Download as pdf or txt
Download as pdf or txt
You are on page 1of 23

AdRI LAL

Roll Mo St

(Question Paper)

fRfaT ffaftr faHTT, JTTT t * toA F7 -

01.01.2021- 31.12.2022 fey

SELECTION FOR PROMOTIION FROM GR'C' TO GR. 'B' SERVICE TO THE POST OF
AENNR (GR.'B') AGAINST 70% QUOTA IN CIVIL ENGINEERING DEPARTMENTNR
FOR ASSESSMENT PERIOD OF 01.01.2021-31.12.2022.

fai-07.05.2022 TebaH AF- 100


MAXIMUM MARKS - 100 DURATION 2 HOURS
DATE 07.05 2022

THT
GENERAL INSTRUCTIONS

There are total 110 objective type questions in the paper and each carry ONE mark. Out
100
of these, answer any
questions. Questions related to Rajbhasha are optional.

TTTTI
There shall be negative marking for incorrect answers. One third of the marks allotted for each questions will
be deducted for the wrong answer

3. 100 afd7 T7 q77 3FAR fu


T fEafa T
100 3 T HIPT ETTI
Ir case of more than 100 questions have been answered, only first 100 answers will be evaluated

TTTT
Answer of objective type questions having
cutting, over writ1ng, erasing, scoring off a ticked answer and
tick1ng another answer, modify1ng the answer in any way will not be evaluated and awarded zero marks in
such cases of corrections

THT TET U t FRT THTtT HTT T T


This question paper is bilingual i.e. English & Hindi. In case of discrepancy or doubts in the reading of the
question, its English version should be taken as authentic for all questions other that Rajbhasha related
questions. For Rajbhasha related questions Hindi version should be taken as authentic
Question Paper for AEN Selection (70%) on 07.05.2022
HETY5 itATr J7A (70%) E HATA TGHT 07.05.2022
1 The principle of working from Whole to part is used in surveying because

(A) Plotting becomes easy cD (Plotting) THH EI GTi B


(B) Survey work can be completed quickly Hd | CDTH U RIE
MC) Accumulation of errors is prevented
(D) All the above
2 If the R.L. of a B.M. is 100 00 m, the back- sight is 1.215 m and the foresight is
1.870 m, the, R.L. of the forward station is -
T STUH c ATRYT 100.00 Hi 6, aoHT 1.215 R P*RHI^T 1.870 i 8,

(A) 99.345 m 99.345 H


(B) 100.345 m 100.345
(C) 100.655 m 100.655 H
(D) 101.870m 101.870 HT

3 Closed contours, with higher value inwards, represent a-


TH, (Closed Contours) HHT TR 7, FH HTGATTd

(A) Depression I3TRI (Depression)


(B) Hillock 4515T (Hillock)
C) Plain Surface
(D) None of the above

4 IMinimum grade of concrete to be used in reinforced concrete as per IS:456-1978 is

(A) M 15. H 15
(B) M 20 H 20
(C) M 10 H 10
(D) M 25 H 25

5 The point of contra flexure lies where

(A) Shear force change sign


(BBending moment is zero or changes sign ST HTHE GT

C) Shear force is zero


(D) Bending moment is maximum

870
9 34 1/22
6 Hooke's law is valid up to the
6(A) YElastic Limit
(B) Yield Limit
C) Limit of Proportionality
(D) UItimate Point

Minimum pitch ofthe rivets shall not be less than

(A) 1.5 d 1.5 3


(B) 2.00d 2.03
L(C) 2.5 d 2.5 3
L (D) 3.0 d 3.03
8 The slab is designed as one way if the ratio of long span to short span iS
(A) Less than 1
1CH
B) Between 1 and 1.5 1 H 1.5 5 da
(C) Between 1.5 and 2 1.5 fR 2 ch Ga
(D) Greater than 2 2 H372c5
( Le Chatelier apparatus is used to determine which of the following
cement properties for

A)SoundnesS EGG HI35TH)


(B) Initial setting time
(C) Compressive strength
(D) Tensile strength
CHISCRI
10 In which of the following
directions, the strength of timber is maximum
(A) Parallel to grains
(B) 45 degree to grains gHT c5 45 13 R
(C)Perpendicularto grainns
(D) Same in all directions

11 The uniformity c0-effticient of soil is


defined as the ratio of
(A)
D 40 to D 10
D 40 to D 10
B ) D 40 to D 20 D 40 to D 20
(C) D50 to D10 D 50 to D 10
(D) D 60 to D 10
D 60 to D 10

2/22
4748 L 36o
S VS cha.no
12 The thickness of steining of well foundation for Railway bridges is usually kept as-
-of outside diameter.
.

(A) One-Eight
L (B) One-Tenth
(C) One-Sixth
(D)One-Fourth

13 Theaction of negativeskin friction on the pileis to:

(A) |Increase the ultimate load on the pile


(B) Reduce the allowable load on the pile
(C) Maintain the working load
(D) Reduce the settlement of the pile.

14 |Consider the following surveys: (1) Reconnaissance survey (2) Preliminary survey
(3)Traffic survey (4) Final location survey The correct sequence in which
thesesurveys are condücted before the alignment oftrack isfinalized is
aiciei HTGUjI R qETR GI (1) Ti HdGUT (2) UIRTY HTHUT (3) IGTYI6
Hd&U (4) afGH RTA HdU
1L (A) 1,3,2,4 1,3,2,4
(B)11.3,4,2 1,3,4,2
(C) 3,1,4,2 3,1,4,2
LD) 3,1,2,4 13,1,2,4
15 In a B.G. railway track, the specified ruling gradient is 1 in 250. The horizontal curve
of 3 will have the permissible gradient of

(A) |1in 257 257 H1


(B)1in 357 357H1
(C) 1 in 457 457 1
(D) 1 in 512 512 H 1

16 Catch
siding isintended to protect
CDHIST3T TT DRAI
(A) Block section
(B) Station limits
(C) Station section
(D) None of the above
17 Which ofthe statement with regard to ballast function is incorrect

(A) To transfer and distribute the load from TRTT aS &T H Tfuxi Y aIS
sleepers to a larger area of formation

(B) To provide non elastic bed to track

(C) To provide necessary resistance to track d R T RRAT Y Eh 5


for longitudinal and lateral stability
(D) To provide effective drainage to track

18 As per IRPWM 2020, The minimum formation width to be ensured for new
works/alteration to existing works in embankment and in cutting (excluding side
drains) for double line straight track is - - -

(A) 13160 mm 13160 THHT


(B) 7850 mm 7850 fHHT
(C) 13610 mm 13610 fHHT
(D)16310mm 16310 THHT
19 How much cant is provided in points and crossings sleepers?
(A) 1 in 20
20 T1
(B) |Zero v
(C)1 in30 30 12
(D) |1 in 25
25 T 1
20 In PSC Sleeper track 600 mm Sleeper Spacing centre to centre will have sleeper
density of

(A) |1500 sleepers per km 1500 TTYR UTT T, HÍ.


(B) 1540 Sleepers per km 1540 YR UId .HI.
(C) 1600 Sleepers per km 1600 kTR UTA TT,H
(D)1660 Sleepers per km |1660kTYR UTT f. Hd.
21 The check rail helps in reducing lateral rail wear on sharp curves by laying along the
which Rail.

(A) Inner rail


(B) Outer rail
(C) Middle rail
(D) INone of the above
2 2 The service life of 60 KG 90 UTS Rail on routes without Rail Grinding interms of
total GMT of traffic carried for considering through rail renewal on the bridge proper
and in approaches (up to 100 m on either side) for all the important bridges

a7T grinding al UR 60 outt 90 qTÍqH TT hi HaI Ga-1, HTduuj gI GI

(A) 800 GMT 800 ttur


(B) 550 GMT 550ttuH
L(C) 525 GMT 525 TuH
(D) (D)400GMT 400 GUHTI
23 What is the ballast requirement for LWR straight track for BG track having concrete
sleeperwith 300 mm ballast cushion?

(A) 2.000 cum per Meter 2.000 cum per Meter


(B) 2.135 cum per Meter 2.135 cum per Meter
(C) 2.304 cum per Meter 2.304 cum per Meter
(D) 2.704 cum per Meter
2.704 Cum per Meter
24 In LWR track on Broad Gauge-

(A) Level crossing should be separated by


providing SEJs,
(B) Level crossing should be laid with rail
free fastenings.
(C) Level crossing should not fall within the
breathing length of LWR.
(D) Level crossing cannot be provided in
LWR
25 As per IRPWM 2020, At which location, Junction fish plates are permitted in PSC
turnout?
3HT5 3TRUT5qUH 2020 c5 HR, GHUHHI ZAZTTTH GNTA fHRT-TTE GST G74TA DET

(A) Both SRJ and heel of crossing


(B) Beyond at least 1 rail length on all sides 5E i 7 47 5
of turnout
(C) SRJ only
(D) Heel of crossing only
26 case of in situ execution of AT Welding train can be allowed only after
|In ***'

.Elapsedafter pouring of portion in mould

l G

(A) 70 minutes 70 fTE


(B) |5 minutes 5 fHT
(C) 20 minutes 20 tT-
30 fHT
L(D) 30 minutes
27 The wearin nose of CMS crossing is measured at
(A) |At ANC UU-TH
(B) 50 mm behind ANC UTET C5 UT5 50HT
(C)100 mm behind ANC VTHT U5 100 fHHT
(D) 150mm behind ANC UTHT 150 fHHT YTES

28 USFD Testing frequency of rails on routes with GMT 8 to 12 is... monthS.


GTUHET 8 H 12 CT T r T USFD G cOT 3TCIT . HEIT
(A) 3 months 3 HElH
(B) 6 months 6 HETH
L(C) 9 months 9H
(D)12months 12 HEIH
29
Frequency of B G track recording on sections where speeds are between 110kmph
&130 kmph is oncein

(A) 2 months 2 TTH


(B)3 months 3 45H
(C) |4 months 4 4EH
(D) 6 months 6 H5TH

30 Two Bridges have been constructed on 2.1 Km long permanent diversion. They can
be opened for passenger traffic

(A) By Sr.DEN of the section.


(B) By sanction of CRS
(C By Inspection and sanction of CRS
(D) By Inspection and sanction of PCE

6/22
31 It becomes necessary to carry out Through rail renewal, when lateral wear exceeds
mmfor B G Group A &Broutes for straight track.

(A)6 mm 6 fHT
(B) 8 mm 8 fe
(C) 9 mm 9 fHei
(D) 10 mm 10 fHt

32 What is speed restriction in KMPH on deep screening site done by BCM and
tamped by machine followed with DGS?

(A) 20 20
(B) 30 30
(C)40p_ 40
(D) 10 10
33 The gross clearance for C class ODC is...
'''"''"
(A) Less than 152.4 mm but not less than | 152.4 Hi H CITO 101.6 fHHT HD4
31
101.6 mm 6
(B 200 mm and below 200 1HT &R HE
(C) 228.6 mm and above 228.6 fHH AR HH A
(D) 400 mm and below 400 HHT R TE

34 Work for which complete Block Protection is notrequired


(A) Working of Dip Lorries, TSUCITRT c4,
(B) De-Stressing of LWR, CTSCTR 3I-RTHT,
(C) Working of Push Trolley in Tunnel,
(D) Through Packing
35 When more than one track machine is running in a block section, there should be a
minimum distance of meters between two units.

(A) 1100 |100


B200 200
(C)150 150
D) 250 250
36 Speed of Material Trains between block stations with the engine leading should not
exceed

(A) Goods train with a similar load


(B) Passenger Train
(C) 30 kmph 30 fahti utd ycT
(D) 60 kmph 60 TchT td TET
37 In case ofstop dead restrictions in BG track, the distances of Caution indicators &
Stop indicator respectively from the site of work are

(A) 600 m & 30m 600 HCR UA 30 TTCR


(B) 1200 m & 30 m
1200 HicR YI 30 Hte
(C) 1200 m & 15 m
1200 HIcR TT 15 CR
(D) 600 m & 15 m
600 HICR Ya 15 HIC
38 |Longer mark on the rail table between
point of mount and point of drop indicates

(A) Sudden derailment


|31H qyYA (HSA 3IRCTHT)
(B)Gradualderailment
(C) Re Railing
(D INone of the above
39 Non participation by railway staff in accident relief
operations will be considered as

(A) Absent from duty


B)Dereliction of duty
(C) On leave
(D) None of these
40 Incontext of Bridge Inspection, NRS
HRT&U H stands for
H NRS GT 348 EI
(A) National rating system
(B)Numerical rating system
(C Numerical rating standard
(D None of the above

9/2
bed block needs
41 URN of a major bridge 20364244 means

(A) ImmediaterepairsS
(B) Special repairs
(C) Planned repairs
36 (D) Routinemaintenance

42 Periodical inspection of Welded girders is done

(A) Once in a year


(B) Once in 3 years 3 HTTY SR
(C) Oncein 2 years 2 HICT UGo GR
(D)Once in 5 years 5 HI eD ak

43 Average thickness of Metallising shall not be less than...

(A) 115 micronS 115 HISD


(B)110microns 110 HISDIH
(C)150 microns |150 HI5D
(D) None of the above

44 Elcometer is used for measuring the

(A) Crosslevel
(B)Gauge
(C) Thickness of paint
(D) None of the above

45 Inepoxy grouting about........ Deep


V groove is made all along thecracks.

25 THHT
(A)25 mm 15 fHT
(B) 15 mm
(C) 1 0 mm | 10 HH.
8 HHT
(D)8 mm
bars should be taken to a depth not less than
46) In jacketting dowel
inside the masonry.

150 THH
150 mm
(A) 300 H.H
B) 300 mm 200 fHHT.
(C) 200 mm 250 THHT
(D) 250 mm
before monsoon
Tunnel should be inspected annually by
- - - - - -

47

(A) Divisional Engineer


(B) SSE/Bridge
(C) SSE/P Way or SSEWorks
(D)VAssistant Divisional Engineer
48 Investigations carried out with the objective of determining the nature and strength

characteristics of the material comprising the slope of Formation is called:

x (A) Technical Investigation


(B)Topological Investigation
(C) Geotechnical Investigation
(D) |lopographic Investigation

49 What is the frequency ofinspection of Buildings by SSE(Works)?


(A) Once a year
(B) Once in 6
months 6 HER HYCS GIR
(C) Once in 2 years 2 qYHVa GIR
(D) Buildings are to be inspected on need CT I TRT&Uj oeT TCRYCDAI TYTR
basisonly
50 What is the minimum height of Plinth as per IRWM?
(A) 450 mm 450 THHT
(B) 600 mmn 600HH
(C) 500 mm 500 HHT.
(D) 300mm 300 1HH
51 Frequency of periodical inspection of Structures such as
workshops, running sheds
platform covers, and foot over bridges by Assistant Divisional Engineer

(A)
Every year.
(B Every 3 years 3 HIC
(C)One fifth every year on programmed
basis
(D) As and when reguire
52 As per IRWM, the average rate of water
consumption per head per day for design
of water supply system
is

(A)200 Litre/Person/Day 200 TCTCR/TGT/ A


(B) 135 Litre/Person/Day
|135 tCezutei/
(C) 165 Litre/Person/Day 165 fCTCR/yti/ ta
(D) 150 Litre/Person/Day 150 TCR/OTGT/ TGA
53 A minimum retention of how many days is required for anaerobic digestion
(A) 5 days 5 TT
(B) 10 days
|10 ta
C(C) 20 days 20 TH
(D) 30 days 301
54) Asper IRWM, septic tanks should be cleaned at an intervalnot exceeding
X

(A) 6 months 6 TETH


(B)12months |12 HETH
C) 3 months 3 TETT
D 3 years. 3q
55 he period of Long term leasing of Railway land isS..

(A)35years 35 HICT
(B) 20 years 20HI
(C) 50years 50 HIT
(D) 15 years 15 HIT
56 Within station limit.... . . is responsible for encroachments.
(A)SSEWorks
(B) SSEWorks & SSE/P Way jointly

C) SM & RPF Inspector jointly

(D) SSEWorks and SM jointly


5757 Maximum height of High Level Platform

(A) 760 mmm 760 fHH


840 HHT
(B)840 mm
(C) 955 mm 955 fHHT
(D)|1000mm 1000 THHT
58 River and floods register contains record of damages due to floods and action
taken thereof. For each bridge sufficient number of pages allotted so as to cover
records of years.

A 5 to 10 years 5 H 10 HTT
B) |10to 15 years 10 15 HIT
(C) 15 to 20 years 15 2 0 HIG
(D)5 year 5 a
59 All Railway affecting works will be jointly inspected by ADEN and Civil authority
of every year.

(A) Before the monsoon


(B) During the monsoon
(C) After the monsoon
L(D) None of the above
For station requiring special design, Scale of plan of the
station yard should be
(A) ,1:100
, 1:1000
,1:100
1:1000
(C)1:500 1:500
(D) ,1:5000
1:5000
61 Works of construction or repairs, the cost of which is met, not out of railway funds
but out of funds from non-railway sources, comes
under

(A) Revenue Works


(B)Deposit Works
(C)SpecialWorks
(D)Repairworks
2 Itis proposed to purchase an item of a specific
brand only. For this
(A) Specification should be prepared in such
a way that only product of that make TCGTH (UTHTOch RI-) H TRE H TUTR
meets the specification_
(B) A PAC should be submitted along with
the requisition
(C) A Sample should be submitted along
with the requisition
(D) None of the above

12/22
63 Section 146 of railway act deals with
T 3TTTH UTRT 146 H HaTea .
(A) Maliciously wrecking or attempting to
wreck a train
(B) Defacing public notices
(C) Trespass and refusal to desist from
trespass
(D) Obstructing Railway Servant in his duty. Hdo dh chdO STT 347 cAIL
64 No Technical and Financial credentials are required for tenders having value up to
RS.

(A) 10 lakh |10CRE


(B) 20 lakh 20 cG
(C) 50 lakh 50 RE
(D) 1crore 1 cRIS5
For checking of all alignment, grades, levels and dimensions by railway officials

(A) The Contractor shall provide all facilities


| like labour and instrumentsS
(B) Railway official shall bring men and
eguipments required for checking
(C) The Contractor shall provide labour but
instruments shall be arranged by Railway. 34c5RUÍ GÍ C4PI I GUTT

(D) None of the abOve

As per RTMM-2019, duration of time prescribed for first POH of CSM/DUO


HT74TRETUHUH -2019 HTR, HQHU/34|HICc c5 U5T GTetga 5 tTy ATTR
(A) -60 days 60 T
(B)75days 75
(C) 90 day 90 TG
(D) 105 days 105 1
67 Squeezing pressure specified for tamping machines for
plain PSC sleepers as per
IRTMM-2019
&H77TRETrHrH -2019 5 HR HIG DhTT FTitYRd UFRUA HEllGT URIR
(A) 90-100 kg/sq.cmm 90-100 fcoT/ qi THT
(B) 100-110 kg/sq.cm |100-110 foAT/ qi EHT
(C) 110-120 kg/sq.cm 110-120 fchT/ Gj HHT
(D) 125-135 kg/sq.cm |125-135 tDAT/ HT

13/22
68 The desirable gap between top edge of tamping tool blade and bottom edge of
sleeper for flat bottom sleeper as per IRTMM-2019 is

(A) 10-12 mm 10-12 fH


(B) 12-15 mm 12-15 HH
C ) 15-20 mm 15-20 fH
(D) 22-25 mm 22-25 fHH
69 In design mode working while doing survey for profile correction Bench marks are to
be provided at interval of
.. GGRIG

(A) 50-100 m 50-100 T


(B) 150 m
150
(C) 500 m 500 HT
(D)200m 200 H
70 Track Machine progress on TMS is fed by
(A) | Sectional SSE/Pway RT ITET GII
s B) PWI/Control
(C) SSE/JE-TMC
HYES/US/ETUHHT
(D)Assistant Divisional Engineer

71
|Who is the Chairperson of" Rail Rajbhasha Consultative Committee"
A) u4, CIS
Chairman, Railway Board
(B)Te TYA Finance Commissioner
(C) Member Staff
(D) Minister of Railway
72 TT-YH TRT 3(3) &74ITA fGHARI oYi ?
|Whois responsible for ensuring compliance of Rule
3(3) of "Adhniyam".
(A) Chief Office Superintendent
(B) Chief Typist
(C) HCTYA 3TGR
(D) H XTRTY TGU Concerned Dealer
ATGR cH GIT|The officer signing the
document in this
regard.

14/22
(73
Who is the Chairperson of Parliamentary Rajbhashasamiti.
(A) Tq TdT H, Union Finance Minister
(B) Union Agriculture Minister
(C) Union Rail Minister
(D TE HET Union Home Minister
74
For use f Rajbhasha Hindi, Indian union has been Grouped in how many groups
(A) 2
(B) 3 3
(C) 4 4
(D) 5 5
75 TR FU i ZTGT4TYT GHT ?
Which is the Rajbhasha of Indian Union.
(A) THT GTU H E I Hindi in Brahmi Lipi
Hindi in Sindhi Lipi
Hindi in Devnagari Lipi
Hindi in Nagari Lipi
76
How many languages are there in Eight Schedule of Constitution.
(A) 19, 19
(B) 20, 20
(C) 21, 21
(D) 22

TRIGHI9I COl-gy HHTG COT GOc co-cpG IGI ?


The frequency ofmeeting of" Nagar Rajbhasha Karyanvan Samiti" is:
(A) Once in a Month
Once in Two Months
Once in Three Months
(D) HTE HY5 R jOnce in Six Months

78 RTGHTTTFYH 1976 TcoH IG UR TTI 615Il ?


On which state, "Rajbhsha Niyam 1976" is not applicable
(A) 3TE YGT
Andhra Pradesh
(B) THGTIIS Tamilnadu
(C) H-cOIHTR Jammu -Kashmir
(D) Kerala

15/22
79
As per Rajbhasha Niyam,Andaman-NikobarIslands are located in which Kshetra
A) GAH Ka Kshetra
(B) H Kha Kshetra
(C) T GA Ga Kshetra
(D) A Gh Kshetra
80
Onwhich date, "Hindi Diwas" is celebrated every year
(A) 02, 2nd October
(B) 22,H 22nd May
(C) 14, HGLO
(D) 30, THGRT
14thSeptember
30th January
81 Doubling work is chargeable in which Plan Head-

(A) 15
(B)
(C) 14
114
(D) None of above

82 What is the rate as percentage of estimated cost of work for "Departmental


charges" of portion executed by Railway for deposit works

(A) 10.50% 10.50%


(B) 6.25% 6.25%
(C) 4% 4%
D ) 12.50% 12.50%
83 |Which of the following is not a Major Penalty:
(A) Reduction to the lower stage in the time
Scale of pay for a specified period, with R &Id, THH TE HTRI ET
further directions as to whether on expiry H aTe
of such period, the reduction will or will
not have the effect of postponing the
future increments of his pay.
(B) Suspension.
(C) Compulsory Retirement
(D) |Removal from service
HOTH6CTHT

16/22
84 RAILWAY SERVICES(CONDUCT)RULES, 1966 Rule 31)stipulates that
T HT (TRU)FUH 1966 1 UH 3(1)(i)THdRrADRal
(A) Every railway servant shall at all times do | c h chHRI E7 HHq THT CDTS O4
nothing which is unbecoming of a railway i aVI GT Baki d f FTYAT
servant
(B) Every railway servant shall at all times
maintain absolute integrity;_
(C) Every railway servant shall at all times
maintain devotion to duty;
(D) None of the above
85 How many and at what periodicity, financial upgradation is to be given to Railway
employee as per Modified Assured Career Progression Scheme:

(A) Two Upgradations, After 12 &24 years , 12 T 24 FHIM T HTd fAarA HT


of continuous regular servicee
(B)Three Upgradations, After completion of , 1 0 , 20 T 30 HIT H 44
10,20 & 30 years of continuous regular
service
(C) One Upgradation, After 15 years of
Continuous regular service
(D) None of the abovve

86 What is the full form of allocation "RRSK"


(A) Rashtriya Rail Saksham Kosh
(B) Rashtriyta Rail Suraksha Kosh
(C) Rashtriyta Rail Sanraksha Kosh RTT HRGT COT
(D) Rail Reserved Safety Kosh

87 What is the Demand No. for Maintenance of Staff Quarters work under revenue?
(A) 6 6

(B) 11
(C) 4 4
(D) 9 9

88
88 What is the Primary Unit for "Cost of Materials-Direct Purchase" in Revenue
Expenditure
(A) 24 24
(B)27 27
28
(D) 32 32

17/22
"
Maintenance of P-Way" in demand no. 4 of Revenue
89 What is the Minor Head for
Expenditure

(A) 200 200


(B) 300 300
(C) 500 500
L(D) None of the above

90 Who, amongst the following. is not to be treated as family member as per Pass
rules

(A) Working spouse of Railway Employeee


(B) Earning Son of Railway employee aged DHETRT T
22 years
22 qytu ya, UI CHHTT ETI
(C) Earning unmarried daughter of Railway
employee aged 25 years. HRT i 25 quju aaied yai
(D) Widowed daughter dependent on DHIdi .
Railway employee
91 Which of the following is not correct in reference
to leave to Railway employee
(A) Regular Railway employee is entitled for RTS C
30 days LAP in one calendar year chHTRT O1 Uc5 calendar qy 30

(B) Regular Railway Employee is entitled for


20 days of LHAP in one calendar year RTS COTRÍ COT UD calendar qY 20

(C) Claim of leave can be done as matter qf I COT GIOI TGDT GTYGOTR G U
right H TGOT
(D) LHAP can be sanctioned as commuted
|leave based on medical certificate.

92 What is the full form of DRF

(A) Depreciation Revenue fund


(B) Depreciation Reserve fund
(C) Development Revenue
fund
(D) Development Rail fund
TacoTRCÍ 55
93 Surplus/Dead Surplus Stores are stores items which are not issued from last
A) 9 months
B) | 12 months 9 HEH
(C) |18 months |12 H6I4
(D 24 months 18 HEI
24 HET

18/22
94 The frequency of stock verification for imprest stores is
(A) Once a year
7
(B) Voncein two years
(C) Oncein 3 years 3 HTC T IR
(D) Anytime
95 Material obtained not for specific works but as a standing Advance for the purpose
of meeting urgent requirements as and when they arise should (with the exception
of consumable stores) be

(A) Emergency Store 31TTDTT 43R


(B) Surplus store 3fteRTy 43R
C) Imprest store
(D) Material at site

96 Which estimate is mainly for the purpose of examining the justification of any work
proposal with cost implications and obtaining the Administrative approval of the
Competent authority.

A) Supplementary Estimate
(B) Part Estimate |YT (UIC) TH
(C) Revised Estimate HRTTeT 3THA (RGI55)
(D) Abstract Estimate HR&HTA (YCE)
97 In works contract, Quantities operated in excess of 125% but upto 140% of the
agreement quantity of the concerned item, shall be paid at
3HCTeHTAT G5 140% T . . . YTAA TDT GTQTT
(A) 99% of the rate awarded FicodR T 99%
(B) 98% of the rate awarded *ico GR OT 98%
(C) 96% of the rate awarded tdipdR CDI 96%
(D) 95% of the rate awarded
ETepci ax 5 95%
98 Under how many classes HOER has been classified?
HOER fcod criHT Hqrfod
(A) 4 Classes 4 cCITH
(B) 5 classes 5 RTTH
(C) 3 classes 3 cciTH
(D) 2 classes 2H
99 Which of the following is not 'Standards of Financial propriety
(A) The expenditure should not prima facie eDCA: GHH 3fec 18 H TE
be more than the occasion demands
8) The amount of allowances granted to
meet expenditure of particular type shall 5 I HY EY HTR T5UT UII ,
be source of profit to the recipients.
(C) No authority shall exercise its powers of b UTfêDTRI
T o HuI TA 1 3FTAT
sanctioning expenditure to pass an order Ioi coi qH TRI TA TCIr TYTT
which will be directly or indirectly to its
Own advantage.
(D) Every government servant should
exercise the same vigilance in
respect of GTA AIT T HTY TEÍ HTaTAT
expenditure incurred from public moneys
aT TEr TT TYTRUT Gl DI Y5 ATGT
as a person of ordinary prudence would A T YAH TGTI I
exercise in respect of the expenditure of
his own money.

100 Who is
competent to Sign a contract agreement in respect of tenders accepted by
the competent authority

(A) One stage below the tender accepting


authority as per extant delegation of
powers of open tenders
(B) One stage below the tender accepting
authority as per extant delegation of
Dowers of limited tenders
(C) One stage above the tender accepting
authority as per extant delegation of
powers of open tenders 354R 5 3T2cRT
(D) |None of the above
101 IRPSM stands for
(A) Indian Railway Project System
Management
S (B)|Indian Railway Projects sanction and
management
(C) Indian Railways Personal Self
management
(D)Noneofthe above
102 Paternity leave is entitled upto- Children

(A)
(B) 2
(C) 3 13
(D)4 4

103 Period of Appeal under DAR Rules is -- days.

(A) 15 days |15T


(B) 30days 30 T
C) 45 days 45 f
(D) 60 days 60 IG

104 When was NPS introduced.

(A) From 01.01.2004 01.01.2004


(B) From 01.01.2006 01.01.2006
(C) From 01.01.2009 01.01.2009
(D)From 01.01.2014 01.01.2014
105 At what periodicity, the PREM meetings are conducted at Board's, Zonal &
Divisional level.

(A) Once in a Quarter


(B Once in a month
(C) once in a year
(D) Once in Six months
106 Operating Ratio in the number of Rupees spent to earn every----

(A) 1000 Rupees 1000 q y


6
00 Rupees
(B) 100 y
(C) 500 Rupees 500
(D) 50 Rupees 50 y

107 What is the medical category for Gateman

(A) A-1 T-1


(B A-2 -2
(C)A-3 -3
(D) B-1 31-1

21/22
108 From the date of opening of tender, The Tenderer(s) shall keep the offer open for a
minimum period of
. . . . . . .

(A) 30 days 30f


(B)45 Days 45
(C) 90 days 90 ta
(D) 120 Days
120f
109 Which of the following works cannot be started on "Urgency Certificate"
(A) Works considered urgently necessary to TH OT G GIA RAT CIr TDIT
safeguard life 3TOYc5 H^II GTI
(B) Works to repair damage to the line
caused by flood to restore
through
Communication
(C) Works to repair
damage to the line
caused by unforeseen
contingency to
maintain through communication
iccoIC 3TGYY¢S HHT TG, TGHF HTT
(D)Works for repair to leaky roofs of staff
quarters

110 SF-11 is related to


THQU5-11 TCoHH HSTYT
(A) Medical category
(B) Travelling Allowance HISGOCT cOERT
(C) Major Penalty
(D) Minor Penalty

You might also like