The document is a pedestal inspection report from NW Steel Technologies that records measurements of anchor bolt distances and alignments from multiple pedestals to check if they are within specified tolerances. It lists the pedestal number, anchor bolt diameter, measurements from 8 anchor bolts on each pedestal, notes on any bolts outside of tolerances, and is signed by the quality control inspector and site engineer.
The document is a pedestal inspection report from NW Steel Technologies that records measurements of anchor bolt distances and alignments from multiple pedestals to check if they are within specified tolerances. It lists the pedestal number, anchor bolt diameter, measurements from 8 anchor bolts on each pedestal, notes on any bolts outside of tolerances, and is signed by the quality control inspector and site engineer.
The document is a pedestal inspection report from NW Steel Technologies that records measurements of anchor bolt distances and alignments from multiple pedestals to check if they are within specified tolerances. It lists the pedestal number, anchor bolt diameter, measurements from 8 anchor bolts on each pedestal, notes on any bolts outside of tolerances, and is signed by the quality control inspector and site engineer.
The document is a pedestal inspection report from NW Steel Technologies that records measurements of anchor bolt distances and alignments from multiple pedestals to check if they are within specified tolerances. It lists the pedestal number, anchor bolt diameter, measurements from 8 anchor bolts on each pedestal, notes on any bolts outside of tolerances, and is signed by the quality control inspector and site engineer.