TYPE PTW NO: WORKING TEAM

Cold Work 608-CW-21 CMEC Equipment


Cold Work 609-CW-21 CMEC Equipment
Cold Work 610-CW-21 CMEC Equipment
Cold Work 611-CW-21 CMEC Equipment
Cold Work 612-CW-21 CMEC Equipment
Cold Work 613-CW-21 CMEC Equipment
Cold Work 614-CW-21 CMEC Equipment
Cold Work 616-CW-21 CMEC Equipment
Cold Work 620-CW-21 CMEC Equipment
Cold Work 621-CW-21 CMEC Equipment
Cold Work 623-CW-21 CMEC Equipment
Cold Work 637-CW-21 CMEC Equipment
Cold Work 638-CW-21 CMEC Equipment
Cold Work 639-CW-21 CMEC Equipment
Cold Work CW-21-3197 CMEC DW
Lifting Work LT-21-01-409 CMEC DW
Lifting Work LT-21-01-421 CMEC DW
Excavation Work EW-21-3001 JPPE
Lifting Work LT-21-01-422 CMEC DW
Lifting Work LT-21-01-423 CMEC DW
Cold Work 772-CW-21 TEC
Cold Work CW-21-4115 JPPE
LOCATION

EPC 2 -18 Level


EPC 2 -30 Level
EPC 2 -30 Level
EPC 2 -45 Level
EPC 2 +66 Level
Mining +30 Level
EPC 2 -30 Level
EPC 2 -66 Level
Mining -95 Level
Mining -06 Level
Mining -06 Level
EPC 2 + 18 Level
Mining +18 Level
Mining +75 Level
S-09
S-09
Mining -60 level
Mining +6 Level
Near JBL workshop +78 Level
E1 Yard
SECMC Colony
Sewage Treatment Plant
WORK DESCRIPTION

1028 Excavator bucket teeth replacement


1023 Excavator bucket teeth replacement
1025 Excavator oil leakage repair
1023 Excavator oil leakage repair
1006 Excavator water coolant leakage repair
1008 Excavator diesel oil leakage repair
1025 Excavator oil leakage repair
5204 Loader heatup problem repair work
1105 Excavator lights repair work
1011 Excavator light failure repair work
1007 Excavator boom cylinder replacement
1004 Excavator bucket teeth replacement
1014 Excavator oil leakage repair
1018 Excavator grease pump repair work
Bolting & Unbolting of Pipes, Pump, Valve, Elbow, Cable Laying & Manua
Lifting of Pump, Pipe Motor, Cable & DB Room
Lifting of Pump, Pipe Motor, Cable & DB Room
Arrangement of cable for dewatering pumps.
Loading and offloading of pipe, DN400, DN600
Loading and offloading of pipe, DN400, DN600
Install the alarm power supply
To repair lifting pump
CONTACT
TIME ISSUE DATE VALID DATE PERSON

08:00 to 18:30 28/2/2022 1/3/2022


08:00 to 18:30 28/2/2022 1/3/2022
08:05 to 18:30 28/2/2022 1/3/2022
08:05 to 18:30 28/2/2022 1/3/2022
08:00 to 18:30 28/2/2022 1/3/2022
08:05 to 18:30 28/2/2022 1/3/2022
08:00 to 18:30 28/2/2022 1/3/2022
11:20 to 18:30 28/2/2022 1/3/2022
15:15 to 18:30 28/2/2022 1/3/2022
15:00 to 18:00 28/2/2022 1/3/2022
08:00 to 18:30 28/2/2022 1/3/2022
08:10 to 18:30 28/2/2022 1/3/2022
08:15 to 18:30 28/2/2022 1/3/2022
08:10 to 18:30 28/2/2022 1/3/2022
15:00 to 18:00 24/2/2022 2/3/2022
15:00 to 18:00 24/2/2022 2/3/2022
08:00 to 18:00 26/2/2022 4/3/2022
08:00 to 18:00 28/2/2022 3/3/2022
08:00 to 18:00 27/2/2022 5/3/2022
08:00 to 18:00 27/2/2022 5/3/2022
08:00 to 18:00 26/2/2022 3/3/2022
08:00 to 18:00 27/2/2022 1/3/2022
Night
LOTO Work