Tokyu-Wika is jointly operating surface section CP101 & CP102 of the Jakarta Mass Rapid Transit Project. This document records concrete quality control details such as delivery times, temperatures, slump tests, and molding of concrete specimens from each batch for third party laboratory testing. Concrete quality is being monitored and documented on site to ensure it meets design specifications.
Original Description:
Original Title
TWJO-ITP-GEN-0003-CHK-002revB Concrete control on site
Tokyu-Wika is jointly operating surface section CP101 & CP102 of the Jakarta Mass Rapid Transit Project. This document records concrete quality control details such as delivery times, temperatures, slump tests, and molding of concrete specimens from each batch for third party laboratory testing. Concrete quality is being monitored and documented on site to ensure it meets design specifications.
Tokyu-Wika is jointly operating surface section CP101 & CP102 of the Jakarta Mass Rapid Transit Project. This document records concrete quality control details such as delivery times, temperatures, slump tests, and molding of concrete specimens from each batch for third party laboratory testing. Concrete quality is being monitored and documented on site to ensure it meets design specifications.
Construction of Jakarta Mass Rapid Transit Project
CONCRETE CONTROL ON SITE
Date: Site Location : Concrete-Supplier :
Lot No: Concrete grade :
Weather: Element type : Mix-design No. :
Element No. : Activity:
Delivery Casting Specimen
Unloading Time Temperature Slump Mold Label No. : Specimen No. Remarks Batching Truck No. Delivery note no. m3 Plant (given by the time Start End Air ( C) 0 Concrete ( C) 0 (cm) Type No. (given on site) laboratory)