Схема Питания к&#1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

IGNITION SIGNAL

[HR (WITH EURO-OBD)]


Wiring Diagram BBS004JG

MBWA1491E

EC-1222
IGNITION SIGNAL
[HR (WITH EURO-OBD)]
Specification data are reference values and are measured between each terminal and ground.
CAUTION: A
Do not use ECM ground terminals when measuring input/output voltage. Doing so may result in dam-
age to the ECM's transistor. Use a ground other than ECM terminals, such as the ground.
TER- EC
WIRE
MINAL ITEM CONDITION DATA (DC Voltage)
COLOR
NO.
[Engine is running] C
[Ignition switch: OFF]
0 - 1.0V
● For a few seconds after turning ignition
ECM relay switch OFF
32 P D
(Self shut-off)
[Ignition switch: OFF]
BATTERY VOLTAGE
● More than a few seconds after turning igni- (11 - 14V)
tion switch OFF
E
BATTERY VOLTAGE
105 G Power supply for ECM [Ignition switch: ON]
(11 - 14V)

EC-1223
IGNITION SIGNAL
[HR (WITH EURO-OBD)]

MBWA1492E

EC-1224
IGNITION SIGNAL
[HR (WITH EURO-OBD)]
Specification data are reference values and are measured between each terminal and ground.
Pulse signal is measured by CONSULT-II. A
CAUTION:
Do not use ECM ground terminals when measuring input/output voltage. Doing so may result in dam-
age to the ECM's transistor. Use a ground other than ECM terminals, such as the ground. EC
TER-
WIRE
MINAL ITEM CONDITION DATA (DC Voltage)
COLOR
NO.
C
0 - 0.3V
[Engine is running]
● Warm-up condition
D
● Idle speed
NOTE:
The pulse cycle changes depending on rpm
17 V Ignition signal No. 1 at idle E
PBIA9265J
18 BR Ignition signal No. 2
21 G Ignition signal No. 4
0.2 - 0.5V
22 Y Ignition signal No. 3
F
[Engine is running]
● Warm-up condition
● Engine speed: 2,000 rpm G

PBIA9266J
H
: Average voltage for pulse signal (Actual pulse signal can be confirmed by oscilloscope.)

Diagnostic Procedure BBS004JH

I
1. CHECK ENGINE START
Turn ignition switch OFF, and restart engine.
Is engine running? J
Yes or No
Yes (With CONSULT-II)>>GO TO 2.
Yes (Without CONSULT-II)>>GO TO 3. K
No >> GO TO 4.

2. CHECK OVERALL FUNCTION L


With CONSULT-II
1. Perform “POWER BALANCE” in “ACTIVE TEST” mode with
CONSULT-II. M
2. Make sure that each circuit produces a momentary engine
speed drop.
OK or NG
OK >> INSPECTION END
NG >> GO TO 10.

PBIB0133E

EC-1225

You might also like