Download as pdf or txt
Download as pdf or txt
You are on page 1of 113

x: 704387.

280

Po
y: 9321873.457

s
z: + 2.680

Sun
ga
Danau

i
Danau
Je
mb
ata
n

Sun
ga
i

Rum
Ta
ndo
n

ah
x: 704582.323

Pom
g y: 9321815.609
ing
Eks
istin
z: + 2.690

pa
n Pav
Jala
Jala
n Pav
ing
Eks
istin
g

ting
g Eksis
Pavin
ing Jalan
Eksist Jalan
Paving Pavin
Jalan g Eksis Jal
ting an

Jalan Paving Eksisting


Pa
vin
g Ek

Kandan
Jalan Paving Eksisting sis
ting

Po
Jalan Aspal Eksisting

s
Jalan Aspal
Ga Eksisting

g
ze
bo Aspal
Eksist
ing
Jalan Ka
nd
an
g
g
tin

g
tin
sis

sis
l Ek

Ek
pa

g
As

vin
n

Pa
la
Ja

n
la
Ja
Eksisting
Jalan Aspal

Pagar
Eksisting
Jalan Aspal

x: 704599.818
y: 9321779.301
z: + 2.670
Eksisting
Jalan Aspal

Jemba

Danau
tan

Danau
Danau
LAYOUT EKSISTING LAHAN IPAL KEMAYORAN
SKALA 1 : 4200
Su
ng
Danau

ai
Danau
Je
mb
ata
n

Ru
Ta
nd

ma
on
x: 704582.323

hP
y: 9321815.609

om
isti ng
ing
Eks z: + 2.690
Pav

pa
n
Jala
Jala
nP
avin
gE
ksis
ting

g
ksistin
Paving E
sisting Jalan
Pa ving Ek Jalan
Jalan Pavin
g Eks Ja
isting lanP

Jalan Paving Eksisting


av
ing
Ek

Kanda
Jalan Paving Eksisting sis
ti ng
Po

ting
Jalan Aspal Eksis
s

Jalan As
Ga

ng
pal Eksis
ting
ze g
bo Aspal
Eksistin
Jalan Ka
nd
an
g
g
tin
g

is
tin

ks
sis

E
al
Ek

p
As
g
vin

n
Pa

la
Ja
n
la
Ja

al Eksisting
Jalan Asp
Pagar

al Eksisting
Jalan Asp

x: 704599.818
y: 9321779.301
z: + 2.670
al Eksisting
Jalan Asp
Jemb

Danau
atan

Danau
Danau

LAYOUT EKSISTING LAHAN IPAL KEMAYORAN


SKALA 1 : 1200
Danau
g
istin
Eks
ing
n Pav
Jala
Jala
n Pav
ing
Eks
istin
g

ting
g Eksis
Pavin
ing Jalan
Eksist Jalan
Paving Pavin
Jalan g Eksis Jal
ting an

Jalan Paving Eksisting


Pa
vin
g Ek
Jalan Paving Eksisting sis
ting

Jalan Aspal Eksisting


Jalan Aspal
Eksisting

Area
ing
Eksist
Aspal
Jalan

Parki
r
g
tin
g
tin

sis
sis

l Ek
Ek
na

pa
Renca

As
vin
Aspal
Jalan

n
Pa

la
Ja
n
la
Ja
Jalan Aspal Rencana

Jalan Aspal Eksisting

Jemba
tan

Danau
LAYOUT PLAN IPAL KEMAYORAN TAHAP KESELURUHAN
SKALA 1 : 4200
Danau
+1.50

is ting
g Eks
avin
nP
Jala
Jala
nP
avin
gE +1.50
ksis
ting

ting
g Eksis +1.50
Pavin
ting Jalan
g Eksis Jalan
Pavin
Jalan Pavin
g Eks Ja
isting lan

Jalan Paving Eksisting


Pa
v ing
Jalan Paving Eksisting Ek
sis
tin
g
ting
Jalan Aspal Eksis
Jalan As
pal Eksis
ting

Area
g
Eksistin
Aspal
Jalan

Parki
r
g
tin
g

is
tin

ks
sis

lE
Ek

pa +2.50
l Renc
ana
As
g

Aspa
vin

an Jalan
Pa

l
Ja
n

+2.65
la
Ja

+2.50

+2.65

+2.65

+3.10
Jalan Aspal Rencana +2.65

+2.65

+2.65

+2.65
+2.95

+3.25

+2.95

+2.65

ting
Jalan Aspal Eksis
Jemb
atan

Danau
LAYOUT PLAN IPAL KEMAYORAN TAHAP KESELURUHAN
SKALA 1 : 1200
Danau
g
istin
Eks
ing
n Pav
Jala
Jala
n Pav
ing
Eks
istin
g

ting
g Eksis
Pavin
ing Jalan
Eksist Jalan
Paving Pavin
Jalan g Eksis Jal
ting an

Jalan Paving Eksisting


Pa
vin
g Ek
Jalan Paving Eksisting sis
ting

Jalan Aspal Eksisting


Jalan Aspal
Eksisting

Area
ing
Eksist
Aspal
Jalan

Parki
r
g
tin
g
tin

sis
sis

l Ek
Ek
na

pa
Renca

As
vin
Aspal
Jalan

n
Pa

la
Ja
n
la
Ja
Jalan Aspal Rencana

Jalan Aspal Eksisting

Jemba
tan

Danau
LAYOUT PLAN IPAL KEMAYORAN TAHAP 1
SKALA 1 : 4200
Danau
+1.50

g
istin
g Eks
avin
nP
Jala
Jala
nP
avin
gE +1.50
ksis
ting

isting
g Eks +1.50
Pavin
ting Jalan
g Eksis Jalan
Pavin
Jalan Pavin
g Eks Ja
isting lan

Jalan Paving Eksisting


Pa
v ing
Jalan Paving Eksisting Ek
sis
tin
g
ting
Jalan Aspal Eksis
Jalan As
pal Eksis
ting

Area
g
Eksistin
Aspal
Jalan

Parki
r
g
in
st
g
tin

si
Ek
sis

al
Ek

ncana
+2.50
p Re
As
g

Aspal
vin

n Jalan
Pa

la
Ja
n

+2.65
la
Ja

+2.50

+2.65

+2.65

+3.10
Jalan Aspal Rencana +2.65

+2.65

+2.95

+3.25

+2.95

ting
Jalan Aspal Eksis
Jemb
atan

Danau
LAYOUT PLAN IPAL KEMAYORAN TAHAP 1
SKALA 1 : 1200
Danau
g
istin
Eks
ing
n Pav
Jala
Jala
n Pav
ing
Eks
istin
g

MH.16 ting
g Eksis
Pavin
MH.17 ing Jalan
Eksist Jalan
Paving Pavin
Jalan g Eksis Jal
ting an

Jalan Paving Eksisting


MH.14 Pa
vin
g Ek
MH.15 Jalan Paving Eksisting sis
ting

Jalan Aspal Eksisting


Jalan Aspal
MH.13 Eksisting

Area
ing
Eksist
Aspal
Jalan

Parki
Parkir
r
MH.1

g
tin
g
tin

sis
sis

l Ek
Ek
na

pa
Renca MH.2

As
vin
Aspal
Jalan

n
Pa

la
Ja
n
la
Ja
MH.3

MH.12
Jalan Aspal Rencana
MH.5
MH.4
MH.6

MH.5A
MH.7
MH.11 MH.5B
MH.8
Jalan Aspal Eksisting

MH.9
MH.10

Jemba
tan

Danau
LAYOUT PLAN PERPIPAAN IPAL KEMAYORAN TAHAP KESELURUHAN
SKALA 1 : 4200
Danau
+1.50

ting
ksis
gE
avin
nP
Jala
Jala
nP
avin
g Eks
+1.50

istin
g

MH.1
6 isting
g Eks +1.50
Pavin
MH.17 ting Jalan
g Eksis Jalan
Pavin
Jalan Pavin
g Eks Ja
isting lan

Jalan Paving Eksisting


MH.14 Pa
vin
gE
MH.15 Jalan Paving Eksisting ksis
tin
g
ting
Jalan Aspal Eksis
Jalan As
pal Eksis
MH.13 ting

Area
Ek sisting
Aspal
Jalan

Parki
r
MH.1
g
in
st
g
tin

i
ks
sis

E
al
Ek

p +2.50
Re ncana MH.2
As
g

Aspal
vin

n Jalan
Pa

la
Ja
n

+2.65
la
Ja

+2.50
MH.3
+2.65

+2.65

MH.12 +3.10
Jalan Aspal Rencana +2.65

MH.5 +2.65

MH.4 +2.65
MH.6
+2.65
+2.95

MH.5A +3.25

MH.7 +2.95
1
MH.1 MH.5B +2.65

ting MH.8
Jalan Aspal Eksis

MH.9
MH.10
Jemb
atan

Danau
LAYOUT PLAN PERPIPAAN IPAL KEMAYORAN TAHAP KESELURUHAN
SKALA 1 : 1200
Danau
g
istin
Eks
ing
n Pav
Jala
Jala
n Pav
ing
Eks
istin
g

MH.16 ting
g Eksis
Pavin
MH.17 ing Jalan
Eksist Jalan
Paving Pavin
Jalan g Eksis Jal
ting an

Jalan Paving Eksisting


MH.14 Pa
vin
g Ek
MH.15 Jalan Paving Eksisting sis
ting

Jalan Aspal Eksisting


Jalan Aspal
MH.13 Eksisting

Area
ing
Eksist
Aspal
Jalan

Parki
r
MH.1

g
tin
g
tin

sis
sis

l Ek
Ek
na

pa
Renca MH.2

As
vin
Aspal
Jalan

n
Pa

la
Ja
n
la
Ja
MH.3

MH.12
Jalan Aspal Rencana
MH.5
MH.4
MH.6

MH.7
MH.11
MH.8
Jalan Aspal Eksisting

MH.9
MH.10

Jemba
tan

Danau
LAYOUT PLAN PERPIPAAN IPAL KEMAYORAN TAHAP 1
SKALA 1 : 4200
+1.50

Jala
n Pav
ing +1.50
Eks
istin
g

isting
g g Eks +1.50

ksistin Pavin
ving E Jalan
Ja lan Pa Jalan
Pavin Ja
g Ek lan
sistin

Jalan Paving Eksisting


g Pa
vin
gE R. PLN

Jalan Paving Eksisting ksi


stin
g
PTM

Traffo

Jalan A
spal Eks
is
Pondasi Genset Beton K-175

ting

Area
ng
Eksisti
Aspal
Jalan

Park
ir
ncana
+2.50
Re
Aspal
Jalan
+2.65

+2.50

+2.65

+2.65

+3.10
+2.65

+2.65

+2.95

+3.25

+2.95

Danau

LAYOUT PLAN PERPIPAAN IPAL KEMAYORAN TAHAP 1


SKALA 1 : 500
ch
U-Dit

BK

+2.65

SALURAN TERBUKA FLOW METER TAHAP 1


SKALA 1 : 100
MH.6

U-Ditch

U-Ditch
BK

MH.5A

MH.7

MH.5B

MH.8

SALURAN TERBUKA FLOW METER TAHAP 2


SKALA 1 : 100
11.18
0.06 0.06 0.06
1.00 10.00

0.06
A

1.00
1.12
Bak Kontrol U-Ditch

0.06
Flowmeter
B

DETAIL SALURAN TERBUKA FLOW METER


SKALA 1 : 50

1.07
Dinding Beton t = 6cm

1.17
Dinding Beton t = 6cm
1.00
1.17
0.07

Pasir Urug t = 10 cm Pasir Urug t = 10 cm

0.10
0.10

1.12
11.18

POTONGAN A - A POTONGAN B - B
SKALA 1 : 50 SKALA 1 : 25
Danau
g
istin
Eks
ing
n Pav
Jala
Jala
n Pav
ing
Eks
istin
g

ting
g Eksis
Pavin
ing Jalan
Eksist Jalan
Paving Pavin
Jalan g Eksis Jal
ting an

Jalan Paving Eksisting


Pa
vin
g Ek
Jalan Paving Eksisting sis
ting

Jalan Aspal Eksisting


Jalan Aspal
Eksisting

Area
ing
Eksist
Aspal
Jalan

Parki
r
g
tin
g
tin

sis
sis

l Ek
Ek
na

pa
Renca

As
vin
Aspal
Jalan

n
Pa

la
Ja
n
la
Ja
Jalan Aspal Rencana

Jalan Aspal Eksisting

Jemba
tan

Danau
LAYOUT PLAN PERKERASAN JALAN IPAL KEMAYORAN TAHAP KESELURUHAN
SKALA 1 : 4200
Danau
+1.50

ting
ksis
gE
avin
nP
Jala
Jala
nP
avin
g Eks
+1.50

istin
g

isting
g Eks +1.50
Pavin
ting Jalan
g Eksis Jalan
Pavin
Jalan Pavin
g Eks Ja
isting lan

Jalan Paving Eksisting


Pa
vin
gE
Jalan Paving Eksisting ksis
tin
g
ting
Jalan Aspal Eksis
Jalan As
pal Eksis
ting

Area
Ek sisting
Aspal
Jalan

Parki
r
g
in
st
g
tin

si
Ek
sis

al
Ek

ncana
+2.50
p Re
As
g

Aspal
vin

n Jalan
Pa

la
Ja
n

+2.65
la
Ja

+2.50

+2.65

+2.65

+3.10
Jalan Aspal Rencana +2.65

+2.65

+2.65

+2.65
+2.95

+3.25

+2.95

+2.65

ting
Jalan Aspal Eksis
Jemb
atan

Danau
LAYOUT PLAN PERKERASAN JALAN IPAL KEMAYORAN TAHAP KESELURUHAN
SKALA 1 : 1200
Danau
g
istin
Eks
ing
n Pav
Jala
Jala
n Pav
ing
Eks
istin
g

ting
g Eksis
Pavin
ing Jalan
Eksist Jalan
Paving Pavin
Jalan g Eksis Jal
ting an

Jalan Paving Eksisting


Pa
vin
g Ek
Jalan Paving Eksisting sis
ting

Jalan Aspal Eksisting


Jalan Aspal
Eksisting

Area
ing
Eksist
Aspal
Jalan

Parki
r
g
tin

g
tin
sis

sis
l Ek

Ek
pa na
Renca

g
vin
As Aspal
n Jalan

Pa
la
Ja

n
la
Ja
Jalan Aspal Rencana

Jalan Aspal Eksisting

Jemba
tan

Danau
LAYOUT PLAN PERKERASAN JALAN IPAL KEMAYORAN TAHAP 1
SKALA 1 : 4200
Danau
+1.50

ting
ksis
gE
avin
nP
Jala
Jala
nP
avin
g Eks
+1.50

istin
g

isting
g Eks +1.50
Pavin
ting Jalan
g Eksis Jalan
Pavin
Jalan Pavin
g Eks Ja
isting lan

Jalan Paving Eksisting


Pa
vin
gE
Jalan Paving Eksisting ksis
tin
g
ting
Jalan Aspal Eksis
Jalan As
pal Eksis
ting

Area
Ek sisting
Aspal
Jalan

Parki
r
g
in
st
g
tin

si
Ek
sis

al
Ek

ncana
+2.50
p Re
As
g

Aspal
vin

n Jalan
Pa

la
Ja
n

+2.65
la
Ja

+2.50

+2.65

+2.65

+3.10
Jalan Aspal Rencana +2.65

+2.65

+2.95

+3.25

+2.95

ting
Jalan Aspal Eksis
Jemb
atan

Danau
LAYOUT PLAN PERKERASAN JALAN IPAL KEMAYORAN TAHAP 1
SKALA 1 : 1200
0.30
0.15

1.00
1.85
0.15 1.55 0.15
2.90 2.90

0.65

0.65

0.65
0.05

0.05

0.05
0.90

0.90

0.90
0.20
1.00
0.20

0.20
Pasir Urug tbl.20cm Pasir Urug tbl.20cm

0.60
Lantai Kerja tbl.5cm Lantai Kerja tbl.5cm
Plat Landasan tbl.15cm Plat Landasan tbl.15cm

POTONGAN B - B

0.30

0.30
SKALA 1 : 50
0.30

0.10
0.80
1.00

2.15 POTONGAN D - D
0.30 1.55 0.30 SKALA 1 : 50

POTONGAN A - A

0.60
0.05
0.85
SKALA 1 : 25

0.20
POTONGAN C - C
SKALA 1 : 50

0.05
0.15
0.40

0.40

0.20

0.05
0.20
POTONGAN E - E POTONGAN F - F
SKALA 1 : 25 SKALA 1 : 25
Danau
g
istin
Eks
ing
n Pav
Jala
Jala
n Pav
ing
Eks
istin
g

ting
g Eksis
Pavin
ing Jalan
Eksist Jalan
Paving Pavin
Jalan g Eksis Jal
ting an

Jalan Paving Eksisting


Pa
vin
g Ek
Jalan Paving Eksisting sis
ting

Jalan Aspal Eksisting


Jalan Aspal
Eksisting

Area
ing
Eksist
Aspal
Jalan

Parki
r
g
tin

g
tin
sis

sis
l Ek

Ek
pa na
Renca

g
As

vin
n Aspal
Jalan

Pa
la
Ja

n
la
Ja
Jalan Aspal Rencana

Jalan Aspal Eksisting

Jemba
tan

Danau
LAYOUT PLAN PAGAR PENGAMAN IPAL KEMAYORAN TAHAP KESELURUHAN
SKALA 1 : 4200
Danau
+1.50

ting
ksis
gE
avin
nP
Jala
Jala
n Pav
ing +1.50
Eks
istin
g

ting
g Eksis +1.50
Pavin
ting Jalan
g Eksis Jalan
Pavin
Jalan Pavin
g Eks Ja
isting lan

Jalan Paving Eksisting


Pa
vin
gE
Jalan Paving Eksisting ksis
tin
g
ting
Jalan Aspal Eksis
Jalan As
pal Eksis
ting

Area
Eksisting
Aspal
Jalan

Parki
r
g
tin
g

is
in

ks
ist

E
s

al
Ek

ncana
+2.50
p Re
As
g

Aspal
vin

n Jalan
Pa

la
Ja
n

+2.65
la
Ja

+2.50

+2.65

+2.65

+3.10
Jalan Aspal Rencana +2.65

+2.65

+2.65

+2.65
+2.95

+3.25

+2.95

+2.65

ting
Jalan Aspal Eksis
Jemb
atan

Danau
LAYOUT PLAN PAGAR PENGAMAN IPAL KEMAYORAN TAHAP KESELURUHAN
SKALA 1 : 1200
+2.05

LF
AREA GO

Danau

MA
IN DRA
IN
+1.50

g
istin
Eks
ing
n Pav
Jala
Jala
n Pav
ing +1.50
Eks
istin
g

ting
g Eksis +1.50
Pavin
ing Jalan
Eksist Jalan +1.50
Paving Pavin
Jalan g Eksis Jal
ting an

Jalan Paving Eksisting


Pa
vin
g Ek R. PLN

Jalan Paving Eksisting


Area Teras ±0.00
- 0.05

sis
ting
PTM

Jalan Aspal Eksisting


Traffo

Jalan Aspal
Eksisting
Area Teras
- 0.05
Pondasi Genset Beton K-175

Area
ing
Eksist
Aspal
Jalan

Parki
r
g
tin

g
tin
sis

sis
l Ek

Ek
pa +2.50 na
Renca

g
As

vin
n Aspal
Jalan

Pa
la
Ja

n
+2.65

la
Ja
+2.50

+2.65

+2.65

+3.10
Jalan Aspal Rencana +2.65

+2.65

+2.95

+3.25

+2.95

Jalan Aspal Eksisting

Jemba
tan

Danau
LAYOUT PAGAR PENGAMAN IPAL KEMAYORAN TAHAP 1
SKALA 1 : 4200

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR KONSULTAN PERENCANA


LAYOUT PAGAR PENGAMAN IPAL KEMAYORAN TAHAP 1 AHLI TEKNIK
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH) AHLI MEKANIKAL
MENGETAHUI/ ELEKTRIKAL
:
NO. HALAMAN SKALA MENYETUJUI
AHLI SIPIL
18 1 : 4200 HIDROLIS
Danau
+1.50

ting
ksis
gE
avin
nP
Jala
Jala
n Pav
ing +1.50
E ksis
ting

ting
g Eksis +1.50
Pavin
ting Jalan
g Eksis Jalan
Pavin
Jalan Pavin
g Eks Ja
isting lan

Jalan Paving Eksisting


Pa
vin
gE
Jalan Paving Eksisting ksis
tin
g
ting
Jalan Aspal Eksis
Jalan As
pa l Eksistin
g

Area
g
Eksistin
Aspal
Jalan

Parki
r
g
in
st
g
tin

i
ks
sis

E
al
Ek

a
Rencan
+2.50
p
As
g

Aspal
vin

an Jalan
Pa

l
Ja
n

+2.65
la
Ja

+2.50

+2.65

+2.65

+3.10
Jalan Aspal Rencana +2.65

+2.65

+2.95

+3.25

+2.95

ting
Jalan Aspal Eksis
Jemb
atan

Danau
LAYOUT PLAN PAGAR PENGAMAN JALAN IPAL KEMAYORAN TAHAP 1
SKALA 1 : 1200
Danau

R80
g
istin
Eks
ing
n Pav
Jala
Jala
n Pav
ing
Eks
istin
g

ting
g Eksis
Pavin
ing Jalan
Eksist Jalan
Paving Pavin
Jalan g Eksis Jal
ting an

Jalan Paving Eksisting


Pa
vin
g Ek
Jalan Paving Eksisting sis
ting

Jalan Aspal Eksisting


Jalan Aspal
Eksisting

Area
ing
Eksist
Aspal
Jalan

Parki
r
g
tin
g
tin

sis
sis

l Ek
Ek
na

pa
Renca

As
vin
Aspal
Jalan

n
Pa

la
Ja
n
la
Ja
Jalan Aspal Rencana

Jalan Aspal Eksisting

Jemba
tan

Danau
LAYOUT PLAN PENANGKAL PETIR IPAL KEMAYORAN TAHAP KESELURUHAN
SKALA 1 : 4200
Danau

R8 0
+1.50

g
istin
g Eks
avin
nP
Jala
Jala
nP
avin
gE +1.50
ksis
ting

isting
g Eks +1.50
Pavin
ting Jalan
g Eksis Jalan
Pavin
Jalan Pavin
g Eks Ja
isting lan

Jalan Paving Eksisting


Pa
v ing
Jalan Paving Eksisting Ek
sis
tin
g
ting
Jalan Aspal Eksis
Jalan As
pal Eksis
ting

Area
g
Eksistin
Aspal
Jalan

Parki
r
g
in
st
g
tin

si
Ek
sis

al
Ek

ncana
+2.50
p
As pal Re
g
vin

As
n Jalan
Pa

la
Ja
n

+2.65
la
Ja

+2.50

+2.65

+2.65
+3.10

Jalan Aspal Rencana +2.65

+2.65

+2.65

+2.65
+2.95

+3.25

+2.95

+2.65

ting
Jalan Aspal Eksis
Jemb
atan

Danau
LAYOUT PLAN PENANGKAL PETIR IPAL KEMAYORAN TAHAP KESELURUHAN
SKALA 1 : 1200
Danau

R80
g
istin
Eks
ing
n Pav
Jala
Jala
n Pav
ing
Eks
istin
g

ting
g Eksis
Pavin
ing Jalan
Eksist Jalan
Paving Pavin
Jalan g Eksis Jal
ting an

Jalan Paving Eksisting


Pa
vin
g Ek
Jalan Paving Eksisting sis
ting

Jalan Aspal Eksisting


Jalan Aspal
Eksisting

Area
ing
Eksist
Aspal
Jalan

Parki
r
g
tin
g
tin

sis
sis

l Ek
Ek
na

pa
Renca

As
vin
Aspal
Jalan

n
Pa

la
Ja
n
la
Ja
Jalan Aspal Rencana

Jalan Aspal Eksisting

Jemba
tan

Danau
LAYOUT PLAN PENANGKAL PETIR IPAL KEMAYORAN TAHAP 1
SKALA 1 : 4200
Danau

R80
+1.50

g
istin
g Eks
avin
nP
Jala
Jala
nP
avin
gE +1.50
ksis
ting

isting
g Eks +1.50
Pavin
ting Jalan
g Eksis Jalan
Pavin
Jalan Pavin
g Eks Ja
isting lan

Jalan Paving Eksisting


Pa
v ing
Jalan Paving Eksisting Ek
sis
tin
g
ting
Jalan Aspal Eksis
Jalan As
pal Eksis
ting

Area
g
Eksistin
Aspal
Jalan

Parki
r
g
in
st
g
tin

si
Ek
sis

al
Ek

ncana
+2.50
p Re
As
g

Aspal
vin

n Jalan
Pa

la
Ja
n

+2.65
la
Ja

+2.50

+2.65

+2.65
+3.10

Jalan Aspal Rencana +2.65

+2.65

+2.95

+3.25

+2.95

ting
Jalan Aspal Eksis
Jemb
atan

Danau
LAYOUT PLAN PENANGKAL PETIR IPAL KEMAYORAN TAHAP 1
SKALA 1 : 1200
DOP

NYA 70mm2
TERMINAL KABEL/CABLE CONNECTION
DRAIN

BC 70mm2

BC 70mm2

REDUCER 40x25
R<1 Ohm

DETAIL BOX KONTROL PENANGKAL PETIR


SKALA NTS
PENANGKAL PETIR RADIUS 80 M

OBSTRUCTION LAMP

KE BOX KONTROL PENANGKAL PETIR

KE BOX KONTROL PENANGKAL PETIR


PLAT 300x300x10

DETAIL PENANGKAL PETIR


SKALA NTS
14.60
3.80 5.30 5.50

0.30

0.30
1.35

0.50
0.30

0.50

0.50
7.60
3.70

7.00
7.60
0.50
0.50
Pipa Outlet ke
Box Kontrol GIP Ø6"
0.30
1.35
0.30

0.30
0.30 0.30 0.30 0.30
3.35 5.00 5.05
14.60

DENAH EQUALISASI 1
SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR KONSULTAN PERENCANA


DENAH EQUALISASI 1 AHLI TEKNIK
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH) AHLI MEKANIKAL
MENGETAHUI/ ELEKTRIKAL
:
NO. HALAMAN SKALA MENYETUJUI
AHLI SIPIL
40 1 : 100 HIDROLIS
14.60
3.20 4.90 4.90
0.40 0.40 0.40 0.40

0.40

0.40
1.20
0.40
7.60
3.60

6.80
7.60
0.40
1.20
0.40

0.40
0.40 13.80 0.40

14.60

DENAH EQUALISASI 2
SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH EQUALISASI 2
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

41 1 : 100
15.40
3.20 4.90 4.90
0.80 0.40 0.40 0.80

C B

0.80

0.80
1.25

2.90
4.30
8.40

8.40
1.00
Panel Box
A A

2.90
1.25
0.80

0.80
C B

DENAH EQUALISASI 3
SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR KONSULTAN PERENCANA


DENAH EQUALISASI 3 AHLI TEKNIK
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH) AHLI MEKANIKAL
MENGETAHUI/ ELEKTRIKAL
:
NO. HALAMAN SKALA MENYETUJUI
AHLI SIPIL
42 1 : 100 HIDROLIS
5.40
0.78 3.45 0.78
0.20 0.20

Pipa PVC Ø4"

Balok 15/40

Balok 20/40

3.50
Panel Box

0.70
Plat Beton Bertulang
tbl. 15cm

1.00
Balok 40/70

0.70
Muka Tanah Muka Tanah
+1.50 +1.50

1.80
Pipa Outlet ke
Box Kontrol GIP Ø6"

11.85
-0.30 -0.30 -0.30

Puddle Flange

Inlet Box CUlvert


1000mmx1000mm

Dinding 15/15 Kolom 30/60


Dinding Beton Bertulang

5.00
t=30cm
Guide Rail
Tangga Operasional
Pipa GIP Ø2"
Void 100x30
Support Pipa

Water Stop
Pompa Submersible
-5.30 -5.30 -5.30
Poer 120x120x50 cm

0.85
Sloof 40/70

Plat Landasan tbl. 30cm

Minipile 25x25 Lantai Kerja tbl. 10cm


L = 18m
Urugan Sirtu tbl. 45cm

0.48 0.25 0.25 0.48


3.20 5.25 4.70
14.60

POTONGAN A - A
SKALA 1 : 100

JUDUL GAMBAR
POTONGAN A - A
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

43 1 : 100
5.75
0.80 3.85 0.80
0.15 0.15
Atap Sirap

Plat Beton Bertulang Pipa GIP Ø4"


tbl. 10cm
Pipa GIP Ø3"
Balok 15/40

Balok 20/40
Pipa PVC Ø3"

Dinding Pas. Bata


t=15cm

3.80

3.50
Pagar Pengaman
Pipa GIP Ø2"

0.70

0.70
Muka Tanah Muka Tanah Muka Tanah Muka Tanah
+1.50 +1.50 +1.50 +1.50

1.80

1.80
Pipa Outlet ke
0.80 2.90 1.00 2.90 0.80 Box Kontrol GIP Ø6"

12.15

11.85
-0.30 -0.30

Kolom 30/60 Dinding 15/15

Kolom 30/60
Tangga Operasional
Pipa GIP Ø2"

Kolom 30/60

5.00

5.00
Dinding Beton Bertulang Dinding Beton Bertulang
t=30cm t=30cm

Void 100x30

Water Stop Water Stop


0.50 0.50 0.50 0.50 0.50

-5.30 -5.30 -5.30 -5.30 -5.30


Poer 120x120x50 cm Poer 120x120x50 cm

0.85

0.85
Sloof 40/70 Sloof 40/70

Plat Landasan tbl. 30cm Plat Landasan tbl. 30cm

Minipile 25x25 Lantai Kerja tbl. 10cm Minipile 25x25 Lantai Kerja tbl. 10cm
L = 18m L = 18m
Urugan Sirtu tbl. 45cm Urugan Sirtu tbl. 45cm

0.30 0.30
7.00
7.60 0.25 0.25
2.95 2.95 0.25
7.60
POTONGAN B - B
SKALA 1 : 100 POTONGAN C - C
SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


POTONGAN B - B
POTONGAN C - C DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

44 1 : 100
5.40
0.78 3.45 0.78
0.20 0.20

D10 -150

Detail 1

3.50
D10 -150 D10 -150

D10 -150 D10 -150 D10 -150

0.70
Muka Tanah Muka Tanah
+1.50 +1.50
Detail 3
Detail 2 Detail 4

1.80
Pipa Outlet ke
Box Kontrol GIP Ø6"

11.85
-0.30 -0.30 -0.30
D19 -150

D13 -150

D19 -150

D13 -150

5.00
Detail 5
D13 -150
D19 -150

D19 -300 D19 -300


-5.30 -5.30 -5.30

0.85
Detail 6 Detail 7

0.40 0.40 0.40 0.40


3.20 4.90 4.90
14.60

POTONGAN PEMBESIAN A - A
SKALA 1 : 100

PEMBERI TUGAS PEKERJAA JUDUL GAMBAR


POTONGAN PEMBESIAN A - A
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

45 1 : 100
5.75
0.80 3.85 0.80
0.15 0.15

D10 -150

3.80

3.50
D10 -150 D10 -150 D10 -150
D10 -150

0.70

0.70
Muka Tanah Muka Tanah Muka Tanah Muka Tanah
+1.50 +1.50 +1.50 +1.50

Detail 8

1.80

1.80
0.80 2.90 1.00 2.90 0.80

12.15

11.85
-0.30 -0.30
D19 -150

D19 -150
D19 -150 D19 -150
D13 -150

D13 -150
D13 -150 D13 -150

5.00

5.00
D13 -150
D13 -150
D19 -150
D19 -150 D19 -300 D19 -300 D19 -300
-5.30 -5.30 -5.30 -5.30

0.85

0.85
Detail 9

0.30 0.30
7.00
0.25 0.25
7.60 2.95 2.95 0.25
7.60

POTONGAN PEMBESIAN B - B
SKALA 1 : 100 POTONGAN PEMBESIAN C - C
SKALA 1 : 100

JUDUL GAMBAR
POTONGAN PEMBESIAN B - B
POTONGAN PEMBESIAN C - C DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

46 1 : 100
14.60
3.20 4.90 4.90
0.40 0.40 0.40 0.40

0.40

0.40
Sloof 40/70 Sloof 40/70 Sloof 40/70

Sloof 40/70

Sloof 40/70
1.20
0.40
Sloof 40/70

Sloof 40/70
Sloof 40/70
Sloof 40/70

Sloof 40/70
7.60
3.60

6.80
7.60
0.40

Sloof 40/70
Sloof 40/70

Sloof 40/70
1.20
0.40

0.40
Sloof 40/70 Sloof 40/70 Sloof 40/70

0.40

6 D 19
0.40 13.80 0.40

14.60
2 D13

2 D13

0.70
DENAH RENCANA SLOOF
SKALA 1 : 100
Ø10 - 125

4 D19

DETAIL SLOOF 40/70


SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA SLOOF
DETAIL SLOOF 40/70 DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

47 1 : 100 & 1 : 20
14.60
2.00 4.10 3.70
1.20 1.20 1.20 1.20

Poer & Minipile Poer & Minipile Poer & Minipile


Poer & Minipile

1.20
2.00
Poer & Minipile Poer & Minipile
Poer & Minipile Poer & Minipile

7.60
1.20
2.00
Poer & Minipile Poer & Minipile Poer & Minipile
Poer & Minipile

1.20
DENAH RENCANA POER & MINIPILE
SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA POER & MINIPILE
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

48 1 : 100
1.20
0.48 0.48
0.25

1.20 -2.30
0.48 0.25 0.48 Ø10 - 150
Poer 120x120x50

0.50
-2.80
Lantai Kerja, t= 10cm -2.90

0.10
0.70
0.48
Urugan Sirtu, t= 70cm

D16-150
Poer 120x120x50
-3.60
A

0.25
1.20
Pondasi Minipile 25x25

D16-150

0.48
Pondasi Minipile 25x25

DENAH PONDASI MINIPILE DAN POER


SKALA 1 : 25

18m
-14.40

DETAIL PONDASI MINIPILE DAN POER


SKALA 1 : 50

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH PONDASI MINIPILE DAN POER
DETAIL PONDASI MINIPILE DAN POER DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

49 1 : 25 & 1 : 50
14.60
3.05 5.00 4.75
0.60 0.30 0.30 0.60

Kolom 30/60 Kolom 30/60 Kolom 30/60


Kolom 30/60
0.60

0.60
1.05

Kolom 30/30 Kolom 30/30


0.30
7.60
3.70

6.40
7.60
0.30

Kolom 30/30 Kolom 30/30


1.05

Kolom 30/60
Kolom 30/60 Kolom 30/60 Kolom 30/60
0.60

0.60
DENAH RENCANA KOLOM 2 D16
0.30

SKALA 1 : 100
2 D16
2 D16
2 D16 0.30

0.60
4 D16
2 D16
2 D16 2 D16
Ø13 - 150

0.30
2 D16

2 D16 Ø13 - 150

2 D16 4 D16

DETAIL KOLOM 30/60 DETAIL KOLOM 30/30


SKALA 1 : 20 SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA KOLOM
DETAIL KOLOM 30/60 DIPERIKSA OLEH :
DETAIL KOLOM 30/30
KAJIAN PERENCANAAN DAN STRATEGI
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

50 1 : 100 & 1 : 20
14.60
3.05 5.00 4.75
0.60 0.30 0.30 0.60

0.60

0.60
1.05
Kolom 20/20 Kolom 20/20

0.30
7.60
3.70

6.40
7.60
Kolom 20/20
0.30

Kolom 20/20
1.05
0.60

0.60
DENAH RENCANA KOLOM
SKALA 1 : 100 0.20

3 D13

2 D13

0.20
3 D13

DETAIL KOLOM 20/20


SKALA 1 : 10

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA KOLOM
DETAIL KOLOM 20/20 DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

51 1 : 100 & 1 : 10
14.60
3.20 5.10 4.70
0.40 0.40 0.40 0.40

0.40

0.40
Balok 40/70 Balok 40/70 Balok 40/70

Balok 40/70

Balok 40/70
1.20
0.40
Balok 40/70

Balok 40/70
Balok 40/70
Balok 40/70
Balok 40/70
7.60
3.60

6.80
7.60
0.40

Balok 40/70

Balok 40/70
Balok 40/70
1.20
0.40

0.40
Balok 40/70 Balok 40/70 Balok 40/70

0.40

6 D 19
0.40 13.80 0.40

14.60
2 D13

DENAH RENCANA BALOK 2 D13

0.70
SKALA 1 : 100
Ø10 - 125

4 D19

DETAIL BALOK 40/70


SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA BALOK
DETAIL BALOK 40/70 DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

52 1 : 100 & 1 : 20
14.60
3.20 5.10 4.70
0.40 0.40 0.40 0.40

0.63 3.45 0.63


0.15 0.20 0.20 0.15

0.40

0.40
0.15
0.52
Balok 15/40

0.63
Balok 20/40

0.20

Balok 15/40

Balok 15/40
Balok 20/40
Balok 20/40
7.60
3.80

6.80
7.60
0.20

Balok 20/40
0.62

Balok 15/40

0.40
0.52
0.15
0.40

0.40 13.80 0.40

14.60

DENAH RENCANA BALOK


SKALA 1 : 100 0.20
0.15

2 D16 2 D13

2 D10 2 D10

0.40

0.40
Ø8 - 125 Ø8 - 125
2 D16 2 D13

DETAIL BALOK 20/40 DETAIL BALOK 15/40


SKALA 1 : 20 SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA BALOK
DETAIL BALOK 20/40 DIPERIKSA OLEH :
DETAIL BALOK 15/40
KAJIAN PERENCANAAN DAN STRATEGI
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

53 1 : 100 & 1 : 20
14.60
3.20 4.90 4.90
0.40 0.40 0.40 0.40

0.80

0.80
1.25

D19 -300
D19 -300

2.90
D19 -300
D19 -300
8.00

8.00
4.30

1.00
2.90
1.25
0.40

0.40
DENAH RENCANA PLAT LANDASAN
SKALA 1 : 100

D19 -300
-5.30

0.30
Plat Landasan tbl. 30cm

+2.05
Lantai Kerja t= 10cm
+1.65

0.85
0.10
Urugan Sirtu t= 70cm

0.45
+1.50

DETAIL RENCANA PLAT LANDASAN


SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA PLAT LANDASAN
DETAIL RENCANA PLAT LANDASAN DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

54 1 : 100 & 1 : 20
15.40
3.20 4.90 4.90
0.80 0.80 0.40 0.40 0.80

0.80
1.25

2.90
D10 -150

D10 -150
4.30
8.40

8.40
1.00
2.90
1.25
0.80

0.80
2.17
2.07 0.10

DENAH RENCANA PLAT PENUTUP


SKALA 1 : 100

+2.20

0.10
+2.10

Plat Beton Bertulang


tbl. 15cm

0.45
0.70
D10 -150
+1.65

0.15
+1.50

DETAIL RENCANA PLAT PENUTUP


SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA PLAT PENUTUP
DETAIL RENCANA PLAT PENUTUP DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

55 1 : 100 & 1 : 20
15.40
3.20 4.90 4.90
0.80 0.40 0.40 0.80

0.80

0.80
1.25

2.90
D10 -150

D10 -150
4.30
8.40

8.40
1.00
2.90
1.25
0.80

0.80
DENAH RENCANA PLAT ATAP
SKALA 1 : 100

Plat Beton Bertulang


tbl. 10cm

0.10
D10 -150 +5.70

+5.60

DETAIL RENCANA PLAT ATAP


SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA PLAT ATAP
DETAIL RENCANA PLAT ATAP DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

56 1 : 100 & 1 : 20
15.40
3.20 4.90 4.90
0.80 0.40 0.40 0.80
0.80

0.80
1.25

2.90
4.30
8.40

8.40
1.00
Pagar Pengaman
Pipa GIP Ø2"

2.90
1.25
0.80

0.80
DENAH RENCANA PAGAR PENGAMAN
SKALA 1 : 100

3.43

Pagar Pengaman
Pipa GIP Ø2"

0.42
Pagar Pengaman
Pipa GIP Ø2"

1.20
0.38
0.40
Tangga Operasional
Pipa GIP Ø2"

DETAIL PAGAR PENGAMAN


SKALA 1 : 25

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA PAGAR PENGAMAN
DETAIL PAGAR PENGAMAN DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

57 1 : 100 & 1 : 25
4.39

0.51 0.56 0.56 0.55 0.57 0.56 0.56 0.51

0.10

Y
4.84
5.05

0.10

Atap Sirap Pipa GIP Ø4"


Pipa GIP Ø3" Pipa GIP Ø3"
2.10
0.35 0.35 0.35 0.35 0.35 0.35

X
DENAH RENCANA ATAP
SKALA 1 : 100

Atap Sirap

Pipa GIP Ø4"

Pipa GIP Ø3"

DETAIL RANGKA ATAP


SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA ATAP
DETAIL RANGKA ATAP DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

58 1 : 100 & 1 : 20
5.05
0.10 0.28 0.28 0.28 0.28 0.28 0.28 0.29 0.29 0.28 0.28 0.28 0.28 0.28 0.10
0.10 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.10

Atap Sirap
+6.91
Pipa GIP Ø4"

0.11
+6.31

+6.20
Pipa GIP Ø3"

0.20
Plat Beton Bertulang
+6.00 tbl. 10cm

+5.83 Balok 15/40

1.01
0.40
+5.70
+5.60

0.30
Pipa PVC Ø3"
+5.30 Balok 20/40

0.80 0.15 3.85 0.15 0.80

5.75

DETAIL POTONGAN ATAP X - X


SKALA 1 : 25

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DETAIL POTONGAN ATAP X - X
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

59 1 : 25
5.40
0.15 0.20 0.20 4.15 0.20 0.20 0.15
0.08 0.08

+7.10

Atap Sirap
+6.92

+6.64

0.59
+6.53
Pipa GIP Ø4"

0.31

0.33
0.31

1.62
Pipa GIP Ø3"
+6.00

Plat Beton Bertulang

0.30
Balok 15/40
tbl. 10cm
+5.70
+5.60

0.10
0.30
0.15 0.63 0.20 3.45 0.20 0.63 0.15
5.40

DETAIL POTONGAN ATAP Y - Y


SKALA 1 : 25

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DETAIL POTONGAN ATAP Y - Y
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

60 1 : 25
0.30
0.30

0.30
D10 -150

0.15
0.30
0.30

0.1
3
1.60

DENAH RENCANA TANGGA DETAIL TANGGA


SKALA 1 : 25 SKALA 1 : 10

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA TANGGA
DETAIL TANGGA DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

61 1 : 25 & 1 : 10
0.80
0.98 0.40 0.40 0.42
0.20 0.63 0.15
0.10

Atap Sirap

Tangga Operasional
Pipa GIP Ø2"
D10 -150 6 D 19
Pipa GIP Ø3"
2 D13

0.15
2 D10

0.20
0.30

2 D13 D10 -150


D10 -150

0.35
Balok 15/40

0.70
2 D16

0.15
2 D13
0.70
0.10

0.55
Balok 40/70
2 D13
Plat Beton Bertulang
0.30

2 D10 t=15cm

Balok 20/40
4 D19
2 D16
Pas. Dinding Bata

Dinding Beton Bertulang


t=30cm

DETAIL 2 DETAIL 3
DETAIL 1 SKALA 1 : 20 SKALA 1 : 20
SKALA 1 : 20

1.00 0.30
0.10 0.80 0.10

Tutup Manhole
D10 -150

0.07
Dinding Beton Bertulang
t=30cm Pipa Outlet ke
Box Kontrol GIP Ø6"
D10 -150

0.48
0.70
D19 -150
Plat Beton Bertulang
t=15cm
D13 -150
0.15

DETAIL 4
SKALA 1 : 20
DETAIL 5
SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DETAIL 1
DETAIL 2 DIPERIKSA OLEH :
DETAIL 3
KAJIAN PERENCANAAN DAN STRATEGI DETAIL 4
DETAIL 5
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

62 1 : 20
D19 -150

D19 -300
6 D 19 D13 -150

6 D 19 D19 -300
Sloof 40/70

0.30
2 D13

0.30
2 D13
2 D13
Sloof 40/70 Poer 120x120x50 cm

0.70
Plat Landasan tbl. 35cm
2 D13
Lantai Kerja tbl. 10cm

0.40
Urugan Sirtu tbl. 45cm
Poer 120x120x50 cm Plat Landasan tbl. 35cm
4 D19
Lantai Kerja tbl. 10cm
Minipile 25x25 Urugan Sirtu tbl. 45cm
4 D19
L = 18m
Minipile 25x25
L = 18m

DETAIL 6 DETAIL 7
SKALA 1 : 20
SKALA 1 : 20

D10 -150

0.15
Plat Beton Bertulang
15cm

6 D 19 D19 -300 1.00


0.87

DETAIL 8
0.30

SKALA 1 : 20
2 D13

Sloof 40/70 Poer 120x120x50 cm


0.70

2 D13 1.00
0.87
0.40

D10 - 150
0.80
Plat Landasan tbl. 35cm X

0.87
1.00
Lantai Kerja tbl. 10cm

Urugan Sirtu tbl. 45cm

0.07
4 D19 D10 - 150

Minipile 25x25
L = 18m

DETAIL 9 POTONGAN X - X
SKALA 1 : 20
DETAIL TUTUP MANHOLE SKALA 1 : 20
SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DETAIL 6
DETAIL 7 DIPERIKSA OLEH :
DETAIL 8
KAJIAN PERENCANAAN DAN STRATEGI DETAIL 9
DETAIL TUTUP MANHOLE
PENANGANAN KAWASAN RTP KEMAYORAN POTONGAN X - X
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

63 1 : 20
15.40
3.20 4.90 4.90
0.80 0.40 0.40 0.80

0.80

0.80
1.25
DETAIL 1

2.90
4.30
8.40

8.40
1.00
Panel Box

2.90
1.25

DETAIL 2
0.80

0.80
DENAH FINISHING DINDING LUAR
SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH FINISHING DINDING LUAR
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

64 1 : 100
5.75 5.40
0.65 4.15 0.65 0.77 3.45 0.78
0.15 0.15
0.20 0.20

Atap Sirap Atap Sirap


Pipa GIP Ø4"

Pipa PVC Ø4"

Pipa GIP Ø3" Pipa GIP Ø3"


+6.00 +6.00

0.40

0.40
+5.60 +5.60

Dinding Pas. Bata

0.60
Dinding Pas. Bata t=15cm

1.00
+5.00 t=15cm Pipa PVC Ø3"

Pipa PVC Ø3"

0.64
+4.10

+4.36 Dinding Kalsiboard Dinding Roster

3.80

3.80
1.60
Pintu Baja Kaca

1.76
+3.00

0.80
+2.60

0.40
+2.20 +2.20

+1.50 +1.50

DETAIL 1 FINISHING DINDING LUAR DETAIL 2 FINISHING DINDING LUAR


SKALA 1 : 50 SKALA 1 : 50

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DETAIL 1 FINISHING DINDING LUAR
DETAIL 2 FINISHING DINDING LUAR DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

65 1 : 50
15.40
3.20 4.90 4.90
0.80 0.40 0.40 0.80

0.80

0.80
1.25

2.90
4.30
8.40

8.40
1.00
P

Panel Box

2.90
J
1.25
0.80

0.80
DENAH KUSEN PINTU DAN JENDELA
SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH KUSEN PINTU DAN JENDELA
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

66 1 : 100
1.60
1.48
0.06 0.06

0.06
B

0.04
0.06

0.05
A
1.62

1.54
A

1.50
1.60
2.16

2.16
0.04

0.05
0.44

0.44
DETAIL KUSEN JENDELA (J)
SKALA 1 : 20

0.04
0.04

DETAIL KUSEN PINTU (P) POT. B - B


SKALA 1 : 20 SKALA 1 : 20

POT. B - B
Rangka Baja
Plat Baja SKALA 1 : 20
tbl. 2mm

0.06 0.06
1.48
1.60
0.05 0.05
1.10
1.20
POT. A - A
SKALA 1 : 20 POT. A - A
SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DETAIL KUSEN PINTU (P)
POT. A - A DIPERIKSA OLEH :
POT. B - B
KAJIAN PERENCANAAN DAN STRATEGI DETAIL KUSEN JENDELA (J)
POT. A - A
PENANGANAN KAWASAN RTP KEMAYORAN POT. B - B
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

67 1 : 20
5.75
5.40 0.80 3.85 0.80
0.78 3.45 0.78 0.15 0.15
0.20 0.20 Atap Sirap
Pipa GIP Ø4"

Pipa PVC Ø4"


Pipa GIP Ø3"

0.10
0.10
+6.00

0.30

0.23
Balok 15/40 Plat Beton Bertulang
+5.60 +5.70 +5.70
+5.52 tbl. 10cm
+5.30 +5.37
Balok 20/40
Balok 20/40 Pipa PVC Ø3"

1.40
Dinding Pas. Bata

1.94
t=15cm

Panel Box

0.70
+3.43
Pagar Pengaman

0.49 0.74
Plat Beton Bertulang Pipa GIP Ø2"
+2.95 +3.01
tbl. 15cm

1.00
+2.69 +2.69
+2.40 Balok 40/70 +2.40
+2.20 +2.20
+2.05 +2.05

0.15

0.15
0.55
+1.50 +1.50

1.80
Pipa Outlet ke
Box Kontrol GIP Ø6"

11.00

11.00
Pipa Outlet ke
Box Kontrol GIP Ø6"
-0.30 -0.30
-0.30
Puddle Flange
Dinding 15/15

Pipa Outlet ke Tangga Operasional

7.35
Fine Screen HDPE Ø6" Pipa GIP Ø2"

Dinding 15/15 Kolom 30/30

Dinding Beton Bertulang

5.00
t=30cm
Dinding Beton Bertulang
Guide Rail t=15cm
Tangga Operasional
Pipa GIP Ø2"
Void 100x30 Void 100x30
Support Pipa

Water Stop 0.50 0.50 0.50 0.50 0.50


Pompa Submersible
-5.30 -5.30 -5.30 -5.30
Poer 120x120x50 cm
Sloof 40/70

Poer 120x120x50 cm Sloof 40/70


Plat Landasan tbl. 30cm
Lantai Kerja tbl. 10cm

Urugan Sirtu tbl. 45cm

DETAIL WF KATROL
SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DETAIL WF KATROL
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

68 1 : 100
Pipa Inlet
dari Blower B C D E

1.20
8.70

6.30
A A

1.20
B C D E

1.20 1.50 11.00 11.00 9.00 1.20


0.30 0.20 0.20
35.60

DENAH RENCANA PENUTUP FIBER CONVENTIONAL ACTIVATED SLUDGE (CAS)


SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA PENUTUP FIBER
DIPERIKSA OLEH :
CONVENTIONAL ACTIVATED SLUDGE (CAS)

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

124 1 : 100
Pipa Inlet
B C dari Blower D E

1.20
8.70

6.30
A A

1.20
B C D E

1.20 1.50 11.00 11.00 9.00 1.20


0.30 0.20 0.20
35.60

TAMPAK ATAS CONVENTIONAL ACTIVATED SLUDGE (CAS)


SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


TAMPAK ATAS CONVENTIONAL ACIVATED SLUDGE (CAS)
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

125 1 : 100
33.70
1.50 11.00 11.00 9.00
0.20 0.30 0.20 0.20 0.30

B C D E
0.20

0.30
2.00

3.00
0.20

A A
6.80
2.00

6.90
0.30
0.20

3.00
2.20
0.20

0.30
B C D E

DENAH CONVENTIONAL ACTIVATED SLUDGE (CAS)


SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH CONVENTIONAL ACTIVATED SLUDGE (CAS)
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

126 1 : 100
35.60
0.30 0.20 0.20
1.20 1.50 11.00 11.00 9.00 1.20

Pipa Menuju Sudge Pagar Pengaman


Tank GIPØ8" Pipa Transmisi Udara Pipa GIP Ø2" Pipa Transmisi Udara

Balok 20/25 Tutup Panel Fiber Valve Valve Jalan inspeksi


t=12cm
+5.90 +5.90
1.00

1.00
Pipa Gip Ø6"
Water Mur Water Mur
+4.90 +4.90 +4.90

Puddle
1.00

Pipa Lumpur GIPØ8"

1.25
Pipa
Flange Pipa Outlet
3.60

Dari Clarifier
0.50

GIPØ8"
Ø 8" ke
Pipa Inlet Clarifier
dari
1.00

Finescreen Kolom 40/75


GIPØ10" Pipa Gip Ø2.5"
+2.90
+2.65 +2.65
0.60

6.70
3.75
Kolom 40/75
Sloof 40/70
Dinding Beton Bertulang
t=30cm
Water Stop Plate Plate
Diffuser Diffuser
Kolom 40/75
-0.10 -0.10 -0.10

0.70
Sloof 40/70
Sloof 40/70 Poer 120x120x50 Poer 120x120x50
Plat Landasan, t= 40cm
Lantai Kerja, t= 10cm
Urugan Sirtu, t= 60cm

Pondasi Minipile 25x25 Pondasi Minipile 25x25

5.18 5.23 5.20 5.20 5.50 2.90


0.40 0.40 0.40 0.40 0.40 0.40 0.40
32.00

POTONGAN A - A
SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


POTONGAN A - A
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

127 1 : 100
8.70 8.70
1.15 2.00 2.00 2.00 1.15 1.15 2.00 2.00 2.00 1.15
0.20 0.20 0.20 0.20

Pagar Pengaman Pagar Pengaman

Jalan inspeksi Jalan inspeksi


t=12cm t=12cm
+5.90 +5.90
Pipa Inlet
Pipa Inlet ke Sekat Spliter Pipa Inlet ke Sekat Spliter
1.00

1.00

1.00

1.00
CAS Ø8'' Box CAS Ø8'' Box
+4.90 +4.90 +4.90 +4.90
2.00

2.00

2.00

2.00
Dinding Beton Bertulang Dinding Beton Bertulang
t=30cm t=30cm

+2.90 +2.90 +2.90 +2.90 +2.90 +2.90


+2.65 +2.65 +2.65 +2.65
0.70

0.70

0.70

0.70
Plat Landasan, t= 40cm Sloof 40/70 Plat Landasan, t= 40cm Sloof 40/70
Lantai Kerja, t= 10cm Lantai Kerja, t= 10cm Poer 120x120x50
Urugan Sirtu, t= 50cm Urugan Sirtu, t= 50cm

Pondasi Minipile 25x25

1.90 1.80 1.90 1.90 1.80 1.90


0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
6.80 6.80

POTONGAN B - B POTONGAN C - C
SKALA 1 : 100 SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


POTONGAN B - B
DIPERIKSA OLEH :
POTONGAN C - C

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

128 1 : 100
8.70 8.70
1.20 2.70 0.90 2.70 1.20 1.20 2.70 0.90 2.70 1.20

Pagar Pengaman Pagar Pengaman Pipa GIP Ø2"

Jalan inspeksi Jalan inspeksi t=12cm


t=12cm

1.00

1.00
Water Mur Water Mur
+3.90 +3.90 +3.90 +3.90

1.00
1.25

1.25
Dinding Beton Bertulang Dinding Beton Bertulang
t=30cm t=30cm 0.50

+2.65 +2.65 +2.65 +2.65

6.80

6.70
1.00
Kolom 40/75

3.75

3.75
Kolom 40/75
0.50
0.38

Water Stop Plate Water Stop Plate


Diffuser Diffuser

-1.10 -1.10 -1.10 -1.10

0.70
0.80
Sloof 40/70 Sloof 40/70

Plat Landasan, t= 40cm Poer 120x120x50 Plat Landasan, t= 40cm Poer 120x120x50
Lantai Kerja, t= 10cm Lantai Kerja, t= 10cm
Urugan Sirtu, t= 60cm Urugan Sirtu, t= 60cm

Pondasi Minipile 25x25 Pondasi Minipile 25x25

2.85 2.85 2.85 2.85


0.40 0.40 0.40 0.40 0.40 0.40
6.90 6.90

POTONGAN D - D POTONGAN E - E
SKALA 1 : 100 SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


POTONGAN D - D
DIPERIKSA OLEH :
POTONGAN E - E

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

129 1 : 100
35.60
0.30 0.20 0.20
1.20 1.50 11.00 11.00 9.00 1.20

+5.90 +5.90 +5.90


1.00

1.00
+4.90 +4.90 +4.90 +4.90
Detail 1 Detail 2
Puddle
1.00

1.25
Flange D19 -150 D19 -150
3.60

D13 -150
D13 -150
D13 -150 D13 -150 D10 -150 D13 -150
D10 -150
1.00

D10 -150

+2.90
+2.65 +2.65
0.60

6.80
Detail 3

3.75
Detail 4

D13 -150 D13 -150

D19 -150 D19 -150


Sloof 40/70
D19 -300 D19 -300 D19 -300 D19 -300 D19 -300 D19 -300 D19 -300 D19 -300 D19 -300 D19 -300
-0.10 -0.10 -0.10

0.80
Detail 5 Detail 6

5.18 5.23 5.20 5.20 5.50 2.90


0.40 0.40 0.40 0.40 0.40 0.40 0.40
32.00

POTONGAN PEMBESIAN A - A
SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


POTONGAN PEMBESIAN A - A
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

130 1 : 100
8.70 8.70
1.15 2.00 2.00 2.00 1.15 1.15 2.00 2.00 2.00 1.15
0.20 0.20 0.20 0.20

D10 -150 D10 -150


+5.90 +5.90
1.00

1.00

1.00

1.00
D13 -150 D13 -150
D10 -150 +4.90 +4.90 D10 -150 +4.90 +3.90

D13 -150 D13 -150 D13 -150 D13 -150


D13 -150 D13 -150
D10 -150 D10 -150 D10 -150 D10 -150
D10 -150 D10 -150
2.00

2.00

2.00

2.00
+2.90

D19 -300 D19 -300 D19 -300 D19 -300 D19 -300 D19 -300
+2.90 +2.90 +2.90 +2.90 +2.90
+2.65 +2.65 +2.65 +2.65
0.70

0.70

0.70

0.70
Detail 7

1.90 1.80 1.90 1.90 1.80 1.90


0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
6.80 6.80

POTONGAN PEMBESIAN B - B POTONGAN PEMBESIAN C - C


SKALA 1 : 100 SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


POTONGAN PEMBESIAN B - B
DIPERIKSA OLEH :
POTONGAN PEMBESIAN C - C

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

131 1 : 100
8.70 8.70
1.20 2.70 0.90 2.70 1.20 1.20 2.70 0.90 2.70 1.20

D10 -150 D10 -150 D10 -150


+5.90 +5.90

1.00

1.00
+3.90 Detail 8 +3.90 +3.90 +3.90

1.25

1.25
D19 -150 D19 -150 D19 -150 D19 -150 D19 -150 D19 -150

D13 -150 D13 -150 D13 -150 D13 -150 D13 -150 D13 -150
+2.65 +2.65 +2.65 +2.65

6.70

6.70
3.75

3.75
Detail 9

D19 -300 D19 -300 D19 -300 D19 -300

-1.10 -1.10 -1.10 -1.10

0.70

0.70
Detail 10

2.85 2.85 2.85 2.85


0.40 0.40 0.40 0.40 0.40 0.40
6.90 6.90

POTONGAN PEMBESIAN D - D POTONGAN PEMBESIAN E - E


SKALA 1 : 100 SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


POTONGAN PEMBESIAN D - D
DIPERIKSA OLEH :
POTONGAN PEMBESIAN E - E

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

132 1 : 100
33.70
1.40 5.18 5.23 5.20 5.20 5.50 2.90
0.30 0.40 0.40 0.39 0.40 0.40 0.40 0.40

Sloof 40/70 Sloof 40/70 Sloof 40/70 Sloof 40/70 Sloof 40/70 Sloof 40/70
0.40

0.40
Sloof 40/70

Sl
1.75

o
of
Sloof 40/70

Sloof 40/70

Sloof 40/70

Sloof 40/70

Sloof 40/70

Sloof 40/70

4 0/

2.81
70
Sloof 40/70
0.40

Sloof 40/70
6.90
1.80

Sloof 40/70 Sloof 40/70 Sloof 40/70 Sloof 40/70 Sloof 40/70 Sloof 40/70

0.49
Sloof 40/70
Sloof 40/70

Sloof 40/70

Sloof 40/70

Sloof 40/70

Sloof 40/70

Sloof 40/70
0.40

2.80
Sloof 40/70

70
1.75

0/
f4
oo
Sl
Sloof 40/70 Sloof 40/70 Sloof 40/70 Sloof 40/70 Sloof 40/70 Sloof 40/70
0.40

0.40
33.70

DENAH RENCANA SLOOF CONVENTIONAL ACTIVATED SLUDGE (CAS) 0.40

SKALA 1 : 100 6 D 19

2 D13

2 D13

0.70
Ø10 - 125

4 D 19

DETAIL SLOOF 40/70


SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA SLOOF CONVENTIONAL
DIPERIKSA OLEH :
ACTIVATED SLUDGE (CAS)
DETAIL SLOOF 40/70
M
KAJIAN PERENCANAAN DAN STRATEGI
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

133 1 : 100 & 1 : 20


32.90
5.18 5.23 5.20 5.20 5.50 2.90
0.85 0.40 0.39 0.40 0.40 0.40 0.85

Kolom 40/75 Kolom 40/75 Kolom 40/75 Kolom 40/75

0.75
0.40
1.75

2.95
0.40

Kolom 40/75 Kolom 40/75 Kolom 40/75 Kolom 40/75


6.90
1.80

0.40
0.40

2.95
1.75

Kolom 40/75 Kolom 40/75 Kolom 40/75 Kolom 40/75

0.75
0.40

32.90

DENAH RENCANA KOLOM CONVENTIONAL ACTIVATED SLUDGE (CAS)


SKALA 1 : 100 0.40

5 D19

Ø10 - 150
4 D19

4 D19

4 D19

0.75
4 D19

4 D19

4 D19

2 D19

5 D19

DETAIL KOLOM 40/75


SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA KOLOM CONVENTIONAL
DIPERIKSA OLEH :
ACTIVATED SLUDGE (CAS)
DETAIL KOLOM 40/75
KAJIAN PERENCANAAN DAN STRATEGI
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

134 1 : 100 & 1 : 20


33.70

D19 - 300
D19 - 300 D19 - 300
D19 - 300
6.90

D19 -300 D19 -300

DENAH PLAT LANDASAN CONVENTIONAL ACTIVATED SLUDGE (CAS)


SKALA 1 : 100

0.40
Plat Landasan tbl. 40cm

0.10
Lantai Kerja tbl. 10cm

Urugan Sirtu tbl. 60cm

0.60
DETAIL PLAT LANDASAN
SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH PLAT LANDASAN CONVENTIONAL
DIPERIKSA OLEH :
ACTIVATED SLUDGE (CAS)
DETAIL PLAT LANDASAN
KAJIAN PERENCANAAN DAN STRATEGI
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

135 1 : 100 & 1 : 20


1.20 4.42 1.20 4.43 1.20 4.40 1.20 4.40 1.20 4.70 1.20 2.15 1.20

Poer & Minipile Poer & Minipile Poer & Minipile


1.20

1.20
2.10

2.10
Poer & Minipile Poer & Minipile Poer & Minipile Poer & Minipile
7.80
1.20

1.20
2.10

2.10
Poer & Minipile Poer & Minipile Poer & Minipile
1.20

1.20
32.90

DENAH RENCANA POER & MINIPILE CONVENTIONAL ACTIVATED SLUDGE (CAS)


SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA POER & MINIPILE
DIPERIKSA OLEH :
CONVENTIONAL ACTIVATED SLUDGE (CAS)

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

136 1 : 100
1.20
0.48 0.48
0.25

1.20 -2.30
0.48 0.25 0.48 Ø10 - 150
Poer 120x120x50

0.50
-2.80
Lantai Kerja, t= 10cm -2.90

0.10
0.70
0.48
Urugan Sirtu, t= 70cm

D16-150
Poer 120x120x50
-3.60
A

0.25
1.20
Pondasi Minipile 25x25

D16-150

0.48
Pondasi Minipile 25x25

DENAH PONDASI MINIPILE DAN POER


SKALA 1 : 25

18m
-14.40

DETAIL PONDASI MINIPILE DAN POER


SKALA 1 : 50

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH PONDASI MINIPILE DAN POER
DIPERIKSA OLEH :
DETAIL PONDASI MINIPILE DAN POER

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

137 1 : 25 & 1 : 50
Detail 1
Detail 2
Pipa Transmisi Udara 6"

Pipa Transmisi Udara 2.5"

Plate Diffuser

LAYOUT PLAN DIFFUSER CONVENTIONAL ACTIVATED SLUDGE (CAS)


SKALA 1 : 200
1.10 0.47 1.10 0.47 1.10

DETAIL 1
Pipa GIP Ø 6" SKALA 1 : 50
Transmisi Udara

Butterfly Valve
Pipa GIP Ø 6"

0.83
Pipa GIP Ø 6"
Transmisi Udara
Transmisi Udara Butterfly Valve Butterfly Valve
Plate Diffuser
+2.50 +2.50
0.27
0.44

Pipa GIP Ø 2.50"


Transmisi Udara
0.27
0.44
0.27

Butterfly Valve
0.97

Pipa GIP Ø 6"


Transmisi Udara

0.20 Pipa GIP Ø 2.50" Pipa GIP Ø 2.50"


Transmisi Udara Transmisi Udara
0.51
0.27
0.44

Plate Diffuser
0.27
0.44
0.27

Pipa GIP Ø 2.50"


Transmisi Udara
Plate Diffuser
0.83

Plate Diffuser

Pipa GIP Ø 6" 1.10 0.47 1.10 0.47 1.10 0.24 0.27 0.44 0.27 0.44 0.27 0.54
Transmisi Udara
-3.50 1.57 1.57 -3.50 Di Las
0.20

0.20
DETAIL 2 POTONGAN DETAIL 2
SKALA 1 : 50 POTONGAN DETAIL 1 SKALA 1 : 50
SKALA 1 : 50

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


LAYOUT PLAN DIFFUSER CONVENTIONAL
DIPERIKSA OLEH :
ACTIVATED SLUDGE (CAS)
DETAIL 1
KAJIAN PERENCANAAN DAN STRATEGI DETAIL 2
POTONGAN DETAIL 1
PENANGANAN KAWASAN RTP KEMAYORAN POTONGAN DETAIL 2
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

138 1 : 200 1 : 20
0.30
0.90
0.30 0.60

4 D 19 0.30 6 D 19 D19 -300


+5.90 +2.90
4 D 19

0.12

0.25
2 D10 2 D13
2 D10

0.40
+2.65

0.60
2 D10
2 D13

0.70
2 D10

0.60
Ø10 - 150
Ø10 - 150 Ø10 - 125

3 D19 Plat Landasan, t= 40cm


3 D 19
D13 -150 Dinding Beton Bertulang D19 -150 Lantai Kerja, t= 10cm
t=20cm 4 D 19 Urugan Sirtu, t= 60cm
D10 -150

0.20 0.40

DETAIL 1 DETAIL 2 DETAIL 3


SKALA 1 : 20 SKALA 1 : 20 SKALA 1 : 20

0.20

Dinding Beton Bertulang


t=20cm
6 D 19
D19 -300 -0.10
-0.10
D13 -150
2 D13
D13 -150

0.40
Sloof 40/70

0.40
2 D13

0.70
Ø10 - 125
Dinding Beton Bertulang
t=20cm

Plat Landasan, t= 40cm Plat Landasan, t= 40cm

Lantai Kerja, t= 10cm 4 D 19 Lantai Kerja, t= 10cm

Urugan Sirtu, t= 60cm Urugan Sirtu, t= 60cm

0.20
0.40

DETAIL 4 DETAIL 5
SKALA 1 : 20
SKALA 1 : 20 DETAIL 6
SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DETAIL 1
DIPERIKSA OLEH :
DETAIL 2
DETAIL 3
KAJIAN PERENCANAAN DAN STRATEGI DETAIL 4
DETAIL 5
PENANGANAN KAWASAN RTP KEMAYORAN DETAIL 6
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

139 1 : 20
0.20 0.30
D13 -150

Dinding Beton Bertulang


t=20cm
D10 -150

6 D 19 D19 -300
+2.90

2 D13
Sloof 40/70 4 D 19
+5.90

2 D13

0.70
2 D10

2 D10

0.60
Ø10 - 125

Plat Landasan, t= 40cm


Ø10 - 150
Lantai Kerja, t= 10cm
4 D 19
Urugan Sirtu, t= 60cm
3 D19

D10 -150
0.40
D13 -150

DETAIL 7 DETAIL 8
SKALA 1 : 20 SKALA 1 : 20

D10 -150

D13 -150

6 D 19

D19 -150
2 D13
D13 -150

2 D13

0.70
Sloof 40/70
Dinding Beton Bertulang
t=30cm Ø10 - 125

Plat Landasan, t= 40cm


4 D19 Lantai Kerja, t= 10cm
4 D 19
Urugan Sirtu, t= 60cm

0.30
0.40

DETAIL 9 DETAIL 10
SKALA 1 : 20 SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DETAIL 7
DIPERIKSA OLEH :
DETAIL 8
DETAIL 9
KAJIAN PERENCANAAN DAN STRATEGI DETAIL 10
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

140 1 : 20
0.24
Plat Beton
0.24 0.36 0.24
tbl.20cm Pagar Pengaman

0.02
0.10

0.06
0.08
0.24 0.36 0.24

0.02
Plat Beton
tbl.20cm
B

+2.65

Unit Clarifier

Unit CAS
Plat Beton
tbl.20cm
A A
Unit Clarifier
0.24

B
Unit CAS Unit Clarifier

TAMPAK ATAS JEMBATAN POTONGAN A - A POTONGAN B - B


SKALA 1 : 100 SKALA 1 : 100 SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


TAMPAK ATAS JEMBATAN
DIPERIKSA OLEH :
POTONGAN A - A
POTONGAN B - B
KAJIAN PERENCANAAN DAN STRATEGI
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

141 1 : 100
Plat Beton
0.24 0.36 0.24
tbl.20cm Pagar Pengaman

D10 -150
D10 -150

0.10

0.08
0.04

0.02
Plat Beton
tbl.20cm

+2.65

Unit Clarifier

Unit CAS

Unit Clarifier

POTONGAN PEMBESIAN A - A POTONGAN PEMBESIAN B - B


SKALA 1 : 100 SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


POTONGAN PEMBESIAN A - A
DIPERIKSA OLEH :
POTONGAN PEMBESIAN B - B

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

142 1 : 100
7.12
Pagar Pengaman Pipa GIP Ø2" Pagar Pengaman Pipa GIP Ø2"

1.20
0.57

0.66

Pagar Pengaman Pipa GIP Ø2"


8.70

6.30
0.57

1.32

0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.61
0.66

Pagar Pengaman Pipa GIP Ø2" Dynabolt


0.57

1.20
Pagar Pengaman Pipa GIP Ø2"

2.90 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 1.25 3.10 1.25

DENAH PAGAR PENGAMAN


SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH PAGAR PENGAMAN
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

143 1 : 100
1.40 1.40 1.10

Pagar Pengaman Pipa GIP Ø2"

Pagar Pengaman Pipa GIP Ø2"

0.40
Pagar Pengaman Pipa GIP Ø2"

1.23
0.40
0.40
Dynabolt Dynabolt

DETAIL PAGAR PENGAMAN


SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DETAIL PAGAR PENGAMAN
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

144 1 : 20
0.24 0.30 0.18 6.17 0.23
0.23

1.20
2.70
8.70

0.90
1.28

Detail 1

2.70
1.20
0.23

Detail 2
7.12

DENAH JALAN INSPEKSI


SKALA 1 : 100

1.20
0.90
Jalan inspeksi t=12cm
Jalan inspeksi t=12cm
D10 -150

D10 -150

0.15
+5.90
0.15

0.30 0.90

DETAIL 1 DETAIL 2
SKALA 1 : 20 SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH JALAN INSPEKSI
DIPERIKSA OLEH :
DETAIL 1
DETAIL 2
KAJIAN PERENCANAAN DAN STRATEGI
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

145 1 : 100 & 1 : 20


33.70
1.40 5.18 5.23 5.20 5.20 5.50 2.90
0.30 0.40 0.40 0.39 0.40 0.40 0.40 0.40

Balok 30/60 Balok 30/60 Balok 30/60 Balok 30/60 Balok 30/60 Balok 30/60
0.40

0.40
Balok 30/60

Balok 30/60

Ba
1.75

lo
k
30

2.81
/6
0
Balok 30/60
0.40

Balok 30/60
6.90
1.80

Balok 30/60 Balok 30/60 Balok 30/60 Balok 30/60 Balok 30/60 Balok 30/60

0.49
Balok 30/60
0.40

2.80
Balok 30/60

0
/6
30
1.75

k
lo
Ba
Balok 30/60 Balok 30/60 Balok 30/60 Balok 30/60 Balok 30/60 Balok 30/60
0.40

0.40
33.70

DENAH RENCANA BALOK CONVENTIONAL ACTIVATED SLUDGE (CAS)


SKALA 1 : 100
0.30
4 D 19

2 D10

2 D10

0.60
Ø10 - 150

3 D19

DETAIL BALOK 30/60


SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA BALOK CONVENTIONAL
DIPERIKSA OLEH :
ACTIVATED SLUDGE (CAS)
DETAIL BALOK 30/60
KAJIAN PERENCANAAN DAN STRATEGI
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

146 1 : 100 & 1 : 20


Pagar Pengaman
Pipa GIP Ø2"

Pipa Transmisi Udara


Tutup Panel Fiber Valve
Balok 20/25

0.09
1.00 1.00
+6.15
+6.06
+5.90 +5.90

0.16
1.00
Pipa Gip Ø6"

+4.90
+4.90

Pipa Lumpur GIPØ8"


Dari Clarifier
Pipa GIP Ø8"

Pipa Gip Ø2.5"

+2.90

7.35
5.00
Dinding Beton Bertulang
t=30cm

Plate Diffuser
Water Stop

Kolom 40/75

-0.10 -0.10

-0.50

1.10
Balok 20/25
2 D10

-1.20 0.09 Tutup Panel Fiber


Plat Landasan, t= 40cm 0.25
Lantai Kerja, t= 10cm Ø8-150
Urugan Sirtu, t= 60cm 2 D10

0.20

DETAIL PENUTUP FIBER


DETAIL BALOK 20/25
SKALA 1 : 50
SKALA 1 : 25

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DETAIL PENUTUP FIBER
DIPERIKSA OLEH :
DETAIL BALOK 20/25

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

147 1 : 50 & 1 : 25
B

11.29

10.05

8.78

7.38

0.40
0.40
0.40
1.10
A A

0.15
0.03 0.03 0.05 0.05 0.05 0.05 0.03 0.03
2.00 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 2.00
2.05 6.94 2.05

DENAH PAGAR PENGAMAN


SKALA 1 : 50

2.00 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 2.00
0.03 0.03 0.05 0.05 0.05 0.05 0.03 0.03

Hollow Besi 50,50,3mm Kawat Gridmesh Pipa Gip Ø2"

0.15
Balok 15/15

1.29

0.90
Pas. Batu Alam Tempel

Kolom 15/15

1.50
1.35
Pas. Dinding Bata t=15cm

Pas. Batu Kali


Tanah Urug

0.20
Sloof 15/20

0.80
1.40
Pas. Batu Kali

0.30
Anstamping t=30cm
Pasir Urug t=20cm

0.10
POTONGAN A - A
SKALA 1 : 50

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH PAGAR PENGAMAN
POTONGAN A - A DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

175 1 : 20
0.15

Kawat Gridmesh

1.29
Hollow Besi 50,50,3mm

0.90
Pas. Dinding Bata t=15cm

1.50
Pas. Batu Alam Tempel

0.15 0.15 0.15 0.15

0.15
0.40 1.25 Tangga Beton

0.40

0.60

0.60
0.40

Tanah Urug

0.20
Tanah Asli
Pasir Urug tbl.20cm Sloof 15/20
Lantai Kerja tbl.5cm
Tangga Beton tbl.15cm

0.80

1.40
Pas. Batu Kali

0.30
Anstamping t=30cm

Pasir Urug t=20cm

Tanah Asli

0.10
0.30
0.80
1.00

POTONGAN B - B
SKALA 1 : 25

TAMPAK DEPAN
SKALA 1 : 50

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


POTONGAN B - B
TAMPAK DEPAN DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

176 1 : 25 & 1 : 20
B C

0.15 0.20 0.15 1.50 0.15 0.20 0.15 1.50 0.15 0.20 0.15

A A

0.15
DENAH PAGAR PENGAMAN
SKALA 1 : 25

0.15 0.20 0.15 1.50 0.15 0.20 0.15 1.50 0.15 0.20 0.15

0.15
Balok 15/15

Pas. Dinding Bata t=15cm

Wiremesh ØM12

1.50
Pas. Batu Kali

1.35
Kawat Loket Galvanis

Kolom 15/15

0.20
Sloof 15/20

0.80
Pas. Batu Kali

1.40
Anstamping t=30cm

0.30
Pasir Urug t=20cm

0.10
POTONGAN A - A
SKALA 1 : 25

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH PAGAR PENGAMAN
POTONGAN A - A DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

177 1 : 25
0.15 0.15

0.15

0.15
Balok 15/15

Pas. Dinding Bata t=15cm


Wiremesh ØM12

1.50

1.50
Pas. Batu Kali
Pas. Batu Alam Tempel

1.35

1.35
Kawat Loket Galvanis

Sloof 15/20 +2.65 Sloof 15/20 +2.65

0.20

0.20
+2.50 +2.50

0.80

0.80
1.40

1.40
Pas. Batu Kali Pas. Batu Kali

0.30

0.30
Anstamping t=30cm Anstamping t=30cm

Pasir Urug t=20cm Pasir Urug t=20cm


0.10

0.10
0.30 0.30
0.80 0.80
1.00 1.00

POTONGAN B - B POTONGAN C - C
SKALA 1 : 25 SKALA 1 : 25

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


POTONGAN A - A
POTONGAN B - B DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

178 1 : 25
12.70
1.89 1.89 1.87 1.87 1.89 1.89
0.20 0.20 0.20 0.20 0.20 0.20 0.20

B C

0.20
2.23
PTM

0.20

Pondasi Genset Beton K-175


A R. PLN
A
±0.00
7.40
2.13

7.40
0.20

Traffo
2.23
0.20

Area Teras Area Teras


- 0.05 - 0.05

B C

0.20 0.20 0.20 0.20


0.81 2.36 0.81 0.79 2.36 0.79 0.81 2.36 0.81
12.70

DENAH RUMAH GENZET & PANEL


SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RUMAH GENZET & PANEL
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

179 1 : 100
TAMPAK DEPAN RUMAH PANEL & GENZET
SKALA 1 : 100

TAMPAK BELAKANG RUMAH PANEL & GENZET


SKALA 1 : 100

TAMPAK SAMPING KANAN RUMAH PANEL & GENZET TAMPAK SAMPING KIRI RUMAH PANEL & GENZET
SKALA 1 : 100 SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


TAMPAK DEPAN RUMAH PANEL & GENZET
DIPERIKSA OLEH :
TAMPAK BELAKANG RUMAH PANEL & GENZET
TAMPAK SAMPING KANAN RUMAH PANEL & GENZET
KAJIAN PERENCANAAN DAN STRATEGI TAMPAK SAMPING KIRI RUMAH PANEL & GENZET
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

180 1 : 100
13.90
8.60
1.89 1.89 1.88 1.88 1.89 1.89
0.20 0.20 0.20 0.20 0.20 0.20 0.20 2.23 2.13 2.23
0.20 0.20 0.20 0.20

Balok 20/40 Balok 20/40 Balok 20/40


Dak Beton tbl.12cm Dak Beton tbl.12cm Dak Beton tbl.12cm
+ 4.10 + 4.10

0.40

0.40
+ 3.73 + 3.73

0.60 0.60 0.60 0.60

Kolom 20/20

Kolom 20/20 Kolom 20/20


Kolom 20/20 Kolom 20/20

Keramik 40x40 Landasan Genzet Sloof 20/35 Keramik 40x40 Sloof 20/35
Spesi tbl.3cm Beton K-250, tbl.90 cm Rollag Bata Spesi tbl.3cm Rollag Bata
Rabat Beton tbl.7cm Pasir Urug t=5cm Rabat Beton tbl.7cm Pasir Urug t=5cm
0.60 + 0.75 + 0.55 0.60 0.60
+ 0.35 + 0.35 + 0.35 + 0.35
+ 0.29 + 0.29 + 0.29 + 0.29 + 0.29 + 0.29

0.35
± 0.00 ± 0.00 ± 0.00 ± 0.00
- 0.20 - 0.20 - 0.20 - 0.20

0.15 0.15
0.20 0.20
- 0.94 - 0.94

- 1.19 - 1.19

Pondasi batu kali Pondasi batu kali


Aanstamping t= 25cm Aanstamping t= 25cm
Pondasi Stroos Ø30cm Pondasi Stroos Ø30cm Pasir Urug t= 10cm Pondasi Stroos Ø30cm Pondasi Stroos Ø30cm Pasir Urug t= 10cm
L= 3.00 m L= 3.00 m L= 3.00 m L= 3.00 m

0.80 3.35 0.80 3.35 0.80 3.35 0.80 0.80 1.61 0.80 1.53 0.80 1.61 0.80
13.25 8.60

POTONGAN A - A POTONGAN B - B
SKALA 1 : 100 SKALA 1 : 100

8.60
2.23 2.13 2.23
0.20 0.20 0.20 0.20

Balok 20/40
Dak Beton tbl.12cm
+ 4.10

0.40
+ 3.73

0.60 0.60

Kolom 20/20 Kolom 20/20

Keramik 40x40 Landasan Genzet Sloof 20/35


Spesi tbl.3cm Beton K-250, tbl.90 cm Rollag Bata
Rabat Beton tbl.7cm Pasir Urug t=5cm
0.60 + 0.75 0.60 + 0.55
+ 0.35 + 0.35
+ 0.29 + 0.29 + 0.29

0.35
± 0.00 ± 0.00
- 0.20 - 0.20

0.15
0.20
- 0.94

- 1.19

Pondasi batu kali


Aanstamping t= 25cm
Pondasi Stroos Ø30cm Pasir Urug t= 10cm
L= 3.00 m

0.80 1.61 0.80 1.53 0.80 1.61 0.80


8.60

POTONGAN C - C
SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


POTONGAN A - A
DIPERIKSA OLEH :
POTONGAN B - B
POTONGAN C - C
KAJIAN PERENCANAAN DAN STRATEGI
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

181 1 : 100
13.70
1.20 2.97 1.20 2.95 1.20 2.98 1.20

Pondasi Stroos Ø30cm


L= 3.00 m

1.20
Sloof 20/35 Sloof 20/35 Sloof 20/35 Kolom 20/20

1.23
Sloof 20/35

Sloof 20/35

Sloof 20/35

Sloof 20/35

1.20
Kolom 20/20

Sloof 20/35

Sloof 20/35

Sloof 20/35

Sloof 20/35

8.40
1.13
Pondasi Stroos Ø30cm
L= 3.00 m

1.20
Sloof 20/35 Kolom 20/20

Sloof 20/35

Sloof 20/35

Sloof 20/35

1.23
Pondasi Stroos Ø30cm Pondasi Stroos Ø30cm
L= 3.00 m L= 3.00 m

1.20
Sloof 20/35 Sloof 20/35 Sloof 20/35

DENAH RENCANA PONDASI STROUS DAN PLAT SETEMPAT


SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA PONDASI STROUS DAN PLAT
DIPERIKSA OLEH :
SETEMPAT

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

182 1 : 100
Pas. Dinding Batu Bata
Lantai Keramik
Spesi t= 3cm
Rabat Beton t= 7cm Sloof 20/35

+0.35 + 0.35
+ 0.29

0.33
-0.04

Kolom 20/20

0.50
0.20
-0.74
Pondasi Plat Beton

0.20
Bertulang 120.120.20 cm

-0.94
Lantai Kerja tbl.5cm

0.15
Pasir Urug tbl.10cm
Pondasi Plat Beton -1.09
Bertulang 120.120.20

0.20
1.20
Kolom 20/20
Strous Ø30 L=3m

Strous Ø30 L=3m

Muka
0.20 Tanah Eksisting

L = 3.00 m
1.20

DENAH PONDASI PLAT SETEMPAT 120.120.20 cm


SKALA 1 : 20

0.20

0.30

1.20

POTONGAN X
SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH PONDASI PLAT SETEMPAT 120.120.20 cm
DIPERIKSA OLEH :
POTONGAN X

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

183 1 : 20
Pas. Dinding Batu Bata
Lantai Keramik
Spesi t= 3cm
Rabat Beton t= 7cm Sloof 20/35

+0.35 + 0.35
3 D13
+ 0.29
2 D10

0.33
Ø8 - 150

-0.04 3 D13

D13-150
Pondasi Plat Beton
Bertulang 120.120.20 cm Kolom 20/20

0.50
x

0.20
1.20
Strous Ø30 L=3m D13-150

0.20
-0.74
D13-150 Pondasi Plat Beton

0.20
Bertulang 120.120.20 cm

-0.94
Lantai Kerja tbl.5cm

0.15
Pasir Urug tbl.10cm
-1.09

0.20

1.20
Begel Spiral
Ø8-150

6 D10

PEMBESIAN PONDASI PLAT SETEMPAT 120.120.20 cm


SKALA 1 : 20
Strous Ø30 L=3m

Muka
Tanah Eksisting

L = 3.00 m
6 D10
0.30

Begel Spiral
Ø8-150

DETAIL STROUS
SKALA 1 : 20

0.20

0.30

1.20

POTONGAN X
SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


PEMBESIAN PONDASI PLAT SETEMPAT 120.120.20 cm
DIPERIKSA OLEH :
POTONGAN X
DETAIL STROUS
KAJIAN PERENCANAAN DAN STRATEGI
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

184 1 : 20
13.70
1.20 2.98 1.20 2.95 1.20 2.98 1.20
0.80 0.80 0.80 0.80
0.30 0.30 0.30 0.30

0.30
0.80
1.20
Sloof 20/35 Sloof 20/35 Sloof 20/35

Sloof 20/35

Sloof 20/35

Sloof 20/35

Sloof 20/35

6.00
8.40
0.20
0.15

Dinding Bata tbl.15cm

Kolom 20/20

0.30
0.80
1.20
Sloof 20/35 Sloof 20/35 Sloof 20/35 Keramik 40x40
Spesi tbl.3cm 0.62

0.01
Rabat Beton tbl.7cm

0.07
Sloof 25/50

0.11
+ 0.35

+ 0.29

0.03
DENAH RENCANA PONDASI BATU KALI

0.28

0.13 0.18
SKALA 1 : 100

0.07
0.16
Rollag Bata

Pasir Urug t=5cm

0.90
Tanah Urug
Tanah Urug

Pas. Batu Kali

0.25
Pas. Aanstampang tbl.25cm

Pasir Urug tbl.10cm

0.10
0.24
0.64
0.96

DETAIL PONDASI BATU KALI


SKALA 1 : 50

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA PONDASI BATU KALI
DIPERIKSA OLEH :
DETAIL PONDASI BATU KALI

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

185 1 : 100
0.42 3.98 3.95 3.97 0.42
0.21 0.20 0.20 0.20 0.20 0.21

0.21
Rollag Bata

0.42
Sloof 20/35 Sloof 20/35 Sloof 20/35

0.20
Sloof 20/35

Sloof 20/35

Sloof 20/35

Sloof 20/35
8.66

7.40

7.00
Rollag Bata

Rollag Bata

0.20
Sloof 20/35 Sloof 20/35 Sloof 20/35

0.42
Rollag Bata

0.21
12.70

13.96

DENAH RENCANA SLOOF & ROLLAG BATA


SKALA 1 : 100

0.20
3 D13

2 D10

0.35

Ø8 - 150

3 D13

DETAIL SLOOF 20/35


SKALA 1 : 10

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA SLOOF & ROLLAG BATA
DIPERIKSA OLEH :
DETAIL SLOOF 20/35

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

186 1 : 100 & 1 : 10


Kolom 20/20 Kolom 20/20 Kolom 20/20 Kolom 20/20

0.20
2.23
Kolom 20/20

0.20
7.40
2.13
Kolom 20/20

0.20
2.23

Kolom 20/20 Kolom 20/20


0.20

0.20 0.20 0.20 0.20


3.98 3.95 3.97
12.70

DENAH RENCANA KOLOM RUMAH GENZET


SKALA 1 : 100

0.20
3 D13

2 D10

0.20
Ø8 - 150

3 D13

DETAIL KOLOM 20/20


SKALA 1 : 10

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA KOLOM RUMAH GENZET
DIPERIKSA OLEH :
DETAIL KOLOM 20/20

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

187 1 : 100 & 1 : 10


3.98 3.95 3.97
0.20 0.20 0.20 0.20

0.21
0.42
Ring Balk 20/40 Ring Balk 20/40 Ring Balk 20/40

0.20
Ring Balk 20/40

Ring Balk 20/40

Ring Balk 20/40

Ring Balk 20/40


7.40

7.00
0.20
Ring Balk 20/40 Ring Balk 20/40 Ring Balk 20/40

12.70

DENAH RENCANA BALOK


SKALA 1 : 100

0.20
3 D13

2 D10

Ø8 - 150

3 D13

DETAIL RING BALK 20/40


SKALA 1 : 10

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA BALOK
DIPERIKSA OLEH :
DETAIL RING BALK 20/40

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

188 1 : 100 & 1 : 10


1.18
0.28 0.28 0.28 0.28

Rangka Baja
0.72
0.60

0.60
Plat Baja
tbl. 3mm
0.60
0.64

0.60
A
2.50

2.50
2.40

2.40
Plat Baja Rangka Baja
tbl. 3mm
0.60
0.64

0.60
0.42 0.42 0.42 0.98
0.44

0.44
0.50

2.36

POT. A - A
DETAIL P1 SKALA 1 : 25 POT. B - B
SKALA 1 : 25 SKALA 1 : 25

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DETAIL P1
DIPERIKSA OLEH :
POTONGAN A - A
POTONGAN B - B
KAJIAN PERENCANAAN DAN STRATEGI
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

188A 1 : 25
TL LED 1x28 W

12.70
DL LED inbow E27 11 W
1.89 1.89 1.87 1.87 1.89 1.89
0.20 0.20 0.20 0.20 0.20 0.20 0.20

SAKLAR TUNGGAL

STOP KONTAK

0.20
2.23
PTM

0.20

Pondasi Genset Beton K-175


R. PLN
±0.00
7.40
2.13

7.40
0.20

Traffo
2.23

P.Lampu
0.20

Area Teras Area Teras


- 0.05 - 0.05

0.20 0.20 0.20 0.20


0.81 2.36 0.81 0.79 2.36 0.79 0.81 2.36 0.81
12.70

DENAH RUMAH GENZET & PANEL


SKALA 1 : 100

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RUMAH GENZET & PANEL
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

188B 1 : 50
0.15
B

Manhole tbl. 8cm

Plat Penutup Beton Bertulang


D8 - 150 D10 - 150

0.12

0.12
tbl. 12cm,
D10 - 150

M. TANAH M. TANAH M. TANAH M. TANAH

0.20

0.20
D13 - 150 D13 - 150

4.00
4.30
D10 - 150 D10 - 150
A Dinding Beton Bertulang

2.02

2.02
1.50

1.50
tbl. 12cm,

0.20

0.20
Plat Landasan tbl. 20cm, Beton bertulang D13 - 150
Lantai Kerja tbl. 5cm D13 - 150
Pasir Urug tbl. 10cm

0.16 2.00 0.15 0.16 2.00 0.15

0.20 2.30 0.20 0.20 2.30 0.20

0.15 2.00 0.15 0.15

2.30
POTONGAN A - A POTONGAN PEMBESIAN A - A
SKALA 1 : 50 SKALA 1 : 50

DENAH TANDON AIR BAWAH


SKALA 1 : 50

Manhole tbl. 8cm


Plat Penutup Beton Bertulang
D10 - 150 D8 - 150
0.12

0.12
tbl. 12cm,
D10 - 150

M. TANAH M. TANAH M. TANAH M. TANAH


0.20

0.20
D13 - 150 D13 - 150

Dinding Beton Bertulang D10 - 150 D10 - 150


2.02

2.02
1.50

1.50
tbl. 12cm,
0.20

0.20
Plat Landasan tbl. 20cm, Beton Bertulang D13 - 150 Plat Landasan tbl. 20cm, Beton Bertulang
Lantai Kerja tbl. 5cm D13 - 150 Lantai Kerja tbl. 5cm
Pasir Urug tbl. 10cm Pasir Urug tbl. 10cm

0.15 4.00 0.15 0.15 4.00 0.15

0.20 4.31 0.20 0.20 4.31 0.20

POTONGAN B - B POTONGAN PEMBESIAN B - B


SKALA 1 : 50 SKALA 1 : 50

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH TANDON AIR BAWAH
DIPERIKSA OLEH :
POTONGAN A - A
POTONGAN B - B
KAJIAN PERENCANAAN DAN STRATEGI POTONGAN PEMBESIAN A - A
POTONGAN PEMBESIAN B - B
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

189 1 : 50
0.15

D10 - 150 Plat Penutup Beton Bertulang


D10 - 150 tbl. 12cm,
D10 - 150
D13 - 150

0.12
Dinding Beton Bertulang D13 - 150
tbl. 12cm D13 - 150
M. TANAH

0.20
Dinding Beton Bertulang
tbl. 12cm

D10 - 150

Plat Landasan tbl. 20cm, Beton bertulang


Lantai Kerja tbl. 5cm D13 - 150
Pasir Urug tbl. 10cm

0.15

DETAIL 1 DETAIL 2
SKALA 1 : 20 SKALA 1 : 20

0.70
0.60

Handel Besi
Ø8 - 150 Ø20mm
D8 - 150

X
0.60
0.70

0.08
D8 - 150 0.60
0.70

POTONGAN X - X
SKALA 1 : 20
DETAIL TUTUP MANHOLE
SKALA 1 : 20

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DETAIL 1
DIPERIKSA OLEH :
DETAIL 2
DETAIL TUTUP MANHOLE
KAJIAN PERENCANAAN DAN STRATEGI POTONGAN X - X
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

190 1 : 20
7.00
0.50 0.63 2.00 0.72 2.60 0.15
0.20 0.20

0.50

0.65
A A

0.85
3.00
2.00

2.85
1.35
0.50
B
0.50 0.63 2.00 1.37 0.97 1.35 0.18
7.00

DENAH POS PANTAU Lt.1


SKALA 1 : 50

7.80
0.20 6.40 0.30 0.10
0.10 0.30 0.10 0.10 0.20

B
0.10

0.10
0.20
0.30

0.30
0.10
0.20
0.10

A A

1.85
3.80
2.40

3.80
0.10

0.10
0.75
0.30

0.30
0.20

B
0.10

0.10
0.10 0.30 5.07 1.35 0.30 0.10
0.20 0.10 0.10 0.18
7.80

DENAH POS PANTAU Lt.2


SKALA 1 : 50
PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR
DENAH POS PANTAU Lt.1
DIPERIKSA OLEH :
DENAH POS PANTAU Lt.2

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

208 1 : 50
7.80

0.40 2.40 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.40
0.22 0.18

Atap Polycarbonat t.10mm

Pipa Gip 2"

0.80
Pipa Gip 2.5"

0.06
Pipa Gip 21"
Plat Expanded FF-3035

1.74
Balok 10/15

0.10
Plat Beton tbl.12cm

Plat Beton tbl.10cm

0.35
Balok 15/30
Balok 15/30 Balok 15/30

6.92
Pas. Dinding Bata

Kolom Ø20

2.32
Dinding Batu Alam

Bangku Duduk

Sloof 20/30 Sloof 20/30

0.30
Pas. Batu Kali Poer tbl.30cm
Lantai Kerja tbl.5cm

0.90
Pasir Urug tbl.10cm

Aanstamping tbl. 25cm Rabat Beton t= 12cm

Pasir Urug tbl.10cm

0.35
Tiang Pancang Lantai Kerja t= 5cm
25x25cm

0.20 0.20 0.12


0.58 2.70 3.19
7.00

POTONGAN A - A
SKALA 1 : 50

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


POTONGAN A - A
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

209 1 : 50
3.80
0.57 2.67 0.57

Pipa Gip 2"


Atap Polycarbonat t.10mm

70

0.80
0.

0.06
Pipa Gip 2.5"

0.54
Plat Expanded FF-3035

Pipa Gip 21"

0.30
Pipa Gip 2"

0.90
Balok 10/15

0.15
Plat Beton tbl.12cm
Plat Beton tbl.10cm

0.30
Balok 15/30

6.92
Pas. Dinding Bata

2.02
Bangku Duduk

0.30
Sloof 20/30

0.30
Pas. Batu Kali Rabat Beton t= 12cm
Lantai Kerja t= 5cm

0.90
Tiang Pancang
Aanstamping tbl. 25cm 25x25cm
Pasir Urug tbl.10cm

0.35
0.15 0.15 0.30
2.40
3.00

POTONGAN B - B
SKALA 1 : 50

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


POTONGAN B - B
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

210 1 : 50
7.00

0.43 2.70 2.77 0.60 0.15


0.15 0.20

0.15

0.15
Sloof 20/30

0.40
0.20

0.20
Sloof 20/30

0.90
Sloof 20/30
3.00
2.30

3.00
1.35
Sloof 20/30
0.20
0.15

0.20
0.15 0.43 2.70 2.02 1.35 0.15
0.20
7.00
3 D13

2 D10

DENAH RENCANA SLOOF & PONDASI TIANG PANCANG

0.30
Ø8 - 150
SKALA 1 : 50
3 D13

DETAIL SLOOF 20/30


SKALA 1 : 10

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA SLOOF & PONDASI TIANG PANCANG
DIPERIKSA OLEH :
DETAIL SLOOF 20/30

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

211 1 : 50 , 1 : 10
D10 - 150

0.05
Poer 270x270x30

0.30
2.70

Lantai Kerja t= 5cm

0.10
D10-150
Poer 270x270x30 Pasir Urug t= 10cm

2.70
D10-150
A
Pondasi Tiang Pancang 25x25

Pondasi Tiang Pancang 25x25

DETAIL PONDASI POER & TIANG PANCANG


SKALA 1 : 50

18m
0.19 0.25 0.79 0.25 0.79 0.25 0.19
2.70

POTONGAN A - A
SKALA 1 : 25

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DETAIL PONDASI POER & TIANG PANCANG
DIPERIKSA OLEH :
POTONGAN A - A

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

212 1 : 50 , 1 : 25
D10 - 150

0.60

0.05

0.05
Poer 135x135x30

0.30

0.30
D10-150
Poer 60x60x30
1.35
Lantai Kerja t= 5cm
Pondasi Tiang Pancang 25x25
A

0.60
0.10

0.10
Pasir Urug t= 10cm
D10-150

D10-150
Poer 135x135x30

A
DETAIL PONDASI POER & TIANG PANCANG

1.35
Pondasi Tiang Pancang 25x25
SKALA 1 : 20

D10-150

Pondasi Tiang Pancang 25x25

DETAIL PONDASI POER & TIANG PANCANG


SKALA 1 : 25

18m

18m
0.55 0.25 0.55 0.18 0.25 0.18
1.35
0.60

POTONGAN A - A POTONGAN A - A
SKALA 1 : 25 SKALA 1 : 25

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DETAIL PONDASI POER & TIANG PANCANG
DIPERIKSA OLEH :
POTONGAN A - A
DETAIL PONDASI POER & TIANG PANCANG
KAJIAN PERENCANAAN DAN STRATEGI POTONGAN A - A
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

213 1 : 25
1.20
0.80
0.30
0.20

0.20
0.25
0.30
Sloof 20/30

0.25
0.20
Sloof 20/30
Sloof 20/30

3.88
1.48
0.20
0.20

0.25
0.80
0.30

0.30
1.20

Sloof 20/30

0.25
0.20
0.20 0.30 0.20 0.20 0.30 0.20
0.25 0.25 5.48 0.25 0.25
7.88

DENAH RENCANA PONDASI BATU KALI


SKALA 1 : 50

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA PONDASI BATU KALI
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

214 1 : 50
1.80
Pas. Batu Kali

2.50
Aanstamping tbl. 25cm

0.50
Pasir Urug tbl.10cm

0.20
0.60
1.60

2.40

DETAIL PONDASI BATU KALI


SKALA 1 : 25

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DETAIL PONDASI BATU KALI
DIPERIKSA OLEH :

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

215 1 : 25
7.00
0.15 0.15 0.15 0.20 0.20 0.15

0.15

0.15
0.15 1.33 0.71 1.21 2.60

Balok 15/30 Balok 15/30 Balok 15/30

Balok 15/30

Balok 15/30
Balok 15/30

0.15

0.15
0.69

Balok 15/30
Ba
0
/3

lo
15

k
15
k

1.20
lo

/3
Ba

0
Balok 15/30 Balok 15/30

Balok 15/30
Balok 15/30
0.15
0.71
3.00

3.00
Balok 15/30

0.15
Balok 15/30 Balok 15/30

Ba

Balok 15/30

1.05
Balok 15/30

/3
lo

15
0.15

k
0.69

15

k
lo
/3

Ba
0
Balok 15/30 Balok 15/30 Balok 15/30

0.15

0.15
0.15

0.15
0.15 1.33 0.71 1.24 1.30 1.23 0.15
0.15 0.15 0.15 0.15 0.15 0.15
7.00

DENAH RENCANA BALOK 15/30


SKALA 1 : 50
0.15
3 D13
7.80
0.20 0.10 0.10 0.40
0.40 1.20 5.20 0.20

2 D10
0.40

0.40

0.30
0.10
Ø8 - 150
3 D13
Balok 10/15
0.20

0.20
Balok 10/15

1.35
DETAIL BALOK 15/30
SKALA 1 : 10
Balok 10/15
2.50
3.80

3.80
Balok 10/15

0.10

0.50
0.10
2 D10
0.10

0.10
0.45
Ø8 - 150
Balok 10/15

0.15
0.40

0.40
2 D10
0.20

0.20
0.40 0.10 0.10 1.28 0.15
0.20 4.96 0.12 0.10 0.40
7.80

DETAIL BALOK 10/15


DENAH RENCANA BALOK 10/15 SKALA 1 : 5
SKALA 1 : 50

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA BALOK 15/30
DIPERIKSA OLEH :
DETAIL BALOK 15/30
DENAH RENCANA BALOK 10/15
KAJIAN PERENCANAAN DAN STRATEGI DETAIL BALOK 10/15
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

216 1 : 50 , 1 : 5
7.00
0.50 0.63 2.00 0.72 2.60 0.15
0.20 0.20

Kolom 15/20 Kolom 15/20

Kolom Ø20cm

0.50
0.88

0.65
0.
88

0.85
Kolom 15/15

2.00
3.00

2.85
1.35
0.50

0.50 0.63 2.00 1.37 0.97 1.35 0.18


7.00

DENAH RENCANA KOLOM Lt.1


SKALA 1 : 50

0.15
2 D10

2 D10 0.20

0.15
0.15 Ø8 - 150
2 D13
2 D13

2 D13

0.20
2 D13
DETAIL KOLOM 15/15

0.20
2 D13 2 D13

SKALA 1 : 10 Ø8 - 150
Ø8 - 150

DETAIL KOLOM Ø20


DETAIL KOLOM 15/20 SKALA 1 : 10
SKALA 1 : 10

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA KOLOM Lt.1
DIPERIKSA OLEH :
DETAIL KOLOM 15/20
DETAIL KOLOM 15/15
KAJIAN PERENCANAAN DAN STRATEGI DETAIL KOLOM Ø20
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

217 1 : 50 , 1 : 10
4.20
0.60 0.60 0.60 0.60 0.60 0.60 0.60

4.20
Pipa Gip 2"
0.60 0.60 0.60 0.60 0.60 0.60 0.60

Pipa Gip 2"

0.70
Atap Polycarbonat t.10mm

A
Pipa Gip 2"

0.80
0.63
2.67

1.70
Pipa Gip 2.5"

0.63

0.06
Pipa Gip 21"

0.84
Plat Expanded FF-3035

0.70
DETAIL POTONGAN A - A
SKALA 1 : 50
DENAH RENCANA ATAP
SKALA 1 : 50
2.67
0.06 2.55 0.06

Pipa Gip 2"


Atap Polycarbonat t.10mm

70

0.80
0.

0.06
Pipa Gip 2.5"

1.70
0.54
Plat Expanded FF-3035

Pipa Gip 21"

0.30
DETAIL POTONGAN B - B
SKALA 1 : 50

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA ATAP
DIPERIKSA OLEH :
DETAIL POTONGAN A - A
DETAIL POTONGAN B - B
KAJIAN PERENCANAAN DAN STRATEGI
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

218 1 : 50
6.80

D10 - 150

3.00
D10 - 150

0.12
0.17
Rabat Beton t= 12cm
Lantai Kerja t= 5cm

D10 - 150

0.05
DETAIL RENCANA PEMBESIAN PLAT LANDASAN LANTAI DASAR
SKALA 1 : 20
DENAH RENCANA PLAT LANDASAN LANTAI DASAR
SKALA 1 : 50

7.80
1.90 5.90

D13- 150
D13 - 150

0.15
Balok 10/15

0.27
Plat Beton tbl.12cm

0.12
D13 - 150

DETAIL RENCANA PEMBESIAN PLAT LANDASAN LANTAI 2


SKALA 1 : 20

1.90 3.97 1.93


7.80

DENAH RENCANA PLAT LANDASAN LANTAI 2


SKALA 1 : 50

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH RENCANA PLAT LANDASAN LANTAI DASAR
DIPERIKSA OLEH :
DETAIL RENCANA PEMBESIAN PLAT LANDASAN LANTAI
DASAR
KAJIAN PERENCANAAN DAN STRATEGI DENAH RENCANA PLAT LANDASAN LANTAI 2
DETAIL RENCANA PEMBESIAN PLAT LANDASAN LANTAI 2
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

219 1 : 50 , 1 : 20
7.00
0.50 0.63 2.00 0.72 2.60 0.15
0.20 0.20

0.50
D10 - 150

0.65
0.10

0.30
Rabat Beton t= 10cm 0.30

0.85
3.00
2.00
0.50

2.85

0.05
D10 - 150
DETAIL RENCANA PEMBESIAN PLAT POT Lt. 1

1.35
SKALA 1 : 20
0.50

0.50 0.63 2.00 1.37 0.97 1.35 0.18


7.00

DENAH PLAT LANTAI POT POS PANTAU Lt.1


SKALA 1 : 50

7.80
0.20 6.40 0.30 0.10
0.10 0.30 0.10 0.10 0.20
0.10

0.10
0.20
0.30

0.30
0.10
D10 - 150

0.20
D10 - 150
0.10

0.10
D10 - 150

0.35
1.85
Rabat Beton t= 10cm

0.10
3.80
2.40

3.80
0.55
0.10

0.10
DETAIL RENCANA PEMBESIAN PLAT LANDASAN LANTAI 2

0.75
SKALA 1 : 20
0.30

0.30
0.20
0.10

0.10
0.10 0.30 5.07 1.35 0.30 0.10
0.20 0.10 0.10 0.18
7.80

DENAH PLAT LANDASAN POT POS PANTAU Lt.2


SKALA 1 : 50

PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR


DENAH PLAT LANTAI POT POS PANTAU Lt.1
DIPERIKSA OLEH :
DETAIL RENCANA PEMBESIAN PLAT POT Lt. 1
DENAH PLAT LANDASAN POT POS PANTAU Lt.2
KAJIAN PERENCANAAN DAN STRATEGI DETAIL RENCANA PEMBESIAN PLAT LANDASAN LANTAI 2
PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

220 1 : 50 , 1 : 20
14.00

1.00 1.26 4.00 1.44 5.20 0.30


0.40 0.40

1.00

1.30
P.Lampu

1.70
4.00
6.00

5.70
0.20

0.20
TL LED 1x28 W

0.40

2.70
SAKLAR TUNGGAL

0.20
1.00
STOP KONTAK

1.00 1.26 4.00 2.74 1.94 2.70 0.36

14.00

TITIK LAMPU POS PANTAU Lt.1 TAHAP KESELURUHAN


SKALA 1 : 50

15.60
0.20

0.40 12.80 0.60 0.20


0.20 0.20
0.60 0.20 0.40

B
0.60

0.60
0.40
0.20

A A

3.70
7.60

4.80

7.60
0.20
1.50
0.40

0.60

0.60
0.20
0.20

B
0.20 0.60 10.14 2.70 0.60
0.40 0.20 0.36 0.20
15.60 0.20

TITIK LAMPU POS PANTAU Lt.2 TAHAP KESELURUHAN


SKALA 1 : 50
PEMBERI TUGAS PEKERJAAN JUDUL GAMBAR
DENAH POS PANTAU Lt.1
DIPERIKSA OLEH :
DENAH POS PANTAU Lt.2

KAJIAN PERENCANAAN DAN STRATEGI


PENANGANAN KAWASAN RTP KEMAYORAN
(SEKTOR AIR LIMBAH)
MENGETAHUI/
:
NO. HALAMAN SKALA MENYETUJUI

220A 1 : 50

You might also like