WBS Ethanol Piping
WBS Ethanol Piping
2 Process 11 55% 1 1 1 1 1 1 1 1 1 1 1
2.1 Demobilization 2 10% 1 1
2.2 Re-PWHT Process 6 30% 1 1 1 1 1 1
2.3 NDE 1 5% 1
3 Installation 5 25% 1 1 1 1 1
3.1 Installation to existing facility 5 25% 1 1 1 1 1
TOTAL 20 100%