Form TECH-6: Curriculum Vitae (CV) for Proposed Key Experts

1. General

Position Title and No. : Transportation Engineer


Name of Key Expert : Oscar Wanyonyi WAFULA
Name of the Firm proposing the : EDCONS (K) LTD
Key Expert
Date of Birth : 10 April, 1980
Nationality : Kenyan
Country of Citizenship/Residence : Kenya
2. Education:
Institution Dates attended Degree/diploma obtained
University of Nairobi, Kenya (2015- Current) M.Sc. Civil Engineering, Transportation (Coursework
completed, Thesis in progress)
Moi University (1999-2004) B.Tech (Hons.), Civil & Structural Engineering
3. Employment record relevant to the assignment

Period Employing organization and Country Summary of activities performed relevant to


your title/position. the Assignment
Contact information for
references*
June 2010 EDCONS (K) Ltd, Nairobi Kenya Resident Engineer and Engineer’s representative in
- Head of Transport Infrastructure Somalia Design and Supervision of Construction of Dockyard
Uganda Tug Jetty at Mombasa Port. Jan 2020-current.
Present
Name of Reference: Godwin Wasike South Sudan ✓ Transportation consultant in the preparation of
Position and Company of Reference: Materials/Pavement and O&M report for the Kenya
Managing Director Urban Roads Authority, Finance, Design, Build and
Maintenance Contract for Project Roads designated
Contact of Reference: LOT 15. Oct-Nov 2019
Email: godwin@ed-cons.com
✓ Engineer’s Representative in the Project
Tel : +254721539222 management and construction supervision for
Construction of town roads in Galkayo North and
South (Bulo-Bacley, Cagarwayne and Market roads)
Somalia. June 2019- present
Highway Engineer in the Consultancy Services for
World Bank funded, Environmental & Social Impact
Study, Preliminary & Detailed Engineering Design, of
Bungoma & Kimilili Municipality roads. June- Oct
2018
✓Civil Engineer in the Structural Pavement Evaluation
of Bardhere and Dinsoor Airstrips, Somalia. June-
August 2018
✓ Civil Engineer (roads and drainage) in the
Preliminary and detailed design of Ronald Ngala
University, Mombasa. Jan- May 2016
✓ Highway Engineer in the Geometric and pavement
design for the Uganda, Siti-1 Small Hydropower
Project Powerhouse 1.5km access road. Feb-April
2015.
✓ Civil Engineer (roads and drainage) in the
Preliminary and detailed design of Africa International
University, Karen. May- Dec 2015
✓ Civil Engineer in the preliminary design of arterial
roads, grading plan and storm water drainage for the

Oscar Wanyonyi Wafula 1 of


9
772-acre mixed use development at Migaa Golf Resort
Estate. Apr-Dec 2013.
✓ Highway Design Engineer in the Feasibility Study,
Preliminary and Preliminary Detailed Design of
Kenol-Sagana-Marua road with EGIS Kenya Ltd.
August-December 2013.
✓ Highway Engineer in the preparatory survey on the
project for construction of Lologo, Road improvement
in Juba, South Sudan. Feb-May 2013.
✓ Civil Engineer in the Provision of Civil Engineering
Design Services for the Design of the new Wau
International Airport, South Sudan. Jan-Aug 2011.
✓ Civil Engineer in the Concept and Preliminary
design for the establishment of the Government of
South Sudan Inland Container Terminal at Eldoret,
Nadapal and Nimule. May-Dec 2011.
✓ Highway Design Engineer in the Consultancy
Services for the Feasibility and Detailed Design of the
Kazangula Bridge, Border Facilities and Corridor
Studies, with EGIS International. Oct-Dec 2010.
Oct. 2015 H.P. Gauff Ingenieure GmbH & Co. Kenya Deputy Resident Engineer in the rehabilitation of
- KG - JBG – Nairobi 47km (152 lane-km) Kisumu-Kakamega (A1) road.
Deputy Resident Engineer Oct 2015- June 2019
June 2019
Name of Reference: Vaughan Palmer
Position and Company of Reference:
Director Transport Department
Contact of Reference:
Email: vpalmer@gauff.com
Tel : +254707393310
Nov. 2009 GIBB Africa Ltd Kenya, Successfully led teams and worked with teams through
- Senior Projects Engineer- Tanzania, delivery of the following projects;
Oct. 2015
Transportation Ghana, Libya, ✓ Construction Supervision of AfDB funded Athi-
Malawi, River Namanga road. Addendum No3, One-Stop
Rwanda, Border post at Namanga, Kenya-Tanzania, border
South Sudan from June 2014 to October 2015 as an Assistant
Resident Engineer.
Advisory Services for the Preparation of the Pre-
feasibility Study Analysis Report (PFAR) for the 180
km Accra-Takoradi Road Dualisation PPP Project in
Ghana from March 2014 to June 2014 as a Highway
Engineer.
✓ Design Review & Supervision of the Completion of
the 24 Km Liwonde - Naminga Road in Malawi from
Jan 2013 to June 2014 as a measurements Engineer in
charge of review of cost estimates and tender
documents.
✓ Construction of the TATU City Satellite Project in
Kiambu, Kenya from Oct 2011 to Dec 2012 as a Civil
Engineer, Roads/Drainage and Assistant Resident
Engineer.
✓ Expansion to Brookside Dairy Factory (USD 100m),
Ruiru Kenya, from June 2011- April 2014 working as
a Civil Engineer.
✓ Improvement to Passenger Terminal Building,
Kigali International Airport, Rwanda from April 2010
to June 2011 working as a terminal and landside Civil
Engineer.
✓ Detailed Design of Athi- River Namanga road.
Addendum No3, One-Stop Border post at Namanga,

Oscar Wanyonyi Wafula 2 of


9
Kenya-Tanzania, border from June 2011 to Dec 2011
as a Highway and Drainage Engineer.
✓ New Greenfield Bugesera International Airport,
Rwanda from Jan 2010 to Dec 2010. Worked as Civil
Engineer and Assistant Airport planner.
✓ Sirth -Benghazi 550 km Railway line EPC Project,
Libya. From Nov 2009 to Oct 2010, working as Civil
Engineer for stations and terminals including spur
roads.
Jan. 2008 Runji & Partners Consulting Kenya Successfully led teams and worked with teams through
- Engineers delivery of the following projects;
Nov. 2009
Civil Engineer ✓ Preparation of the Kenya National Airports System
plan. (10 Airports) Year: Aug 2008-Nov 2009 as
landside civil engineer.
✓ Design Review of the EU funded 120 km Merille
River Marsabit road (A2) Year: June 2009 to Nov 2009
as measurements engineer.
✓ Technical, Performance and Financial Audit for
Kenya Roads Board in the North Rift Kenya Region
Year: April2008 to June2008, Oct 2008- Dec /2008 as
Highway Engineer.
✓ Preliminary and detailed Engineering Design of the
105 Km Mwingi-Thuci River (C93) Road Year: Feb
2008 to Sep 2008 as assistant highway engineer.
✓ Preliminary and detailed Engineering Design of the
110 Km Voi-Mwatate-Taveta (A23) Road, Year: Feb
2008 to April 2008 as assistant highway engineer.
Sep. 2006 Cape Consult Limited Kenya, Successfully led teams and worked with teams through
- Civil Engineer Rwanda delivery of the following projects;
Dec. 2007 ✓ Supervision of the Construction and rehabilitation of
83 km Njoro Turn-off-Timboroa (A104) road project.
Year: June 2007 to Jan 2008 as an assistant engineer
✓ Kigali free zone project, Rwanda. Design of
infrastructure services. Year: Jan 2007 to June 2007 as
a civil engineer
Jan. 2005 Civil Engineering Design Consulting Kenya Successfully worked with teams through delivery of
- Engineers the following projects;
Graduate Engineer Design review and Construction Supervision of the
Dec. 2006
New
Westgate shopping Mall, Nairobi, Year: Jan 2006 To:
Dec
2006 as an assistant structural engineer
✓ Construction of the Chancery of the Embassy of
Japan,
Nairobi as an assistant structural engineer. Jan 2005 to
December 2005
*Contact information for references is required only for assignments during the last 3 years.
4. Membership in Professional Associations and Publications:
• Registered Consulting Engineer: - Engineers Board of Kenya (Reg. No. E489).
• Corporate Member of the Institution of Engineers of Kenya (M.I.E.K) (Reg. No. M3329)
• Associate Member, Chartered Institute of Arbitrators (Reg. No 39411)
5. Language Skills (indicate only languages in which you can work):
Speaking Reading Writing
English excellent excellent excellent
Swahili excellent excellent excellent
French Fair Fair Fair

Oscar Wanyonyi Wafula 3 of


9
6. Adequacy for the Assignment:
Detailed Tasks Assigned on Consultant’s Team of Experts:
[List major deliverables/ tasks as in TECH-5 in which the Expert will be involved]
Reference to Prior Work/Assignments that Best Illustrates Capability to Handle the Assigned Tasks
Overview

Team Leader with a total of 16 years of professional experience in design and construction supervision of structures
(earth, steel and concrete) including port projects, site investigations, determination and assessment of various
construction projects.

Furthermore, Eng. Wafula has garnered more than 10 years in experience in general engineering management. He
also has work experience for projects funded by international donors like the World Bank, Africa Development Bank
and JICA.

Eng. Wafula design expertise refers to a wide scope of civil engineering projects. Besides focus on quality control,
his strength is the effective project management and the coordination of teams.
Project: Design and Supervision of Construction of Dockyard Tug Jetty at
Mombasa Port
Year & duration: 2019-2020 (12 months)
Location: Mombasa Port, Kenya Client/ Finance: Kenya Ports Authority and INROS-Lackner
Kenya Ltd
Main Project - Kenya Ports Authority and INROS-Lackner Kenya Ltd
Features: - Technical design, environmental impact assessment, preparation of cost estimates and
technical specifications, tender assistance and supervision of construction of
Dockyard Tug Jetty at Mombasa Port.
Positions Held: Resident Engineer
Activities Responsible for:
Performed: - Site project management, contract administration, monitoring of progress of works,
quality assurance, cost monitoring of works, ensure compliance to environmental
management plan.
Project: Finance, Design, Build and Maintenance Contract for Roads Annuity
Program for KURA designated LOT 15.
Year & duration: October- December 2019 (3 months)
Location: Central, Kenya Client/ Finance: Mota Engil Engenharia & Construcao
Africa and Anguloraso Kenya, Ltd.
Main Project - Finance, Design, Build and Maintenance Contract for Roads Annuity Program for
Features: KURA designated LOT 15 comprising of ten (10) roads totalling 44.9 km within
Nyeri, Laikipia, Kirinyaga, Embu, Murang’a and Tharaka Nithi counties.
Positions Held: Consultant
Activities - Coordination and preparation of Engineering, Materials/Pavement and Operations/
Performed: Maintenance report
Project: Construction supervision for Construction of town roads in Galkayo North and South (Bulo-
Bacley, Cagarwayne and Market roads), Somalia.
Year & duration: June 2019- December 2019 (4 months)
Location: Galkayo- Somalia Client/ Finance: Somalia Stability Fund (SSF)
Main Project - Adam Smith International Africa Limited Implementing Agency of the Somalia
Features: Stability Fund (SSF) The work is divided into:
a) Roads- Upgrading to bitumen standards existing gravel roads; Bulo Bacley
road 1.49km, Market road 0.42km, Cagarweyne road 0.267km
b) Solar light repairs- inspection and supervision of repairs of covering existing
329 poles of solar in North & South Galkacyo
Positions Held: Engineer’s Representative
Activities - Design Review
Performed: - Cost Appraisal
- Monitoring of work progress
- Implementation of QA/QC and approval system for the works
- Measurement, valuation and cost monitoring of works Issuance of instructions
- Assessment of claims

Oscar Wanyonyi Wafula 4 of


9
- Stakeholder engagement
- Monitoring of contractor’s ESMP.
Project: Construction Supervision of the rehabilitation of 47km (152 lane-km) Kisumu-Kakamega (A1)
Year & duration: October 2015 – June 2019 (45 months)
Location: Kenya Client/ Finance: KeNHA (World Bank KTSSP program.)
Main Project - Construction of a water treatment plant (capacity 18,000m3 per day)
Features: - Construction of a 15 No water storage tanks
- Develop a water transmission network of 120 km (main pipe: DN 500)
- Construction of a fully equipped laboratory
- Gavel paved road of 700 m long
Positions Held: Project Manager
Activities - Overall works supervision of the project
Performed: - Monitor and ensure all the civil, mechanical and electrical works are completed on
budget and time.
- Supervision of the appointed project consultant and contractor
- Co-ordinate training of the in-house technical staff on advance project management
concepts and conditions of contract (FIDIC – red book)
- Co-ordinate and manage work verification as well as quality control
- Review and process all periodic consultants and contractor’s payment certificates
- Manage and escalate all contractual correspondence
Project: - Structural Pavement Evaluation of Bardhere and Dinsoor Airstrips, Somalia
Year & duration: - June- August 2018
Location: - Somalia Client/ Financ
Main Project - Pavement Structural Evaluation
Features:
Positions Held: - Civil Engineer
Activities - Construction materials investigation
Performed: - Pavement Design
- Cost Estimates
Project: Construction Supervision of Athi- River Namanga road. Addendum No3, One-Stop Border
post at Namanga, Kenya-Tanzania, border
Year & duration: June 2014 to October 2015 (17 months)
Location: Kenya-Tanzania, border Client/ Finance: KeNHA (AfDB)
Main Project - One-stop border post between the Kenya and Tanzania Border at Namanga Town
Features: comprising of customs buildings, warehouses, truck parking bays and holding
facilities, border security installations, approach roads and internal circulation roads,
NMT facilities, bridges and drainage works and ancillary facilities
Positions Held: Deputy Resident Engineer
Activities - Assisted the Resident Engineer on all technical and administrative aspects of
Performed: supervision in compliance with the approved design, specifications and sound
engineering practice, in charge of implementation of QA/QC and approval system for
the works. Measurement, valuation and cost monitoring of works. Monitoring of work
progress through inspection, reporting and regular progress meetings. In charge of
health and safety.
Project: Advisory Services for the Preparation of the Pre-feasibility Study Analysis Report (PFAR) for
the 180 km Accra-Takoradi Road Dualisation PPP Project in Ghana
Year & duration: March 2014 to June 2014 (3 months)
Location: Ghana Client/ Finance: Ministry of Roads and Highways (MRH)
Ghana. (World Bank)
Main Project - Needs assessment, defining broad project outputs, defining scope of project,
Features: undertaking options analysis, market assessment, compiling pre-feasibility
assessment report for the 180km highway earmarked for PPP form of contracting.
Positions Held: Highway Engineer.
Activities - Visual inspections to observe traffic composition, identification of constraints to the
Performed: flow of traffic, conducting traffic delay studies, assessing the riding quality,
identifying sections with inadequate road geometry, assessing road safety
requirements and encroachment of the road reserve etc. Analysis of constraints,
evaluation of technical options, preparation of cost estimates, preparation of CAPEX

Oscar Wanyonyi Wafula 5 of


9
projections and preparation of prefeasibility study report.
Project: Design Review & Supervision of the Completion of the 24 Km Liwonde - Naminga Road in
Malawi
Year & duration: January 2013 to June 2014 (18 months)
Location: Malawi Client/ Finance: The Roads Authority, Malawi (OPEC Fund
for International Development (OFID))
Main Project - 24 km Liwonde – Naminga road, provision of detailed designs for the rehabilitation/
Features: upgrading of the loop road at Liwonde Township, supervision of the completion of
the outstanding works on the Liwonde – Naminga project as well as construction
works of the Liwonde Township loop road.
Positions Held: Measurements Engineer
Activities - Review of bill of quantities, cost estimates, specifications and conditions of contract.
Performed:
Project: Concept and preliminary design for the establishment of the Government of South Sudan
Inland Container Terminal and Bulk Oil Storage Terminal at Eldoret
Year & duration: May-September 2011 (3 months)
Location: Eldoret- Kenya Client/ Finance: Government of South Sudan, Ministry of
Trade and Mayira Ltd (GoSS)
Main Project - Concept and Preliminary design, preparation of engineers estimate for the
Features: establishment of the Government of South Sudan (GOSS) Inland Container Terminal
and Bulk Oil Storage Terminal at Eldoret in Kenya with a railway siding,
Positions Held: Civil Engineer
Activities - Civil engineering design of circulation, parking and drainage
Performed: - Construction material investigation and pavement design
- Water and sanitation engineering design
- Engineering cost estimates
Project: Concept and preliminary design for the establishment of the Government of South Sudan
Inland Container Terminal Nimule, Uganda.
Year & duration: May-September 2011 (3 months)
Location: Nimule, Uganda Client/ Finance: Government of South Sudan, Ministry of
Trade and Mayira Ltd (GoSS)
Main Project - Concept and Preliminary design, preparation of engineers estimate for the
Features: establishment of the Government of South Sudan (GOSS) Inland Container Terminal
at Nimule, North Uganda border with South Sudan.
Positions Held: Civil Engineer
Activities - Civil engineering design of circulation, parking and drainage
Performed: - Construction material investigation and pavement design
- Water and sanitation engineering design
- Engineering cost estimates
Project: Improvement to Passenger Terminal Building, Kigali International Airport, Rwanda
Year & duration: April 2010 to June 2011 (15 months)
Location: Rwanda Client/ Finance: Rwanda Civil Aviation Authority &
Rwanda Ministry of Infrastructure (GoR)
Main Project - Improvement to the Existing Passenger Terminal Building. Financed by Government
Features: of Rwanda.
Positions Held: Terminal and landside Civil Engineer.
Activities - Preparation of trip generation, modal split, trip distribution and traffic assignment of
Performed: ground access parking and circulation needs, demand capacity analysis,
reconfiguration of parking and circulation areas to suit ICAO Annex 17 security
guidelines, design of storm water drainage systems, sanitary sewer network.
Preparation of tender documents.
Project: Detailed Design of Athi- River Namanga road. Addendum No3, One-Stop Border post at
Namanga, Kenya-Tanzania,
Year & duration: June 2011 to December 2011 (7 months)
Location: Kenya-Tanzania, Client/ Finance: KeNHA (JICA)
Main Project - Preliminary and detailed design of a one-stop border post between the Kenya and
Features: Tanzania Border at Namanga Town.
Positions Held: Highway and Drainage Engineer.

Oscar Wanyonyi Wafula 6 of


9
Activities - Planning of operational concepts. Terrain surface modelling, geometric and pavement
Performed: design of approach roads and truck parking areas. Preparation of tender documents.
Project: New Greenfield Bugesera International Airport, Rwanda
Year & duration: January 2010 to December 2010 (12 months)
Location: Rwanda Client/ Finance: Rwanda Civil Aviation Authority &
Rwanda Ministry of Infrastructure (GoR)
Main Project - Detailed design of a new greenfield airport with all associated facilities
Features:
Positions Held: Civil Engineer and Assistant Airport planner
Activities - Under the guidance of the airport planner, tasked with airside and ground access civil
Performed: engineering design including; Planning and design of runway, taxiways, aprons,
ground access. Preparation of trip generation, modal split, trip distribution and traffic
assignment of ground access and parking. Airport trunk storm water drainage design.
Preparation of airport layout plan (ALP) drawings.
Project: Sirth -Benghazi 550 km Railway line EPC Project, Libya.
Year & duration: November 2009 to October 2010 (12 months)
Location: Libya Client/ Finance: Russian Railways Ltd (Government of
Libya)
Main Project - Design contractor for 550 Km Railway with Passenger Stations with varying size and
Features: location. Construction project involved the construction of 554 km of permanent way
comprising of rail and road bridges, drainage structures and approximately 96km of
highways, branch, agricultural and gravel roads
Positions Held: Civil Engineer for stations and terminals including spur roads
Activities - Terrain surface modelling, review of storm water drainage designs, external sanitary
Performed: sewer hydraulic design, detailed geometric and pavement design of ground access
roads and parking areas, review of ground access civil works construction drawings.
Project: Preparation of the Kenya National Airports System plan. (10 Airports)
Year & duration: August 2008-November 2009 (16 months)
Location: Kenya Client/ Finance: Kenya Airports Authority (KAA)
Main Project - Updating of the National Airport System Masterplan for all major aerodromes in
Features: Kenya.
Positions Held: Landside civil engineer.
Activities - Civil Engineer and local project liaison in charge of data collection and visual
Performed: diagnostics, preparation of trip generation, modal split, trip distribution and traffic
assignment of ground access and parking, analysis of airport’s demand vs capacity
for the ground access systems, planning of water supply and sanitation future demand,
design of future projections in ground access and utilities. Preparation of ground
access airport layout drawings, cost estimates and preparation of inputs into the
capital investment program. Stakeholders’ engagement during RAP.
Project: Design Review of 120 km Merille River Marsabit road (A2) Year Year:
Year & duration: June 2009 to November 2009 (6 months)
Location: Kenya Client/ Finance: European Commission, Kenya
Main Project - Design review and preparation of bidding documentation of the 124km (A2) road.
Features:
Positions Held: Measurements engineer
Activities - Reviewing and updating unit rates, bill of quantities and cost estimates and
Performed: preparation of the cash flow projections
Project: Technical, Performance and Financial Audit for Kenya Roads Board in the North Rift Kenya
Region
Year & duration: April 2008 to June2008, Oct 2008- Dec /2008 (6 months)
Location: Kenya Client/ Finance: Kenya Roads Board (KRB)
Main Project - Technical, Performance and Financial Audit for Kenya Roads Board in the North Rift
Features: Kenya Region in particular routine and periodic maintenance of rural roads. Financed
by Kenya Roads Board.
Positions Held: Highway Engineer.
Activities - Assessment and reporting on Project identification, selection and prioritization
Performed: process, project procurement process, contract management process, quality and
extent of works, financial records and capacity evaluation of road agencies in the

Oscar Wanyonyi Wafula 7 of


9
North Rift Kenya Region.
Project: Preliminary and detailed Engineering Design of the 105 Km Mwingi-Thuci River (C93) Road
Year & duration: February 2008 to September 2008 (8 months)
Location: Kenya Client/ Finance: Ministry of Roads and Public works, Kenya
Main Project - Preparation of preliminary and detailed engineering design, environmental/social
Features: impact assessment of 105km gravel road to bitumen standards including preparation
of bidding documents. Study financed by Government of Kenya.
Positions Held: Assistant highway engineer.
Activities - Carried out road inventory survey, coordination of classified traffic count, traffic data
Performed: analysis, geometric design, preparation of plan and profile drawings, cross sections,
and setting out data, calculation of earthworks and pavement quantities and derivation
of unit rates from prevailing costs of materials, labour and plant.
Project: Preliminary and detailed Engineering Design of the 110 Km Voi-Mwatate-Taveta (A23) Road,
Year & duration: February 2008 to April 2008 (3 months)
Location: Kenya Client/ Finance: Ministry of Roads and Public works, Kenya
Main Project - Preparation of preliminary and detailed engineering design, environmental/social
Features: impact assessment of 110km gravel road to bitumen standards including preparation
of bidding documents.
Positions Held: Assistant highway engineer.
Activities - Preparation of the detailed engineer’s cost estimate based on the geometric and
Performed: structural design through derivation of unit rates from prevailing costs of materials,
labour and plant.
Project: Supervision of the Construction and rehabilitation of 83 km Njoro Turn-off-Timboroa (A104)
road project.
Year & duration: June 2007 to January 2008 (8 months)
Location: Kenya Client/ Finance: Ministry of Roads and Public works, Kenya
(World Bank (NCTIP Program))
Main Project - Detailed design and construction supervision of 83 km Njoro Turn-off to Timboroa
Features: road
Positions Held: Assistant engineer
Activities - Under guidance by the DRE/Highway Engineer; carried out additional geometric
Performed: design, review of plotted cross section by the contractor for approval by the RE, and
preparation of revised contract drawings
Project: Kigali free zone project, Rwanda. Design of infrastructure services.
Year & duration: January 2007 to June 2007 (6 months)
Location: Rwanda Client/ Finance: Rwanda Investment and Economic
Partnership Agency (RIEPA) (GoR)
Main Project - Detailed design, engineering drawings and tender documents for required
Features: infrastructural services specifically; road network, drainage system, water supply
network, waste water reticulation and treatment on 90 ha piece of land in Kigali
Rwanda
Positions Held: Civil engineer
Activities - Coordinating materials sampling and testing, data collection, coordination of electro-
Performed: mechanical design with civil works, roads geometric design, storm water drainage
design, foul sewer drainage design, preparation of cost estimates and tender
documents.

Oscar Wanyonyi Wafula 8 of


9
7. Certification:
I, the undersigned, certify to the best of my knowledge and belief that:
(i) This CV correctly describes my qualifications and my experience;
(ii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs
specified for me in the Expert Schedule in Form TECH-7 provided team mobilization takes place within the validity
of this proposal or any agreed extension thereof;
(iii) I am committed to undertake the assignment within the validity of Proposal;
(iv) I am not part of the team who wrote the terms of reference for this consulting services assignment;
(v) I am, pursuant to Clauses 3 and 4 of the ITC, eligible for engagement.

I understand that any misstatement described herein may lead to my disqualification or dismissal, if engaged.

Date: 11 November 2020


[Signature of Key Expert or authorized representative of the firm] Day/Month/Year

Full name of authorized representative:

Oscar Wanyonyi Wafula 9 of