PENAMBAHAN BIAYA RENOVASI KANTOR BIZPARK 3

Konstruksi 7 x12 = 84 m2
A. Toilet
No Keterangan Barang Jenis Pcs Harga Satuan Jumlah
1 Toilet Berdiri 1 Rp 2,000,000 Rp 2,000,000
Rp 2,000,000
B. Material
1 Pipa 0.5 4 Rp 35,000 Rp 140,000
2 GRC 4 Rp 65,000 Rp 260,000
3 Baja 3 Rp 125,000 Rp 375,000
4 Hollo 40 25 Rp 40,000 Rp 1,000,000
5 Keni 1/2 L Drat 2 Rp 8,000 Rp 16,000
6 Keni 1/2 L Rucika 3 Rp 4,000 Rp 12,000
7 Lem 1 Rp 8,000 Rp 8,000
8 Pipa 2' 1 Rp 85,000 Rp 85,000
9 Keni 2' L 2 Rp 20,000 Rp 40,000
10 Keni 2' T 1 Rp 20,000 Rp 200,000
Rp 2,136,000
C. Wastafel
1. Wastafel 1 Rp 500,000 Rp 500,000
D. Kelistrikan
1 Stop Kontak 10 Rp 25,000 Rp 250,000
2 Mangkok 10 Rp 5,000 Rp 50,000
Rp 300,000
E. Pintu
1 Pintu Alumunium 3 Rp 2,500,000 Rp 7,500,000
Rp 7,500,000
F. Tukang Sipil
1 Tukang Rp 700,000

Total Pengajuan Rp 13,136,000