Professional Documents
Culture Documents
Positioning Unit: Preparations
Positioning Unit: Preparations
Positioning Unit: Preparations
Positioning unit
Simba 1252 - 1254, 1354
Preparations
Diesel engine must be running.
See Driving instruction The hydraulic pressure button must be depressed.
Positioning panel
1 2 3 4 5 6
Slow
positioning
Positioning
1 2 3
1250 0186 83
Atlas Copco Underground drill rigs
Positioning unit
Simba 1252 - 1254, 1354
Positioning
4 5 6
1250 0186 84
After positioning
CAUTION! Press the hydraulic pressure button after positioning.
9852 2034 01