Republic of the Philippines
DEPARTMENT OF TRANSPORTATION
Notice of Contract Award.
This is to inform the results of the valuation of bids that was submitted last 15 July 2021 for
the South Commuter Railway Project - Package CP $-06: Procurement of Building and
Civil Engineering Works for approximately 10.28 km of Railway Viaduct Structure
including elevated Stations at Cabuyao, Banlic and Calamba under PB No. PB20-031-6 and
to notify that the contract was awarded last 16 September 2022 in accordance with ITB 41.1.
‘The summary of the evaluation are as follows:
1. List of Bidders
Bid Price as Read
& Construction Co.,
Ltd. and Dong-Ah
Republic of
Korea
USD 126,128,367.00
Name of Bidder Country Out at Opening Evaluated Bid Price
Joint Venture of PHP 33,244,495,043.22 | PHP 33,244,475,915.83
PT Adhi Karya USD 8,855,273.26 USD 8,855,273.26
Perserc) Thkacapr | Indonesia | : =
(Persero) (PHP Equivalent) (PHP Equivalent)
PP (Persero) Tbk PHP 33,672,647,505.34 | PHP 33,672,628,377.95
Republic of
ona Korea | PHP 20,500,695,202.40 | PHP 20,500,695,202.40
pce | ee USD 166,657,951.26 | USD 166,657,951.26
EEI Corporation | Republic of +
the (PHP Equivalent) | (PHP Equivalent)
Philippines | PHP 28,558,607/145.82 | PHP 28,558,607,145.82
Joint Venture of ]
Hyundai Engineering PHP 19,733,539,175.00 | PHP 19,733,539,175.73
USD 126,128,367.00
Notice of Contract Award for CP $-06
Geological ee |
Engineering Company (PHP Equivalent) (PHP Equivalent)
Lid. PHP 25,831,845,719.45. | PHP 25,831,845,720.18
PHP 24,571,325,757.98 | PHP 24,571,325,757.99
GS Engineering & — | Republic of | _USD 139,459,98 USD 139,459,983.29 |
Construction Corp. Korea (PHP Equivalent) (PHP Equivalent)
PHP 31,314,215,950.05 | PHP 31,314,215,950.06
Fe eee Japan, | PHP 28,809,544,865.31 | PHP 28,811,491,436.98
jumitomo Mitsui _| Philippines,
oe USD 1,900,000.00 USD 1,900,000.00
Clara International | Thailand | JPY 7.968,673,720.00 | JPY 7,968,673,720.00
|
4
Page bof 3Corp, and Italian Thai
(PHP Equivalent) (PHP Equivalent)
Development PHP 32,384,004,364.17 | PHP 32,385,950,935.84
PHP 33,396,581,478.02 | PHP 33,397,145,195.00
Joint Venture of | | Hong Kong | USD 27,107,264.00 USD 27,099,716.13,
ce a a and EUR 15,788,006.00 EUR 15,800,919.22
sia) Limited and aa
First Balfour, Inc Philippines |" (PHP Equivalent) (PHP Equivalent)
PHP 35,622,932,460.50 | PHP 35,623,880,213.26
ae PHP 29,200,964,393.40 | PHP 29,200,964,393.40
eee . Republic of | USD 56,574,717.82 USD 56,574,717.82
Construction Group | Korea (PHP Equivalent) (PHP Equivalent)
PHP 31,936,352,000.00 | PHP 31,936,352,000.00
2. Reasons why other Bids were Unsuccessful
Package
Reasons why Bid was
Na Name of Bidder ae Reference
Joint Venture of —_| The Bidder did not extend its, ADB
PT AdhiKarya _| bid validity in accordance Procurement
(Persero) Tbk and PT PP | with ADB Procurement Guidelines Sec.
(Persero) Tbk Guidelines Sec. 2.57. 2.57 and ITB 18.2.
Joint Venture of me Ba aaah baad
DLE&C Co., Ltd. and lowest cost combination of the ITB 35.4
EEL Corporation | technical responsive Bids as
Lee per EQC 14.
The Bid is not among the
GS Engineering & | lowest cost combination of the a
Construction Corp. _ | technical responsive Bids as .
ae per EQC 14.
Joint Venture of
Sumitomo Mitsui _| The Bid is not among the
Construction Co,,Sta. | lowest cost combination of the ed
Clara International _ | technical responsive Bids as :
Corp. and Italian Thai. | per EQC 1.4.
Development
‘The bidder did not disclose
Joint Venture of —_| details of their pending 5
Leighton Contractors | litigations and arbitrations peas poe
(Asia) Limited and First | which was required as per ITB on
Balfour, Inc. 17:1, EQC 2.2.3 and Form 4
CON-1,
Notice of Contract Award for CP $-06
Page 2 of 3
4Samsung C&T
Engineering &
Construction Group
The Bidder did not extend its ADB
bid validity in accordance Procurement
with ADB Procurement Guidelines Sec.
Guidelines Sec. 2.57. 2.57 and ITB 18.2.
3. The Successful Bidder
Name of Bidder Joint Venture of Hyundai Engineering &
Construction Co,, Ltd., and Dong-Ah Geological
Engineering Company Ltd.
Address Unit 803, Lot 14 Block 2 Mckinley Business Park,
Bonifacio Global City, Taguig City
Contract Price
PHP 19,733,539,175.73, USD 126,128,367.00,
inclusive of provisional sums and Value-Added
Tax (VAT)
Duration of Contract
1,552 Calendar Days,
Scope of Contract Awarded
Building and Civil Engineering Works for
approximately 10.28 km of Railway Viaduct,
Structure including elevated Stations at Cabuyao,
Banlic and Calamba
USEC. KIM ROBERT C. DE LEON
Department of Transportation
Head of the Procuring Entity
Notice of Contract Award for CP S-06
Page 3 of 3