Download as pdf
Download as pdf
You are on page 1of 2
TUTORIAL, FOR STEEL- FRAMED GANTRY Student No z Course Code: Question No sModule Title: Code: . — a ———y- tem No. Description of Work Quantity | Unit | Rate s BiLt.NO,.¥* — SURSTRUCTURE EXCAVATION, poe fer @luman. bases 5 fom. exi Keun ald cca tn A. os 63/| we Rackfilling...to. acnlation 5 Bu} ..anloing. Flom excavation , §3,,| me Disposal of, excinarted rratericals i .. vemoved. fiom. 8ike. to.a dumping |. C, Blea. Pro by .conlacton, 4, | wt, / - B3/I- Steel-framed Gantry Tem ‘Description Quy Unit Rate HKS. BillNo-5 ‘STEEL AND METAL WORKS ISTRUCTURAL STEEL WORK forade *: welded and bolted {ebrication {columns A | 203 x 203 x 86ke universal columns 8666 | ke lBeams B | 406 178 x 74kg universal beams 3501 | ke C | 254x146 x 43kg universal beams si | ke D_ | 254 x 89x 35.7kp universal channels 242 | ke \Connections E | 12 thick plates 550 ke F | 16 thick plates $60 ke G ] 152% 102..23.99k angles 212 ke H | 102x 102 1891ke angles 315 ke Z| 102% 102 14.44kg anges 659 ke K | 76x 76x 10.57ke angles 280 ke L._ Holding down bots; nuts and washers; 25 ram diameter x 450 mm long 88 ar M_ Chequer plating: 10 mm thick soe | kg [Surface preparation with painting system Type A as |General Specification: on stracturlsteet before fixing N |General surfaces 377 m2 Fire protection with sprayed materia coating as |General Specification; on structural steel B |General surfaces m7 m2 BSI (Carried to Collection:

You might also like