Proposal No. 11800247 Rev.3
Proprietary and Confidential. © Copyright 2016 Aqwise – Wise Water Technologies Ltd.
To: SADESA S.A From: Guy Gadot
Attn.: Mr. Daniel Delgado Date: 07 September 2016
Cc: Pages: 20
Sadesa Tannery Wastewater treatment plant in Paraguay; Proposal No
Subject:
11800247 Rev.3
Aqwise is pleased to provide you with our revised proposal for Sadesa tannery wastewater
treatment plant in Paraguay. The proposed wastewater treatment plant is based on Aqwise’
AGAR® (Attached Growth Airlift Reactor) technology.
The AGAR® system offers several advantages to the wastewater treatment system including:
Excellent effluent quality
Robustness – Fast recovery and resistance to process upsets (both hydraulic and toxic)
Operational simplicity and scalability
Low operation and maintenance cost
Fast deployment procedure
Nitrification in cases where typically nitrification is difficult for the conventional systems
The following proposal offers a Greenfield design for a completely new reactor to treat 2,000
m3/d for both organic load reduction and nitrogen removal. Wastewater will arrive to the new
reactor after the existing primary treatment, and will flow to a new secondary clarifier.
Detailed Process Description and supporting technical documentation are presented below and
in technical equipment data sheets (Annexes). If you have any questions or require additional
information please feel free to contact us.
Table of Contents
2
1 Design data.............................................................................................4
2 Process description...............................................................................6
3 Technical data........................................................................................8
4 Equipment specifications...................................................................10
3
1 Design data
m3/d 2,000
Design flow Flow is equalized
m3/h 83.3
4
1.2 Effluent quality after secondary clarifier
5
2 Process description
The wastewater treatment plant design will have the following units:
Primary treatment:
o Fine screening – existing
o EQ tank – existing
o Primary clarifier– existing
o Primary DAF– existing
o pH correction system – existing
o Nutrients dosing system (phosphoric acid) – to be added
o Antifoam dosing system – to be added
Biological treatment:
o IFAS system - new
o Secondary clarifier – new
The proposed biological process is the IFAS (Integrated Fixed Film Activated Sludge) AGAR ®
system, which utilizes attached growth on ABC (Aqwise Biomass Carriers) with suspended solids
returned from the clarifier.
The AGAR® technology will be installed in a biological reactor with an operative volume of 4,250 m3.
The 1st stage will be an anoxic stage for pre-denitrification. This stage will be equipped with
mechanical mixers and diffusers as backup for aeration.
The 2nd stage will be an aerobic stage for BOD removal and some nitrification.
The 3rd stage will be an aerobic stage for complete nitrification. Biomass carriers will be
filled inside this stage.
The 4th stage will be an anoxic stage for post-denitrification. This stage will also be
equipped with mechanical mixers.
The 5th stage will be a small aerobic stage for post-aeration to increase DO levels in the
final effluent. This stage could also be built outside of the biological reactor and requires
only a short retention time.
The reactor will be divided into 2 symmetric lines working in parallel for ease of maintenance and
redundancy.
6
Aeration will be achieved by fine bubble diffusers in all aerobic stages.
Wedge wire screens will be installed at the outlet of the 3 rd stage in order to maintain the carriers
inside the reactor, while the wastewater flows downstream. The screens are continuously cleaned
by the mixing flow of water, air bubbles and biomass carriers.
An internal re-circulation from the 3rd (aerobic) stage to the 1st (anoxic) stage will ensure sufficient
denitrification.
The treated wastewater will flow from the biological reactor to a secondary clarifier for solid-liquid
separation.
Returned activated sludge (RAS) will be re-circulated from the secondary clarifier to the 1 st stage of
the biological reactor.
7
3 Technical data
Value
Sludge quantities are considered for the max BOD and TKN inlet values. However it is
recommended to assume sludge quantities for average inlet conditions. Since peak conditions are
usually temporal and not ongoing; the real sludge quantities will be lower.
8
As we do not have Average inlet values, we based our design on the full range of Min and Max inlet
values. We recommend considering average inlet values to assume more representative sludge
quantities for further treatment and disposal.
9
4 Equipment specifications
Tubular Wedge wire screens are offered, valid for a maximum inlet flow rate of 500 m3/h, including
IC and RAS.
# of units (both
Location Diameter [inch] Length [m]
lines)
4.2 Aeration
4.3.1. Air blowers
Aqwise will provide three (3) blowers, to provide all oxygen necessary for the biological process. At
any moment, two blowers will be operated, while the 3rd will be on stand-by (2+1).
Manufacturer: Aerzen
Type: PD Delta blower G5
Flow rate: 2,600 Nm3/h each
Differential pressure: 650 mbar
Installed power: 75 / 90 kW TBD
Including silence hood
Including AERtronic system
Aerzen PD blower
1
4.3.2. Diffusers system
A Fine bubble aeration system was defined for this installation due to its high energy efficiency. The
diffusers will be distributed on the reactor floor according to Aqwise specific design.
Air distribution in the reactor is by drop leg pipes. On the reactor floor air is distributed by a grid via
fine bubble diffusers.
(*) Diffusers will also be installed inside the anoxic stages. The diffusers in the anoxic stages will be
coarse bubble type, and will assist to get a faster stabilization of the biological process, and also to
control the anoxic/aerobic conditions inside the reactor.
1
4.3 Mixers in anoxic zones
Good mixing of the pre and post anoxic zones is important in order to have good de-nitrification.
ABS submersible mixers are offered for this function.
The submersible mixer is designed as a compact, water pressure tight unit including propeller and
integrally casted installation bracket for the attachment on the square guide tube. Mixers Include
option for angle adjustment.
1
Specifications:
Number of units: 5 units (2 for each line + 1 stand-by in dry
storage)
Flow: 125 - 175 m³/h
Hydraulic pressure: 7.0 – 8.0 m
Temperature monitoring by thermal sensors (140 °C) in the
stator windings.
Seal monitoring by a moisture probe (DI) in the seal chamber
which signals an inspection alerts if there is leakage at the
shaft seals. Submersible pumps for IC
Maximum submergence depth of 20 m.
MOC: Housing and impeller – cast iron (EN-GJL-250); Shaft – AISI 420; Fasteners and
lifting hoop – AISI 316
Motor power: 3.0 – 4.5 kW
Voltage: 400 V
Frequency: 50 Hz
Opening at suction: DN150
Discharge opening: DN150
4.5 Air-Lifts
The airlift is essentially a U-shaped tube with one end set just
beneath water level (300 mm) while the other extending above the
water level up to 25% of the submergence depth. Using a
telescopic sleeve on the submerged side of the airlift pump, one
can adjust the suction flow.
Air-Lift U-PVC
1
Parameter Description
1
4.7 Extra instrumentation and equipment (not in Aqwise scope)
Flow meters – currently we have no information regarding flow measuring. For better process
control we ask that a flow meter will be installed on Inlet, RAS, WAS and internal circulation lines,
and that the flow will be measured continuously.
pH control in the biological reactor - We ask that additional pH monitoring will occur in the biological
reactor itself. Sometimes in industrial applications pH changes in the biological reactor due to
reactions occurring in the reactor. We would like to avoid a condition in which pH becomes
problematic to the biological process (e.g. below 6 or above 8). In this case the pH control will stop
feeding into the reactor in order to protect the microorganisms in the reactor and pH correction
measurements will be applied.
DO control in the biological reactor and Pressure indication on main air pipe – both aerobic stages
in the reactor should have DO monitoring (dissolved oxygen) for better control of aeration and
energy requirements.
DO probes will control the level of which the blowers will be operated (via VFD). If DO level is too
low or too high, the blowers’ frequency will be increased or decreased accordingly.
Anti-Foam detector and system – Foam may appear in the aerobic stages. An anti-foam system will
be installed according to Aqwise specifications. The system will be based on recirculating clean
water (after solids-liquid separation) and spraying it on the reactor surface. Into the water line, a
dosing pump will dose anti-foam chemical (Nalco 71101 or equal). In addition, we ask to install a
foam detector, based on a through beam photoelectric switch. The foam detector will insure that
anti-foam chemical will be dosed to the anti-foam system only when necessary, and will save costs.
1
5 Scope of supply and pricing
N
o Items Comments
5.2 Equipment
N
o Items Type Supplier Comments
1
5.3 Project components to be supplied by client / others
N
o Items
2 Civil works and buildings, including new concrete basin for the secondary clarifier
Supply and installation of all new equipment not stated in section 5.2 (e.g. pumping to reactor,
3
antifoam dosing pumps, control probes, Flow meters etc.)
5 Supply and installation of all hydraulic piping Inc. valves, instrumentation, fitting supports
Main air pipe from the blowers to the reactor up until diffuser system drop legs including main
6
valves on each drop leg.
Electrical and control works and installation. Including control and electrical panel, instruments
7
and cabling
All existing units upstream and downstream the reactor in working condition (e.g. pre-treatment,
8
secondary settling, existing pumping stations, etc.)
Operation costs such as chemicals, power, sludge disposal, disposal of grit (containers), external
10
lab analysis
11 Site development such as: gardening, road paving, light, walkways etc.
1
6 Pricing and General Terms and conditions
Price for the scope of supply detailed in section 5.1 & 5.2 USD
30% of the total contract price shall be paid upon delivery of the engineering package,
including drawings and design data;
30% of the total contract price shall be paid upon notice by AQWISE that the main
equipment is ready for delivery; a proportional amount shall be payable upon notice of
readiness for partial delivery;
10% of the total contract price shall be paid upon completion of a Successful Performance
Test, but not later than ninety (90) days from delivery of main equipment;
1
6.4 General terms and conditions
These terms and conditions of sale (these “Terms”) govern the purchase and sale of the products and/or related services
(collectively, the “Products”), referred to in AQWISE’s quotation, proposal or acknowledgment, as the case may be (the
“Documents”). Notwithstanding any terms set forth in Customer’s purchase order, if any, which are hereby rejected, these Terms
constitute a counter offer with respect to the Products, acceptance of which by Customer is expressly limited to these Terms.
These Terms shall apply whether or not they are attached to or enclosed with the Products.
1. Delivery. Delivery of the products shall be in material compliance with the Documents. Unless otherwise determined in the
Documents, delivery shall be within ninety (90) days from the date of receipt of Customer's purchase order, and shipping
terms are FOB (designated port in country of origin)) (Incoterms 2000). Partial shipment is allowed.
2. Intellectual Property Ownership. All devices, designs, drawings, plans and specifications, estimates, prices, notes, electronic
3. data and other documents or information prepared or disclosed by AQWISE, together with any improvements, modifications
and derivative works of the Products, and all intellectual property rights related to any of the aforesaid shall remain
AQWISE's property. AQWISE grants Customer a non-exclusive, non-transferable license to use the Products and any
documentation pertaining thereto solely for Customer’s use of the Products in accordance with their designated purpose.
Customer shall not disclose any material or other proprietary information provided to it by AQWISE to third parties without
AQWISE’s prior written consent.
4. Payment. Customer shall pay AQWISE the total purchase price set forth in the Documents. Unless the Documents provide
otherwise, freight, storage, insurance and all taxes, duties or other governmental charges relating to the Products shall be
paid by Customer. If AQWISE is required to pay any such charges, Customer shall immediately reimburse AQWISE. Unless
the Documents provide otherwise, all payments are due within 30 days after receipt of invoice. Payments due to AQWISE
shall not be subject to any withholding, deduction or offset. Amounts invoiced by AQWISE, which are not paid by Customer
when due shall bear interest at the rate of 1½% per month (or the highest legal rate, if less), until paid and Customer shall
pay all of Aqwise's reasonable costs (including attorneys' fees) of collecting amounts due and unpaid. AQWISE shall be
deemed to have retained title to all Products until all accounts payable by Customer have been finally settled. Customer will
store such Products subject to retention of title and insure them at its expense against loss and damage for their entire value
with a reputable insurance company, and shall name AQWISE as an additional insured party.
5. Returns. Customer shall not return any Product for any reason other than pursuant to a warranty claim without first
obtaining authorization from AQWISE. Unless pursuant to a warranty claim, returns of Products shall be in the original
packaging or equivalent and unused.
6. Cancellation. If Customer cancels or suspends its order for any reason other than Aqwise's breach, Customer shall promptly
pay AQWISE for work performed and Products delivered prior to cancellation or suspension and any other direct costs and
expenses incurred by AQWISE as a result of such cancellation or suspension.
7. Warranty. Subject to the following, AQWISE warrants to Customer that the Products shall be free from significant defects in
material and workmanship at the date of delivery thereof. The Products are considered free from such defects if they
materially conform to the description in the Documents. The warranty period ( “Warranty Period”) for all Products is the
period beginning on the delivery date thereof and ending twelve (12) months thereafter; the warranty period for repaired or
replaced Products shall end with the expiry of the original Warranty Period applicable to the Products that have become
subject of the repair or replacement. This warranty shall automatically terminate and become null and void (1) if the Products
have been modified or tampered with other than by or on behalf of AQWISE, (2) in case of normal wear and tear and
consumables, (3) if the Products are used, maintained operated or stored other than in accordance with AQWISE’s written
instructions; (4) in case of abuse, negligence or accident and/or (5) Customer is in default of any payment obligation towards
AQWISE. This warranty does not include damage resulting from neglect, accident, fire, lightning, power failure or other
hazard, or unreasonable use or storage.
AQWISE’s entire liability, and Customer’s exclusive remedy, under this warranty is for AQWISE to use commercially
reasonable efforts to re-perform, repair the Products, replace the Products with equivalent new or refurbished products, or, at
AQWISE’s option, return the purchase price paid for the Products. The foregoing warranty shall not apply to any Products
that are supplied by AQWISE to conform with specifications provided by Customer or which are manufactured by third
parties which are not selected by AQWISE, as to which (i) AQWISE hereby assigns to Customer, to the extent assignable,
any warranties made to Aqwise; and (ii) AQWISE shall have no other liability to Customer under warranty, tort or any other
legal theory.
8. Limitation of Warranty. EXCEPT AS OTHERWISE EXPRESSLY PROVIDED IN PARAGRAPH 6 ABOVE, AQWISE PROVIDES
THE PRODUCTS “AS IS” AND, UNLESS OTHERWISE MANDATED BY APPLICABLE LAW, AQWISE MAKES NO WARRANTY
OR REPRESENTATION WHATSOEVER, EXPRESS OR IMPLIED, INCLUDING, WITHOUT LIMITATION, ANY AND ALL
WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE .
9. Limitation of Liability. NOTWITHSTANDING ANYTHING TO THE CONTRARY, AQWISE SHALL NOT BE LIABLE TO
CUSTOMER OR TO ANY THIRD PARTY FOR CONSEQUENTIAL, INCIDENTAL, INDIRECT, PUNITIVE OR SPECIAL
DAMAGES, EVEN IF AQWISE HAS BEEN APPRISED OF THE LIKELIHOOD THEREOF AND OTHERWISE REGARDLESS OF
THE FORESEEABILITY THEREOF. AQWISE’S LIABILITY FOR DAMAGES ARISING OUT OF THIS AGREEMENT SHALL TO
THE
1
EXTENT PERMITTED BY APPLICABLE LAW, IN NO EVENT EXCEED THE PURCHASE PRICE PAID BY CUSTOMER TO
AQWISE FOR THE PRODUCTS, REGARDLESS OF WHETHER A CLAIM IS BASED ON CONTRACT, TORT, STRICT LIABILITY,
PRODUCT LIABILITY OR OTHERWISE. ANY AND ALL LIABILITY OF AQWISE SHALL PERMANENTLY CEASE UPON THE
END OF THE WARRANTY PERIOD. THE FOREGOING PROVISIONS OF THIS PARAGRAPH SHALL ALSO APPLY TO
AQWISE’S PERSONNEL, AGENTS, LICENSEES, LICENSORS AND SUBCONTRACTORS OF ANY AND ALL TIER.
10. Force Majeure. Neither AQWISE nor Customer shall have any liability for any breach (except for breach of payment
obligations) caused by extreme weather or other act of God, strike or other labor shortage or disturbance, fire, accident, war
or civil disturbance, delay of carriers, failure of normal sources of supply, act of government or any other cause beyond such
party’s reasonable control.
11. Miscellaneous. These Terms, together with the Documents set forth the entire agreement between the parties with respect to
the Products, supersede all prior agreements, oral or written, and cannot be modified except by agreement in writing signed
by both parties. No course of dealing or usage of trade or course of performance will be relevant to explain or supplement
any of these Terms. If any of these Terms is invalid, illegal or unenforceable, such term shall be limited only to the extent
necessary to make it valid and enforceable and the remaining provisions shall not in any way be affected or impaired. The
failure of either party to enforce any rights granted hereunder, or to take action against the other party in the event of any
breach hereunder, shall not be deemed a waiver by that party as to subsequent enforcement of rights or subsequent actions in
the event of future breaches. These Terms shall be governed by and construed in accordance with the laws of Israel without
regard to conflicts of law provisions thereof. The competent courts in Tel Aviv, Israel shall have exclusive jurisdiction over
any disputes arising out of these Terms. Customer may not assign any rights or obligations hereunder without the prior
written consent of AQWISE.