Annexure for necessary corrections/modifications are as follows:-

Clause 2.0.2: (Page 2-3; 3rd Para, 5th Line)


Delete “and the Contractor ……………..roadway embankment”.

Clause 2.0.3 (b): (Page 2-4; Last Para, 6th Line)


After required Add new sentence “The above mentioned staff shall be
in addition to that required for aggregate, bitumen and concrete
testing”.

Clause 2.1.1: (Page 2-4; 1st Para, 2nd Line)


After Engineer add new sentence “to a minimum depth of 150mm
from natural ground level”.

Clause 2.1.3: (Page 2-5)


Before last Para Add a new Para “Operation of clearing and grubbing
shall in no way be deemed to effect any level or volume change of the
area. The Contractor shall have allowed for the cost thereof by
including that cost in the unit rate tendered for roadway embankment”.
(After Last Para)
Add a new Para “Before bottom layer of embankment is placed, the
Contractor will grub up and remove without extra pavement, any
vegetation that may, in the meantime have grown on surface
previously cleared and grubbed”.

Clause 2.1.4: (Page 2-5; Last Para, Last Line)


After necessary add “at no extra cost”.

Clause 2.1.5: (Page 2-6; 1st Para, 1st Line)


After tree stem add “measured 600mm above ground level”.

Clause 2.1.6: (Page 2-6; 1st Para, 3rd Line)


After 300mm add “measured 600mm”.

Clause 2.3.4: (Page 2-11; 1st Para, 2nd Line)


After Concrete slab, delete “HBB/BFS” and add “Partial”.

Clause 2.7.1: (Page 2-22; 1st Para, 10th Line)


After compacted to delete “98% of Maximum …………………….
method D” and add “95% of Maximum Dry Density determined by
AASHTO T-180, Method D, but for the top 500mm minimum CBR
shall be 5% at 95% MDD. In addition to the CBR requirement A-6 or
A-7 material (determined as per AASHTO M-145) shall not be used in
the top 500mm of embankment just below the improved subgrade or
subbase as the case may be”.
2

Clause2.7.2: (Page 2-22; 2nd Para, 2nd Line)


After will pass a, read 50 instead of 100.
(Page 2-23; 1st Para, 2nd Line)
After not greater than, read 10 instead of 25.

Clause 2.7.3 (f): (Page 2-28; 5th Para, Last Line)


After determine its, add “Atterberg Limits”,
(Page 2-28; 7th Para, 3rd Line)
After at least each, delete “250 sqm……………..Compacted” and add
“100m longitudinal reach of each layer of embankment Compacted.
The testing frequency may be increased by the Engineer based on non
uniformity of compactive effort”.

Clause 2.7.4(b): (Page 2-30; 3rd Para, 3rd Line)


After Specified herein, Add “However the compacted thickness shall
not exceed 150mm for cohesive soil and 250mm for sand
embankment”.

Clause 2.9.2: (Page 2-34; 1st Para, 1st Line)


After at least, read “150” instead of “100”.

(Page 2-35; 2nd Para, 4th Line)


After greater than, read “75” instead of “100”

(Page 2-35; 3rd Para, 3rd Line)


After for each, read “100 meter” instead of “250sqm”.

(Page 2-35; 3rd Para, 4th Line)


After Subgrade surface, add “Per lane”.

(Page 2-35; 5th Para, 2nd Line)


After at least, read “500” instead of “200”.

Clause 2.9.5: (Page 2-37)


3rd Para starts “If the pavement” instead of “The pavement”.

Clause 3.0.2: (Page 3-3; 1st Para, 2nd Line)


After quantities, add “as per lines and grads shown on the drawings
and”
Clause 3.1.2: (Page 3-3; 1st Para, 3rd Line)
After a minimum of , road 5% “ instead of 12%”.
3

Clause 3.1.4: (Page 3-4; 1st Para, 1st Line)


After for each, read “100 meter longitudinal stretch” instead of
“600sqm”
(Page 3-4; 2nd Para, 1st Line)
After shall be tested, delete “at least…………..completed work” and
add “for each 100 meter of completed work per lane”.
Clause 3.2.2 (a): Page 3-6; 2nd Para)
Read “These aggregates shall be ………..(i)………..(ii)…40%.............
instead of “These………….(i)..50%...................(ii)45%...........
Clause 3.2.2 (b): (Page 3-6)
The table showing “Total percent passing” shall be replaced as below:-

The Para below the table “Total Percent Passing” shall be replaced by
“…………………”………

(Page 3-6;????? Line)


Para below the table AASHTO standard specification Designation M-
147, 3rd Line)
After method-D, delete “when tested………..service conditions”.

Last time after greater than read “25” instead of “30” and after more
than 6 add new sentence “sand equivalent value as per AASHTO T-
176) shall be 25 minimum.

(Page 3-7; 1st Line)


After grading shall be, read “C or D” instead of “C,D,E of F”.
Clause 3.2.3: (Page 3-7; 5th Para, 3rd Line)
After other course, add a real sentence “Segragation…………… time
materials”.
(5th Para, Last Line)
After cooperation, add a new sentence “No handling or………….
Material”.
(6th Para, 3rd Line)
After the available equipment, add “upto a maximum limit of
150mm”.
Clause 3.2.4: (Page 3-8; 1st Para, 5th Line)
After from each, read “200” instead of “50”.
Last sentence of this Para – “At least one test………………… subbase
course”. Is replaced as follows, “At lest one test……… permitted)

(Page 3-15; 3rd Para, 3rd Line)


After the grading, read “A or B or C” instead of “A, B and C” and in
4th line after “specification M 147-65 add “as directed by the
Engineer”. In 4th Para 2nd Line read as follows, “than 25 and a
plasticity index of not more than 4”.
4

(In 5th Para, last Line)


After greater than, read “15%” instead of “35%”.
(In 6th Para, 3rd Line)
After not exceed, read “12%” instead of “15%”.
(Page 3-16; 1st Line)
After more than, read “35%” instead of “40%”.
Clause 3.4.2: (Page 3-16)
Last Para of this clause shall be read as “The California…………..
thirty (30)”.
Clause 3.4.4: (Page 3-18)
Last Para of this Clause shall be read as “Field………….. Permitted”.