Download as pdf or txt
Download as pdf or txt
You are on page 1of 23

J:\2019 jobs\19057 BK CLEMSON SC\Drawings\10 A-1 Floor Plan.

dwg(A-1) 1\15\20-10:08am(cpolanski)
SERVING
DINING ROOM KITCHEN

CUSTOMER
PICK-UP
COOLER

OFFICE

STOCK

FREEZER

WOMEN MEN CREW

FLOOR PLAN
SCALE: 1/4" = 1'-0"

1 REVISED PER REVIEW COMMENTS 1/9/20


No. Description Date
- REVISIONS

BURGER KING
500 OLD GREENVILLE HWY
CLEMSON, S. CAROLINA 29631
CARROLS, LLC
SYRACUSE, NEW YORK

FLOOR PLAN
& MISC. DETAILS
TYPICAL INTERIOR PARTITION
3 SCALE: NOT TO SCALE

.
SSUE
1/9/20
JAMES W. MANGUSO
ARCHITECT

J A M E S W. M A N G U S O
ARCHITECT
4080 Ridge Lea Road
B u f f a l o, N. Y. 1 4 2 2 8
(716) 837 - 0833

PLAN DETAIL
PLAN DETAIL 2 Date: 12/10/2019 Drawing No.
1 SCALE: 1 1/2" = 1'-0"

A-1
SCALE: 1 1/2" = 1'-0" D r a w n By : CJP
C h e c k e d By: JWM
Job Number: 19057
J:\2019 jobs\19057 BK CLEMSON SC\Drawings\14 A-3 Building sections.dwg(A-3P) 1\15\20-1:54pm(cpolanski)
DINING ROOM
GAYLORD

KITCHEN

BUILDING SECTION
1

1 REVISED PER REVIEW COMMENTS 1/9/20


No. Description Date
- REVISIONS

BURGER KING
500 OLD GREENVILLE HWY
CLEMSON, S. CAROLINA 29631
CARROLS, LLC
SYRACUSE, NEW YORK

BUILDING
CROSS SECTIONS
BUILDING SECTION
2

.
SSUE
1/9/20
JAMES W. MANGUSO
ARCHITECT

J A M E S W. M A N G U S O
ARCHITECT
4080 Ridge Lea Road
B u f f a l o, N. Y. 1 4 2 2 8
(716) 837 - 0833

Date: 12/10/2019 Drawing No.

A-3P
SITE CROSS SECTION D r a w n By : CJP
3 C h e c k e d By: JWM
Job Number: 19057
SECURITY
LIGHTING™ RWSC
LED RADIUS WALL SCONCE

The RWSC LED radius wall sconce series offers a combination of light
distributions that wash the building facade while the radial soft form housing
accentuates building architectural design elements in all commercial and
residential applications.

The RWSC LED provides excellent illumination with a high efficiency LED
light source of 72 or 36 mid power LEDS that deliver up to 2,400 lumens and
up to 109 lumens per watt.

The RWSC LED fixture has become a building standard and is stocked as a
quick ship item in many colors and distributions.

Features
• Durable cast aluminum housing
• Integrated design eliminates high angle brightness
• Completely sealed, flat tempered glass lenses, UL listed for use in wet
locations
• DLC, Downlight only, full cut-off

Operating Temperature
• -30°C to 40°C Dimensions
Electrical:
• Dimming is an option (consult factory) B C
Mounting
RWSC features Intelligent Mounting Bracket which helps save time and
A
money by allowing only one person to easily install. The small mounting
bracket is very user friendly and features an integrated level bubble on the
bracket ensuring fixture installation will always be perfect.

A B C
Certifications/Listings 7.25" 18.0" 9.0"
4.2

Ordering Information Ordering Example: RWSC - XXL - XK - XX - U - XX - XX

RWSC DO

Series # of LED's CCT Distribution Voltage Finish Options

RWSC Radius Wall 36L1 36 Mid-Power LED's 3K 3000K DO Down only U Universal 120/277V DB Dark Bronze PC Photocontrol6,7
Sconce
72L2 72 Mid-Power LED's 5K 5000K UD Up/Down WH White
BK Black
PS Platinum Silver
Quick Ship:
RA RAL Color4
RWSC36LU5KDOBK
CC Custom Color5
1 RWSC36LU5KDOWH
36L Only available in DO distribution
2
72L Only available in UD distribution RWSC36LU5KDODB
3
One remote inverter required to operate every 8 down only or 5
RWSC36LU5KDOPS Accessories
up/down fixtures requiring EM operation
4
Must provide RAL color at time of ordering RWSC72L5KUDUWH LG125T Remote Emergency Inverter (grid
5
Must provide color sample at time of ordering mount only)3
RWSC72LU5KUDBK
6
PC must be factory installed LG125S Remote Emergency Inverter
7
PC available on down only RWSC72LU5KUDDB (surface mount only)3
RWSC72LU5KUDPS
Web: www.securitylighting.com
2100 Golf Road, Suite 460, Rolling Meadows, IL 60008-4704
Phone: 1-800-LIGHT IT, 1-800-544-4848, Fax: 847-279-0642
Copyright ©2016 Security Lighting, a division of Hubbell Lighting, Inc.
All Rights Reserved. • Specifications subject to change without notice. • Printed in U.S.A. • SLS0027 04/18
SECURITY
LIGHTING™ RWSC
LED RADIUS WALL SCONCE

Performance Data
5K 3K
(5000K nominal, 80 CRI) (3000K nominal, 80 CRI)
Drive Current
# of LEDS System Watts Distribution Type Lumens LPW1 B U G Lumens LPW1 B U G
(Milliamps)
36 350 14.4 down 1565 108.7 0 0 0 1561 109.1 0 0 0
72 350 25 up/down 2400 96 n/a n/a n/a 2391 97.6 n/a n/a n/a

Lumen values are from photometric tests performed in accordance with IESNA LM-79-08. Data is considered to be representative of the configurations shown.
1

Actual performance may differ as a result of end-user environment and application.

Photometric Data
LUMINAIRE DATA ISOMETRIC FOOT CANDLES POLAR GRAPH
RWSC-36L-5K-DO-U-PS
Wall Mounting Outdoor Fixture 3

DRIVER LED30W-085-C0350
Lamp LED .1
141
2
Lumens 1565 .2

Watts 14.4
.5
Efficacy 109 281
1 1
Mounting Wall 2
Spacing Criterion (0-180) 1.20
5 422
0
ZONE LUMENS % FIXT.
1
Front Low (0-30) 218.6 14.0
562
Front Medium (30-60) 424.2 27.1 1
Front High (60-80) 135.5 8.7 Maximum Candela = 562 Located At Horizontal Angle = 0, Vertical Angle = 0
# 1 - Vertical Plane Through Horizontal Angles (0 - 180) (Through Max. Cd.)
Front Very High (80-90) 4.2 0.3 # 2 - Horizontal Cone Through Vertical Angle (0) (Through Max. Cd.)
Back Low (0-30) 218.6 14.0 1.75
2
Back Medium (30-60) 424.2 27.1
Back High (60-80) 135.5 8.7
Back Very High (80-90) 4.2 0.3 2.75
Uplight Low (90-100) 0.0 0.0 3

Uplight High (100-180) 0.0 0.0

4
0 1 2 2.25 3 3.75 4
IES ROAD REPORT
Distance In Units Of Mounting Height IES ROAD REPORT
PHOTOMETRIC FILENAME : RWSC-72L-5K-UD-U-PS.IES
Values Based On 10 Foot Mounting Height PHOTOMETRIC FILENAME : RWSC-72L-5K-UD-U-PS.IES

LUMINAIRE DATA ISOFOOTCANDLE


ISOMETRIC FOOTLINES
1/2 Maximum OF Trace
Candela
CANDLES HORIZONTAL
Shown AsILLUMINANCE
Dashed Curve POLAR GRAPH
POLAR GRAPH

RWSC-72L-5K-UD-U-PS (+) = Maximum Candela Point


3 519
Wall Mounting Outdoor Fixture
DRIVER LED50W-142-C0350
.1 389
Lamp LED 2
.2
Lumens 2400
Watts 25 .5 260 2

Efficacy 96 1 1

Mounting Wall 2 130

Spacing Criterion (0-180) 1.20


0 5

ZONE LUMENS % FIXT.


Front Low (0-30) 201.4 8.4
Front Medium (30-60) 387.5 16.1 1

Front High (60-80) 119.6 5.0


Front Very High (80-90) 3.5 0.1 1.75
Back Low (0-30) 201.4 8.4 2
Back Medium (30-60) 387.5 16.1
Back High (60-80) 119.6 5.0
2.75 1
Back Very High (80-90) 3.5 0.1 3
Uplight Low (90-100) 5.6 0.2
Maximum Candela = 519 Located At Horizontal Angle = 0, Vertical Angle = 0
Uplight High (100-180) 970.7 40.4 # 1 - Vertical Plane Through Horizontal Angles (0 - 180) (Through Max. Cd.)
# 2 - Horizontal Cone Through Vertical Angle (0) (Through Max. Cd.)
4
0 1 2 2.25 3 3.75 4

Distance In Units Of Mounting Height


Web: www.securitylighting.com
Values Based On 10 Foot Mounting Height
2100 Golf Road, Suite 460, Rolling Meadows, IL 60008-47041/2 Maximum Candela Trace Shown As Dashed Curve
Phone: 1-800-LIGHT IT, 1-800-544-4848, Fax: 847-279-0642 (+) = Maximum Candela Point
Copyright ©2016 Security Lighting, a division of Hubbell Lighting, Inc.
All Rights Reserved. • Specifications subject to change without notice. • Printed in U.S.A. • SLS0027 04/18

Photometric Toolbox Professional Edition - Copyright 2002-2011 by Lighting Analysts, Inc. Page 5
Calculations based on published IES Methods and recommendations, values rounded for display purposes.
Results derived from content of manufacturers photometric file.
LIGHTBAND

BK 2020
LED IMAGE LIGHTING

1016
I N S T A L L AT I O N G U I D E

918.622.4978
www.lektroninc.com
sales@lektroninc.com
GETTING STARTED CONTENTS
Following these few simple steps will ensure a successful Getting Started, Component Identification & Required Tools
installation each time. Remember: No more than 32 boards per
power supply. SECTION PAGE
1. Read ALL instructions, before starting installation.
2. Inspect the boxes for damage and check the parts against 1. Component Identification & Required Tools......................... 2
the supplied parts list.
2. Proper Measuring & Placement of the Lightband................. 3
NOTE: Report damaged parts or shortages immediately to
prevent job slowdown/stoppage to 1-800-634-4059 ext. 0 3. Installation of Cut Sections & Sizing the LED Band.............. 4
3. Refer to attached provided print and confirm job
measurements. 4. Setting the Power Supply........................................................ 5
4. Layout your job on paper, making note of power supply
5. Testing Each Section................................................................ 6
placement.
Power supplies can be placed at the end of runs or side by side 6. Lens Installation........................................................................ 7
to power allowable linear footage in each direction.
NOTE: If job measurements do not correspond to provided 7. End Cap Installation................................................................. 8
drawing, call Lektron Immediately at 1-800-634-4059.

INSTALLATION SEQUENCE

DETAILS LED SPECIFICATIONS


Input ................................................................... 120V
12” LED boards pull close to the same voltage as shorter
7Output
- Y ...............................................................
E A R W A R R A N T Y 25 VAC break-apart boards. Maximum of 3-3” Boards per circuit. No more
than 32 boards on a circuit. Do not connect more than one power
Max. Load Footage ........................................... 32 Lineal ft. 20L supply per circuit.
Watts per Foot .................................................. 1.50 (if 20L)
Dimming Capable ............................................. Yes
Bending Parameters ......................................... None
Limited Warranty Terms .................................. BK Pro Rated Warranty
2. Install mounting brackets; reference “Installing the
Mounting Brackets” for proper installation procedures.
Materials ............................................................ Aluminum Housing
3. Install string line or laser level; it is recommended that
Polycarbonate Lens
you install a string line 18” up from the top of the parapet
Dimensions ........................................................ Custom wall to properly align the top of the housing and corners.
Certification ...................................................... cULus E174914 4. Set corners into place; reference “Installing the Inside
and Outside Corners” for proper installation procedures.
Below we have identified a sequence of operations that will 5. Set housing into place; reference “Installing the
guide you in the proper installation of the parapet band Housings” for proper installation procedures.
system. However, always be aware of your surroundings 6. Install remaining adjustment brackets; reference
and site conditions that cannot be taken into consideration “Installing Adjustment Brackets” for proper installation
when writing this guideline. It is always your responsibility procedures.
to ensure a safe and clean workplace environment. 7. Install LED’s; reference “Installing LED’s” for proper
installation procedures.
1. Review the onsite construction plans; if they are different 8. Install the transformers; it is critical to test the LED’s
from what was supplied with the parapet band system or if for proper operation prior to installing the lens.
you are missing any components in the system call Lektron 9. Install the lens; reference “Installing the Lens” for
Branding Solutions at 1-800-634-4059 immediately. proper installation procedures.
It is recommended that you start your installation with a 10. Install the end and corner caps; reference “Installing
corner, and then work to the towers or the back of the the End Caps” and “Installing the Inside and Outside
building. This will allow the smaller section of cut housing Corners for proper installation procedures.
to be on the end opposing corners. By doing this it will 11. Inspect to insure parapet band system look and
eliminate two small sections of housing being close to one operates correctly.
another.

Page 1
C O M P O N E N T I D E N T I F I C AT I O N
SEC. 1 & REQUIRED TOOLS

Die-stamped
Aluminum
2.50 Housing
Prefinished

#12 x 2” .75
HEX HEAD
191-7011 SCREW
ALUMINUM 16 Ga.
HOUSING Galvinized
8’ LENGTH
185-7022 #10 x 3/4” Steel
FLAT RED POLYCARBONATE LENS HEX HEAD
CONTINUOUS LENGTH SCREW Red Lens

185-5045 185-5515 191-5003


MOUNTING ADJUSTMENT HOUSING
BRACKET BRACKET COUPLING

SEAL TIGHT
CONDUIT

185-0017
185-2006
25V LOW VOLTAGE
16 Ga.
J-BOX TRANSFORMER Galvinized
185-0007 Steel
PLTC 15.00 13.38
CABLE

185-5021 185-5022 STRAIN RELIEF 185-5023


MALE FEMALE
PIGTAIL PIGTAIL
& LIQUID-TIGHT BLUE
CONNECTOR CONNECTOR CONNECTOR WIRE NUT

Aluminum
#8 x 1/2”
LEFT PAN 191-1136 191-2040 Housing
END
CAP
HEAD 3” 5L RED BOARD
TRACK
CLIP Prefinished
SCREW
BK Silver
#6 x 1/2”
RIGHT
PAN
12” 20 LAMP RED MAIN BOARD
END
HEAD
CAP
SCREW

O.S. 191-1025
CORNER O.S. CORNER
.88
HOUSING CAP

I.S. 191-1026
CORNER I.S. CORNER
HOUSING CAP

REQUIRED TOOLS: MOUNTING SURFACES VARY


• 25’ Measuring Tape • Carpenter Pencil
• 100’ Measuring Tape • Caulk Gun PLEASE USE PROPER SCREW WHEN MOUNTING
• Framing Square • Box Knife THE HOUSING TO THE STRUCTURE.
• Square - (1’) • Wire Strippers
• Portable Rechargable Drill • Wire Snips HEX HEAD TEK SCREW WITH NEOPRENE WASHER
5/16” Hexbit and unibit • Laser Tool or Chalk Line IS PROVIDED AND NOT TO BE USED WITH
Masonry bits (if brick wall) • Substitute Fasteners for the MATERIAL OTHER THAN METAL
• Extension Cord Application if Applicable
• Sawzall or Compound Saw

Page 2
PROPER MEASURING &
SEC. 2 PLACEMENT OF THE LIGHTBAND

INSTALLING THE MOUNTING BRACKET INSTALLING THE CORNERS CONT.

1. Determine if your location is typical or high wind zone. 3. Install the first 8’ aluminum fixture housing by aligning to
2. Mark mounting bracket locations. Housings will share the edge of the mounting bracket and approximately 1/4”
a bracket. Set bracket 1/4” from the end of the run. from the end of the run. Insure that housing is plumb and
3. Install using a dab of caulk beneath each #12 x 2 level, shim if required. Fasten each with 5 #10 x 3/4” Hex
screw penetration as shown. Head tek screws, spaced approximately 2 in. apart,
through the mounting bracket.
2-#12 X 2” 4. Using four #10 x 3/4” tek screws, screw through housing
and the fixture coupling while holding the seam together,
put one screw into each fixture, joining the pieces together
securely.
5. Apply second bracket to the backside of the housing fixture
using a dot of caulk for each screw to waterproof. Secure
with two #10 x 3/4” tek screws.
TYPICAL
MOUNTING
48” 6. Slide brackets until the housing is plumb. Clamp the
adjustment bracket together and run two #10 x 3/4” tek
screws through the assembly to hold securely.
7. Repeat the process.
48” 32”
32” COUPLING 2 8ft SECTIONS

32”

HIGH WIND
MOUNTING IMPORTANT: DO NOT SKIP ANY STEPS IN THIS SECTION.
FIXTURES MAY BE LIFTED AND BLOWN OFF PRIOR TO ALL
ATTACHMENTS BEING SECURELY MADE.

INSTALLING THE CORNERS INSTALLING ADJUSTMENT BRACKETS

1. Set corner housing onto 4 mounting brackets NOTE: Adjustment brackets should be mounted at equal
2. Attach corner to brackets with #10 x 3/4” tek screws. intervals, to the mounting brackets. The purpose of the
adjustment bracket is to keep the light band vertically
NOTE: BRACKETS ENLARGED TO SHOW DETAIL straight, as well as provide stability to the light band.
TIP: APPLY ALL BOTTOM BRACKETS FIRST, ALL TOP
BRACKETS NEXT AND THEN SECURE IN THE MIDDLE.
1. Measure and mark locations for the Adjustment Brackets,
install 1/2 of the Adjustment Bracket. Use two #12 x 2” tek
screws, applied through a dot of caulk.

IMPORTANT: SCORE PROTECTIVE


PLASTIC ALONG THE HOUSING
BRACKET WITH A RAZOR KNIFE,
AND REMOVE FROM HOUSING.

Page 3
I N S T A L L AT I O N O F C U T S E C T I O N S
SEC. 3 & SIZING THE LED BAND

END OF A RUN REINSTALLING THE LED BOARDS

ALL HOUSINGS ARE SHIPPED PRE-LOADED


1. Measure and field cut last section.
1. Install LED chains into pre-installed clips. Be careful not to
2. If this run dead ends into a wall or tower, allow 1/4” break the LEDs.
space to insert an end cap at the end of the run.
2. After housing cuts are made and installed, LED light boards
3. Add a coupling to the cut section using #8 screws. must fit the size of the newly cut housing.

4. Additional adjustment brackets are needed for 3. Install full 1 foot boards until less than 1 foot of space
support. remains.

4. Gently adjust LED lights to fit the adjusted housing

5. Trim LED light board length at wire connections only. Leave


the longest wire length possible
ADDITIONAL ADJUSTMENT BRACKET

DO NOT CUT 1 FOOT LED CIRCUIT


BOARDS!

LEAVE NO GAPS BETWEEN BOARDS!

6. Connect 3” boards with wire nuts when


less than one foot is needed to fill the
housing with lights. Do not connect
more than three of the 3” LED light
boards together.

7. Snap LEDs into the Track.

8. Shortened Track is now ready for


installation.

VERY IMPORTANT:
Insulate or remove unused wires at end of
run to prevent shorting. Do not connect
wires together or to next circuit.

Angle LED Board, Push into groove and


snap-in, opposite side.

Page 4
SETTING THE
SEC. 4 P O W E R S U P P LY

NOTE: Any primary voltage supply greater than 120, “STOP” call Lektron at 918-622-4978
1. Attach J-Boxes with supplied screws to available support member. TO J-BOX
2. Attach transformers inside of J-Boxes.
3. Drill 7/8” hole through the housing.
4. Install Liquid-Tight Connector for low voltage wire. Connect conduit.
5. Install low voltage wire into the conduit and connect to LED.

Side by Side mounting location shown below can reduce primary and secondary wiring labor time.

NOTE: One transformer per 32 boards maximum or less. No less than 8 boards per transformer

WIRE CONNECTIONS

.55 AMP PRIMARY LOAD SECURE ELECTRICAL BOX SCREWS PROVIDED


OR OTHER SUITABLE ANCHORS. MOUNT AS
POWER SUPPLY CLOSE AS POSSIBLE TO LEDs TO MINIMIZE
LOW VOLTAGE POWER CABLE LENGTH. INSTALL
POWER SUPPLY INSIDE ELECTRICAL BOX AND
ATTACH WITH 3/4” SCREW.

Use Only UL Approved


Provided Transformer
25 VAC Low 25 VAC
Blue and Yellow low

Recognized 24Vac
Liquid-Tight Voltage Primary
Black & White wires = Primary
UL Class 2
voltage wires from
Connector

100va
power supplies. connection only by Electrician
Connect to low
voltage cable
(Non-Polarized)

Power Cable from


power supply
to LEDs Only

Silicone
top of
J-Box 25 VAC Low !
A conduit fitting
Voltage
DO NOT CONNECT
installed so that conduit 120 VOLTS TO LEDs.
can be used. LEDs are 25Vac only

NOTE: LEDs are not polarity sensitive, color coding is for


consistency on the low voltage side.

VERY IMPORTANT: KEEP LOW VOLTAGE CIRCUITS ELECTRICALLY SEPARATE, DO NOT CONNECT TRANSFORMERS
OR LEDs FROM DIFFERENT 32 BOARD CIRCUITS TOGETHER OR CONNECT MORE THAN 32 BOARDS TO A TRANSFORMER!

120 VAC 120 VAC


32 Boards or Less 32 Boards or Less

8 Boards or Less 8 Boards or Less

120 VAC 120 VAC


16 Boards or Less 16 Boards or Less 32 Boards or Less

8 Boards or Less 8 Boards or Less

NOTE: MAXIMUM 32 BOARDS PER POWER SUPPLY. SHOWN 3 CONFIGURATIONS.


Page 5
TESTING
SEC. 5 EACH SECTION

IMPORTANT: DO NOT SKIP THIS STEP! ALWAYS CHECK ALL LED


LIGHTS BEFORE CONTINUING.

TESTING EACH SECTION


1. Using the installed power supplies, supply power to the
LED light chains by connecting a temporary 120V
connection to the black and white wires on the power
supply to power the LED lights.

REMEMBER: BLACK AND WHITE WIRES ARE FOR 120V POWER IN


BLUE AND RED ARE FOR LOW-VOLTAGE POWER OUT.

2. Check to see if all LEDs are lit and working correcting.

3. If a board or section does not light up, is damaged, etc.,


disconnect power and check connections or replace a
board by splicing in another.

DO NOT APPLY 120V TO THE BLUE OR RED WIRES OR DIRECTLY


TO THE LED LIGHT BOARDS

Page 6
LENS
SEC. 6 I N S T A L L AT I O N

LENS SIZING, CUTTING, AND INSTALLATION LENS TRIM GUIDE


The lens has a high expansion and contraction rate and Polycarbonate Lens Trim Length (Inches)
therefore must be trimmed from the overall dimension in for a Given Temperature and Length
accordance with the lens trim guide.
Temp
(F) 10’ 20’ 30’ 40’ 50’
There is also a UV protection applied to one side of the
lens, make sure that the UV protected side is facing out 0 11/16 1 5/16 1 15/16 2 9/16 3 3/16
when installed. 5 11/16 1 1/4 1 7/8 2 1/2 3 1/8
10 5/8 1 3/16 1 3/4 2 3/8 3
1. First measure each section of housing from end to end,
corner to corner, etc. this will determine your overall 15 5/8 1 1/8 1 11/16 2 1/4 2 7/8
length of lens for each section. 20 5/8 1 1/16 1 5/8 2 3/16 2 3/4
25 5/8 1 1/16 1 9/16 2 1/8 2 5/8
2. Check outside temperature, reference the “Lens Trim 30 5/8 1 1 1/2 2 2 1/2
Guide” to the right to determine the amount of lens that
needs to be subtracted from the overall length. 35 1/2 1 1 7/16 1 7/8 2 3/8
40 1/2 1 1 3/8 1 13/16 2 1/4
NOTE: The length of lens that will be deducted from your 45 1/2 7/8 1 5/16 1 3/4 2 3/16
overall length is critical in order to accommodate the 50 1/2 13/16 1 1/4 1 5/8 2 1/16
expansion and contraction of the lens in varying
temperatures. 55 3/8 3/4 1 3/16 1 9/16 1 15/16
60 3/8 3/4 1 3/16 1 7/16 1 13/16
3. After determining the Trim Length, subtract that from 65 3/8 11/16 1 1 3/8 1 11/16
your overall length for that section. 70 3/8 5/8 1 1 1/4 1 9/16
75 5/16 9/16 7/8 1 3/16 1 1/2
Example: 45’ section will require a trim length of 1 3/4”,
leaving you with an overall cut length of 44’ 10 1/4”. 80 5/16 9/16 13/16 1 1/8 1 3/8
85 5/16 1/2 3/4 1 1 1/4
4. Using the example above, cut your lens to 44’ 10 1/4” 90 5/16 1/2 11/16 7/8 1 1/8
long using a sawzall or jig saw. 95 5/16 7/16 5/8 13/16 1
100 3/16 3/8 9/16 3/4 7/8
Use caution when cutting your lens as the vibration
caused by cutting can scratch the lens if not properly 105 3/16 5/16 1/2 5/8 13/16
secured. 110 3/16 1/4 3/8 9/16 11/16
115 3/16 1/4 5/16 1/2 9/16
5. Once ready to install the lens, remove the protective 120 1/8 3/16 1/4 3/8 7/16
film from both sides and slide the lens into the bottom
portion of the housing. See Figure 1. 125 1/8 3/16 3/16 1/4 3/8
130 1/8 1/8 3/16 3/16 1/4
NOTE: This may take 2 or more people depending on the 135 1/8 1/8 1/8 1/8 3/16
length of the lens. 140 0.00 0.00 0.00 0.00 0.00

FIGURE 1 FIGURE 2

Page 7
END CAP
SEC. 7 I N S T A L L AT I O N

SILVER END CAP INSTALLATION RED CORNER CAP INSTALLATION

1. Fasten the silver end cap to the top of the 1. Place top edge of end cap inside housing lip.
housing using (2) #8 x 1/2” silver self-tapping
2. Attach bottom trim to hold in place.
screws.

2. Fasten the bottom of the end cap to the back


of the housing using (2) #8 x 1/2” silver
self-tapping screws.

3. Slide the upper portion of the red corner cap


into the housing and secure between the lens ISO. VIEW -
and the lens flashing. OUTSIDE CORNER &
OUTSIDE CORNER CAP

ISO. VIEW -
INSIDE CORNER &
INSIDE CORNER CAP

NOTE: Do not install the NOTE: Trim is on the outside of the lens

corner or end caps until


the LEDs and Lens have
been installed and tested.

Page 8
sales@lektroninc.com 918.622.4978 www.lektroninc.com
PLANS PREPARED BY:

LEGEND SITE DEVELOPMENT DATA


C AMPBELL
SITE ENG INEE R ING & A SS OC IA TES , INC .
C i vil Engineer ing a nd Land P lanni ng
31 Boland Court
Greenville, SC 29615
(864) 335-4090
Fax: (864) 335-4095

200'
XXX
VICINITY MAP

OLD GREENVILLE HWY NOTE: SEE ARCH. PLANS FOR


SC HWY 93 (PUBLIC R/W) EXACT BUILDING DIMENSIONS,
UTILITY ENTRY POINTS, DOOR
SCDOT LOCATIONS, ETC.

SIGN LEGEND
±815.5
814.0

818.3
LAND USE:
RESTAURANT

ZONING:

500 OLD GREENVILLE HWY


CP-2 OVERALL PARKING TABLE:

CLEMSON, SC 29631
CITY OF CLEMSON
818.0

TAX MAP: 4054-15-53-7539


PICKENS COUNTY
BURGER KING
818.5 ROC - 60
3,235 SF
F.F.E. = 819.5

819.0

BIKE RACK DETAIL

EXISTING
SHOPPING
CENTER
PARKING LOT DEVELOPER:
CARROLS, LLC
968 JAMES STREET
SYRACUSE, NY 13203
CONTACT: TOM BROGAN
(315) 424-0513 x 2257

GRADING NOTE:
822.0
821.0
821.5

823.0

R
SITE PLAN
S
C
G

Know what's below.


R
824.0 ID

SP-1
(N

Callbefore you dig.


A
D
8
824.0 )
3

TRASH CAN DETAIL

NOT FOR CONSTRUCTION


GENERAL NOTES & SPECIFICATIONS
TREE MUST MEET OR EXCEED ANSI Z60.1
LAWN INSTALLATION: Lawn areas shall be fine graded to a smooth, positively draining ARCHITECTURAL REVIEW OVERLAY DISTRICT #5 STANDARDS (AMERICAN STANDARD FOR NURSERY STOCK
DO NOT HEAVILY PRUNE THE TREE
slope, removing all stones over 3/4" . Agricultural limestone shall be incorporated AT PLANTING. PRUNE ONLY
into the soil at a rate of 50 pounds per 1000 square feet. Apply specified seed at 1. SITE STANDARDS EACH TREE MUST BE PLANTED SUCH THAT THE ROOT FLARE
CROSSOVER LIMBS, CO-DOMINANT
IS VISIBLE AT THE TOP OF THE ROOTBALL. TREES WHERE
recommended rate. Straw mulch or hydromulch shall be used as deemed necessary by the
Landscape Contractor and Landscape Architect. The Landscape Contractor shall be
d. Landscaping THE ROOT FLARE IS NOT VISIBLE SHALL BE REJECTED.
LEADERS, AND BROKEN OR DEAD
BRANCHES. SOME INTERIOR TWIGS McLeod
DO NOT COVER THE TOP OF THE ROOTBALL WITH SOIL. AND LATERAL RANCHES MAY BE Landscape Architects, LLC
responsible to establish a full stand of grass and will repair any bare spots 1'- 0" square 2. Existing trees over 8" DBH retained PRUNED; HOWEVER, DO NOT
due to uneven seed distribution, drought or erosion. 1 - 12" Maple SET TOP OF ROOT BALL 3"
REMOVE THE TERMINAL BUDS OF 100 West Washington Street
BRANCHES THAT EXTEND TO THE
SOD INSTALLATION: Sodded lawn areas shall be fine graded to a smooth, positively draining ABOVE ADJACENT FINISH GRADE EDGE OF THE CROWN. Suite 400
slope, removing all stones over 3/4" . Sod shall be healthy, thick sod placed so that joints 1 - 19" Oak Greenville, SC 29601
TREE STRAPPING TO BE A FLEXIBLE
are butt tight. Staple as necessary. Sod shall be trimmed to match bed lines shown on plan. 1 - 21" Oak 3" MIN MULCH RING. DO NOT PLACE MULCH IN CONTACT WITH MATERIAL SUCH AS RUBBER OR NYLON.
(864) 370-3635
Startup fertilizer shall be incorporated into the soil at the manufacturer's recommended rate. 2 - 22" Oaks TREE TRUNK. KEEP MULCH 4" AWAY FROM TRUNK BASE TIGHTEN ONLY ENOUGH TO KEEP FROM SLIPPING.
ALLOW FOR TRUNK MOVEMENT.
Any area of sod that fails to root, settles or dies will be replace by the Landscape Contractor. 1 - 23" Oak
REMOVE TWINE, ROPE, WIRE AND BURLAP FROM
UTILITY LOCATION: The Landscape Contractor is responsible for contacting the utility locator 4" HIGH EARTH SAUCER BEYOND EDGE OF ROOTBALL TOP HALF OF ROOTBALL. REMOVE ALL TREE STRAPS.
service and is responsible for any damage done to utilities. 5. Upperstory trees planted along property line abutting Old Greenville Highway
DIAMETER OF THE HOLE SHALL BE
at a ratio of one tree for every 30 linear feet in a minimum 8' wide planting strip. TRIPLE THE DIAMETER OF ROOT BALL
QUANTITIES Plant quantities are shown for the contractor's convenience only. SIDES SHOULD GRADUALLY SLOPE
PLANTS SHALL BE INSTALLED AS SHOWN. Contractor is responsible for confirming 161.23 lf / 30 = 5 trees required AMENDED BACKFILL MIXTURE OF
all quantities prior to bidding and installation. Provided: 2 new trees / 3 existing trees 1/3 ORGANIC MATTER AND 30" LONG WOOD STAKE
2/3 SOIL FROM SITE
BIDS In order to keep all bids standard, all bids are to have unit prices listed. CITY OF CLEMSON ZONING ORDINANCE 6"

The Owner has the option to delete any portion of the contract prior to signing the contract EXISTING 22" OAK OPTIONAL METAL DRIVE ANCHORS, SIT ROOTBALL ON 6" MOUND OF UNDISTURBED SOIL
INSTALLED PER MANUFACTURES DIRECTIONS TO PREVENT SETTLING
or beginning work. This will be a unit price contract. SECTION 19-905. BUFFERYARD, SCREENING AND LANDSCAPING SPECIFICATIONS TO REMAIN
AREA TWICE THE WIDTH OF ROOT BALL
PLANT QUALITY All plants shall be nursery grown, have a full habit of G. Vehicular use area
MULCH RING 2FT BEYOND TREE PIT
growth as is characteristic of that species, and shall be free of disease 1. At least 10% of the total interior square footage of all vehicular use area shall be EXISTING 22" OAK
or insects. General plant quality shall be as specified in the "USA Standard TO REMAIN
for Nursery Stock" (published by the American Association of Nurserymen). dedicated to landscaping
21,700 square feet x 10% = 2,170 SECTION: TREE PLANTING DETAIL
Please contact the Landscape Architect if there is difficulty in locating a
particular plant. If necessary, a substitute plant will be recommended by 2,385 square feet provided CROSS SECTION
LEASE LINE
the Landscape Architect.
H. Landscape requirements of vehicular use area EXISTING 21" OAK
PLANTING HOLES Trees and shrubs: Remove rock and construction debris from planting area. 1. Sufficient upper story trees within and around vehicular use area to ensure any TO REMAIN
Dig holes two to three times as wide as the rootball and only as dep as the height of the EXISTING 12" MAPLE
root ball. Soil at the bottom ot the hole is left undisturbed. See planting detail portion is within 40 ft of a planted, or retained tree trunk
additional information. TO REMAIN
4. Shrubs within a landscape buffer abutting a street right-of-way or within a perimeter SEALS
GLH-48 TOP OF BALL 1"-2" ABOVE GRADE SHAPE OF SHRUB IN THIS DRAWING
SETTING OF PLANTS The root ball of container grown plants shall be scarified of the vehicle use area shall be arranged to form a continuous row (SHRUBS SPACED 4' 0.C.) NOT TYPICAL FOR ALL VARIETIES
in several places prior to planting. Plant shrubs and trees so that the top of the root ball VL-90
will be even with or slightly above the adjacent soil line. SINGLE PLANTING HOLE - backfill REMOVE PAPER, PLASTIC, OR METAL
bottom half of space around the rootball with loosened original soil (use amended soil only when DYH-7 CONTAINER THAT MAY BE AROUND ROOTS
necessary for good soil tilth, (See ORGANIC AMENDMENTS). Tamp lightly. Finish filling the hole MULCH AND WATER ENTIRE BED
with loose soil and gently tamp again. SHRUB BEDS - Backfill bottom half of bed surrounding EXISTING 19" OAK AMENDED BACKFILL MIXTURE OF
1/3 ORGANIC MATTER AND
shrubs with amended backfill (see ORGANIC AMENDMENTS). Tamp lightly and water to settle soil TO REMAIN

Y
STH-3 2/3 SOIL FROM SITE

W
Finish filling hole with loose amended backfill and gently tamp again. Water shrub bed to settle soil. VL-148

H
PLANTINGS NOT DONE IN THIS MANNER SHALL BE REMOVED AND PROPERLY REPLANTED. DIAMETER OF HOLE SHALL

G
BALLS GREATER THAN 2' IN DIAMETER BE TWICE THE DIAMETER

N
ORGANIC AMENDMENTS Organic amendments should be added to backfill for all shrub beds and SGJ-24 SHALL SIT ON MOUND OF UNDISTURBED OF THE ROOT BALL.

LL
)
SOIL TO PREVENT SETTLING. BALLS

KI
W
when deemed necessary to improve soil tilth of single planting holes. Organic matter should comprise

R/
(SHRUBS SPACED SMALLER THAN 2' MAY SIT ON

VI
VL-41

T IC
approximately 10 to 20 percent of this total soil volume. 4' O.C.) COMPACTED SOIL MIXTURE.

O L

ER
EN
D UB
DYH-7

SC (P
PREPARATION OF GROUND COVER AND SEASONAL COLOR BEDS : The existing soil in AREA DOUBLE THE WIDTH OF ROOT BALL

93
RE

G
Y
ground cover and seasonal color beds shall be thoroughly cultivated 6 inches deep, STH-3

W
WO-1

R
H
to a fine texture ( no clods over 1/2") with a mechanical tiller. A plant mix of 60%

G
C

BU
SECTION: SHRUB PLANTING DETAIL

S
screened shredded topsoil, 20% sand, and 20% well rotted sawdust or peat shall then WO-1 1. REV PER ARCH BOARD MTG

LD
be thoroughly incorporated into the existing soil with the tiller so that the soil mix (6" deep) VL-35 01/16/20
is 1/2 original soil and 1/2 plant mix. N.T.S.

O
All groundcover and seasonal color beds shall receive a 2" layer of fine textured, REVISIONS
screened, pine bark mulch, or equal.
PLANTINGS NOT DONE IN THIS MANNER SHALL BE REMOVED AND PROPERLY REPLANTED.
FERTILIZING Upon completion of plantings, all shrubs shall receive 1/6 cup of 16-4-8 VL-80
fertilizer (50% of nitrogen slow release) evenly broadcast at the base of the plants. EXISTING 23" OAK GLH-16
Trees shall receive 1/4 cup of 16-4-8 fertilizer (50% of nitrogen slow release) per (SHRUBS SPACED 4' O.C.) CGD-13
TO REMAIN
inch of caliper. Ground cover beds shall be fertilized at the rate of 20 pounds of TM-2 CLJ-5
16-4-8 ( 50% of nitrogen slow release) per 1000 square feet. CGD-9
LOR-11
SOD
STAKING OF TREES Trees should only be staked if necessary, such as when planted in areas of SOD BE-1 DBH-5
high winds or steep slopes. Under certain circumstances, others may be staked at the discretion SOD
of the Landscape Contractor or Landscape Architect. The Landscape Contractor is responsible
for all wind damage to trees, (provided winds are less than 60 mph) during the guarantee period,
and may stake other trees (for his own protection) at his option. Landscape Contractor will be
responsible for removal of all staking material one year after installation.
TRANSPLANTS All plant material to be transplanted shall be transplanted according to guidelines

Clemson, South Carolina


set by AAN standards. Transplanted material will not be guaranteed by the landscape contractor. LEASE LINE WO-1

Burger King Restaurant


Landscape Submittal
MULCHING As specified on planting list. Hardwood mulch: All beds to receive a 3" layer of aged
hardwood bark mulch (free of wood chips or large chunks of bark). Fresh hardwood bark mulch
is not recommended to be used, as water run-off may cause staining on adjacent concrete surfaces. SOD
All damages incurred by the use of fresh hardwood mulch shall be the responsibility of the landscape WO-1
BE-1 LEASE LINE

SC Highway 93
contractor. Pinestraw: All beds to receive a 4" layer (prior to compaction) of pinestraw. After
natural compaction, pinestraw should have a depth of 2". SOD VL-20
All trees located in lawn areas shall receive a 3' diameter ring of mulch. Mulch in these areas STH-11
is to follow the above listed guidelines.
BNS-5
GRADING All final grading shall be the responsibility of the landscape contractor. The responsibility
for any additional grading (if needed) shall be determined prior to bidding. STH-5 BNS-18
BE-1
BACKFILL Landscape contractor to verify any additional backfill/topsoil needed prior to beginning SOD
work. A unit price for topsoil shall be included in all bid documents to allow for circumstances that
might arise during installation. WO-1
SOD
INSPECTION It shall be the contractor's responsibility to provide for inspection BE-1
of the plant material by the Landscape Architect prior to installation. GLH-23
All plant material will be inspected. Plants not conforming precisely to the plant list SOD
(SHRUBS SPACED AT 4' O.C.)
will not be accepted and shall be replaced at the contractor's own expense.
LICENSES The contractor will be responsible for obtaining all licenses necessary to complete
the work.
SOD SOD
CLEAN UP Final clean up of any disturbances occurring as a result of landscape operations shall be
the responsibility of the landscape contractor. WO-1
INSURANCE With the submittal of bid documents, the landscape contractor shall also submit a
certificate of insurance for workman's compensation and a contractor's general liability. Contractors BE-1
not providing evidence of such insurance will be ineligible to recieve the contract for the job

GUARANTEE All plant material and workmanship to be guaranteed for one year from STH-5
the date of acceptance by the Owner. Plant replacement to occur only once.
The contractor will not be responsible for defects resulting from neglect by the Owner,
abuse or damage by others, or unusual phenomena or incidents beyond the landscape
contractors control which result from natural causes such as floods, lightning, storms, SOD
freezing rains, or winds over 60 miles per hour, fire, vandalism or theft.
PLANT LIST
IRRIGATION Adequate irrigation to support the required plant material shall be required.
KEY QUANTITY COMMON NAME BOTANICAL NAME MINIMUM SIZE AT TIME OF PLANTING
TREE CANOPY TREE CANOPY BE 5 BOSQUE ELM ULMUS PARVIFOLIA 'UPMTF' 2" CALIPER
DRIP-LINE DRIP-LINE EXISTING EXISTING TM 2 TRIDENT MAPLE ACER RUBRUM BUERGERANUM 2" CALIPER
TRANSFORMER MAPLE WILLOW OAK QUERCUS PHELLOS 2" CALIPER
WO 6
BNS 23 BIRD'S NEST SPRUCE PICEA ABIES 'NIDIFORMIS' 3 GALLON
UNDISTURBED AREA CGD 19 CINNAMON GIRL DISTYLIUM DISTYLIUM 'PIIDIST-V' pp27,631 3 GALLON
S:\BURGER KING\CLEMSON\FILES IN\01-17-20 from Georgia\for plotting.dwg | Layout: L1.0

EXISTING THIS DOCUMENT IS PROPERTY OF


CLJ 5 CLEYERA CLEYERA JAPONICA 3 GALLON McLEOD LANDSCAPE ARCHITECTS, LLC.
LIGHT POLE DWARF BURFORD HOLLY ILEX CORNUTA 'BURFORDII NANA' 3 GALLON
DBH 5 THE UNAUTHORIZED USE, REPRODUCTION,
METAL "T" FENCE POST
3 GALLON OR COPYING OF THIS DOCUMENT IS
DYH 14 DWARF YAUPON HOLLY ILEX VOMITORIA 'STOKE'S DWARF' STRICTLY PROHIBITED AND IS TO BE
GLH 87 GREEN LUSTRE HOLLY ILEX CRENATA 'GREEN LUSTRE' 3 GALLON RETURNED UPON REQUEST.
ORIGINAL GRADE (UNDISTURBED)
ORANGE SAFETY FENCE LOR 11 RUBY LOROPETALUM LOROPETALUM CHINENSE 'RUBY' 3 GALLON
4' Ht. SGJ 19 SEA GREEN JUNIPER JUNIPERUS CHINENSIS 'SEA GREEN' 3 GALLON
SOFT TOUCH HOLLY ILEX CRENATA 'SOFT TOUCH' 3 GALLON DRAWN
NOTE: CUTTING ANY OF THE TREE'S ROOT SYSTEM STH 28
DURING CONSTRUCTION IS HIGHLY DISCOURAGED. GMA
10 GAUGE METAL WIRE ATTACHED 4' POT
TO POST RUN CONTINUOUS
WHEN THIS IS UNAVOIDABLE, HOWEVER, FLUSH
VL 373 VARIEGATED LIROPE LIRIOPE MUSCARII 'VARIEGATA' DESIGN
CUTS SHOULD BE MADE.

MULCH HARDWOOD GMA


INSTALL FENCE AT DRIP-LINE
OF TREE SOD BERMUDA CHECKED

INSTALL POST AT 10' O.C.


NOTES: DATE
INSTALL 10 GAUGE METAL WIRE ALONG DETAIL: ELEVATION-TREE PROTECTION BARRIER 1. PLANT MATERIAL / SOD / MULCH SHALL BE VERIFIED BY THE LANDSCAPE CONTRACTOR PRIOR TO Dec 2019
TREE CANOPY (DRIPLINE) TOP OF POST. ATTACH SAFETY FENCE BIDDING. ANY DISCREPANCIES SHALL BE REPORTED TO THE LANDSCAPE ARCHITECT
N.T.S. SCALE
TO METAL WIRE.
IMMEDIATELY. LANDSCAPE ARCHITECT ASSUMES NO LIABILITY FOR QUANTITY DISCREPANCIES. 1"=20'-0"
2. CONTRACTOR TO VERIFY THAT ALL PLANT MATERIALS ARE AVAILABLE, AS SPECIFIED, WHEN
Jan 17, 2020 at 8:02 by fegli

DETAIL: TREE PROTECTION BARRIER PROPOSAL IS SUBMITTED. JOB NO.


N.T.S. 3. NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED WITHOUT WRITTEN APPROVAL BY THE 20002
LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. SHEET
4. LANDSCAPE ARCHITECT OR OWNER SHALL HAVE THE RIGHT, AT ANY STAGE OF THE 20 10 0 20
CONSTRUCTION OPERATION, TO REJECT ANY AND ALL WORK WHICH, IN HIS OPINION, DO NOT
MEET THE REQUIREMENTS OF THESE PLANS OR SPECIFICATIONS. 1" = 20' - 0"
L1.0
Catalog # : Project :

Prepared By : Date :

Slice Medium - SLM


Outdoor LED Area Light

The Slice’s sleek design makes it perfectly-


suited for Commercial & Industrial
applications, while its cost-effective
die-cast aluminum housing makes its
acquisition cost very competitive. The
Slice offers high performance silicone
optics, die cast aluminum housing, 42,000+
lumens and is available with integral Airlink
Synapse controls.

Features & Specifications IP66 ARRA


Funding Compliant

Optical System
• State-of-the-Art one piece silicone optic sheet delivers industry leading
optical control with an integrated gasket to provide IP66 rated sealed optical
chamber in 1 component.
• Proprietary silicone refractor optics provide exceptional coverage and
uniformity in IES Types 2, 3, 5W, FT and FTA. Product Dimensions
• Silicone optical material does not yellow or crack with age and provides a 16"
typical light transmittance of 93%. (407mm)
• Zero uplight. 4 15/16"
• Available in 5000K, 4000K, 3000K, and 2700K color temperatures per ANSI (126mm)
C78.377. Also Available in Phosphor Converted Amber with Peak intensity
at 610nm.
• Minimum CRI of 70. 28-11/16" (729mm)
• Integral Louver (IL) option available for improved back-light control without
sacrificing street side performance. See page 5 for more details.

Electrical ø.88" (22mm)


• High-performance driver features over-voltage, under-voltage, short-circuit
and over temperature protection. 1.2" (30mm)
• 0-10V dimming (10% - 100%) standard.
2.4" (61mm)
• Standard Universal Voltage (120-277 Vac) Input 50/60 Hz or optional High
Voltage (347-480 Vac).
B3 Pole Drill Pattern
• L80 Calculated Life: >100k Hours (See Lumen Maintenance on Page 3)
• Total harmonic distortion: <20%
• Operating temperature: -40°C to +50°C (-40°F to +122°F). 42L lumen
package rated to +40ºC.
• Power factor: >.90
• Input power stays constant over life. Control
• Field replaceable surge protection device meets a minimum Category C Low Receptacle
operation (per ANSI/IEEE C62.41.2).
• High-efficacy LEDs mounted to metal-core circuit board to maximize heat
dissipation 13-3/8"
(340mm)
• Components are fully encased in potting material for moisture resistance.
IMSBT Motion Photocell Sensor
Driver complies with FCC standards. Driver and key electronic components
can easily be accessed.

Bottom View Top View


LSI Industries Inc. 10000 Alliance Rd. Cincinnati, OH 45242 • www.lsi-industries.com • (513) 372-3200 • ©LSI Industries Inc. All Rights Reserved. 11/19/19
Slice Medium - SLM
Outdoor LED Area Light

& Brackets

LSI offers a full line of poles BKA UMB CLR


and brackets to complete your The 3G rated Universal Mounting
Bracket (UMB) allows for seamless
lighting assembly. Our USA integration of LSI Luminaires
manufacturing facility has the onto existing/retrofit or new
construction poles. The UMB
same high quality standards bracket was designed specifically
for our poles and brackets as for square or round (tapered/
we do our lighting fixtures. straight) poles with (2) mounting
hole spaces between 3.5"-5". Bolt
pattern B3 on fixture side.

BKA ASF CLR


The adjustable Slip Fitter is a 3G
rated rugged die cast aluminum
adapter to mount LSI luminaires
onto a 2" (51mm) IP, 2.375" (60mm)
O.D. tenon. The Adjustable Slip
Square Round Tapered Fitter can be rotated 180º allowing
Pole Pole Pole for tilting LSI luminaires up to 45º
14'-39' 10'-30' 20'-39' and 90º when using a vertical tenon.
Works with B3 pole drill pattern.

BKS PQMH CLR BKS PQM15 CLR


The Pole Quick Mount Bracket The Pole Quick Mount Bracket
allows for lightning fast allows for preset 15º uptilt of LSI
installation of LSI luminaires onto luminaires for greater throw of
existing and new construction light and increased vertical
poles with LSI's B3 or B5 illumination as well as fast
standard pole bolt patterns. B3 installation onto poles with LSI's
bolt pattern on fixture side. 3" or 5" bolt pattern. B3 and B5
pole drill pattern. B3 bolt pattern
on fixture side.

LSI Industries Inc. 10000 Alliance Rd. Cincinnati, OH 45242 • www.lsi-industries.com • (513) 372-3200 • ©LSI Industries Inc. All Rights Reserved. 11/19/19
Burger King OP018857
Clemson, SC
01/15/20
Design Option A
+-15'-6" - REMODELED EXISTING MONUMENT SIGN Graphic Layout
Page 2
+-7'-4" - REMODELED FASCIA PANELS
Remodeled Existing Sign with New aluminum fascia panels +-5’-0” FASCIA PANEL
and Brake Formed aluminum Box Trim at top and bottom +-2'-7" - REMODELED
each section extended from the existing sign. 4’-0” BK LOGO FASCIA PANELS
New 4’ Dia. LED Illuminated BK Logo installed each side of sign.

Non-Illuminated Sign Panel:


1 1/8” Depth x 10” x 4’-10” Fabricated aluminum
single face sign panels with 1/4” thick aluminum
LANG STON PLAZ A plate applied letters installed to each side of the
existing Monument Sign.

+-5’-5 3/4” - EXTENSION TO MATCH EXISTING

4’-0” BK LOGO

End of Existing
MATCH EXISTING
DIMENSIONS TO

Monument Sign

Concrete Slab (Covered with landscape)

Added Masonry Split Face Block and aluminum


Box Trim with aluminum skirt to tie into the existing Sign Base
FRONT ELEVATION - MONUMENT SIGN
construction matching building material size, shape and color. SCALE 1/2” = 1’-0”

MET
MET
C US

Client Review Status Declaration Date / Description Project Information


Allen Industries, Inc. requires that an " Approved" drawing be obtained Copyright © 2018 Allen Industries, Inc. 01/15/20 Issue Date Client Burger King Op018857
from the client prior to any production release or production release revision. This is an original, unpublished drawing, created by Allen Industries, Inc. This drawing is
1 500 Old Greenville Hwy., Clemson, SC 29631
Approved Approved as Noted Revise &Resubmit submitted to you in confidence for your use solely in connection with the project being
2
Name
planned for you by Allen Industries, Inc. and is not to be shown to anyone outside your
organization, nor used, reproduced, copied or exhibited in any fashion whatsoever. The
designs shown on the drawing (except for any registered trademarks that may belong to a
3 File Op018857 Clemson SC_100 1-800-967-2553
Title Date client of Allen Industries, Inc.) remain the property of Allen Industries, Inc. 4 Sales House Design SPN PM Justin Burgess
www.allenindustries.com

You might also like