Project Under Pass Simpang Patal-Pusri

INSTALASI D.WALL
Location

Date Start

Finish

NO DEPTH EXCAVATION DESCRIPTION


I. TYPE D. WALL :
1 -1.00
II. Nomor Panel :
2 -2.00

3 -3.00
III. Size D. Wall :
Length :_______________________ m'
4 -4.00
Wide :_______________________ m'
5 -5.00
High :_______________________ m'
6 -6.00
VI. Depth Excavation : m'
7 -7.00

8 -8.00
VII. Grouting
9 -9.00
Start Finish Vol ( M3)

10 -10.00

11 -11.00

12 -12.00

13 -13.00
NOTE :
14 -14.00

15 -15.00

16 -16.00

17 -17.00

18 -18.00

19 -19.00

20 -20.00

Pengawas Bina Marga Konsultan Supervisi Main Kontraktor Sub - Kontraktor