TIMELINE PEMBANGUNAN FIBER OPTIC ALL JAVA

Duration
NO Implementasi Fiber Optic VineWood Babelan
(days)
D-1 D-2 D-3 D-4
A Implementasi Fiber Optic
ATP 1 1 1 1 1 1 1 1
FO Distribution 24 Core - Aerial 12 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
FO Distribution 12 Core - Aerial 12 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Joint Closure - Branching 24 Core 4
ODP-8 Box 5
Splitter 1:8 5
Splitter 1:16 5
Pole 7 m 12 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Fixing Slack 5
Penyambungan Kabel Optik Single Mode dengan cara fusion splice 5
Test OPM ( power meter) 5
OTDR 5
Mobiliasasi 2

B Connector Kabel PLN Twist Kedap Air 6


Kabel Twist 2x10mm Jumbo Standar 6
Klem Tiang PJU 7inch / Klem Ornament - Galvanis 6
Kap PJU / Kap Lampu Jalan 250 watt 6
Box Panel Outdoor 60x80x20cm 1mm-Panel Listrik 6
Tiang PJU Lengkung, Tiang PJU Bengkok 1,5 inch, 2m 6
Sensor Cahaya/fotocell EWIG 3A/6A/10/A Otomatis Lampu 6
Kap Lampu Jalan PJU e27+Tiang+Kabel 6
MCB K60N 1P 16A 20A 32A 40A 50A 63A 6KA SCHENEIDER 6
Jasa instalasi 6
pemasangan KHW baru 2200A
2022

D-4 D-5 D-6 D-7 D-8 D-9 D-10 D-11 D-12 D-13

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
D-13 D-14 D-15 D-16 D-17 D-18 D-19 D-20
D-21