Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

:z.

¡i¡ DRILCO
See-Flo Degasser

Dimensions 01Standard - and Deep - Pit Size Degassers

t
12"

69"

.,~. 1'.. ':

21"

20/." Oia.
!
t
101/2' long
36"

ADJUST ABLE
Sld. Pit - S1"-63"
Deep Pil - 7S" -87"
Sld. Pil-69"
Oeep Pit-93"

Inlet
Screen I 32"

Fig. 1 Dimensions 01 Standard- and Deep-Pit Degassers

1-2 3/82
í
Si; DRJLCO
See-Flo Degasser

from

([ flow line

Degassed Mud Pit


i
Mínimum
Mud
JJ Level

t
Swing Elbow Type Return Une

Fig. 10 Return lines help maintain submergence depth.

Fluid Return Une Discharge Direction

Use a fluid return line back to the degas-


ser pit (Fig. 10) to prevent the fluid level from
being pumped down below the minimum re-
quired for adequate flow. Keep mud level as
high as possible above the pump inlets. Adjust
the fluid return line so that it maintains mud
level in the pit.

Change Direction 01 Fluid Discharge Spray Tank

Obstructions and installation conditions


Fig. 11 Discharge direction can be rotated in
in the pit may necessitate changing the fluid 2~.5 o increments.
discharge direction. which means rotating the
spray tank to a new position with the riser
pipe. On newly-manufactured degassers. the The spray tank is assembled onto the
spray-tan k discharge points in the direction riser pipe with 4 bolts placed thwugh the
shown in Figure I1 as sol id lines anJ the solid tank's bottom tlange and screwed ¡nlo the
arrow. The dotted lines indicate how thl:?spra~ riser pipe tlange below. The riser pipe Ilange
tank can be rotateJ to Jifferent positions. contains 16 holes making it possihle !o posi-

1-8 1/80

\
See-Flo Degasser

Adjust Depth of Degasser in Pit l. Locate the unit enough off the bottom
of the pit (2-ft. minimum) lO prevent solids
Brackets can be bolted in place at six build up in pump.
difTerent height positions. Bracket placement
determines the depth ofthe unit in the pit. The 2. Elevate spray tank enough to establish
series of mounting holes on the riser pipe and downward slope of the trough so that fluid
pump frame permits a total adjustment of 15". flows through it by gravity to the next pit.
Existing rig framework can also be modified to
support brackets at higher or lower levels. . 3. Top ofpump frame tube must be above
When establishing depth of the unit in the pit, the highest potential mud level.
refer to Figure 9 and follow these rules:

Remove 2 bolts (15/16"wrench). .

Move brackets I
.. . up to lower unit in pit and
down to raise unít in pit.

Pump
Frame
Tube
Brackets moved down,
raises degasser.
Locate off bottom and out of solids

Fig. 9 Adjusting depth of degasser in pit

1/80 1-7

You might also like