Project package Excavation Location: The checklist shall be completed daily and posted on the site by the designated "Competent Person(s)" for the excavation. Inspection is to be performed before workers are allowed to enter the excavation each morning or after a change of site condition (e.g. rainstorm, groundwater, sidewall deterioration, or adjacent ground fissuring). At the end of each workday, this checklist is to be given to NAYA-PMC Safety Engineer for review and filing. NAYA-PMC Safety Engineer is to maintain a consolidated list of all excavation in his work areas and conduct safety audit of excavation during the course of the work day. All NAYA-PMC Safety Requirements are to be complied with all times. The excavation designated "Competent Person(s)" for the excavation must be knowledgeable of NAYA-PMC Safety Requirements and have the necessary training and experience to ensure the work is performed safely. Tick Control Measures / Standard Requirements in Place Comments YES NO N/A Approved MS, JSA and Documents available on site NAYA-PMC Pre-Excavation Checklist has been completed and available on site Have all relevant departments have been notified All underground utilities, cables, pipelines located and marked Exposed underground utilities, cables, pipelines physically protected Approved work permit and PR-certified WPR available on site Is a confined space entry required, issued and available on site Is gas testing required and performed e.g. excavation 1.2 m and deeper (4 ft.) PR-certified standby man and/or Fire watch required and available on site. Are pedestrian crossovers required and provided (with guardrails and toe board) Is access to plant equipment maintained If excavation near roadway, are flagmen with reflectorize vest present If excavation on the road, road blocks, rerouting cones and signs available Are shoring / sloping / benching acceptable to prevent sidewall cave-ins Is shoring materials in sound condition and free of damage / defects Is shoring installed / maintained by qualified personnel Are adequate ladders provided within a travel distance of 7.5 m (25 ft.) Are ladders properly secured and extended 1 m (3 ft.) above the surface Is excavation free of tension cracks or other evidence of sidewall failure Is excavation free of water, hydrocarbons or other toxic substances Are materials and spoils set back at least 0.6 m (2 ft.) from excavation edge Are pedestrian barricades / lights placed at least 1m (3 ft.) from excavation edge Are cranes not closer than the depth of excavation to edge of the excavation Are scaffolds erected not closer than 1.5 times the depth of the excavation from edge Are overall conditions acceptable and safe for work
Competent Person’s Name & Signature Date Verified by PMC Civil Engr. / Supv.