BGC PROJECTS

Technical Clarification Sheet / Technical Checklist

Enquiry Ref:
Project Name:
VENDOR Name:
VENDOR Quotation Number & Date:

Status
Sr. No Subject Reference Discipline Technical Clarification Points VENDOR’s Response VENDOR’s
(Open/Closed)
Response-TQ-3

The Offered valves shall be in Full compliance with Material Requisition and all its
G01 General Piping other attachments, MESC Numbers, MESC Buying Description Sheets and all
mandatory MESC SPEs stated in MESC Buying Description Sheets.

Vendor shall offer TAT approved design from TAMAP listed Manufacturer in
accordance with SPE 77/300 and EFA agreement. Vendor shall submit TAT
certificates along with the quotation and specify Shell GSI Report No. / TAT Certificate
G02 General Piping
No. against each line item in the quotation to ensure TAT coverage for offered
valves.Offered valves which are not covered under TAT range must be stated in the
Quotation & Deviation List.

If MESC Nos. are not available in the piping classes then project specific MESC Nos.
and MESC buying description sheets shall be generated and shall have suffix “Q, Q1,
Q2 or B1, B2, B3”. For example 7767110111Q, 7703265081B1 etc. The changes or
G03 General Piping addition to standard MESC Nos. will be indicated in red colour.
The project specific MESC Nos. and MESC buying description sheets are not available
on Shell MESC portal hence it will be attached with the relevant material requisitions.
Vendor has to download standard MESC Nos. from Shell MESC portal.

Vendor shall submit duly signed and stamped copies of all MESC Nos. and MESC
G04 General Piping
Buying Description sheets specified in Material Requisition.

Vendor shall submit following documents after Purchase Order.


Vendor Document index, ITP, GA Drawings & Tagplate Drawing, MTCs including IGC,
Ferrite,Heat Treatment, Impact test, Hardness Test Results (wherever applicable),
Procedures, NDE Reports (if applicable per SPE 77/302), Production FET Report,
Production Low Temperature Test Report (whenever applicable), Pressure Test
G05 Piping Report, Painting Procedure & Painting Inspection Report, Certificate of Compliance,
Spare Parts List for 2 Years Operation, Packing List, IOM, MRB & MRB Index.
WOOD Document submission procedure will be shared after Purchase Order.
General – Vendor
Documents

1 of 6
BGC PROJECTS

Technical Clarification Sheet / Technical Checklist

Enquiry Ref:
Project Name:
VENDOR Name:
VENDOR Quotation Number & Date:

Status
Sr. No Subject Reference
General – Vendor Discipline Technical Clarification Points VENDOR’s Response VENDOR’s
(Open/Closed)
Response-TQ-3
Documents
Additionally following documents also to be submitted after Purchase Orde by Vendor.
1. Fabrication/Production Schedule
2. Inspection Release Notes (IRN)
3. Packing and Shipping Schedule to ensure all the Items (including quantity) of
G05.1 Piping purchase orders have been dispatched.
Any additional Item specific Vendor document will be confirmed Post Order

Vendor to submit list of 2 Years Operation Spare parts in accordance with Spare Parts
G06 General – SPIR Piping Strategy for BGC project (Doc. No- 0000-BGC-G000-GE00-G00000-OA-5980-00002)
included in MR. The copy of E-SPIR shall be submitted after PO.

Vendor to include following minimum information in the offer. Otherwise vendor offer
will not be evaluated further.
1. Size, MESC Nos., Short Description & offered MESC Version against each line item.
General- Vendor
G07 Piping 2. DVT Associated Test IDs for offered valves.
Offer
3. TEC code for offered valves & TEC for DVT qualified vales. Any mismatches in TEC
code shall be identified in the deviation list with suitable technical justification.
4. Delivery Schedule against each line item.

Being EFA Suppliers, it is Vendor’s responsibility to strictly offer only TAT or DVT
approved design and also submit supporting TAT or DVT Certificates including list of
qualified valves and clarification or approved deviations if any. WOOD holds no
responsibility to verify TAT or DVT certificates and list.
General-
If Vendor is not having TAT/DVT approved design and also will not going to perform
G08 Responsibly of Piping
DVT then Vendor to clearly write in the deviation list that “Offered Valves are not
Vendors
TAT/DVT certified and further NO DVT will be performed”.
After Purchase order, if WOOD finds that some of the offered valves are not having
TAT or DVT certificates then Vendor will be responsible to perform TAT or DVT of
these valves without any cost & schedule impact to Purchase Order.

Vendor to submit duly signed & stamped copy of attached Deviation List which include
General- the deviations (if any) for offered valves and other deviations (EVADOC list) agreed
G09 Responsibly of Piping during TAT qualification.
Vendors Vendor to clearly write "No Deviation" in case vendor don't have any deviation.

2 of 6
BGC PROJECTS

Technical Clarification Sheet / Technical Checklist

Enquiry Ref:
Project Name:
VENDOR Name:
VENDOR Quotation Number & Date:

Status
Sr. No Subject Reference Discipline Technical Clarification Points VENDOR’s Response VENDOR’s
(Open/Closed)
Response-TQ-3

Being EFA supplier, Vendor can offer valves which have successfully passed DVT or
valves which will have DVT in future (specify approximate dates for DVT), in this case
Vendor to submit letter of compliance stating vendor takes full responsibility that
T01 Technical Points Piping offered valve will be fully in compliance with MESC Buying Description & will
successfully pass DVT qualification before Final Inspection of these Valves and
Vendor is authorized to supply these valves under EFA agreement. Also these
deviations shall be specified in Deviation List.

Vendor offered valves shall be in compliance with MESC buying description, MESC
T02 Technical Points Piping SPE 77/302 and other relevant MESC Specifications mentioned in the MESC buying
description sheets.

3 of 6
BGC PROJECTS

Technical Clarification Sheet / Technical Checklist

Enquiry Ref:
Project Name:
VENDOR Name:
VENDOR Quotation Number & Date:

Status
Sr. No Subject Reference Discipline Technical Clarification Points VENDOR’s Response VENDOR’s
(Open/Closed)
Response-TQ-3

All offered valves shall minimum comply with MESC SPEs version 14 or 14A. However
T03 Technical Points Piping older version may be acceptable if TAT certificates are still valid.
Vendor shall specification MESC Version against each line item in the quotation.

Technical Points
Wafer / Wafer Lug Type Check and Butterfly Valves shall have through bolted design
for Wafer / Wafer
T04 Piping irrespective of what specified in relevant MESC Buying Description Sheet.
Lug Type Check &
Tapped holes design is NOT acceptable.
Butterfly Valves

If weld overlay on internal parts of the valves (such as body, laterals & cover) are
required in accordance any MESC SPE requirement then weld overlay material shall
T05 Technical Points Piping
be equivalent or superior to trim material irrespective of weld overlay material required
as per MESC SPEs.

All valves shall be purchased from Shell approved TAMAP manufacturers who are
having standard ITPs approved by Shell Global Solutions during TAT qualification
T06 Piping
process. The same ITPs shall be followed in order to reduce the efforts on developing
project specific inspection points.

Inspection & Testing


Final witness inspection is expected and WOOD inspector will check the completeness
of vendor documents as per approved Vendor Document Index(VDI), review &
T07 Piping stamped all the test certificates, test results, perform visual & dimensional check,
marking & tagging check as per approved GA drawings & tagplate drawing.
However any witness points will be conveyed while reviewing ITP for each order.

All valves shall be 100% pressure tested (hydrostatic and pneumatic test) including
back seat test for Gate & Globe Valves. Testing requirements and testing standard will
T08 Pressure Test Piping
be same as agreed during TAT qualification process. Extent of Testing shall be as
agreed in EFA.

Other Testing Heat Treatment, Impact Testing, Welding & Hard Facing, Ferrite test, Hardness & IGC
T09 Piping
Requirements Testing shall be in accordance with MESC SPE 77/302.

4 of 6
BGC PROJECTS

Technical Clarification Sheet / Technical Checklist

Enquiry Ref:
Project Name:
VENDOR Name:
VENDOR Quotation Number & Date:

Status
Sr. No Subject Reference Discipline Technical Clarification Points VENDOR’s Response VENDOR’s
(Open/Closed)
Response-TQ-3

NDE requirements and extent of NDE to be performed shall be in accordance


T10 NDE Requirements Piping Inspection Category specified in the relevant MESC buying description sheet and
MESC SPE 77/302.

Fugitive Emission
T11 Production Test Piping Vendor to perform FET (wherever applicable) in accordance with MESC SPE 77/312.
(FET)

Low Temperature Vendor to perform Low Temperature Test (wherever applicable) in accordance with
T12 Piping
(LT) Production Test MESC SPE 77/200.

Marking & Tagging requirement shall be in accordance Specification for Marking and
Colour Coding (Doc. No. 9500-WGEL-G000-ISGP-G00000-MP-7880-00007).
Each valve shall have Permanent Tagplate securely attached with body of valve.
T13 Permanent Tagplate Piping
Following minimum information shall be included on Permanent Tagplate.
The manufacturer’s name or Trademark, Nominal size, Material Grade, Rating, Trim
material Grade, any other marking requirements as per MESC SPEs.

Each valve shall be provided with SS316 Supplementary Tagplate securely attached
with SS316 wire to the valve.
Vendor has to include following information on Supplementary Tagplate.
Supplementary
T14 Piping
Tagplate
1. BGC Purchase Order & Item No.
2. MESC No.
3. Painting Specification & Paint System

Packing & Preservation shall be as per BGC – Preservation, Packing, Marking and
Despatch Instruction Doc. No. 9500-WGEL-G001-ISGP-G00000-ZV-G03-000001-001,
attached with this MR.

Packing & preservation Procedure shall be submitted after contract award which shall
be in line with the above document.
Packing &
T15 Piping Piping Valves shall be export packed suitable for sea worthy, road and air
Preservation
transportation and shall be packed and protected against the risk of damage during
transportation and storage. Also,
Unpacking and Preservation Procedure, Packing, Handling and Shipping Procedure, &
Packing and Shipping Schedule shall be as per EFA agreement / DEP requirement &
BGC – PRESERVATION, PACKING, MARKING AND DESPATCH INSTRUCTION
(Doc. No. 9500-WGEL-G001-ISGP-G00000-ZV-G03-000001-001)

5 of 6
BGC PROJECTS

Technical Clarification Sheet / Technical Checklist

Enquiry Ref:
Project Name:
VENDOR Name:
VENDOR Quotation Number & Date:

Status
Sr. No Subject Reference Discipline Technical Clarification Points VENDOR’s Response VENDOR’s
(Open/Closed)
Response-TQ-3

All carbon steel (CS & LTCS) and stainless steel (SS) valves shall be painted in
accordance with BGC Project Painting Specification (Doc. No. 1000-BGC-G000-ISGP-
G00000-RA-7754-00001). Vendor to update & submit unpriced quotation along with
TQ2 response.
• Paint System CS-5, Total DFT - 100µm (Inorganic Zinc Silicate & Silicone Aluminium)
for CS, LTCS & Ducticle Iron Valves (Operating / Design Temperature Range -29 0C to
4000C), Finish Color - Aluminium

• Paint System CS-5.1, Total DFT - 150µm (two coats of Heat Resistant Cold Spray
T16
Aluminum @ DFT 75 micron each coat) for CS & LTCS Valves ( Operating / Design
Temperature range -500C to 2000C), Finish Color - Aluminium

• Paint System for SS / Duplex valves considering uninsulated valves, Total DFT -
75µm (three coats of Silicone aluminium @ DFT 25µm each coat for the Operating /
External Painting Piping Design temperature range of -500C to 2000C), Finish Color - Aluminium

Painting System CS 5.1 and SS valves will be added into BGC Project Painting later
on.

The Ends of socket weld and butt weld valves shall not be painted for a distance of 15-
20mm from the ends; unpainted area shall be taped over with duct tape or similar to
T17
provide protection against corrosion and ingress of foreign material until valves are
installed.

The Ends of valves fitted with pup pieces shall be left unpainted for a distance of
50mm from the plain / bevel end, unpainted area shall be taped over with duct tape or
T18 similar to provide protection against corrosion and ingress of foreign material until
valves are installed. Plain / Bevel ends shall be protected against damage during
shipping and storage

Locking Arrangement Irrespective of Requirement in MESC SPEs, all Valve shall be provided with locking
T19
for valves arrangement

6 of 6