NW STEEL TECHNOLOGIES, INC.

PEDESTAL INSPECTION REPORT


Date: _____________ LIR No.:________________
Project: ______________________ Shift: Day Night
Tolerance Anchor Bolt Distance, mm: ± 0 Alignment, mm: ± 2 Operation Time: _________________
PEDESTAL
Anchor Anchor Bolt Distance, mm Anchor
Pedestal Bolt Bolt Remarks
No. Diameter, 1 2 3 4 5 6 7 8 Alignment,
mm mm.

                                                                                   
                                                                                   
                                                                                   
                                                                                   
                                                                                   
                                                                                   
                                                                                   

Inspected by: _______________ Noted by: _________________


QC Inspector Site Engineer