1.05 Confirm all paint/surface coatings are free from damage. Ongoing
1.06 Desiccant bags is provided and checked for condition, quantity and replace as necessary. Ongoing
1.07 Ensure all holes for entry cable are plugged properly at terminal box. Ongoing
1.08 All flanged openings shall be provided with vinyl cap or metal closure with gasket or substantial Ongoing
wood closures (3/4” thickness minimum) and at least four full diameter bolts to protect the flanges
from damage and prevent the entry of dirt and moisture to the equipment interior. Wooden covers
should not directly in contact with flange surfaces. Plastic sheet, rubber sheet, or equal shall be
placed in between. Wooden cover shall not be used for extended outdoor storage more than 3
months.
1.09 Plastic wrapping shall be removed for outdoor storage. Ongoing
1.10 Stainless steel and other exotic materials shall be stored separately from carbon steel materials, Ongoing
1.11 Desiccant shall not be used to protect rubber and stainless-steel products, Ongoing
1.12 All stainless steel and other exotic materials fitting and flanges shall be stored indoor. Ongoing
1.13 Confirm that all necessary covers, end caps and plugs are in position and replace any that are Ongoing
missing.
1.14 Confirm all instruments on packages or skids are in good condition with no visible damage. Ongoing
1.15 Check all openings and hook up connections are closed/blinded. Ongoing
1.16 Confirm dampers are in good condition and protected from contamination. Ongoing
1.17 Confirm all cabinets, panels, junction box’s, enclosure doors and covers have not been damaged Ongoing
during the inspection checks. Confirm they are replaced / installed correctly.
1.18 All panel fronts, gauges and in line instrumentation adequately protected from construction activity. Ongoing
1.19 Ensure equipment that is installed is protected suitably from any ongoing construction activities to Ongoing
prevent any damage.
1.20 Confirm preservation tag or label is fitted & updated. Ongoing
12
PRESERVATION Inspection & Test Record
PRES-M-09 Rotating Equipment – Gas Turbines
Project Name:
Tag No:
Description:
Subsystem:
System:
lubricating oil base rust preventative or filling with an inert gas, depending on the nature of the
service and type of equipment.
4.05 Bearing housings shall be filled to the bottom of the shaft/labyrinth bushings with preservation oil Monthly
for ball, roller and sleeve type bearings and pad type thrust bearings.
4.06 Check that any greased bearings contain adequate grease. Monthly
4.07 Check oil bath bearing, housings & lube systems are full & preserved and oil drain and inlet are Monthly
plugged with metal or plastic plug).
4.08 Confirm turbine enclosure is preserved with and completely sealed. Monthly
4.09 Verify turbine ventilation and exhaust duct blinded is fitted and there is no degradation of refractory Monthly
lining.
Comments:
Note: Tick all check item under OK - Satisfactory; N/A - Not Applicable; Punch items(s) are to be PL.
Contractor Company
Data Input
Performed By Checked By Checked By Accepted By Witnessed By