XXXX Dua Sdn Bhd was given the license to generate electrical power by hydro
system and to export the power to TNB via the Interconnection Point at 33kV TNB
Pencawang Masuk Utama (PMU) XXX located at XXXXX
UiTM Solar Power Dua Sdn Bhd generates 25,000 kWac at 1500 V DC. The DC
power is then converted into 800 V AC through String Inverters. The low voltage AC
is then stepped up using a step-up transformer to 33kV and transmitted through an
underground 33kV XLPE cable where the point of common coupling is at TNB PPU
Seri Alam. Please refer to attachment for overall Single Line Diagram (SLD).
Below are the details of the protection relays that are used for the 33 kV system:-
Make: ABB
Model: RED 615
CT Ratio: 600/300/1A (Class X)
Full load current of 25 MWac, Ifull load = (25,000kW) / (√3 x 33kV x p.f.)
= (25,000kW) / (√3 x 33kV x 1.0)
= 437.39 A
5.0 RELAY SETTINGS
The current setting (PMS) and time setting (TMS) of the OCEF relay is based on
grading with the existing relay settings at the TNB incomer at 33kV PPU Seri Alam.
This is to achieve discrimination between all the OCEF relays when a fault occurs in
any part of the system.
No Item Details
1 CT Ratio 600/300/5A
2 Class 5P20
3 Max Power 25 MWac
4 Voltage 33 kV
5 Power Factor 1
6 OC setting (IDMT) PS 73% (437A), TMS 0.09
7 EF setting (IDMT) PS 15% (88A), TMS 0.08
Total Reverse Power calculated from the PV solar plant is 350 kW.
Ratio of the CT connected to the Reverse Power Relay (SEL 751A) is 600/300/5A,
Ratio of the VT connected to the Reverse Power Relay (SEL 751A) is 33/0.11kV,
No Item Details
1 CT Ratio 600/300/5A
2 Class 5P20
3 PT Ratio 33kV/110V
4 Losses 350 kW
5 Power Factor 1
6 Primary Current 6.123 A
7 Secondary Current 0.051 A
8 Secondary Pickup Power 9.72 VA
9 Time Delay 5 sec
Current Differential Relay Type ABB RED 615
The setting of low operating value should not be unnecessary low and in order to
ensure protection stability against transient in the event of external faults.
The stabilisation slope is decisive for the stability of the protection during external
faults, i.e in the presence of high through-fault currents. The slope defines the ratio of
the differential current to restraint current. The setting should be like this, when
operating under load condition, weak faults causing only a low differential current still
can be detected, but at the same time there is no risk of false tripping during through
- faults. A typical slope is 0.5ln under fault current and 1.5ln under heavy fault current
is suitable in this protection application.
6.0 CONCLUSION
This report presents the protection coordination study and proposed relay settings for
UiTM Solar Power Dua plant interconnection to TNB 33kV PPU Seri Alam.
7.0 ATTACHMENT
3311.V
INTERLOCKING SCHEME 'i' .\?.it, APPROVED - - -
r -2
lll<V PPU Seri Alam TENAGA
NASIONAL 8ElfHAD - . ,,,.,.,.........."'"""
'L
APPROVED1MTHCOMMENTS
'······ ········:Jl
AC
1 2 50A 25kA 3sec
VCB A TRI PPED - VCB B TRIPPED e v iewe d /Ver i f ie d .,,.,.,,..._.,""""'°"""''""'"• = ••
"'CIS P'.Iz n g m e or : "' D •e • RETURNED FOR CORRECTION I
<hconr!ectorswitch
R . I MPORT ANT
<C
....I
I-
VCB B CLOSED - VCB A CANNOT CLOSED
I ·-- ,,.,,.,.,..,°"
-
<C Ve mca1ion ,_. comformanc• 10 scM me end f\H"lctki c,iiilit y. Thi "" rtnca1ion
fo-,a Resubmit fOJ Approvlll 1 Ix
>-
c . m . . , . ,. ., ,,.,._.., I
RE J E C T E D
C l::
w P'.I ' S12lNSOCAL( VCB A OPEN - VCB B CANNOT CLOSED nc r o l lo .. fflo c:<1n tr1a or from >-"!eo"'<)ll• n l o conl r• clc1 i obh1jaUon & 1u nn!Qol
z g 600/300/lA BU2S58kAA,R/Js
RCO-e1,
!CURRENT DIFF. ... c l ffc11tk1n ACCEPTED F ORI NF ORI A TION
V)
□ CLX EARTH SVITCH B CLOSED- VCB A CANNOT CLOS- LI>• l)l)Uhan sl<im dan l""9si iAi tidal< '"" lepaska n konlrol:IV d, noa.i. P•••• Ma,i • """'.."""""""''""
:::) I- m (Rl'IO) 1ndat kontrak. I spes!ti k1;s ACCEPTED WITH COMMENTS
t H. n ik at
a.. <C
a.. '-' C
VCB A CLOSED - EARTH SVITCH B CANNOT CLOSHI f" alapp,ovolof UMldl lailed1c1>em, diav<• m• w.+be o.,t,j,,c"•'' !o ••.1•:c•1ttul _ .. ....,...,.,,...pon!lon1 , """"•"ic
I
C/EF
w CTS (RINC) t, L -
oruaetorof
- - - - - - - - - - - - - - - - - - - -; t- -i,te commi11ktn
nii l1 t al 1ilfl
w oondllr,y pri,nar, equi;HT""" '' nn6y
No•l: A pp,ov.11 0, commenst dou
.,,.,-
not iwlev• theC
t1onscov, r.-d Ul'!Mf comad R!VISIOH DESCRIPTION DATE
APPROVED
• App rtw JI ii
a..
>- □ •Subjei;ted to 8WA.'• ,fc
,00/YJO/>A
TARIFF TARIFF
LEGEND • lhert •haft ' te s t i n,pUc 1t lon .ttf\l li h • \'t i Eng in e-re: Tan Pi Hu Khemrnarat H. PROJECT TTTll!
Cl:: CL 0 .2, t5VA
PV Engin,/er E l ec t r i c a l
<C oil CIS I"") MffiR MAIN umR CHECK Db, t pl oe, 1 Dec 20j 19 12- Dec- 2019
Sa llf ungan
V'b.!. I POWER
DUA
. . . . .. .
Cl:: ws
w MAIN Teknik ,I B1p Tu j u 1 n :
a.. CABLE ENO TERMINATKJN SWITCHGEARI © AMMETER SELECTOR SWITCH
UiTM SOLAR POWER DUA SON. BHD.
□ Babat Boleh
Tenaga
( .
w
500/IA
CL 0.2, '""<D I I
STATION
{ VACUUM CIRCUIT BREAKER / GIS UiTM Solar Power Duo Sdn Bhd.
> ..
.........
[AR SWITCH
...I
..
....I I DIGITAL POWER METER
b.......................
I
>
P'.I P'.I
CL.
0.5(20VA) .,._.,, I PHASE INDICATION LIGHT
, ss\ON
OY'tflEREIG NEER:
FuRRENT
-
600 /1A vrs
I © VOLTAGE SELECTOR SWITCH
POVRYI
Cl:: OIFF .
w
a..
I
@ X
CIS 11:BOA /4 (:v)_"' ?
>
D
....I
w
□
zC l llV, 125M. 25M, J,,ec --1 JEW 1250A
J5kV 1 251,A/Js
251,1
MINIATURE CIRCUIT BREAKER (in VCB Unit)
I- - '<' POYRY ENERGY SONBHO(551240-M)
w
1- I G1S
li-11
di9connedor switch ' C I -E3- FUSE 14--06, lML 14, MEN.IRA HIP S£HG 2, l'WA HIP SENC
w ::
+-"'.i-JEW 12501,251,1 .. - JE W NO. 1, JIU>I P.RAll£E, 502!0 K\IOIA UAf'LR
A a.. 1 Ir.
□
• QS
--,.;Id,
1250A
V)
J6kY 1250"- 25f<A/Js
9NCL£ 8US8AA r-;,XCIS
--{3-- LIGHTNING ARRESTER EU!CTNCAI. CONSU.TNff:
•
V) oil JkY 1250A 25kA/ J s
-
....I a.. SINGL£ BVSBAR
I
600/IA
Cl5P20 IOVA 7SR1102
600/1A (
Cl.5P20 lOYA 7SR\102 { LOAD SIJITCH
V)
C @- TRANSFORMER
w
k: a..600/IA
o2 \OVA I 11
l,htosurementl 600/1
CL0.2 I
ent ),_ DISC □NNECT□R
TRANSAFE CONSULT SON. BHD.
(MECHANICAL AND ELECTIRCAL CONSULTANTS)
z
:3
SIJITCH
--
□ PHASE IMOICATION UGHT :)'° E INOtCATION LIGHT No 9A, Jolan Snuker I3/'lB ,
Sekiyen 13, 40100 Shah Alam, Selongor.
Tel: 03-55233632 Fox: 03-5524 2632
VT PRIMARY SWITCH Emoit odmin.t,cilromole-consvll.com
J X I C X 630 SO.•M J X 1C X 630 so.
"-/XLPE/AWA/PVC :mv CABLE ;J./XIJ'f./AWA/PVC JJkV CABLE Cl S CONSU..TANT:
'-'"D UNOERCROUND LAID UNDERGROUND
PERUNDING ZE
--
JURIJTEJ« P8RUNDING
CONSl'l ff:\'G ENGINEERS
t,WNCONT'IU,CTOfl:
No 23. Lo,ongSetiabucf.
Damonsaa Heights.50490Kuala Lump!.K, Moklysia.
J-,1: + 60320111002
MIH.t'ACT\JM:11:JV!NDOIII:
DRAWING
[OAA
...............
rm.,
PV Single Line Diagram
,,.._.,"°, UI TM/SPIC/TSC.PVSLD/001
A;IE\lfflON NO:
H
Reverse Power Calculation for UiTM Solar Plant
LV System
Smart Datalogger
Night Load per unit: 0W
No of SmartACU: 10 nos
Total Night Load: 0W
String Inverter
Night Load per unit: 3.3 W
No of Inverter: 140
Total Night Load: 462 W
MVAC
33 kV transformer
Cable for 33 kV Tx
Total Cable length: 10,245 m
Cable resistance per unit: 0.0469 Ω/km
Total cable resistance: 0.4804905 Ω
Current flowing through: 5.5 A
Cable power loss: 14.7 W (I^2R)