Professional Documents
Culture Documents
Be Civil Engineering Semester 5 2018 May Hydrology and Water Resource Engineering HWR Pattern 2015
Be Civil Engineering Semester 5 2018 May Hydrology and Water Resource Engineering HWR Pattern 2015
Be Civil Engineering Semester 5 2018 May Hydrology and Water Resource Engineering HWR Pattern 2015
7
[5353]-501
9:5
T.E. (Civil)
4:0
81
5/2 1
HYDROLOGY & WATER RESOURCE ENGINEERING
9
01
8 0 30
.23 01 (2015 Pattern)
Time : 2½ Hours] [Max. Marks : 70
2/0
P
Instructions to the candidates:
8.2 G
Q12.
16
7
9:5
49
Q1) a) the isohytes due to storm were having following data; [4]
4:0
81
91
isohytes[mm] Area[km2]
01
30
150 40
5/2
01
170-150 150
2/0
GP
150-140 70
80
.23
140-130 200
CE
16
130-110 25
8.2
9:5
49
OR
30
5/2
Q2) a) What are the different types of rain gauges? Explain non-recording type
01
2/0
P.T.O.
OR
Q4) Estimate the number of days required between two watering for a crop having
following data : [7]
7
9:5
i) Field capacity = 30%,
4:0
ii) permanent wilting point = 15%
81
5/2 1
9
01
iii) Apparent density of soil = 1.5
iv) 8 0 30
effective depth of root zone = 755.55 mm,
.23 01
v)
2/0
daily consumptive use of water for crop = 10 mm
8.2 G
P
.24 CE
16
7
of well are 10 m and 0.5m respectively. Determine aquifer constant of
9:5
water bearing statum. [3]
49
4:0
b) Distinguish between unconfined aquifer and perched aquifer.
81 [3]
91
01
30
OR
5/2
01
2/0
Q7) a) Define unit hydrograph. State factors affecting the unit hydrograph. 7
.24
9:5
Explain the components with the help of sketch. [8]
49
4:0
81
OR
5/2
01
2/0
Q8) a) State various methods to estimate flood and explain rational method in
GP
80
detail. [8]
.23
CE
[5353]-501 2
Q9) a) Explain the different steps involved in calculating the useful life of reservoir.
[8]
7
b) Write a note on B/C ratio for reservoir Explain any two methods. [8]
9:5
OR
4:0
81
5/2 1
Q10)a) Explain types of reservoirs and explain the points considered for selecting
9
the site for a reservoir and state the investigations required for construction
01
8 0 30
of reservoir.
.23 01 [8]
b) 2/0
Explain I.S.D method of flood routing. [8]
8.2 G
P
.24 CE
Q11)a) What are the field information to be collected before providing Drainage
16
7
9:5
b) Explain the Participatory Irrigation Management? Explain Need and
49
4:0
Objective of farmer Participation in Irrigation Management. [6]
81
91
c) How water management can be applied while Irrigation. [6]
01
30
5/2
OR
01
2/0
Q12)a) What is water logging? State methods to improve the sub-surface drainage.
GP
80
[6]
.23
7
.24
9:5
eee
49
4:0
81
91
01
30
5/2
01
2/0
GP
80
.23
CE
16
8.2
.24
49
[5353]-501 3