Fig 1.1 Table of Microscope dimensions and weights
Fig 1.2 CM100/CM120 Microscope dimensions
Fig 1.3 CM100/CM120 Minimum room layout
Fig 1.4 CM100/CM120 Service clearances and room
Fig 1.5 CM100/CM120 Room layout, part 2
Fig 1.6 General recommendations airco & room light
Fig 1.7 Cross section of room to show minimum airflow
Fig 1.8 Mechanical vibrations CM100 - V
Fig 1.9 Mechanical vibrations CM100 - F<>B
Fig 1.10 Mechanical vibrations CM100 - L<>R
Fig 1.11 Acoustic vibrations CM SERIES
Fig 1.12 Electromagnetic fields CM100
Fig 1.13 Humidity
Fig 1.14 Pre-installation check list part 1
Fig 1.15 Pre-installation check list part 2
Fig 1.16 Pre-installation check list part 3
Contents
Figures
H
H
Contents
Figures
1 ENTRANCE TO THE ROOM
1.3 STAIRS
1.4 CORRIDORS
1.5 TRESHOLDS
Contents
Figures
H
H
Contents
Figures
2 ROOM REQUIREMENTS
2.1 WIDTH
2.2 LENGTH
2.3 HEIGHT
2.4 TEMPERATURE
• AIRCO
2.5 HUMIDITY
Contents
Figures
H
H
Contents
Figures
3 SERVICES FOR MICROSCOPE
3.2 WATER
3.4 NITROGEN
Contents
Figures
H
H
Contents
Figures
4 PREFORMANCE LIMITING FACTORS
4.1 VIBRATIONS
• ACCOUSTIC
• FLOOR
• MICROSCOPE
4.3 TEMPERATURE
• ROOM
• WATER (ABOVE DEW POINT)
4.4 DRAUGHT
Contents
Figures
H
H
Contents
Figures
DIMENSIONS AND WEIGHTS OF THE MICROSCOPE + ACCESSORIES
Contents
Figures
H
H
Fig. 1-1 Microscope dimensions and weights Basic course Pre- Installation 1-7
Fig. 1-2 CM100/CM120 Microscope dimensions Basic course Pre- Installation 1-8
Contents
Figures
200
1200
400
400
Power
50
supply unit
600
260
70
280
100
115
cable duct
550 550
100
800
50
1000
265 260
H2O, N2, Air Electrical cables
120
695
Electronics
437.5
rack
981
700
515
1170
472
1018
300
87.5
Microscope console
515
915
745
1334
1505
1670
Contents
Figures
CM100/CM120 Microscope dimensions, Fig. 1
H
H EM4299B
Fig. 1-2 CM100/CM120 Microscope dimensions Basic course Pre- Installation 1-8
Fig. 1-3 CM100/CM120 Minimum room layout Basic course Pre- Installation 1-9
Contents
Figures
min. 2500
Power
supply unit
00
.15
min
min. 3000
min. 450
Electron
ics rack
Microsc
ope con
sole
min. 300
min. 600
min. 300
EM4594A
Lay-out for CM120 (not for BioTWIN)
Contents
CM100/CM120 Minimum room layout, Fig. 3
Figures
H
H
Fig. 1-3 CM100/CM120 Minimum room layout Basic course Pre- Installation 1-9
Fig. 1-4 Service clearances and room layout Basic course Pre- Installation 1-10
Contents
Figures
F B min. 150
Power
C supply unit 600
min. 1500
400
1670
A
E
1170
Microscope console
min. 600
min. 350
EM4301A
CABLE LENGTH ABCD = 5M
EF = 2.45M
Contents
Figures
H
H
Fig. 1-4 Service clearances and room layout Basic course Pre- Installation 1-10
Fig. 1-5 CM100/CM120 Room layout, part 2 Basic course Pre- Installation 1-11
Contents
Figures
min. 2200 max. 2450
min. 2650
min.2450
min. 200
EM4290
Contents
Fig. 6, CM100/CM120 Microscope dimensions and room layout
Figures
H
H
Fig. 1-5 CM100/CM120 Room layout, part 2 Basic course Pre- Installation 1-11
Fig. 1-6 General recommendations airco & room light Basic course Pre- Installation 1-12
Contents
Figures
Note: The size of the openings in the ceiling must be such that
the air draught is less than 1cm /min.
Tube light Tube light
Tube light
1meter
Tube light
Chimn
ey
Note: Within this area draughts should be
eliminated as far possible.
Power cabinet
Service room
EM6916
Contents
Figures
H
H
Fig. 1-6 General recommendations airco & room light Basic course Pre- Installation 1-12
Fig. 1-7 Cross section of room to show min. airflow Basic course Pre- Installation 1-13
Contents
Figures
Cross section of the room
Ceiling
The holes in the ceiling must The holes in the ceiling must
be such that the air draught be such that the air draught
is < 1cm/min. is < 1cm/min.
Service
room
Microscope room
curtain
curtain
Heat source
Fig. 8a
Contents
Figures
H
H
Fig. 1-7 Cross section of room to show min. airflow Basic course Pre- Installation 1-13
Fig. 1-8 Mechanical vibrations CM100 - V Basic course Pre- Installation 1-14
Contents
Figures
Mechanical vibrations
CM100 -V
CM100 V (Z)
10m
1m
500
III
100
II
50
g
I
10
Oct/3 - rms
5
1µ
EM7108A
Contents
Figures
H
H
Fig. 1-8 Mechanical vibrations CM100 - V Basic course Pre- Installation 1-14
Fig. 1-9 Mechanical vibrations CM100 - F<>B Basic course Pre- Installation 1-15
Contents
Figures
Mechanical vibrations
CM100 -F<>B
CM100 H F B (X)
10m
III
1m
500
II
100
I
50
g
10
Oct/3 - rms
5
1µ
EM7109A
Contents
Figures
H
H
Fig. 1-9 Mechanical vibrations CM100 - F<>B Basic course Pre- Installation 1-15
Fig. 1-10 Mechanical vibrations CM100 - L<>R Basic course Pre- Installation 1-16
Contents
Figures
Mechanical vibrations
CM100 - L<>R
CM100 H L R (Y)
10m
1m II
500
I
100
50
g
10
Oct/3 - rms
5
1µ
EM7110A
Contents
Figures
H
H
Fig. 1-10 Mechanical vibrations CM100 - F<>B Basic course Pre- Installation 1-16
Fig. 1-11 Acoustic vibrations CM SERIES Basic course Pre- Installation 1-17
Contents
Figures
Acoustic vibrations CM SERIES
CM’s
112
92
Acoustiaal Vibrations
dB
SPL
52
Oct/3 - rms
32
20 100 800 Hz 1kHz 2 5 10 20 kHz
EM7123A
Contents
Figures
H
H
Fig. 1-11 Acoustic vibrations CM SERIES Basic course Pre- Installation 1-17
Fig. 1-12 Electromagnetic fields CM100 Basic course Pre- Installation 1-18
Contents
Figures
Electromagnetic fields CM100
50
30
10
Magnetic fields
mV
BT X, Y
- 10
HC X, Y
BT Z
- 30 HC Z
Time - Peakhold
- 50
4 12 20 28 32 ms
EM7126
Contents
Figures
H
H
Fig. 1-12 Electromagnetic fields CM100 Basic course Pre- Installation 1-18
Fig. 1-13 Humidity Basic course Pre- Installation 1-19
Contents
Figures
HUMIDITY
Various parts in the microscope are cooled. In case the humidity is high these
parts may accumulate condensation. This will depend on the relation
temperature versus relative humidity.
30
100%
25 90%
80%
T Dew point(OC)
70%
20
60%
50%
15
40%
10 Relative
humidity
10 12 14 16 18 20 22 24 26 28 30
T ambient (OC) EM1372A
Contents
Figures
H
H filter is wet.
Fig. 1-13 Humidity Basic course Pre- Installation 1-19
Fig. 1-14 Pre-installation check list part 1 Basic course Pre- Installation 1-20
Contents
Figures
11 PRE-INSTALLATION CHECK LIST
Checked
Subject Min. / Max. value and ok Remarks
yes no
Pneumatic air min. > 5.0 x 105 N/m2 Connected via 8.5 mm
supply pressure max < 7.0 x 105 N/m2 hose pillars
oil contents
< 0.08 mg/cm3
Contents
Figures
H
H
Fig. 1-14 Pre-installation check list part 1 Basic course Pre- Installation 1-20
Fig. 1-15 Pre-installation check list part 2 Basic course Pre- Installation 1-21
Contents
Figures
Checked
Subject Min. / Max. value and ok Remarks
yes no
Water pressure min. > 3.0 x 105 N/m2 Water flow 45l/hour per
(Pa) (3 Bar) branch (3 liter/min total)
max < 6.0 x 105 N/m2 Water flow 45l/hour per
(Pa) (6 Bar) branch (3 liter/min total)
Nitrogen supply pressure min. > 0.1 x105 N/m2 Connected via 6.0 mm
(Pa) hose pillars
max < 0.5 x 105 N/m2
(Pa)
Water contents < 10 ppm
Contents
Figures
H
H
Fig. 1-15 Pre-installation check list part 2 Basic course Pre- Installation 1-21
Fig. 1-16 Pre-installation check list part 3 Basic course Pre- Installation 1-22
Contents
Figures
Checked
Subject Min. / Max. value and ok Remarks
yes no
Mains supply 200V, 210V, 220V, 230V, Other voltages via trans-
240, 50 / 60 Hz former PW 6345/01
1RWH ** In case of voltages of - 6% with a duration of more than 1 min., a mains stabilizer PE1403 (850 VA) must be used to feed the heating ele-
ment of the ODP
1RWH Any deviation from these installation and safety requirements may cause deterioration in Instrument Specification.
Contents
Figures
H
H
Fig. 1-16 Pre-installation check list part 3 Basic course Pre- Installation 1-22
Basic course Pre- Installation 1-23
Contents
Figures
Contents
Figures
H
H