Golden Parameter

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Field Operations - RJIL R4G R4G-80-PLG-CHK-PR-001

Golden Parameter Checksheet (R4G-80-PLG-CHK-PR-001)- Site Wise (eNodeB ) PM Work Order

Date: Site SAP ID:

Domain Device Final Check Point Parameters Specifications Value to be filled Remarks
UTL EB SEB Meters reading/Status EB KWH KWH

DG Run hour hrs

DG Fuel Level in ltrs ltrs

UTL DGS Record all operational parameters SEB_KWH kwh

DG_KWH kwh
DG Battery Voltage
Volts.
during cranking
UTL EAS Record grid earth resistance. as per < 2 Ohm

UTL EAS Record Voltage between Neutral & Earth < 5 volt
Xmer Neutral,
ok/not ok
Xmer Neutral, body,fence earthing, LT panel, body,fence earthing
UTL EAS
ACDB earthing earthing of LT panel,
ok/not ok
ACDB
Earthing between +ve bus, ODC,rack,Eqpt with
UTL EAS ok/not ok
TGB
Earthing of lightening arrestors and its continuity
UTL EAS Lightening Arrestor ok/not ok
from air termination up to down conductor.

UTL SMP SMPS Software Version


Count of batteries in
UTL SMP Nos.
SMPS Software Version, No.of Batteries SMPS
configured,LVD setting LVD Setting for critical
UTL SMP Volt
Load
LVD Setting for Non-
UTL SMP Volt
Critical Load
Battery SOC %

Battery SOH %
Batteries communication & SOC/SOH,Battery
UTL SMP
Voltg/abnormal temp
Battery Voltage Volts.

Battery Temp. deg.C

Current Load on Battery Amp.


Mode of operation, present oprtn
UTL SMP
Status(LED),Load on Battery LED Status (Operational
Red/Green/No Light
Mode)
MW Antenna Count Actual

MWV CMW Validate Phy. Stat. Vs Inventory Stat. Make Actual

Size Actual

IPS ESR /PAR Check Device Temperature Device (ESR) Temp. Less then 70 deg

____________________________________
(Signature and Name of PM Executor)

Rev:00 Issue Date: 02-Aug-2018 Page 1 of 1

You might also like