PUBLIC SCHOOLS
WORK SESSION
FACILITY & SITE IMPROVEMENT NEEDS
October 5, 2022 1
Agenda
• Q&A
WHAT WE KNOW ABOUT WDC
Playground Needs
3
Current Identified Deferred
Maintenance Needs
• Track and Field Surface
• Track and Field Lighting
• Football Field Bleachers
• Baseball Field Bleachers
• Softball Field Bleachers
• Football Field Concession Stand
• Outdoor Fencing
• Tennis Courts
• CTE Space
• Auditorium
• High School small group, classroom
and/or office space
• HS Parking Lot and Parent Loop
• HS Awning
• Playgrounds
Preliminary
Project Selection Worksheet Potential Funding Mechanism
Project Selected
Energy Savings
Health & Safety
Referendum
Lease Levy
Abatement
ESSER
Budget
Capital
LTFM
Estimated Budget
Summary
Description
HIGH SCHOOL
Outdoor Athletics / Fitness
Resurface Track - 8 Lane (blue) $501,900 X
Install Turf Field $2,062,100 X
LED Lighting - Track/Field $451,900 X
Home - Grandstand (700 seats & Press box) $607,800 X
Visitor - Angle Frame Bleachers (300 seats) $98,700 X
Baseball (150 seat with cover) Bleachers $97,000 X
Softball (150 seat with cover) Bleachers $97,000 X
Concessions Building (remodel) $257,400 X
New Cold Storage Building $121,600 X
Baseball/Softball Field Fencing Replacement $362,600 X
Replace Tennis Courts $534,300 X
Sidewalks - ADA (TBD) $114,400 X
Tech. Ed.
Remodel / Additional Tech. Ed. Space $1,966,300 X
Other
Parent Pickup/Dropoff Modifications $1,347,100 X
Install Awning (shade) for HS/MS Patio $75,100 X
Auditiorium Addition (350-400 seats) $7,722,000 X
ELEMENTARY SCHOOL
Playgrounds
Additional K-2 Playground & New Equipment $364,700 X
M-State Playground (Resurface & New Equip.) $158,700 X 5
Previous Assessment Results
7
The Overview
• From 2007/08 Wadena-Deer Creek’s K-12 enrollment declined from 1,076 to a low of 924
in 2011/12 and then began a steady rise.
• K-4 enrollment has increased from the around 380 to just over 400 with the major increase
over the past three years. Enrollment in grades 5-6 is up but fluctuates due to year-to-year
changes with only two grades in the mix. Grade 7-12 enrollment has steadily declined from
558 to 387.
• While the average Grade 7-12 class has declined from 93 to 65, the average K-4 class has
increased from 76 to 81. This points to a gradual overall increase in enrollment as the
younger grades progress into high school.
• The number of students living in the district regardless of which district they actually
attend (the so-called “resident pool”) declined through 2011/12 at which time the number
began rising, a trend that is expected to continue.
• Wadena-Deer Creek loses roughly 30% of its resident students through open enrollment to
other districts primarily Verndale, New York Mills and Bertha-Hewitt. In 2016/17 315
students (excluding Freshwater Education District) opted out while the number of students
coming to the district has risen over time from 86 to 112.
• Projected K-12 enrollment is expected to grow a robust 16% from 963
today to 1,113 in 2026/27.
8
Wadena-Deer Creek PreK-12 Enrollment Projection to 2026/27
Grade 2016/17 2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27
EC 73 69 75 73 78 73 73 73 76 76 76
Kg 82 84 84 92 89 94 89 89 89 92 92
1 74 83 85 85 93 90 95 90 90 90 93
2 79 74 83 84 84 92 89 95 90 90 90
3 79 80 74 83 85 85 93 90 96 91 91
4 89 81 82 76 85 87 87 95 92 97 92
5 88 91 83 84 76 85 87 87 95 92 97
6 84 87 90 82 83 76 84 86 86 94 91
7 53 82 85 88 80 81 74 82 83 84 91
8 69 52 79 82 85 78 78 72 79 81 81
9 70 67 50 77 80 83 75 76 70 77 79
10 66 73 70 52 80 83 86 78 79 72 80
11 78 65 72 69 51 79 82 85 77 78 72
12 52 63 54 59 57 42 64 67 69 62 63
Total EC - 12 1,036 1,050 1,065 1,086 1,106 1,127 1,157 1,164 1,172 1,176 1,189
Total Kg - 12 963 981 990 1,013 1,029 1,054 1,084 1,091 1,096 1,100 1,113
K-4 403 401 407 420 436 448 453 459 456 460 458
5-6 172 178 173 166 159 160 171 173 181 186 188
7 - 12 388 402 409 427 434 445 460 459 458 454 466
Student Enrollment
17-18 18-19 19-20 20-21 21-22 22-23
K 81 76 95 91 86 90
1 75 85 78 84 85 85
2 79 73 86 72 84 86
3 80 79 80 86 77 90
4 78 76 80 80 91 75
5 87 79 81 78 81 94
6 94 85 80 76 79 77
7 84 89 86 79 78 76
8 64 76 82 84 78 77
9 64 62 82 74 85 76
10 72 63 63 78 77 92
11 74 74 61 57 75 80
12 67 71 64 55 52 75
Focused on
Elementary School
Needs/Improvements
12
Where do we
go from
here?
13
Proper Planning
• What are our immediate needs?
• What are long term needs?
• How do we prioritize?
• How do we fund?
• How do we plan well in advance for larger needs in the future?
Phase I:
Assessment Phase II: Phase III: Phase IV:
Solutioning Decision Process Implementation
Space Needs 50 YARD LINE!
Analysis
Stakeholder Listening Sessions
(Demographics)
Develop Solution Options
Educational
Adequacy & Develop Community
District Board Project
Technology Financial Leadership
Consultation Approval Implementation
Assessment Options Review
Feedback &
Facilities, Refinement
Operational and
Architectural
Assessment
Accountability!
15
Community and
Stakeholder Input
16
Community & Stakeholder Input
Listening Sessions
• Separate Listening Sessions:
• Community Stakeholders
• Students
• School Board & Administration
• Teachers & Staff (Elementary/High
School)
• Open & honest responses should reflect
the point of view from each of the
stakeholder groups
• Each group holds a UNIQUE perspective
on the schools
17
Community & Stakeholder Input
Developing Common Topics
18
Space Needs
Professional
demographic study to
identify projected
future enrollment.
19
Space Needs
Updated Demographics Study
Past Future
Trends Births
Population
Dynamics
Adjacent Today’s
Districts Picture
District District Economic
Enrollment
Enrollment Factors
Dynamics
Past The
Trends Future
Wild
Cards
Other Adjacent
Factors Districts
20
Space Needs
Updated Demographics Study
Are we still on
track for
projections?
21
Educational Needs
Providing a 21st
Century Learning
Environment
Educational Needs
Educational Adequacy Assessment
CATEGORY COLOR
1 Classroom Size and Suitability Y
Educational Adequacy is a complete analysis
2 Cafeteria/Kitchen/Serving Y
3 Security and Supervision R of a school building focusing on multiple
4 Main Office/Nurse/Support Services R categories
5 Science Classrooms/Labs G
6 Art Classrooms/Labs R
7 Music Classrooms/Practice Areas/Etc. Y Analysis in each category is based upon…
R
1. Current District use
8 Staff Lounge/Collaborative Planning Areas
9 Student Commons/Break-Out Areas R
10 Physical Education/Athletics/Locker Rooms/Pool Etc. Y
2. Accepted education guidelines
11 Site Suitability: Fields/Green Space/ Storage Etc. Y 3. Designing School Buildings for 21st Century Learning
12 Parking/Bus Drop-Off: Staff/Students/Parents R 4. Anticipated future needs
13 Technology G
5. Input from the district’s educational staff
14 Library/Media Center: Location/Size/Layout Y
15 Special Education/Support Services G
16 Auditoriums/Performing Arts Spaces R
17 Career and Technical Education Y
18 Hallways/Lockers/Washrooms/ Maintenance space Y
23
Facility Needs Assessment
Are we missing anything?
A team of
Professionals will
conduct a facility
assessment from
building envelope to
infrastructure to
interior finishes to
exterior spaces
24
Facility Needs Assessment
Interior Spaces
Exterior and Building Envelope
25
Planning Process Outcome
27
Four Phase Approach
Communicate Communicate Communicate Communicate
Process Findings Recommendations Results
Phase I:
Assessment Phase II: Phase III: Phase IV:
Solutioning Decision Process Implementation
Space Needs
Analysis
Stakeholder Listening Sessions
(Demographics)
Develop Solution Options
Educational
Adequacy & Develop Community
District Board Project
Technology Financial Leadership
Consultation Approval Implementation
Assessment Options Review
Feedback &
Facilities, Refinement
Operational and
Architectural
Assessment
Accountability!
28
Solutioning
WADENA - DEER CREEK - PRELIMINARY BIM SUMMARY - DRAFT
Project Selection Worksheet Potential Funding Mechanism
Project Selected
Energy Savings
Health & Safety
Referendum
Lease Levy
Abatement
"Selected Only"
ESSER
Capital
LTFM
Estimated Budget
Estimated Budget
HIGH SCHOOL
Outdoor Athletics / Fitness
E-# Resurface Track - 8 Lane (blue) $501,900 X $0
E-# Install Turf Field $2,062,100 X $0
E-#
E-#
LED Lighting - Track/Field
Home - Grandstand (700 seats & Press box)
$451,900
$607,800
X
X
$0
$0 Prioritize Needs
E-# Visitor - Angle Frame Bleachers (300 seats) $98,700 X $0
E-# Baseball (150 seat with cover) Bleachers $97,000 X $0
E-# Softball (150 seat with cover) Bleachers $97,000 X $0
E-# Concessions Building (remodel) $257,400 X $0
E-# New Cold Storage Building $121,600 X $0
E-# Baseball/Softball Field Fencing Replacement $362,600 X $0
E-# Replace Tennis Courts $534,300 X $0
E-# Sidewalks - ADA (TBD) $114,400 X $0
Tech. Ed.
HS-# Remodel / Additional Tech. Ed. Space $1,966,300 X $0
Other
E-# Parent Pickup/Dropoff Modifications $1,347,100 X $0
E-# Install Awning (shade) for HS/MS Patio $75,100 X $0
E-# Auditiorium Addition (350-400 seats) $7,722,000 X $0
ELEMENTARY SCHOOL
Playgrounds
HS-# Additional K-2 Playground & New Equipment $364,700 X $0
HS-# M-State Playground (Resurface & New Equip.) $158,700 X $0
29
Financial Opportunities
Minnesota school districts have been empowered through
these financial solutions:
• MN Statute 123B.65 (Performance Contracting)
• MN Statute 123B.595 (Long-Term Facility Maintenance)
• MN Statute 123B.57 (Health & Safety)
ICS specializes in
• Abatement Levy Authority the careful
• MN Statute 126C.44 (Safe Schools) utilization of these
• MN Statute 126.40 (Lease Levy Authority) statutes to address
facilities’ needs.
• Building Bond Referendum
“Using a combination of Capital, Health and Safety, as well as Long Term Facility Maintenance funding, our
District bonded $4.6 million to renovate our two buildings. We replaced the aged heating system in our
Elementary Building, converting from steam to hot water. We also replaced one boiler in each building, thereby
updating our equipment by over 60 years. Heating, roofing, asbestos abatement, security, ceilings, lighting,
flooring and parking lot improvements were all planned and managed by the FJJ team..”
Phase I:
Assessment Phase II: Phase III: Phase IV:
Solutioning Decision Process Implementation
Space Needs
Analysis
Stakeholder Listening Sessions
(Demographics)
Develop Solution Options
Educational
Adequacy & Develop Community
District Board Project
Technology Financial Leadership
Consultation Approval Implementation
Assessment Options Review
Feedback &
Facilities, Refinement
Operational and
Architectural
Assessment
Accountability!
32
Four Phase Approach
Communicate Communicate Communicate Communicate
Process Findings Recommendations Results
Phase I:
Assessment Phase II: Phase III: Phase IV:
Solutioning Decision Process Implementation
Space Needs
Analysis
Stakeholder Listening Sessions
(Demographics)
Develop Solution Options
Educational
Adequacy & Develop Community
District Board Project
Technology Financial Leadership
Consultation Approval Implementation
Assessment Options Review
Feedback &
Facilities, Refinement
Operational and
Architectural
Assessment
Accountability!
33
Potential Path Forward
• Updated Demographics Analysis
• November 2022 – January 2023
• Stakeholder Listening Sessions
• Board Members early Jan. 2023
• Staff/Administration Jan. 16, 2023
• Students Jan. 2023
• Community Mid January 2023
• Surveys and Assessments
• November 2022 – January 2023
• Develop Project Scope Options and Alternatives
• February – April 2023
• Board Works Sessions to prioritize needs
• April 2023 – May 2023
• District Communications Planning
• Ongoing
• Public Review of Options
• June 2023
• Board Decision
• July 2023
• Bring Preferred Plan through Referendum Election Process
• August 2023 – November 2023
Q&A