Professional Documents
Culture Documents
Golden Parameter
Golden Parameter
Golden Parameter
Domain Device Final Check Point Parameters Specifications Value to be filled Remarks
UTL EB SEB Meters reading/Status EB KWH KWH
DG_KWH kwh
DG Battery Voltage
Volts.
during cranking
UTL EAS Record grid earth resistance. as per < 2 Ohm
UTL EAS Record Voltage between Neutral & Earth < 5 volt
Xmer Neutral,
ok/not ok
Xmer Neutral, body,fence earthing, LT panel, body,fence earthing
UTL EAS
ACDB earthing earthing of LT panel,
ok/not ok
ACDB
Earthing between +ve bus, ODC,rack,Eqpt with
UTL EAS ok/not ok
TGB
Earthing of lightening arrestors and its continuity
UTL EAS Lightening Arrestor ok/not ok
from air termination up to down conductor.
Battery SOH %
Batteries communication & SOC/SOH,Battery
UTL SMP
Voltg/abnormal temp
Battery Voltage Volts.
Size Actual
IPS ESR /PAR Check Device Temperature Device (ESR) Temp. Less then 70 deg
____________________________________
(Signature and Name of PM Executor)