Professional Documents
Culture Documents
89.elevator Assembly & Erection
89.elevator Assembly & Erection
TASK DESCRIPTION Hoist assembly ,erection & operation SUBCONTRACTOR Dodsal Engg. & Const. Pte Ltd.
TRA TEAM MEMBERS Mr.Suresh Simham(Sr.Engr-Struct.),Mr. Bassem kini (Opration Manager-NFT),Mr. Rajesh (Sr.HSE Page 1 of 12 DATE: 06.08.2012
Officer)
5578-E3-REP-HSE-020 Page 1 of 12
DODSAL ENGINEERING & CONSTRUCTION PTE LTD
02 Crane operation & Overloading An approved Lifting plan shall be Close supervision
Personnel & obtained before commencement 3 2 6 Assign Banks 2 1 2
Vehicular Wrong lifting tools Assets
movement and tackles of the work. man wherever
Obtain proper work permit before required.
Collapse of load
start of work. Permit should be
Improper Lifting
availed from the applicable
preparations
concerned authority e.g. SECL,
Suspended load TAKREER .
Wrong guide lines Conduct TBM before starting
Lack of work.
communication in Use only 3rd party certified, SECL
lifting Inspected & colour coded lifting
Unauthorized crane tools, equipments.
operator Deploy competent & 3rd party
Personnel hit by the certified crane operators and
load riggers.
5578-E3-REP-HSE-020 Page 2 of 12
DODSAL ENGINEERING & CONSTRUCTION PTE LTD
5578-E3-REP-HSE-020 Page 3 of 12
DODSAL ENGINEERING & CONSTRUCTION PTE LTD
4 General
4.1 Work in night Poor illumination Personnel Obtain proper Night work permit Conduct TBT and
shift and assets before commencement of work. 2 1 2 advise work front 1 1 1
Slip , Trip , Fall
Permit should be availed from the to take adequate
applicable concerned authority sleep/ rest in day
e.g. SECL, TAKREER. time.
Work permit shall be subjected to
4.2 Working at Fall of personnel, Personnel Personnel must be undergone 3 2 6 Close supervision.
height Fall of material Injury “Work At Height “ training from Maintain good 2 1 2
Ceilings / roof SECL prior to access elevated housekeeping.
Use of
Improper access Fall from place. Secure loose
Scaffolding
Inadequate scaffold/ height Proper "PPE" (Double lanyard full materials and
Use of full body
working platform Fall of body harness). tools while
harness
Poor fall protection material Use adequate work platform. Do working at height
Use of man
arrangements not use scaffold if it is red tagged. Conduct TBM and
lift/Manbasket
Horizontal / vertical Use only certified Man basket, made aware
Use of ladder travel riding personnel shall wear Full hazards of
5578-E3-REP-HSE-020 Page 5 of 12
DODSAL ENGINEERING & CONSTRUCTION PTE LTD
Working in
personnel Determine hydration level
by monitor urine.
the vicinity of hot
zone –radiation Ensure appropriate training
effect provided Provide
Lack of Organize work to reduce welfare facilities –
Water & Electrolyte exposure – e.g. work-rest e.g. first aid and
Temperature schedules, job rotation, team emergency
procedures
rotation, more workers on job
& Humidity (Temp
above 40C & Resolution No. (471/2012) mid- !
humidity above day break will start from 12:30
60%) – 15:00 HRS
Lack of Effective15th of June until 15th
training of September 2012
Type of food
Non
competent first
5578-E3-REP-HSE-020 Page 6 of 12
DODSAL ENGINEERING & CONSTRUCTION PTE LTD
05 Hoist operational
Site SAMSUNG
Vishual Checks Damage of sign label legible - SWL clearly 3 2 6 1 1 1
Supervisor
Personnel displayed
SWL not mentioned
& Assets Unique identifier
Third party Drop test must be carried out
inspection(Drop after new installation & every six
Test) not carried out month hoist must be undergone
drop test.
5578-E3-REP-HSE-020 Page 7 of 12
DODSAL ENGINEERING & CONSTRUCTION PTE LTD
5578-E3-REP-HSE-020 Page 8 of 12
DODSAL ENGINEERING & CONSTRUCTION PTE LTD
5.6 Hoist operation Unauthorized/ Personnel The operator must be trained so Close supervision
Untrained personnel & Assets that he is familiar with the 3 3 9 The stuffs must 1 1 1
operate the hoist operation of the hoist and be placed steadily
function of all parts. in the cage for
Wind speed
Never operate the hoist the sake of
Person with vertigo when wind speed at the top of the guarantee all the
Electrocution hoist exceeding 20m/s and the things not incline
Abnormal sound foul weather condition. and overturn.
No obstacles in the hoist or Proper "PPE"
Over speed counterweight way. (Double lanyard
Overload No accumulated water in the full body
Horse playing foundation. harness).
Make sure that the load is less
Smoking inside the
than payload. Don’t allow travel
cage
Not open door and let hand or person with
Non adhering to PPE something out of cage vertigo.
Non adhering to The passenger and stuffs can not
100% tie-off lean close to the any doors.
Close the doors.(incl. The cage
gates, the enclosure gate, the
Site Engineer
trap door). Make sure the door
can locked reliably.
Be away to everyone while start.
With counterweight hoist must be
observed frequently to see the
counter roller whether out off the
counterweight rail.
Must check the cable whether be
divorced from cable guide in
every working day.
Stop the cage at the ground
landing, lock the 3-phese switch
and cut of the power when work
is finished for the day.
Make sure that the inspection,
maintenance and drop test must
be done periodically.
Turn the switch to “ON” and lock
it. No one can cut off easily when
it turn on. You can turn the switch
to “OFF” exertly in the urgency,
but you must replace the switch
after it. When you turn the witch
to “OFF” and lock it , no one can
turn on easily.
5578-E3-REP-HSE-020 Page 10 of 12
DODSAL ENGINEERING & CONSTRUCTION PTE LTD
5.7 Emergency Untrained personnel Working Adequate training shall be given Close supervision
situation personnel to the working personnel to tackle 3 2 6 1 1 1
Panic
emergency situation while riding
Functioning of trap on elevated hoist.
door Emergency contact number shall
Emergency number be displayed inside the cage.
not displayed If abnormal phenomena take
Poor communication place, press the emergency stop
button and depress it until the
tubules are solved.
Pull the control box through the
trap door when working at the
roof of the cage.
If the hoist stops abnormally,
drive it down to the ground
landing by hand. Lift the brake
lifter on the motor to allow the
cage to slide down slowly.
Remarks:
Prepared By : Name: Mr. Rajesh Somappa, Reviewed by: Name: Arup Roy Chowdhury Approved By; Name:
Designation: HSE Officer Designation: HSE Manager ,Dodsal Designation: HSE Manager,SECL
Sign: Sign: Sign:
Date: 06.08.2012 Date: 06.08.2012 Date:
5578-E3-REP-HSE-020 Page 11 of 12
DODSAL ENGINEERING & CONSTRUCTION PTE LTD
Severity
4 – Catastrophic – Imminent danger exists, hazard capable of causing death or illness at wide scale
3 – Critical – Hazard can result in serious illness, severe injury, property and equipment damage
2 – Marginal – Hazard can cause illness, injury or equipment damage but the damage is not expected to be serious
1 – Negligible – Hazard will not result in serious injury or illness, remote possibility of damage beyond minor first-aid case.
5578-E3-REP-HSE-020 Page 12 of 12