0.00 0.00 20.00 1.00 0.00 0.00
SUSTENTO DE METRADOS: VOLUMENES DE CORTE Y RELLENO - MOVIMIENTO DE
TIERRAS

ENTIDAD : PROYECTO ESPECIAL HUALLAGA CENTRAL Y BAJO MAYO

MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE
EXP. TEC. PIP :
POLVORA, PROVINCIA DE TOCACHE, DEPARTAMENTO DE SAN MARTÍN

UBICACIÓN : VISTA ALEGRE - SANTA ROSA DE MISHOLLO DEL DISTRITO DEL POLVORA - TOCACHE - SAN MARTIN

FECHA : JUNIO DEL 2022

RESIDENTE
RESPONS. : ING. CARLOS NICOLAS REYNA FLORES

EST. AC AR D VC VCms VCrs VCrf VR ms rs rf


0+470.00 0.05 2.34 10.00 0.25 0.25 0.00 0.00 24.00 1.00 0.00 0.00
0+480.00 0.09 2.05 10.00 0.70 0.70 0.00 0.00 21.95 1.00 0.00 0.00
0+490.00 0.24 1.37 10.00 1.65 1.65 0.00 0.00 17.10 1.00 0.00 0.00
0+500.00 0 1.18 10.00 1.20 1.20 0.00 0.00 12.75 1.00 0.00 0.00
0+510.00 0 1.33 10.00 0.00 0.00 0.00 0.00 12.55 1.00 0.00 0.00
0+520.00 0.22 1.15 10.00 1.10 1.10 0.00 0.00 12.40 1.00 0.00 0.00
0+540.00 0.53 0.08 20.00 7.50 7.50 0.00 0.00 12.30 1.00 0.00 0.00
0+560.00 3.2 0 20.00 37.30 37.30 0.00 0.00 0.80 1.00 0.00 0.00
0+570.00 4.41 0 10.00 38.05 38.05 0.00 0.00 0.00 1.00 0.00 0.00
0+580.00 2.07 0 10.00 32.40 32.40 0.00 0.00 0.00 1.00 0.00 0.00
0+590.00 2.67 0 10.00 23.70 23.70 0.00 0.00 0.00 1.00 0.00 0.00
0+600.00 0.46 0.13 10.00 15.65 15.65 0.00 0.00 0.65 1.00 0.00 0.00
0+620.00 0.47 1.11 20.00 9.30 9.30 0.00 0.00 12.40 1.00 0.00 0.00
0+630.00 0.09 1.1 10.00 2.80 2.80 0.00 0.00 11.05 1.00 0.00 0.00
0+640.00 0.07 1.18 10.00 0.80 0.80 0.00 0.00 11.40 1.00 0.00 0.00
0+650.00 0 2.26 10.00 0.35 0.35 0.00 0.00 17.20 1.00 0.00 0.00
0+660.00 0 2.5 10.00 0.00 0.00 0.00 0.00 23.80 1.00 0.00 0.00
0+680.00 0 1.15 20.00 0.00 0.00 0.00 0.00 36.50 1.00 0.00 0.00
0+700.00 0.1 0.98 20.00 1.00 1.00 0.00 0.00 21.30 1.00 0.00 0.00
0+720.00 0.17 1.13 20.00 2.70 2.70 0.00 0.00 21.10 1.00 0.00 0.00
0+740.00 0.11 1.02 20.00 2.80 2.80 0.00 0.00 21.50 1.00 0.00 0.00
0+750.00 0 1.21 10.00 0.55 0.55 0.00 0.00 11.15 1.00 0.00 0.00
0+760.00 0.1 1.3 10.00 0.50 0.50 0.00 0.00 12.55 1.00 0.00 0.00
0+780.00 0 0.85 20.00 1.00 1.00 0.00 0.00 21.50 1.00 0.00 0.00
0+800.00 0 1.46 20.00 0.00 0.00 0.00 0.00 23.10 1.00 0.00 0.00
0+820.00 0 1 20.00 0.00 0.00 0.00 0.00 24.60 1.00 0.00 0.00
0+840.00 0 0.34 20.00 0.00 0.00 0.00 0.00 13.40 1.00 0.00 0.00
0+850.00 0 0.5 10.00 0.00 0.00 0.00 0.00 4.20 1.00 0.00 0.00
0+860.00 0.07 0.86 10.00 0.35 0.35 0.00 0.00 6.80 1.00 0.00 0.00
0+870.00 0.08 1.07 10.00 0.75 0.75 0.00 0.00 9.65 1.00 0.00 0.00
0+880.00 0 1.24 10.00 0.40 0.40 0.00 0.00 11.55 1.00 0.00 0.00
0+890.00 0 1.24 10.00 0.00 0.00 0.00 0.00 12.40 1.00 0.00 0.00
0+900.00 0 1.17 10.00 0.00 0.00 0.00 0.00 12.05 1.00 0.00 0.00
0+920.00 0.16 0.52 20.00 1.60 1.60 0.00 0.00 16.90 1.00 0.00 0.00
0+940.00 0 1.78 20.00 1.60 1.60 0.00 0.00 23.00 1.00 0.00 0.00
SUSTENTO DE METRADOS: VOLUMENES DE CORTE Y RELLENO - MOVIMIENTO DE
TIERRAS

ENTIDAD : PROYECTO ESPECIAL HUALLAGA CENTRAL Y BAJO MAYO

MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE
EXP. TEC. PIP :
POLVORA, PROVINCIA DE TOCACHE, DEPARTAMENTO DE SAN MARTÍN

UBICACIÓN : VISTA ALEGRE - SANTA ROSA DE MISHOLLO DEL DISTRITO DEL POLVORA - TOCACHE - SAN MARTIN

FECHA : JUNIO DEL 2022

RESIDENTE
RESPONS. : ING. CARLOS NICOLAS REYNA FLORES

EST. AC AR D VC VCms VCrs VCrf VR ms rs rf


0+960.00 0 2.19 20.00 0.00 0.00 0.00 0.00 39.70 1.00 0.00 0.00
0+980.00 0 0.56 20.00 0.00 0.00 0.00 0.00 27.50 1.00 0.00 0.00
1+000.00 1.27 0.01 20.00 12.70 12.70 0.00 0.00 5.70 1.00 0.00 0.00
TOTAL (M3) 1689.85 1689.85 0.00 0.00 751.20

EST. AC AR D VC VCms VCrs VCrf VR ms rs rf


1+000.00 1.27 0.01
1+020.00 1.77 0.55 20.00 30.40 30.40 0.00 0.00 5.60 1.00 0.00 0.00
1+030.00 2.47 0.79 10.00 21.20 21.20 0.00 0.00 6.70 1.00 0.00 0.00
1+040.00 3.89 0.22 10.00 31.80 31.80 0.00 0.00 5.05 1.00 0.00 0.00
1+050.00 3.91 0.01 10.00 39.00 39.00 0.00 0.00 1.15 1.00 0.00 0.00
1+060.00 3.62 0.02 10.00 37.65 37.65 0.00 0.00 0.15 1.00 0.00 0.00
1+080.00 1.18 0.04 20.00 48.00 48.00 0.00 0.00 0.60 1.00 0.00 0.00
1+090.00 0.23 0.75 10.00 7.05 7.05 0.00 0.00 3.95 1.00 0.00 0.00
1+100.00 0.11 1.26 10.00 1.70 1.70 0.00 0.00 10.05 1.00 0.00 0.00
1+110.00 0.29 1.33 10.00 2.00 2.00 0.00 0.00 12.95 1.00 0.00 0.00
1+120.00 0.36 1.37 10.00 3.25 3.25 0.00 0.00 13.50 1.00 0.00 0.00
1+130.00 0.14 1.19 10.00 2.50 2.50 0.00 0.00 12.80 1.00 0.00 0.00
1+140.00 0.06 0.98 10.00 1.00 1.00 0.00 0.00 10.85 1.00 0.00 0.00
1+150.00 0.05 0.53 10.00 0.55 0.55 0.00 0.00 7.55 1.00 0.00 0.00
1+160.00 0.17 0.2 10.00 1.10 1.10 0.00 0.00 3.65 1.00 0.00 0.00
1+170.00 0 0.54 10.00 0.85 0.85 0.00 0.00 3.70 1.00 0.00 0.00
1+180.00 0.04 0.8 10.00 0.20 0.20 0.00 0.00 6.70 1.00 0.00 0.00
1+200.00 0.07 1.37 20.00 1.10 1.10 0.00 0.00 21.70 1.00 0.00 0.00
1+210.00 0.15 1.35 10.00 1.10 1.10 0.00 0.00 13.60 1.00 0.00 0.00
1+220.00 0.15 1.24 10.00 1.50 1.50 0.00 0.00 12.95 1.00 0.00 0.00
1+230.00 0.27 0.96 10.00 2.10 2.10 0.00 0.00 11.00 1.00 0.00 0.00
1+240.00 0.33 0.88 10.00 3.00 3.00 0.00 0.00 9.20 1.00 0.00 0.00
1+260.00 0.3 1.06 20.00 6.30 6.30 0.00 0.00 19.40 1.00 0.00 0.00
1+280.00 0.11 2.01 20.00 4.10 4.10 0.00 0.00 30.70 1.00 0.00 0.00
1+300.00 0 3.82 20.00 1.10 1.10 0.00 0.00 58.30 1.00 0.00 0.00
SUSTENTO DE METRADOS: VOLUMENES DE CORTE Y RELLENO - MOVIMIENTO DE
TIERRAS

ENTIDAD : PROYECTO ESPECIAL HUALLAGA CENTRAL Y BAJO MAYO

MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE
EXP. TEC. PIP :
POLVORA, PROVINCIA DE TOCACHE, DEPARTAMENTO DE SAN MARTÍN

UBICACIÓN : VISTA ALEGRE - SANTA ROSA DE MISHOLLO DEL DISTRITO DEL POLVORA - TOCACHE - SAN MARTIN

FECHA : JUNIO DEL 2022

RESIDENTE
RESPONS. : ING. CARLOS NICOLAS REYNA FLORES

EST. AC AR D VC VCms VCrs VCrf VR ms rs rf


1+310.00 0 4.29 10.00 0.00 0.00 0.00 0.00 40.55 1.00 0.00 0.00
1+320.00 0 2.57 10.00 0.00 0.00 0.00 0.00 34.30 1.00 0.00 0.00
1+330.00 0.19 1.86 10.00 0.95 0.95 0.00 0.00 22.15 1.00 0.00 0.00
1+340.00 0.08 2.16 10.00 1.35 1.35 0.00 0.00 20.10 1.00 0.00 0.00
1+350.00 0.25 1.44 10.00 1.65 1.65 0.00 0.00 18.00 1.00 0.00 0.00
1+360.00 0.81 0.58 10.00 5.30 5.30 0.00 0.00 10.10 1.00 0.00 0.00
1+380.00 2.68 0 20.00 34.90 34.90 0.00 0.00 5.80 1.00 0.00 0.00
1+390.00 3.14 0 10.00 29.10 29.10 0.00 0.00 0.00 1.00 0.00 0.00
1+400.00 3.17 0 10.00 31.55 31.55 0.00 0.00 0.00 1.00 0.00 0.00
1+420.00 3.82 0 20.00 69.90 69.90 0.00 0.00 0.00 1.00 0.00 0.00
1+430.00 4.21 0 10.00 40.15 40.15 0.00 0.00 0.00 1.00 0.00 0.00
1+440.00 3.87 0 10.00 40.40 40.40 0.00 0.00 0.00 1.00 0.00 0.00
1+450.00 2.86 0 10.00 33.65 33.65 0.00 0.00 0.00 1.00 0.00 0.00
1+460.00 1.58 0.01 10.00 22.20 22.20 0.00 0.00 0.05 1.00 0.00 0.00
1+480.00 0 0.78 20.00 15.80 15.80 0.00 0.00 7.90 1.00 0.00 0.00
1+500.00 0 1.71 20.00 0.00 0.00 0.00 0.00 24.90 1.00 0.00 0.00
1+510.00 0 1.93 10.00 0.00 0.00 0.00 0.00 18.20 1.00 0.00 0.00
1+520.00 0 2.56 10.00 0.00 0.00 0.00 0.00 22.45 1.00 0.00 0.00
1+530.00 0 2.74 10.00 0.00 0.00 0.00 0.00 26.50 1.00 0.00 0.00
1+540.00 0 2.53 10.00 0.00 0.00 0.00 0.00 26.35 1.00 0.00 0.00
1+550.00 0.22 1.25 10.00 1.10 1.10 0.00 0.00 18.90 1.00 0.00 0.00
1+560.00 0.48 0.48 10.00 3.50 3.50 0.00 0.00 8.65 1.00 0.00 0.00
1+570.00 0.18 0.74 10.00 3.30 3.30 0.00 0.00 6.10 1.00 0.00 0.00
1+580.00 0 2.21 10.00 0.90 0.90 0.00 0.00 14.75 1.00 0.00 0.00
1+590.00 0 4.04 10.00 0.00 0.00 0.00 0.00 31.25 1.00 0.00 0.00
1+600.00 0 5.66 10.00 0.00 0.00 0.00 0.00 48.50 1.00 0.00 0.00
1+610.00 0 6.71 10.00 0.00 0.00 0.00 0.00 61.85 1.00 0.00 0.00
1+620.00 0 6.03 10.00 0.00 0.00 0.00 0.00 63.70 1.00 0.00 0.00
1+640.00 0 4.77 20.00 0.00 0.00 0.00 0.00 108.00 1.00 0.00 0.00
1+650.00 0 3.62 10.00 0.00 0.00 0.00 0.00 41.95 1.00 0.00 0.00
1+660.00 0.04 2.98 10.00 0.20 0.20 0.00 0.00 33.00 1.00 0.00 0.00
1+670.00 0 2.54 10.00 0.20 0.20 0.00 0.00 27.60 1.00 0.00 0.00
1+680.00 0 2.68 10.00 0.00 0.00 0.00 0.00 26.10 1.00 0.00 0.00
1+690.00 0 2.42 10.00 0.00 0.00 0.00 0.00 25.50 1.00 0.00 0.00
1+700.00 0 1.81 10.00 0.00 0.00 0.00 0.00 21.15 1.00 0.00 0.00
SUSTENTO DE METRADOS: VOLUMENES DE CORTE Y RELLENO - MOVIMIENTO DE
TIERRAS

ENTIDAD : PROYECTO ESPECIAL HUALLAGA CENTRAL Y BAJO MAYO

MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE
EXP. TEC. PIP :
POLVORA, PROVINCIA DE TOCACHE, DEPARTAMENTO DE SAN MARTÍN

UBICACIÓN : VISTA ALEGRE - SANTA ROSA DE MISHOLLO DEL DISTRITO DEL POLVORA - TOCACHE - SAN MARTIN

FECHA : JUNIO DEL 2022

RESIDENTE
RESPONS. : ING. CARLOS NICOLAS REYNA FLORES

EST. AC AR D VC VCms VCrs VCrf VR ms rs rf


1+720.00 0 1.67 20.00 0.00 0.00 0.00 0.00 34.80 1.00 0.00 0.00
1+740.00 0 1.79 20.00 0.00 0.00 0.00 0.00 34.60 1.00 0.00 0.00
1+760.00 0 2.71 20.00 0.00 0.00 0.00 0.00 45.00 1.00 0.00 0.00
1+770.00 0 2.49 10.00 0.00 0.00 0.00 0.00 26.00 1.00 0.00 0.00
1+780.00 0 1.25 10.00 0.00 0.00 0.00 0.00 18.70 1.00 0.00 0.00
1+790.00 0.63 0.69 10.00 3.15 3.15 0.00 0.00 9.70 1.00 0.00 0.00
1+800.00 1.42 0.74 10.00 10.25 10.25 0.00 0.00 7.15 1.00 0.00 0.00
1+810.00 1.74 1.86 10.00 15.80 15.80 0.00 0.00 13.00 1.00 0.00 0.00
1+820.00 0.56 3.41 10.00 11.50 11.50 0.00 0.00 26.35 1.00 0.00 0.00
1+830.00 0 4.84 10.00 2.80 2.80 0.00 0.00 41.25 1.00 0.00 0.00
1+840.00 0 5.13 10.00 0.00 0.00 0.00 0.00 49.85 1.00 0.00 0.00
1+850.00 0 1.41 10.00 0.00 0.00 0.00 0.00 32.70 1.00 0.00 0.00
1+860.00 2.24 0.03 10.00 11.20 11.20 0.00 0.00 7.20 1.00 0.00 0.00
1+871.73 1.57 3.37 11.73 22.35 22.35 0.00 0.00 19.94 1.00 0.00 0.00
PROYECCION DE PUENTE 1+880
1+882.83 1.45 5.69
1+890.00 8.39 0 7.17 35.27 35.27 0.00 0.00 20.39 1.00 0.00 0.00
1+900.00 13.56 0 10.00 109.75 109.75 0.00 0.00 0.00 1.00 0.00 0.00
1+910.00 10.2 0 10.00 118.80 118.80 0.00 0.00 0.00 1.00 0.00 0.00
1+920.00 4.41 0 10.00 73.05 73.05 0.00 0.00 0.00 1.00 0.00 0.00
1+930.00 1.2 0 10.00 28.05 28.05 0.00 0.00 0.00 1.00 0.00 0.00
1+940.00 0.11 0.37 10.00 6.55 6.55 0.00 0.00 1.85 1.00 0.00 0.00
1+950.00 0 2.09 10.00 0.55 0.55 0.00 0.00 12.30 1.00 0.00 0.00
1+960.00 0 1.79 10.00 0.00 0.00 0.00 0.00 19.40 1.00 0.00 0.00
1+980.00 0 0.83 20.00 0.00 0.00 0.00 0.00 26.20 1.00 0.00 0.00
2+000.00 0.09 1.46 20.00 0.90 0.90 0.00 0.00 22.90 1.00 0.00 0.00
TOTAL (M3) 1034.62 1034.62 0.00 0.00 1565.44

EST. AC AR D VC VCms VCrs VCrf VR ms rs rf


2+000.00 0.09 1.46
2+020.00 0 1.14 20.00 0.90 0.90 0.00 0.00 26.00 1.00 0.00 0.00
2+040.00 0 0.77 20.00 0.00 0.00 0.00 0.00 19.10 1.00 0.00 0.00
2+060.00 0.43 0.33 20.00 4.30 4.30 0.00 0.00 11.00 1.00 0.00 0.00
SUSTENTO DE METRADOS: VOLUMENES DE CORTE Y RELLENO - MOVIMIENTO DE
TIERRAS

ENTIDAD : PROYECTO ESPECIAL HUALLAGA CENTRAL Y BAJO MAYO

MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE
EXP. TEC. PIP :
POLVORA, PROVINCIA DE TOCACHE, DEPARTAMENTO DE SAN MARTÍN

UBICACIÓN : VISTA ALEGRE - SANTA ROSA DE MISHOLLO DEL DISTRITO DEL POLVORA - TOCACHE - SAN MARTIN

FECHA : JUNIO DEL 2022

RESIDENTE
RESPONS. : ING. CARLOS NICOLAS REYNA FLORES

EST. AC AR D VC VCms VCrs VCrf VR ms rs rf


2+070.00 0.28 0.63 10.00 3.55 3.55 0.00 0.00 4.80 1.00 0.00 0.00
2+080.00 0.07 1.55 10.00 1.75 1.75 0.00 0.00 10.90 1.00 0.00 0.00
2+090.00 0 2.24 10.00 0.35 0.35 0.00 0.00 18.95 1.00 0.00 0.00
2+100.00 0 2.56 10.00 0.00 0.00 0.00 0.00 24.00 1.00 0.00 0.00
2+110.00 0 2.41 10.00 0.00 0.00 0.00 0.00 24.85 1.00 0.00 0.00
2+120.00 0 1.88 10.00 0.00 0.00 0.00 0.00 21.45 1.00 0.00 0.00
2+130.00 0.04 1.36 10.00 0.20 0.20 0.00 0.00 16.20 1.00 0.00 0.00
2+140.00 0.45 0.5 10.00 2.45 2.45 0.00 0.00 9.30 1.00 0.00 0.00
2+150.00 0.77 0.27 10.00 6.10 6.10 0.00 0.00 3.85 1.00 0.00 0.00
2+160.00 0.98 0.54 10.00 8.75 8.75 0.00 0.00 4.05 1.00 0.00 0.00
2+170.00 0.6 1.14 10.00 7.90 7.90 0.00 0.00 8.40 1.00 0.00 0.00
2+180.00 0.22 1.77 10.00 4.10 4.10 0.00 0.00 14.55 1.00 0.00 0.00
2+200.00 0 2.91 20.00 2.20 2.20 0.00 0.00 46.80 1.00 0.00 0.00
2+220.00 0.37 2.64 20.00 3.70 3.70 0.00 0.00 55.50 1.00 0.00 0.00
2+230.00 0.55 2.9 10.00 4.60 4.60 0.00 0.00 27.70 1.00 0.00 0.00
2+240.00 0 3.62 10.00 2.75 2.75 0.00 0.00 32.60 1.00 0.00 0.00
2+250.00 0 4.87 10.00 0.00 0.00 0.00 0.00 42.45 1.00 0.00 0.00
2+260.00 0 5.11 10.00 0.00 0.00 0.00 0.00 49.90 1.00 0.00 0.00
2+270.00 0 6.28 10.00 0.00 0.00 0.00 0.00 56.95 1.00 0.00 0.00
2+280.00 0 11.94 10.00 0.00 0.00 0.00 0.00 91.10 1.00 0.00 0.00
2+300.00 0.09 3.34 20.00 0.90 0.90 0.00 0.00 152.80 1.00 0.00 0.00
2+320.00 0.31 1.06 20.00 4.00 4.00 0.00 0.00 44.00 1.00 0.00 0.00
2+330.00 0.27 1.04 10.00 2.90 2.90 0.00 0.00 10.50 1.00 0.00 0.00
2+340.00 0.32 1.13 10.00 2.95 2.95 0.00 0.00 10.85 1.00 0.00 0.00
2+350.00 0.23 1.58 10.00 2.75 2.75 0.00 0.00 13.55 1.00 0.00 0.00
2+360.00 0 2.18 10.00 1.15 1.15 0.00 0.00 18.80 1.00 0.00 0.00
2+370.00 0 1.94 10.00 0.00 0.00 0.00 0.00 20.60 1.00 0.00 0.00
2+380.00 0 1.18 10.00 0.00 0.00 0.00 0.00 15.60 1.00 0.00 0.00
2+390.00 0 0.84 10.00 0.00 0.00 0.00 0.00 10.10 1.00 0.00 0.00
2+400.00 0 0.69 10.00 0.00 0.00 0.00 0.00 7.65 1.00 0.00 0.00
2+410.00 0 1.55 10.00 0.00 0.00 0.00 0.00 11.20 1.00 0.00 0.00
2+420.00 0 2.42 10.00 0.00 0.00 0.00 0.00 19.85 1.00 0.00 0.00
2+430.00 0 4.34 10.00 0.00 0.00 0.00 0.00 33.80 1.00 0.00 0.00
2+440.00 0 2.48 10.00 0.00 0.00 0.00 0.00 34.10 1.00 0.00 0.00
2+460.00 0.3 0.7 20.00 3.00 3.00 0.00 0.00 31.80 1.00 0.00 0.00
SUSTENTO DE METRADOS: VOLUMENES DE CORTE Y RELLENO - MOVIMIENTO DE
TIERRAS

ENTIDAD : PROYECTO ESPECIAL HUALLAGA CENTRAL Y BAJO MAYO

MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE
EXP. TEC. PIP :
POLVORA, PROVINCIA DE TOCACHE, DEPARTAMENTO DE SAN MARTÍN

UBICACIÓN : VISTA ALEGRE - SANTA ROSA DE MISHOLLO DEL DISTRITO DEL POLVORA - TOCACHE - SAN MARTIN

FECHA : JUNIO DEL 2022

RESIDENTE
RESPONS. : ING. CARLOS NICOLAS REYNA FLORES

EST. AC AR D VC VCms VCrs VCrf VR ms rs rf


2+480.00 0 1.03 20.00 3.00 3.00 0.00 0.00 17.30 1.00 0.00 0.00
2+500.00 0 1.2 20.00 0.00 0.00 0.00 0.00 22.30 1.00 0.00 0.00
2+520.00 0.26 0.76 20.00 2.60 2.60 0.00 0.00 19.60 1.00 0.00 0.00
2+530.00 0.38 1.27 10.00 3.20 3.20 0.00 0.00 10.15 1.00 0.00 0.00
2+540.00 0.13 1.58 10.00 2.55 2.55 0.00 0.00 14.25 1.00 0.00 0.00
2+550.00 0.03 0.93 10.00 0.80 0.80 0.00 0.00 12.55 1.00 0.00 0.00
2+560.00 0.04 0.83 10.00 0.35 0.35 0.00 0.00 8.80 1.00 0.00 0.00
2+580.00 0.19 1.17 20.00 2.30 2.30 0.00 0.00 20.00 1.00 0.00 0.00
2+590.00 0.41 1.4 10.00 3.00 3.00 0.00 0.00 12.85 1.00 0.00 0.00
2+600.00 0.63 1.04 10.00 5.20 5.20 0.00 0.00 12.20 1.00 0.00 0.00
2+610.00 0.41 1.12 10.00 5.20 5.20 0.00 0.00 10.80 1.00 0.00 0.00
2+620.00 0.32 0.78 10.00 3.65 3.65 0.00 0.00 9.50 1.00 0.00 0.00
2+640.00 0.06 1.53 20.00 3.80 3.80 0.00 0.00 23.10 1.00 0.00 0.00
2+650.00 0.08 1.63 10.00 0.70 0.70 0.00 0.00 15.80 1.00 0.00 0.00
2+660.00 0 2.3 10.00 0.40 0.40 0.00 0.00 19.65 1.00 0.00 0.00
2+670.00 0 2.31 10.00 0.00 0.00 0.00 0.00 23.05 1.00 0.00 0.00
2+680.00 0.02 1.85 10.00 0.10 0.10 0.00 0.00 20.80 1.00 0.00 0.00
2+700.00 0.86 0.74 20.00 8.80 8.80 0.00 0.00 25.90 1.00 0.00 0.00
2+710.00 0.79 0.81 10.00 8.25 8.25 0.00 0.00 7.75 1.00 0.00 0.00
2+720.00 0.53 1.34 10.00 6.60 6.60 0.00 0.00 10.75 1.00 0.00 0.00
2+740.00 0 2.59 20.00 5.30 5.30 0.00 0.00 39.30 1.00 0.00 0.00
2+760.00 0 3.29 20.00 0.00 0.00 0.00 0.00 58.80 1.00 0.00 0.00
2+780.00 0.28 2.81 20.00 2.80 2.80 0.00 0.00 61.00 1.00 0.00 0.00
2+790.00 0.55 1.96 10.00 4.15 4.15 0.00 0.00 23.85 1.00 0.00 0.00
2+800.00 0.51 1.33 10.00 5.30 5.30 0.00 0.00 16.45 1.00 0.00 0.00
2+820.00 0 1.86 20.00 5.10 5.10 0.00 0.00 31.90 1.00 0.00 0.00
2+840.00 0 1.88 20.00 0.00 0.00 0.00 0.00 37.40 1.00 0.00 0.00
2+850.00 0 1.37 10.00 0.00 0.00 0.00 0.00 16.25 1.00 0.00 0.00
2+860.00 0.03 1.12 10.00 0.15 0.15 0.00 0.00 12.45 1.00 0.00 0.00
2+870.00 0 0.6 10.00 0.15 0.15 0.00 0.00 8.60 1.00 0.00 0.00
2+880.00 0.03 0.14 10.00 0.15 0.15 0.00 0.00 3.70 1.00 0.00 0.00
2+900.00 2.23 0 20.00 22.60 22.60 0.00 0.00 1.40 1.00 0.00 0.00
2+910.00 2.69 0 10.00 24.60 24.60 0.00 0.00 0.00 1.00 0.00 0.00
2+920.00 2.09 0 10.00 23.90 23.90 0.00 0.00 0.00 1.00 0.00 0.00
2+940.00 0.99 0.4 20.00 30.80 30.80 0.00 0.00 4.00 1.00 0.00 0.00
SUSTENTO DE METRADOS: VOLUMENES DE CORTE Y RELLENO - MOVIMIENTO DE
TIERRAS

ENTIDAD : PROYECTO ESPECIAL HUALLAGA CENTRAL Y BAJO MAYO

MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE
EXP. TEC. PIP :
POLVORA, PROVINCIA DE TOCACHE, DEPARTAMENTO DE SAN MARTÍN

UBICACIÓN : VISTA ALEGRE - SANTA ROSA DE MISHOLLO DEL DISTRITO DEL POLVORA - TOCACHE - SAN MARTIN

FECHA : JUNIO DEL 2022

RESIDENTE
RESPONS. : ING. CARLOS NICOLAS REYNA FLORES

EST. AC AR D VC VCms VCrs VCrf VR ms rs rf


2+950.00 1.34 0.46 10.00 11.65 11.65 0.00 0.00 4.30 1.00 0.00 0.00
2+960.00 0.66 0.49 10.00 10.00 10.00 0.00 0.00 4.75 1.00 0.00 0.00
2+970.00 0.05 0.98 10.00 3.55 3.55 0.00 0.00 7.35 1.00 0.00 0.00
2+980.00 0 1.57 10.00 0.25 0.25 0.00 0.00 12.75 1.00 0.00 0.00
3+000.00 0.06 1.1 20.00 0.60 0.60 0.00 0.00 26.70 1.00 0.00 0.00
TOTAL (M3) 282.80 282.80 0.00 0.00 1743.65

EST. AC AR D VC VCms VCrs VCrf VR ms rs rf


3+000.00 0.06 1.1
3+020.00 1.04 0.87 20.00 11.00 11.00 0.00 0.00 19.70 1.00 0.00 0.00
3+030.00 1.11 2 10.00 10.75 10.75 0.00 0.00 14.35 1.00 0.00 0.00
3+040.00 1.75 3.06 10.00 14.30 14.30 0.00 0.00 25.30 1.00 0.00 0.00
3+050.00 2.63 2.54 10.00 21.90 21.90 0.00 0.00 28.00 1.00 0.00 0.00
3+060.00 3.18 1.72 10.00 29.05 29.05 0.00 0.00 21.30 1.00 0.00 0.00
3+070.00 1.72 1.24 10.00 24.50 24.50 0.00 0.00 14.80 1.00 0.00 0.00
3+080.00 0.38 1 10.00 10.50 10.50 0.00 0.00 11.20 1.00 0.00 0.00
3+100.00 1.63 0 20.00 20.10 20.10 0.00 0.00 10.00 1.00 0.00 0.00
3+120.00 8.78 0 20.00 104.10 104.10 0.00 0.00 0.00 1.00 0.00 0.00
3+140.00 3.2 0 20.00 119.80 119.80 0.00 0.00 0.00 1.00 0.00 0.00
3+160.00 0.59 0.52 20.00 37.90 37.90 0.00 0.00 5.20 1.00 0.00 0.00
3+180.00 0 1.82 20.00 5.90 5.90 0.00 0.00 23.40 1.00 0.00 0.00
3+200.00 0.46 0.37 20.00 4.60 4.60 0.00 0.00 21.90 1.00 0.00 0.00
3+220.00 4.86 0 20.00 53.20 53.20 0.00 0.00 3.70 1.00 0.00 0.00
3+240.00 19.66 0 20.00 245.20 245.20 0.00 0.00 0.00 1.00 0.00 0.00
3+260.00 12.77 0 20.00 324.30 324.30 0.00 0.00 0.00 1.00 0.00 0.00
3+274.68 2.43 1.34 14.68 111.59 111.59 0.00 0.00 9.84 1.00 0.00 0.00
PROYECCION DE PUENTE 3+280
3+283.68 3.59 0
3+300.00 15.59 0 16.32 156.48 156.48 0.00 0.00 0.00 1.00 0.00 0.00
3+320.00 39.97 0 20.00 555.60 555.60 0.00 0.00 0.00 1.00 0.00 0.00
3+340.00 37.57 0 20.00 775.40 775.40 0.00 0.00 0.00 1.00 0.00 0.00
3+350.00 20.5 0 30.00 907.05 907.05 0.00 0.00 0.00 1.00 0.00 0.00
3+360.00 4.98 4.46 10.00 127.40 127.40 0.00 0.00 22.30 1.00 0.00 0.00
3+370.00 0 11.08 10.00 24.90 24.90 0.00 0.00 77.70 1.00 0.00 0.00
3+380.00 0 6.97 10.00 0.00 0.00 0.00 0.00 90.25 1.00 0.00 0.00
SUSTENTO DE METRADOS: VOLUMENES DE CORTE Y RELLENO - MOVIMIENTO DE
TIERRAS

ENTIDAD : PROYECTO ESPECIAL HUALLAGA CENTRAL Y BAJO MAYO

MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE
EXP. TEC. PIP :
POLVORA, PROVINCIA DE TOCACHE, DEPARTAMENTO DE SAN MARTÍN

UBICACIÓN : VISTA ALEGRE - SANTA ROSA DE MISHOLLO DEL DISTRITO DEL POLVORA - TOCACHE - SAN MARTIN

FECHA : JUNIO DEL 2022

RESIDENTE
RESPONS. : ING. CARLOS NICOLAS REYNA FLORES

EST. AC AR D VC VCms VCrs VCrf VR ms rs rf


3+398.83 1.42 4.5 18.83 13.37 13.37 0.00 0.00 108.00 1.00 0.00 0.00
PROYECCION DE PUENTE 3+400
3+407.43 2.85 2.3
3+410.00 3.42 0.14 2.57 8.05 8.05 0.00 0.00 3.13 1.00 0.00 0.00
3+420.00 18.5 0 10.00 109.60 109.60 0.00 0.00 0.70 1.00 0.00 0.00
3+430.00 26.58 0 10.00 225.40 225.40 0.00 0.00 0.00 1.00 0.00 0.00
3+440.00 26.92 0 10.00 267.50 267.50 0.00 0.00 0.00 1.00 0.00 0.00
3+450.00 24.53 0 10.00 257.25 257.25 0.00 0.00 0.00 1.00 0.00 0.00
3+460.00 25.44 0 10.00 249.85 249.85 0.00 0.00 0.00 1.00 0.00 0.00
3+470.00 29.92 0 10.00 276.80 276.80 0.00 0.00 0.00 1.00 0.00 0.00
3+480.00 33.47 0 10.00 316.95 316.95 0.00 0.00 0.00 1.00 0.00 0.00
3+490.00 29.81 0 10.00 316.40 316.40 0.00 0.00 0.00 1.00 0.00 0.00
3+500.00 21.61 0 10.00 257.10 257.10 0.00 0.00 0.00 1.00 0.00 0.00
3+510.00 15.01 0 10.00 183.10 183.10 0.00 0.00 0.00 1.00 0.00 0.00
3+520.00 8.98 0 10.00 119.95 119.95 0.00 0.00 0.00 1.00 0.00 0.00
3+540.00 2.39 0 20.00 113.70 113.70 0.00 0.00 0.00 1.00 0.00 0.00
3+560.00 3.56 0 20.00 59.50 59.50 0.00 0.00 0.00 1.00 0.00 0.00
3+580.00 4.72 0 20.00 82.80 82.80 0.00 0.00 0.00 1.00 0.00 0.00
3+600.00 5.87 0 20.00 105.90 105.90 0.00 0.00 0.00 1.00 0.00 0.00
3+620.00 6.56 0 20.00 124.30 124.30 0.00 0.00 0.00 1.00 0.00 0.00
3+640.00 7.28 0 20.00 138.40 138.40 0.00 0.00 0.00 1.00 0.00 0.00
3+650.00 6.98 0 10.00 71.30 71.30 0.00 0.00 0.00 1.00 0.00 0.00
3+660.00 5.51 0 10.00 62.45 62.45 0.00 0.00 0.00 1.00 0.00 0.00
3+670.00 3.33 0.04 10.00 44.20 44.20 0.00 0.00 0.20 1.00 0.00 0.00
3+680.00 2.93 0.68 10.00 31.30 31.30 0.00 0.00 3.60 1.00 0.00 0.00
3+690.00 3.91 0.96 10.00 34.20 34.20 0.00 0.00 8.20 1.00 0.00 0.00
3+700.00 2.74 1.14 10.00 33.25 33.25 0.00 0.00 10.50 1.00 0.00 0.00
3+710.00 1.73 1.09 10.00 22.35 22.35 0.00 0.00 11.15 1.00 0.00 0.00
3+720.00 0.57 1.22 10.00 11.50 11.50 0.00 0.00 11.55 1.00 0.00 0.00
3+730.00 0.23 0.66 10.00 4.00 4.00 0.00 0.00 9.40 1.00 0.00 0.00
3+740.00 0.5 0.36 10.00 3.65 3.65 0.00 0.00 5.10 1.00 0.00 0.00
3+750.00 0.83 0.22 10.00 6.65 6.65 0.00 0.00 2.90 1.00 0.00 0.00
3+760.00 1.08 0.31 10.00 9.55 9.55 0.00 0.00 2.65 1.00 0.00 0.00
3+770.00 1.04 0.56 10.00 10.60 10.60 0.00 0.00 4.35 1.00 0.00 0.00
3+780.00 1.08 0.6 10.00 10.60 10.60 0.00 0.00 5.80 1.00 0.00 0.00
SUSTENTO DE METRADOS: VOLUMENES DE CORTE Y RELLENO - MOVIMIENTO DE
TIERRAS

ENTIDAD : PROYECTO ESPECIAL HUALLAGA CENTRAL Y BAJO MAYO

MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE
EXP. TEC. PIP :
POLVORA, PROVINCIA DE TOCACHE, DEPARTAMENTO DE SAN MARTÍN

UBICACIÓN : VISTA ALEGRE - SANTA ROSA DE MISHOLLO DEL DISTRITO DEL POLVORA - TOCACHE - SAN MARTIN

FECHA : JUNIO DEL 2022

RESIDENTE
RESPONS. : ING. CARLOS NICOLAS REYNA FLORES

EST. AC AR D VC VCms VCrs VCrf VR ms rs rf


3+790.00 1.15 0.36 10.00 11.15 11.15 0.00 0.00 4.80 1.00 0.00 0.00
3+800.00 1.28 0.35 10.00 12.15 12.15 0.00 0.00 3.55 1.00 0.00 0.00
3+810.00 1.31 0.31 10.00 12.95 12.95 0.00 0.00 3.30 1.00 0.00 0.00
3+820.00 1.59 0 10.00 14.50 14.50 0.00 0.00 1.55 1.00 0.00 0.00
3+840.00 4.4 0 20.00 59.90 59.90 0.00 0.00 0.00 1.00 0.00 0.00
3+860.00 6.85 0 20.00 112.50 112.50 0.00 0.00 0.00 1.00 0.00 0.00
3+880.00 8.61 0 20.00 154.60 154.60 0.00 0.00 0.00 1.00 0.00 0.00
3+900.00 8.72 0 20.00 173.30 173.30 0.00 0.00 0.00 1.00 0.00 0.00
3+920.00 9.95 0 20.00 186.70 186.70 0.00 0.00 0.00 1.00 0.00 0.00
3+940.00 7.39 0 20.00 173.40 173.40 0.00 0.00 0.00 1.00 0.00 0.00
3+960.00 1.51 0.94 20.00 89.00 89.00 0.00 0.00 9.40 1.00 0.00 0.00
3+980.00 0 4.87 20.00 15.10 15.10 0.00 0.00 58.10 1.00 0.00 0.00
4+000.00 1.22 0.47 20.00 12.20 12.20 0.00 0.00 53.40 1.00 0.00 0.00
TOTAL (M3) 8304.49 8304.49 0.00 0.00 720.27

EST. AC AR D VC VCms VCrs VCrf VR ms rs rf


4+000.00 1.22 0.47
4+010.00 7.13 0 10.00 41.75 41.75 0.00 0.00 2.35 1.00 0.00 0.00
4+020.00 16.25 0 10.00 116.90 116.90 0.00 0.00 0.00 1.00 0.00 0.00
4+030.00 19.81 0 10.00 180.30 180.30 0.00 0.00 0.00 1.00 0.00 0.00
4+040.00 17.71 0 10.00 187.60 187.60 0.00 0.00 0.00 1.00 0.00 0.00
4+050.00 12 0 10.00 148.55 148.55 0.00 0.00 0.00 1.00 0.00 0.00
4+060.00 6.92 1.4 10.00 94.60 94.60 0.00 0.00 7.00 1.00 0.00 0.00
4+080.00 3.26 0 20.00 101.80 101.80 0.00 0.00 14.00 1.00 0.00 0.00
4+097.60 1.51 1.24 17.60 41.96 41.96 0.00 0.00 10.91 1.00 0.00 0.00
PROYECCION DE PUENTE 4+100
4+106.60 2 4.19
4+120.00 6.22 0 13.40 55.09 55.09 0.00 0.00 28.08 1.00 0.00 0.00
4+140.00 15.57 0 20.00 217.90 217.90 0.00 0.00 0.00 1.00 0.00 0.00
4+160.00 16.22 0 20.00 317.90 317.90 0.00 0.00 0.00 1.00 0.00 0.00
4+180.00 8.44 0.33 20.00 246.60 246.60 0.00 0.00 3.30 1.00 0.00 0.00
4+200.00 5.37 1.23 20.00 138.10 138.10 0.00 0.00 15.60 1.00 0.00 0.00
4+220.00 6.61 1.05 20.00 119.80 119.80 0.00 0.00 22.80 1.00 0.00 0.00
4+230.00 3.69 1.56 10.00 51.50 51.50 0.00 0.00 13.05 1.00 0.00 0.00
4+240.00 2.13 2.92 10.00 29.10 29.10 0.00 0.00 22.40 1.00 0.00 0.00
SUSTENTO DE METRADOS: VOLUMENES DE CORTE Y RELLENO - MOVIMIENTO DE
TIERRAS

ENTIDAD : PROYECTO ESPECIAL HUALLAGA CENTRAL Y BAJO MAYO

MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE
EXP. TEC. PIP :
POLVORA, PROVINCIA DE TOCACHE, DEPARTAMENTO DE SAN MARTÍN

UBICACIÓN : VISTA ALEGRE - SANTA ROSA DE MISHOLLO DEL DISTRITO DEL POLVORA - TOCACHE - SAN MARTIN

FECHA : JUNIO DEL 2022

RESIDENTE
RESPONS. : ING. CARLOS NICOLAS REYNA FLORES

EST. AC AR D VC VCms VCrs VCrf VR ms rs rf


4+260.00 0 4.15 20.00 21.30 21.30 0.00 0.00 70.70 1.00 0.00 0.00
4+270.00 0 3.56 10.00 0.00 0.00 0.00 0.00 38.55 1.00 0.00 0.00
4+280.00 0 2.24 10.00 0.00 0.00 0.00 0.00 29.00 1.00 0.00 0.00
4+300.00 0.15 1.15 20.00 1.50 1.50 0.00 0.00 33.90 1.00 0.00 0.00
4+310.00 0 3.72 10.00 0.75 0.75 0.00 0.00 24.35 1.00 0.00 0.00
4+320.00 0 3.42 10.00 0.00 0.00 0.00 0.00 35.70 1.00 0.00 0.00
4+340.00 0.28 4.36 20.00 2.80 2.80 0.00 0.00 77.80 1.00 0.00 0.00
4+350.00 0.48 5.61 10.00 3.80 3.80 0.00 0.00 49.85 1.00 0.00 0.00
4+360.00 0.95 4.12 10.00 7.15 7.15 0.00 0.00 48.65 1.00 0.00 0.00
4+370.00 0.73 3.16 10.00 8.40 8.40 0.00 0.00 36.40 1.00 0.00 0.00
4+380.00 0.47 1.92 10.00 6.00 6.00 0.00 0.00 25.40 1.00 0.00 0.00
4+400.00 1.39 0.34 20.00 18.60 18.60 0.00 0.00 22.60 1.00 0.00 0.00
4+410.00 0.84 0.28 10.00 11.15 11.15 0.00 0.00 3.10 1.00 0.00 0.00
4+420.00 0.47 1.01 10.00 6.55 6.55 0.00 0.00 6.45 1.00 0.00 0.00
4+430.00 0.1 1.79 10.00 2.85 2.85 0.00 0.00 14.00 1.00 0.00 0.00
4+440.00 0 2 10.00 0.50 0.50 0.00 0.00 18.95 1.00 0.00 0.00
4+460.00 0.09 0.59 20.00 0.90 0.90 0.00 0.00 25.90 1.00 0.00 0.00
4+480.00 0.31 0.55 20.00 4.00 4.00 0.00 0.00 11.40 1.00 0.00 0.00
4+500.00 0 1.72 20.00 3.10 3.10 0.00 0.00 22.70 1.00 0.00 0.00
4+510.00 0.01 2.52 10.00 0.05 0.05 0.00 0.00 21.20 1.00 0.00 0.00
4+520.00 0.47 2.1 10.00 2.40 2.40 0.00 0.00 23.10 1.00 0.00 0.00
4+530.00 0.87 0.29 10.00 6.70 6.70 0.00 0.00 11.95 1.00 0.00 0.00
4+540.00 1.52 1.22 10.00 11.95 11.95 0.00 0.00 7.55 1.00 0.00 0.00
4+550.00 3.47 0 10.00 24.95 24.95 0.00 0.00 6.10 1.00 0.00 0.00
4+560.00 6.77 0 10.00 51.20 51.20 0.00 0.00 0.00 1.00 0.00 0.00
4+570.00 10.54 0 10.00 86.55 86.55 0.00 0.00 0.00 1.00 0.00 0.00
4+580.00 14.69 0 10.00 126.15 126.15 0.00 0.00 0.00 1.00 0.00 0.00
4+600.00 10.45 0 20.00 251.40 251.40 0.00 0.00 0.00 1.00 0.00 0.00
4+610.00 7.25 0 10.00 88.50 88.50 0.00 0.00 0.00 1.00 0.00 0.00
4+620.00 4.91 0 10.00 60.80 60.80 0.00 0.00 0.00 1.00 0.00 0.00
4+630.00 5.18 0 10.00 50.45 50.45 0.00 0.00 0.00 1.00 0.00 0.00
4+640.00 5.32 0 10.00 52.50 52.50 0.00 0.00 0.00 1.00 0.00 0.00
4+660.00 0.41 1.17 20.00 57.30 57.30 0.00 0.00 11.70 1.00 0.00 0.00
4+680.00 0 2.41 20.00 4.10 4.10 0.00 0.00 35.80 1.00 0.00 0.00
4+700.00 3.22 0 20.00 32.20 32.20 0.00 0.00 24.10 1.00 0.00 0.00
SUSTENTO DE METRADOS: VOLUMENES DE CORTE Y RELLENO - MOVIMIENTO DE
TIERRAS

ENTIDAD : PROYECTO ESPECIAL HUALLAGA CENTRAL Y BAJO MAYO

MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE
EXP. TEC. PIP :
POLVORA, PROVINCIA DE TOCACHE, DEPARTAMENTO DE SAN MARTÍN

UBICACIÓN : VISTA ALEGRE - SANTA ROSA DE MISHOLLO DEL DISTRITO DEL POLVORA - TOCACHE - SAN MARTIN

FECHA : JUNIO DEL 2022

RESIDENTE
RESPONS. : ING. CARLOS NICOLAS REYNA FLORES

EST. AC AR D VC VCms VCrs VCrf VR ms rs rf


4+720.00 5.77 0 20.00 89.90 89.90 0.00 0.00 0.00 1.00 0.00 0.00
4+740.00 4.51 0 20.00 102.80 102.80 0.00 0.00 0.00 1.00 0.00 0.00
4+743.45 3.63 0.02 3.45 14.04 14.04 0.00 0.00 0.03 1.00 0.00 0.00
TOTAL (M3) 3302.75 3302.75 0.00 0.00 876.43
OBRA : MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE POLVORA, PROVINCIA DE TOCACHE,
DEPARTAMENTO DE SAN MARTÍN
TRAMO : VISTA ALEGRE - SANTA ROSA DE MISHOLLO
CONTRATI : CONSORCIO MISHOLLO
SUPERVIS : CONSORCIO SUPERVISOR TOCACHE

METRADOS TRASPORTE MATERIAL EXCEDENTE POR CORTE DE EXPLANACION


: Transporte de : Transporte de
UBICACIÓN MOVIMIENTO DE TIERRAS ACOPIO DT D.M.E DT mat excedente D mat excedente
< 1 km D>< 1 km

CORTE Metrado
Inicio Final LADO Long C.G. Ubicación Acceso Km Ubicación Acceso Km m3.km m3.km
NORMAL Adicional
00+000 01+000 1,000.00 0.50 1,689.85 2.20000 0.000 1.700 2.20000 0.100 1.800 1,487.07 1,351.88
01+000 02+000 1,000.00 1.50 1,034.62 2.20000 0.000 0.700 2.20000 0.100 0.800 703.54 0.00
02+000 03+000 1,000.00 2.50 282.80 2.20000 0.000 0.300 2.30000 0.100 0.300 50.90 0.00
03+000 04+000 1,000.00 3.50 8,304.49 2.20000 0.000 1.300 2.30000 0.100 1.300 7,307.95 2,491.35
04+000 04+743 743.45 4.37 3,302.75 2.20000 0.000 2.172 4.74000 0.100 0.468 1,150.27 0.00
4,743.45 14,614.51 - 10,699.73 3,843.23

MATERIAL EXCEDENTE (VARIOS) 3099.296 1016.782


REPLANTEO 13,799.03 4,860.01
EXPEDIENTE TECNICO 19,725.70 7,639.75
DEDUCTIVO 5,926.67 2,779.74
OBRA : MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE POLVORA, PROVINCIA DE TOCACHE,
DEPARTAMENTO DE SAN MARTÍN
TRAMO : VISTA ALEGRE - SANTA ROSA DE MISHOLLO
CONTRATI : CONSORCIO MISHOLLO
SUPERVIS : CONSORCIO SUPERVISOR TOCACHE

METRADOS TRANSPORTE DE MATERIAL EXCEDENTE DE CORTE POR MEJORAMIENTO


: Transporte de : Transporte de
UBICACIÓN MOVIMIENTO DE TIERRAS ACOPIO DT D.M.E DT mat excedente D mat excedente
< 1 km D>< 1 km

CORTE DE Metrado
Inicio Final LADO Long C.G. Ubicación Acceso Km Ubicación Acceso Km m3.km m3.km
MEJ Adicional
00+000 01+000 1,000.00 0.50 3,025.55 2.20000 0.000 1.700 2.20000 0.100 1.800 2,662.48 2,420.44
01+000 02+000 1,000.00 1.50 3,546.44 2.20000 0.000 0.700 2.20000 0.100 0.800 2,411.58 0.00
02+000 03+000 1,000.00 2.50 3,325.05 2.20000 0.000 0.300 2.30000 0.100 0.300 598.51 0.00
03+000 04+000 1,000.00 3.50 3,336.99 2.20000 0.000 1.300 2.30000 0.100 1.300 2,936.55 1,001.10
04+000 04+743 743.45 4.37 2,631.99 2.20000 0.000 2.172 4.74000 0.100 0.468 916.66 0.00
4,743.45 15,866.02 - 9,525.78 3,421.54
: MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO
OBRA
DE POLVORA, PROVINCIA DE TOCACHE, DEPARTAMENTO DE SAN MARTÍN

TRAMO : VISTA ALEGRE - SANTA ROSA DE MISHOLLO


CONTRATISTA : CONSORCIO MISHOLLO
SUPERVISOR : CONSORCIO SUPERVISOR TOCACHE

RESUMEN TRANSPORTE DE MATERIAL GRANULAR

: Transporte de mat : Transporte de mat


granular D < 1 km granular D>< 1 km

TERRAPLENES Y MEJORAMIENTO Y RECONFORMACION 14197.16 8102.19

RELLENOS DE PUENTES 738.208672 315.172368

TOTAL 14935.37 m3-Km 8417.36 m3-Km


OBRA : MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE POLVORA, PROVINCIA DE TOCACHE, DEPARTAMENTO DE SAN MARTÍN
TRAMO : VISTA ALEGRE - SANTA ROSA DE MISHOLLO
CONTRATIS : CONSORCIO MISHOLLO
SUPERVISO : CONSORCIO SUPERVISOR TOCACHE

METRADOS TRASNPORTE DE MATERIAL GRANULAR (RELLENOS Y MEJORAMIENTOS)


: Transporte de : Transporte de
UBICACIÓN ACOPIO DT mat granular D < mat granular D>< D.M.E DT
1 km 1 km
TOTAL Metrado
Inicio Final LADO Long C.G. MEJOR TERRAPLEN RECON Ubicación Acceso Km m3.km m3.km Ubicación Acceso Km
GRANULAR Adicional
00+000 01+000 1,000.00 0.50 3,025.55 751.20 174.92 3,951.67 2.20000 0.000 1.700 3,477.47 2,766.17 2.20000 0.100 1.800
01+000 02+000 1,000.00 1.50 3,546.44 1,565.44 186.73 5,298.60 2.20000 0.000 0.700 3,073.19 0.00 2.20000 0.100 0.800
02+000 03+000 1,000.00 2.50 3,325.05 1,743.65 294.59 5,363.29 2.20000 0.000 0.300 965.39 0.00 2.30000 0.100 0.300
03+000 04+000 1,000.00 3.50 3,336.99 720.27 26.49 4,083.75 2.20000 0.000 1.300 3,593.70 1,225.13 2.30000 0.100 1.300
04+000 04+743 743.45 4.37 2,631.99 876.43 - 3,508.41 2.20000 0.000 2.172 3,087.40 4,110.90 4.74000 0.100 0.468
4,743.45 15,866.02 5,656.99 682.73 22,205.73 - 14,197.16 8,102.19
OBRA : MEJORAMIENTO DEL CAMINO VECINAL SM-909, TRAMO:VISTA ALEGRE – SANTA ROSA DE MISHOLLO DEL DISTRITO DE POLVORA, PROVINCIA DE TOCACHE, DEPARTAMENTO DE SAN MARTÍN

TRAMO : VISTA ALEGRE - SANTA ROSA DE MISHOLLO

CONTRATISTA: CONSORCIO MISHOLLO

SUPERVISOR : CONSORCIO SUPERVISOR TOCACHE

METRADOS TRASNPORTE DE MATERIAL GRANULAR (RELLENOS DE PUENTES)


: Transporte de : Transporte de
UBICACIÓN ACOPIO DT mat granular D < mat granular D><
1 km 1 km
Metrado
Inicio Final LADO Long C.G. PUENTE Ubicación Acceso Km m3.km m3.km
Adicional
01+800 01+800 - 1.80 175.20 2.20000 0.000 0.400 49.06 0.00
03+280 03+280 - 3.28 204.16 2.20000 0.000 1.080 179.66 16.33
03+400 03+400 - 3.40 317.48 2.20000 0.000 1.200 279.38 63.50
04+100 04+100 - 4.10 261.49 2.20000 0.000 1.900 230.11 235.34
- 958.33 - 738.21 315.17
PLANILLA DE METRADOS - CUNETAS REVESTIDAS

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF!
#REF!

N° DIMENSIONES UNIDAD
COD. DESCRIPCION
Veces L (m) A (m) H (m) Kg M2 M3 OTRAS Unid.
01.06 OBRAS DE ARTE Y DRENAJE
01.06.03 CUNETAS REVESTIDAS
01.06.03.01 TRABAJOS PRELIMINARES
01.06.03.01.01 LIMPIEZA MANUAL DE TERRENO 4,683.45 7,259.35 m2
MARGEN IZQUIERDA
PROG. 0 AL 240 IZQ 1 240.00 1.55 372.00
PROG. 240 AL 350 IZQ 1 110.00 1.55 170.50
PROG. 390 AL 420 IZQ 1 30.00 1.55 46.50
PROG. 430 AL 500 IZQ 1 70.00 1.55 108.50
PROG. 620 AL 630 IZQ 1 10.00 1.55 15.50
PROG. 900 AL 940 IZQ 1 40.00 1.55 62.00
PROG. 960 AL 1060 IZQ 1 100.00 1.55 155.00
PROG. 1240 AL 1280 IZQ 1 40.00 1.55 62.00
PROG. 1380 AL 1400 IZQ 1 20.00 1.55 31.00
PROG. 1480 AL 1590 IZQ 1 110.00 1.55 170.50
PROG. 1620 AL 1720 IZQ 1 100.00 1.55 155.00
PROG. 1770 AL 1830 IZQ 1 60.00 1.55 93.00
PROG. 1900 AL 1960 IZQ 1 60.00 1.55 93.00
PROG. 2060 AL 2120 IZQ 1 60.00 1.55 93.00
PROG. 2220 AL 2240 IZQ 1 20.00 1.55 31.00
PROG. 2320 AL 2350 IZQ 1 30.00 1.55 46.50
PROG. 2390 AL 2400 IZQ 1 10.00 1.55 15.50
PROG. 2460 AL 2560 IZQ 1 100.00 1.55 155.00
PROG. 2580 AL 2360 IZQ 1 380.00 1.55 589.00
PROG. 2980 AL 3070 IZQ 1 90.00 1.55 139.50
PROG. 3120 AL 3140 IZQ 1 20.00 1.55 31.00
PROG. 3220 AL 3260 IZQ 1 40.00 1.55 62.00
PROG. 3320 AL 3370 IZQ 1 50.00 1.55 77.50
PROG. 3690 AL 3770 IZQ 1 80.00 1.55 124.00
PROG. 3920 AL 4020 IZQ 1 100.00 1.55 155.00
PROG. 4130 AL 4200 IZQ 1 70.00 1.55 108.50
PROG. 4210 AL 4320 IZQ 1 110.00 1.55 170.50
PROG. 4380 AL 4480 IZQ 1 100.00 1.55 155.00
PROG. 4550 AL 4660 IZQ 1 110.00 1.55 170.50
PROG. 4720 AL 4743.45 IZQ 1 23.45 1.55 36.35

MARGEN DERECHA
PROG. 0 AL 240 DER 1 240.00 1.55 372.00
PROG. 240 AL 350 DER 1 110.00 1.55 170.50
PROG. 350 AL 390 DER 1 40.00 1.55 62.00
PROG. 390 AL 420 DER 1 30.00 1.55 46.50
PROG. 740 AL 880 DER 1 140.00 1.55 217.00
PROG. 900 AL 940 DER 1 40.00 1.55 62.00
PROG. 1120 AL 1150 DER 1 30.00 1.55 46.50
PROG. 1240 AL 1280 DER 1 40.00 1.55 62.00
PROG. 1300 AL 1350 DER 1 50.00 1.55 77.50
PROG. 1420 AL 1450 DER 1 30.00 1.55 46.50
PROG. 1620 AL 1720 DER 1 100.00 1.55 155.00
PROG. 1740 AL 1760 DER 1 20.00 1.55 31.00
PLANILLA DE METRADOS - CUNETAS REVESTIDAS

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF!
#REF!

N° DIMENSIONES UNIDAD
COD. DESCRIPCION
Veces L (m) A (m) H (m) Kg M2 M3 OTRAS Unid.
PROG. 1770 AL 1830 DER 1 60.00 1.55 93.00
PROG. 1900 AL 1960 DER 1 60.00 1.55 93.00
PROG. 2130 AL 2180 DER 1 50.00 1.55 77.50
PROG. 2580 AL 2960 DER 1 380.00 1.55 589.00
PROG. 3120 AL 3140 DER 1 20.00 1.55 31.00
PROG. 3220 AL 3260 DER 1 40.00 1.55 62.00
PROG. 3420 AL 3460 DER 1 40.00 1.55 62.00
PROG. 3480 AL 3680 DER 1 200.00 1.55 310.00
PROG. 3690 AL 3770 DER 1 80.00 1.55 124.00
PROG. 3790 AL 3860 DER 1 70.00 1.55 108.50
PROG. 4130 AL 4200 DER 1 70.00 1.55 108.50
PROG. 4210 AL 4320 DER 1 110.00 1.55 170.50
PROG. 4340 AL 4380 DER 1 40.00 1.55 62.00
PROG. 4380 AL 4480 DER 1 100.00 1.55 155.00
PROG. 4550 AL 4660 DER 1 110.00 1.55 170.50

01.06.03.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR 7,259.35 m2


material suelto 1 7,259.35 ……… ……… 7,259.35
PLANILLA DE METRADOS - CUNETAS REVESTIDAS

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF!
#REF!

N° DIMENSIONES UNIDAD
COD. DESCRIPCION
Veces L (m) A (m) H (m) Kg M2 M3 OTRAS Unid.
01.06.03.02 MOVIMIENTO DE TIERRAS
01.06.03.02.01 PERFILADO DE CUNETAS LATERALES EN MATERIAL SUELTO 1,920.21 m3
MARGEN IZQUIERDA
CUNETA TRIANGULAR 1 2383.45 0.20 Perimetro = 2.05 977.21

MARGEN DERECHA
CUNETA TRIANGULAR 1 2300.00 0.20 Perimetro = 2.05 943.00

01.06.03.02.02 RELLENO CON MATERIAL HORMIGON E=0.10 COMPACTADO C/EQUIPO 936.69 m3

MARGEN IZQUIERDA
CUNETA TRIANGULAR 1 2383.45 0.200 476.69

MARGEN DERECHA
CUNETA TRIANGULAR 1 2300.00 0.200 460.00

01.06.03.02.03 ELIMINACION DE MATERIAL EXCEDENTE DP>= 1.70 KM 2,400.27 m3


eliminacion de corte en material suelto 1.25 1,920.21 2400.27

01.06.03.03 CONCRETO SIMPLE


01.06.03.03.01 CONCRETO F'C= 175 KG/CM2 EN CUNETAS 838.34 m3
CUNETAS TRINGULARES
Cunetas triangulares 1.0 4,683.45 0.179 838.34

01.06.03.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN CUNETAS 4,917.62 m2


CUNETAS TRINGULARES
Cunetas triangulares 1.0 4,683.45 1.05 4917.62

01.06.03.03.03 TEKNOPORT E=1" PARA JUNTA DE DILATACION 2,499.20 ml


CUNETAS TRINGULARES
Cunetas triangulares 1 1,562.00 1.60 2499.20

01.06.03.03.04 SELLADO DE JUNTAS DE DILATACION E=1" CON MEZCLA ASFALTICA 2,499.20 ml


CUNETAS TRINGULARES
Cunetas triangulares 1 1,562.00 1.60 2499.20