Professional Documents
Culture Documents
RS5860 - 6295534 Sirotorque E-Motor Kit S-L-e-motor PDF
RS5860 - 6295534 Sirotorque E-Motor Kit S-L-e-motor PDF
诺德牙科设
设备(佛山
山)有限公
公司 版 本 页 数
Siron
na Dental Systems
S Foshan
F Co.,Ltd. Revision Pa
age
A 1/1
16
文
文件编号
电
电马达厂
厂外安装
装(S/L)
) 发行日期 期
6392869
9 SiroTorque E-Motor
E Kit Retrofit (S//L)
Docu
ument No. E
Effective Da
ate
SIR
IROT
OTORQ
RQUE
UE E--MO
MOTOR
OR KIT
K T
RE ROFI
RETRO FIT INS
INSTAL
ALLA
LATIO
IONN
IN TRUC
INSTR UCTIO
ION
( /L)
(S/L
修订
订记录 Revvision Reco
ord
制订订/修订日期 期
修订要点
修 制订/修 修订人 审核 批准 发行
行
Issu
ued/Revisio
on
Issued Initiate
ed By Checked
C B
By App
proved By Release
ed By
Date
20
012-04-27
7 New
w Version Vincentt Feng
西诺
诺德牙科设
设备(佛山
山)有限公
公司 版 本 页 数
Siron
na Dental Systems
S Foshan
F Co.,Ltd. Revision Pa
age
A 2/1
16
文
文件编号
电
电马达厂
厂外安装
装(S/L)
) 发行日期 期
6392869
9 SiroTorque E-Motor
E Kit Retrofit (S//L)
Docu
ument No. E
Effective Da
ate
Ⅰ). Denttist Elemeent (DE) Installatio
I on
2. Unscrew
w two screwss from the bo
ottom of DE;
Step 1
3. Removve all hose es of retrofiit position which
w
connecte
ed to related
d valves;
Step 2
Step 3
Key
K points: Before
B the firsst contact wiith electronicc
co
omponents, please wea ar the ESD wrist
band
for release off the body's sstatic electric
city.;
Stepp2
4pcss Screw cylin
nder(61681152)
Part
P Name Part Num
mber QTTY
Sirotorque
S L 59549255 1 pccs
E-motor
E boaard
Phillips
P screw 9
6066679 4 pccs
ST2.9x8
S 6168152
2 4 pccs
Screw
S cylind
der 6017243
3 4 pccs
Washer
W 3
Stepp3
1.
1 Insert 1ppcs E-motorr cable ( 6289792 ) too the
corresponnding connecctor on Sirottorque L e-m
motor
board
Step11
792);
1ppcs E-motor cable(62897
c
Part Name
N Part Num
mber QTTY
Step22 E-motor
E cablee 628979
92 1 pcs
p
2.
2 Insert F100 00 4-pluger lline row onto
o the
corrresponding pposition of boottom cover of
o
F1000 DE
3.
3 Connect E-motor cab orresponding hole
ble to the co
of F1000 4-pluger line row (As ( step3 photo
p
Step1 shown):
Brown caable conne ect to X5 possition
Blue cabble connect to
o X6 position
n
Step22
Part Name
N Part Num
mber QTTY
cross
c recesssed small 60182333 2 pcs
p
pan
p head scrrew M3×6
F1000
F 4-plug
ger line row 6158310 1 pcs
p
Steep3
2.
2 take 1pcs sirotorque
s E--motor hose assembly(hannging
unit) (62899917)
3.
3 Install sirrotorque E-m motor hose assembly(hannging
unit) (62899917) to the position2 of F1000 DE
Step1
1pcs sirotorque E-motor hose asssembly(hangiing unit)(62899917)
keypoint:ch
k hange the hosse to sirotorqque E-motor hose
asseembly(hanginng unit) (6289
9917)
Step2
Step3
Tool & Fixture 1. Scisssors
西诺
诺德牙科设
设备(佛山
山)有限公
公司 版 本 页 数
Siron
na Dental Systems
S Foshan
F Co.,Ltd. Revision Pa
age
A 7/1
16
文
文件编号
电
电马达厂
厂外安装
装(S/L)
) 发行日期 期
6392869
9 SiroTorque E-Motor
E Kit Retrofit (S//L)
Docu
ument No. E
Effective Da
ate
E. As th
he photos sh
hown:
1. Put the
t electric m
motor cable terminals
into the
t correspo onding slot (note
( that
the bayonet-bit
b o
of electric motor
m line
terminals);
2. Posittion of Green
n wire and Blue wire is
intercchangeable
Step 1
G
Green
B
Blue
Blaack
Brown
Step2
1.
1 Insert the
e Φ10 innerr sheath from disassem mbling
Φ10 inner sheath
s handpiecee hose pro ocess to sirrotorque E-m motor
hose asssembly (hang ging unit) (6
6289917), tig
ghten
1pcs Plasstic tie 5×20
00(6060292)on siroto orque
E-motor hose
h assembbly(hanging unit)
u
2.
2 Cut 30cm from the e yellow hose of siroto orque
E-motor hose assembly (hanging unit)
2-1.
2 And then connect the yellow w hose from m the
E-motor hose asse embly to th he Joint3 po ort of
Step1
E-motor Three port (6295575)
2-2.
2 Connectt 30cm yelloww hose cut frrom E-motor hose
assembbly to the Joint3 port of E--motor Three
e port
Joinnt4 of E-motoor (62955775)
3 three-port 2 . Connect F1000 PU Blue hoseΦ4.3X
2-3 XΦ2.8
(61588007) to the Joint 4 port ofo E-motor Three
T
port
1
3.
3 3-1 Conne ect the other terminal off F1000 PU Blue
hoseΦΦ4.3XΦ2.8 (6158807 7) to the
E-m
motor Joint3 of E--motor corressponding watter regulating valve sam me as
Three
e-Port three-port on the
e step 3 pictu
ure shown
(6295575) 2 3-2 Conne ect the bluee hose to th he corresponnding
integrration valve ssame as on the
t step 3 piicture
30 cm
c shown n
3-3 Connect the Turquoise hose to the
corressponding inte egration valv
ve same as on
o the
Step2 step 3 picture shown
Air
3 Part
P Name Part Num
mber QTTY
E-motor
E three
e-port 62955775 1 pcs
p
Plastic
P tie 5×200 60602992 1 pcs
p
Water
S 3
Step
2.
2 Take 2 pccs of 3 × 1200 Plastic ties
1pcs for tying
t the watter &air hosees;
1pcs for tying
t the cab
bles from E-m motor handpiiece
hose set)
As the step 2 picture shown
Step1
Step2
Part Name
N Part Num
mber QT
TY
Plastic
P tie 3×120 60603000 2pcs
2. Cut the
t quadrate e hole and remove the burr
Step1 (markked in the re
ed area).;
Stepp3
Step3
1.
1 Connect the cable of Hanging g unit Siroto
orque
E-motor
E keybboard 2 to th e e-motor display
he Sirotorque
board,
b as ste
ep1 picture sshown
2. e cable(6288026)
2 take 1pccs Sirotorque ;
3 3-1 Con
3. nnect Sirotorrque cable to t the Siroto
orque
E-motor display bo oard corresp ponding interrface,
as step3 picture showwn;
Step1 3-2 Connector the oother cable of Hanging unit
Siroto
orque E-mottor keyboard d 2 to the PCB
boardd. As the step
p3 picture sh
hown
Sirotorrque cable(66288026)
Step2
Part Nam
me Part Number QTYY
Sirotorque
S ca
able 6288026 1 pcss
Step3
1.
1 Connect thet other terrminal of Sirotorque cabble to
Sirotorquue L E-motor bboard corresp
ponding interrface
2 Close the
2. e Dentist Ele
ement upper cover, Fix th
he DE
with two screws on b
bottom of DE
Dentist
D Ele
ement (S/LL) Installattion for
Sirotorque
S E
E-motor Rettrofit Kit Co
ompleted
**Remark:
*
If
I there have Square Fooot Control Kit for FON NA L
Treatment
T b
before Sirottorque E-mo otor Kit retrofit
installation,
i ng processes “Ⅱ).
Please skip the followin
Square
S Foott Control A Assembly” and
a “ Ⅲ ).Sq
quare
Foot
F Controll Installationn”
Step1
Part Nam
me Part Number QTY
Y
Step2
Ⅱ). Square
e Foot Co
ontrol Ins
stallation
n
Belloows
1. As step1 photo shown, remoove the bellow
ws, Unscrew two
t
ws in the redd circle, rem
screw move the back k housing. And
A
keep bellows & twwo screws & bback housingg
Baack housing
Step 1
Step 2
Front houusing
jam heaad
5. Acccording to Water-Air
W layyout drawing , as step6 phhoto
shown:
Pu ut DA hose ofo square foott control throuugh 1pcs coooper
F1000 backk bu ushing 5, then t connecct it to th hree-port whhich
wire nip coonnected witth other DA A hose from water unit and a
tigghten the coooper bushing 5 with three-port
Put
P SA hose of o square foott control throu
ugh 1pcs coooper
Sttep 5 bushing
b 3, theen connect it to two-port which
w conneccted
with
w other SA A hose fromm water unit and tighten the
cooper bushinng 3 with two-port
Put
P WA hosee of square foot contro ol through 1pcs
DA cooper bushinng 3, then coonnect it to two-port whhich
WA connected witth other WA A hose from Water unit and a
SA tiighten the coooper bushing 3 with two-p port
Put
P FA hose of o square foott control throuugh 1pcs coooper
bushing
b 5, thhen connect it to three-port or four-pport
which
w conneccted with A11 hose from water unit and a
tiighten the cooper bushhing 5 with h three-port or
FA
four-port.
fo
Remarrk: all the cooper bushhing are keept during the
disasseembling proceess before
Step 6
Part
P Name Part Number QTY
7. Pu ut on Back housing
h and bbellows, fix back
b housingg to
thee treatment with
w screws.
Remarrk: All the back housing & Bellows & Screws are kept
k
during the disassemmbling process before