Request 

For Information
DIAGEO ATREYU
September 29, 2022

N° Question Answer Drawing


GENERAL
EARTHWORKS
CONCRETE & CIVIL WORKS
STRUCTURE
In the drawing "02‐SS‐520‐ROOF DETAILS " in detail of CONNECTION OF 
STRINGS WT 6 TO COL. W, does not specify how the welding application 
will be in "connection plate plant 5". Please indicate.Reference image is 
attached.

in the drawing 02 ‐ S‐201 to 02‐S‐203 OVERALLL EAST ELEVATION FRAMING,  
4MT‐14 elements connected to W10X12 profile are indicated. Indicate your 
connection.

Connection details are missing for profile w14x68 to W24x84 and HSS 
4x4x23/8, as well as to CB24 x 26.

3
Request For Information
DIAGEO DISTELLERY
September 29, 2022

N° Question Answer Drawing


GENERAL
EARTHWORKS
CONCRETE & CIVIL WORKS
STRUCTURE
No viene indicado la geometria del hueco para la viga acastelada CB24X36/ The hole geometry is 
not indicated for the CB24X36 composite beam.

No viene indicado la conexión columna viga W16X26, w18x55 y W21X44/The W16X26, W18x55 and 
W21X44 column‐beam connection is not indicated.

Falta detalles de conexión para los perfiles del pasador/Missing connection details for the pin 
profiles..

No viene indicado la conexión del marco sismico con la viga W21X44  en el area de la plataforma/The 
connection of the seismic frame to the W21X44 beam in the platform area is not indicated..

4
Indicar las conexiones en toda el área de la plataforma/Indicate the connections in the entire 
platform area.

Indicar el peralte de la armadura, asi como la soldadura de las placas de conexión de las cuerdas 
superior e inferior/Indicate the truss depth as well as the welding of the upper and lower chord 
connection plates..

No viene conexión W18X35 con columna en patin y alma/No W18X35 connection with column on 
skid and core is available.

7
No existe ninguna conexión en el marco eje 2.G'/There is no connection in the frame axis 2.

8
Request For Information
DIAGEO DISTELLERY
September 29, 2022

N° Question Answer Drawing


GENERAL
EARTHWORKS
CONCRETE & CIVIL WORKS
STRUCTURE
Placa base: No indicado La soldadura de las placas de SHEARLOG y soldadura de la placa sismica. Plano 02‐S‐
501/Base plate: Not indicated SHEARLOG plate welding and seismic plate welding. Drawing 02‐S‐501

Plano 02‐S‐501. Placa base: PB‐06W24X76, El visel lo indica en el alma y el filete es para la placa sismica ?/Drawing 02‐
S‐501. Base plate: PB‐06W24X76, The visel indicates it in the soul and the fillet is for the seismic plate ?

Falta indicar la placa base de la columna W14X90/The base plate of the W14X90 column is missing.

El el marco eje G´ las columnas indican W24x68 y en planta indica W24X250, cual es la correcta ?/On the G' axis 
frame, the columns indicate W24x68 and on the floor plan it indicates W24X250, which is the correct one ?
4

No viene indicado la conexión del marco sismico con la viga W21X44  en el area de la plataforma/The connection of 
the seismic frame to the W21X44 beam in the platform area is not indicated.

Indicar las conexiones en el area de oficinas para las vigas secundarias CB24X26 y CV21X22 que llegan a muro y 
conexiones de toda el area de la plataforma/Indicate the connections in the office area for the secondary beams 
CB24X26 and CV21X22 that reach the wall and connections of the entire platform area.

EN RESUMEN, HACE FALTA EN SU TOTALIDAD LAS CONEXIONES DE LA ESTRUCTURA, SOLO HAY CONEXIONES DE
ELEMENTOS PRINCIPALES DE LA NAVER PRINCIPAL/IN SHORT, THE WHOLE STRUCTURE CONNECTIONS ARE
MISSING, THERE ARE ONLY CONNECTIONS OF THE MAIN ELEMENTS OF THE MAIN NAVER.