Professional Documents
Culture Documents
Aba Lakew Residence Aba Yikuno Bridge To University Road
Aba Lakew Residence Aba Yikuno Bridge To University Road
September 2022
Dedre markos
1
TABLE OF CONTENT
TITLE PAGE
1. Introduction-------------------------------------------------------------------------------------------------------- 1
3. Methodology------------------------------------------------------------------------------------------------------- 1
6. Conclusion ---------------------------------------------------------------------------------------------------------- 7
2
1. Introduction
Debremarkos town has planned different infrastructure and service delivery projects under its
capital investment projects. Those projects will finance by world bank /UIIDP/, city
administration and other development partners. Constructing Endalkachew Ashkerkari through
Zewudu residence to tropical college cobblestone road is one of the projects which the town has
planned in different kebeles of the town administration. The implementation of this project will
create employment opportunities. However the project may have negative environmental and
social impacts. Therefore before implement the proposed project considering/take it in to
account/ environmental issues through environmental and social impact assessment/ESIA/, it is
mandatory to conduct ESIA, every project passes through screening process which provide basic
information about the project whether the project need EIA or not and to determine the
schedule of the project. The screening conducted based on environmental and social
management guide line/ESMG/. To indicate the risk of causing undesirable environmental and
social effects by rating the sensitivity of the proposed site, using impact identification and
classification, checklist of impacts and detailed questionnaires are important.
The project is located at 04 kebele administration. The city administration has a plan to
construct cobble stone road Endalkachew Ashkerkari through Zewudu residence to tropical college
cobblestone road in order to increase road coverage and improve drainage system. The project
has 545 m length and 12m width. The project benefits the surrounding community.
3. Objectives
The objectives of the screening process of the project is to determine whether the project need
EIA or not and to know the level at which the project fall.
4. Methodology
The methodology used to carry out this screening process includes site visit, ULG report,
reviewing of guidelines.
3
5. Environmental and social screening
According to environmental and social guideline the screening process has to components
Environmental screening and social safeguard screening, the screening process help to
determine the schedule of the project. The project is evaluated based on the screening form.
The screening determine the schedule of the project whether the project needs EIA or not by
using different checklist.
ULG construction works project name cobble stone road Endalkachew Ashkerkari through
Zewudu residence to tropical college cobblestone roads
4
Table3. Checklist of impacts
5
incorporated in the design to constrain pollution within the laws and
regulations and to address pesticide use, storage and handling
Does the design adequately detail mitigating measures -
5. Environmental Assessment Report or environmental studies required: Yes/No answers and bullet lists
preferred except where descriptive detail is essential
If Screening identifies environmental issues that require an ESIA or a study, No
does the proposal include the ESIA or study?
Indicate the scope and time frame of any outstanding environmental study. September
Required Environmental Monitoring Plan: Yes
If the screening identifies environmental issues that require long term or No
intermittent monitoring (effluent, gaseous discharges, water quality, soil
quality, air quality, noise etc.), does the proposal detail adequate
monitoring requirements?
6. Public participation/information requirements: Yes/No answers and bullet lists preferred except
where descriptive detail is essential
Does the proposal require, under national or local laws, the public to be Yes
informed, consulted or involved?
Has consultation been completed? Yes
Indicate the time frame of any outstanding consultation process. -
Refer to relevant legislative acts in Ethiopia. -
7. Land and resettlement: Yes/No answers and bullet lists preferred except where descriptive detail is
essential.
What is the likelihood of land purchase for the ULG construction works No
project?
How will the proponent go about land purchase? No
Will people’s livelihoods be affected in any way, therefore requiring some No
form of compensation?
Will people need to be displaced, and therefore require compensation and No
resettlement assistance?
Are the relevant authorities aware of the need for a Resettlement Process, No
involving a census, valuation, consultation, compensation, evaluation and
monitoring?
What level or type of compensation is planned? -
Who will monitor actual payments? -
Categorization and recommendations
Schedule 1 Project to be fed into the standard ESIA process determined by MEF
Schedule 2 Project will not require an ESIA, but will necessitate the inclusion of
environmental and social mitigation and enhancement measures in the
design and implementation of the project through the use of standard
construction contract clauses and an environmental management plan
Schedule 3 Project is not subject to environmental assessment as no potential
impacts are anticipated.
Prepared by:- Tiruneh Engida
6
Sign ---------------------------
Date----------------------------
The social impact screening using checklists gives us general information about the project
social impact.
Site Sensitivity
Issues
Low Medium High
Involuntary resettlement
Checklist of impacts
Economic or physical resettlement required
New settlement pressures created
7
Other (specify):
Recommendations:
8
Sign ---------------------------
Date----------------------------
6. Conclusion
REVEWED BY
NAME ------------------------
SIGNITURE -------------------
DATE ----------------------------