Professional Documents
Culture Documents
Turn Buckle - JXJ
Turn Buckle - JXJ
Turn Buckle - JXJ
This Certificate complies with the requirements of the Lifting Operations & Lifting Equipment Regulations 1998
Particular of any test carried out as part of examination: Visual & Thorough Examination
Date of last thorough examination New item Date of next thorough examination 05-Jan-2023
1) Is this the first examination after installation or assembly at a new site or location? Yes
2) Is the examination carried out within an interval of 6 months/12 months? 6 Months
3) Is the examination carried after any exceptional circumstance/alteration? No
4) Identification of any part found to have a defect which is or could become a danger to persons and a
No
description of the defect
5) Is the above defect of any danger immediately or at any date (specify)? NA
6) Particulars of renewal/repair/rectification/replacement required to remedy the above affect None
7) The item described herein were tested and thereafter examined in accordance to ASME B30.26
The equipment tested and examined in accordance to the standards ASME / ANSI / BS EN / API / LOLER and at the time of inspection, herein were found to
be free from cracks or damages or flaws or any other defects which could become a danger to person. This Equipment is 'SAFE TO USE' at the time of
Inspection. This inspection certificate shall not be reproduced in part / in full without approval of Inspection body.
Mohamed Yasir
Name & position of the person who carried out the test and thorough
examination Lifting Gear Inspector
LEEA LEG & LMM
Jayachandran Nair
Name & position of the person authenticating this certificate
Technical Manager