Professional Documents
Culture Documents
Liftign Lug Calculation
Liftign Lug Calculation
: VP-PP-V3601A-100
PROGRAM NAME : LIFTING1 REV. NO. :
VERSION : 0 PAGE : OF
1. CHECK OF LUG
1-1. SHEAR STRESS DUE TO, W1
2W1 2 x 27877.5
σ1 = ------------ = -----------------
(P-d)t1 170 x 55
= 5.96 KG/mm^2 < SLs = 13.246 KG/mm^2 O.K!!
1-2. TENSION DUE TO, W1
W1 27877.5
σ2 = ------------ = -------------------
(P-d)t1 170 x 55
= 2.982 KG/mm^2 < SLt = 16.557 KG/mm^2 O.K!!
2.STRESS AT GUIDE POINT (SECTION "I-I")
6 x W2 x B 6 x 7,469.8 x 120
σ3 = ------------ = ------------------ = 6.84 KG/mm^2
P x t1^2 260 x 3025
W4 16979.93
σ9 = ---------- = ---------- = 1.417 KG/mm^2 < SWs = 8.113 KG/mm^2
(U+V/√2)xP 11983.94 O.K!!
NOTE
1. DYNAMIC LOAD SHALL BE DETERMINED BY 1.5 x DEADLOAD.
2. SLt ---- ALLOWABLE TENSILE OR COMPRESSIVE STRESS OF LUG.
SLs ---- ALLOWABLE SHEAR STRESS OF LUG.
SWs ---- ALLOWABLE SHEAR STRESS OF WELDMENT.
DOC.NO. : DC-3001
PROGRAM NAME : LIFT-LUG REV.NO. :
VERSION : 0 PAGE : 53 OF
************************************************
* DESIGN OF LIFTING LUG IN PRESSURE VESSEL *
************************************************
R
d
A L1
h
L t
V = W / 2 = 8125.0 KG
P = V / SINα = 9381.9 KG
H = V / TANα = 4691.0 KG
DOC.NO. : DC-3001
PROGRAM NAME : LIFT-LUG REV.NO. :
VERSION : 0 PAGE : 54 OF 54
【2】LUG DESIGN
1) SHEAR STRESS AT TOP OF LUG
A = t × (R - r ) = 2250.000 MM^2
3) COMBINED STRESS
【3】SHELL STRESS
1) LINE LOADS
F1 = 6ML / (L×L) = 173.7397 KG/MM^2
F2 = V / L = 45.1389 KG/MM^2
2We 32119.42
S1 = =
(2R - d) x t 1760
= 18.250 KG/MM2 < SLs = 16.874 KG/MM2 NOT O.K !!
We 16059.71
S2 = =
(ℓ1 + ℓ2) x t 3740
= 4.294 KG/MM2 < SLt = 21.092 KG/MM2 O.K !!
3 . REQUIRED THICKNESS : Ta
We 16059.71
Ta = = = 11.897 MM
(2R - d) x SLs 1349.894
USED THICKNESS : 22 MM
We 16059.71
Sw = =
2((ℓ1 x h1) + (ℓ2 x h2) + (ℓ3 x h3)) 5460
= 2.941 KG/MM2 < SWs = 10.335 KG/MM 2
O.K !!
DOC. NO. : T-5401
PROGRAM NAME : LIFTING2 REV. NO. :
VERSION : 0 PAGE : OF
1. CHECK OF LUG
1-1. SHEAR STRESS DUE TO, W1
2W1 2 x 13793.75
σ1 = ------------ = -----------------
(P-d)t1 230 x 36
= 3.33 kg/mm^2 < SLs = 11.643 kg/mm^2 O.K!!
1-2. TENSION DUE TO, W1
W1 13793.8
σ2 = ------------ = -------------------
(P-d)t1 230 x 36
= 1.666 kg/mm^2 < SLs = 11.643 kg/mm^2 O.K!!
2.STRESS AT GUIDE POINT (SECTION "I-I")
2-1. BENDING STRESS DUE TO, W2
6 x W2 x B 6 x 3,696.0 x 140
σ3 = ------------ = ------------------ = 7.49 kg/mm^2
P x t1^2 320 x 1296
W4 8867.41
σ9 = ---------- = ---------- = 1.159 kg/mm^2 < SWs = 7.131 kg/mm^2
(U+V/√2)xP 7647.87 O.K!!
NOTE
1. DYNAMIC LOAD SHALL BE DETERMINED BY 1.25xDEADLOAD.
2. SLt ---- ALLOWABLE TENSILE OR COMPRESSIVE STRESS OF LUG.
SLs ---- ALLOWABLE SHEAR STRESS OF LUG.
SWs ---- ALLOWABLE SHEAR STRESS OF WELDMENT.
PROGRAM NAME : LIFLUG100 DOC. NO. : 6103-E-42A/B
VERSION : 0 REV. NO. :
PAGE :
===================================
TRUNNION LIFTING LUG CALCULATION
===================================
ⓐ
e * DIMENSION (UNIT:MM) *
e : 200 tc : 20
t r : 125.85 Do : 273.1
rw : 157.55 Dc : 380
Di r t : 21.4 Di : 230.3
Do Dc J : 21
tc
0
J
ⓐ
1) DESIGN DATA
TRUNNION SIZE : 10" - SCH.120
TRUNNION MATERIAL : SA106 Gr.B
COVER PLATE MATERIAL : SA516 Gr.70
TRUNNION YIELD STRESS Sy : 24.6074 KG/MM^2
ERECTION WEIGHT W : 79080 KG
IMPACT FACTOR E : 1.4
2) CALCULATION
FORCE (F)
F = W / 2 = 39540 KGF
S'sw = [(Sbw/2)^2 + Ssw^2]^0.5 = 7.58 KG/MM^2 < 0.4*Sy = 9.84296 KG/MM^2 (O.K!!)
d) COMBINED MAXIMUM TENSION ; (S)
Sw = (Sbw/2) + [(Sbw/2)^2 + Ssw^2]^0.5 = 13.95 KG/MM^2 < 0.6*Sy = 14.76444 KG/MM^2 (O.K!!)
#REF!
#REF!
PROGRAM NAME : LIFLUG100 DOC. NO. : VP-GA01-14V003-100
VERSION : 0 REV. NO. :
PAGE :
===================================
TRUNNION LIFTING LUG CALCULATION
===================================
* DIMENSION (UNIT:MM) *
e : 101.6 Do : 273.1
r : 129 Dp : 381 (PAD DIAMET
rw : 146.05 Dc : 330.2
t : 15.1 Di : 242.9
J : 9.5 k : 9.5 (SHELL TO PA
tc : 13 (COVER PLATE 두께)
td : 13 (PAD PLATE 두께)
1) DESIGN DATA
TRUNNION SIZE : 10" - SCH.80
TRUNNION MATERIAL : SA106 Gr.B
COVER PLATE MATERIAL : SA516 Gr.70
TRUNNION YIELD STRESS Sy : 24.6074 KG/MM^2
ERECTION WEIGHT W : 45223 KG
IMPACT FACTOR E : 1.5
2) CALCULATION
FORCE (F)
F = W / 2 = 22611.5 KGF
S'sw = [(Sbw/2)^2 + Ssw^2]^0.5 = 7.22 KG/MM^2 < 0.4*Sy = 9.8430 KG/MM^2 (O.K!!)
d) COMBINED MAXIMUM TENSION ; (S)
Sw = (Sbw/2) + [(Sbw/2)^2 + Ssw^2]^0.5 = 11.6 KG/MM^2 < 0.6*Sy = 14.7644 KG/MM^2 (O.K!!)
S'sw = [(Sbw / 2)^2 + Ssw^2 ]^0.5 = 4.72 KG/MM^2 < 0.4*Sy = 9.8430 KG/MM^2 (O.K!!)
Sw = (Sbw/2) + [(Sbw / 2)^2 + Ssw^2]^0.5 = 7 KG/MM^2 < 0.6*Sy = 14.7644 KG/MM^2 (O.K!!)