QAS - ERE 0.11 Slab Inspection Report

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

NW STEEL TECHNOLOGIES, INC.

SLAB INSPECTION REPORT


Date: _____________ SIR No.:________________
Project: ______________________ Shift: Day Night
Tolerance Splicing Length/Width of Rebar: 0/+ 10mm. Spacing: ±10 mm.
Formworks (Length/Width): ±5 mm. Rebar Spacing: ±10 mm.
Splicing Splicing Formworks Shoring
Slab No. Length of Width of Spacing Spacing of Remarks
Rebar, mm Length, mm. Width, mm.
Rebar, mm Rebar, mm.

Inspected by: _______________ Noted by: _________________


QC Inspector Site Engineer
QAS - ERE 0.11

You might also like