Professional Documents
Culture Documents
A B D E F G H: Property& Supply Room
A B D E F G H: Property& Supply Room
..\..\..\Desktop\TAF
Documents\TAFLogo.jpg
Logo.jpg
34725
4225 2500 3000 2500 3500 4000 4000 4000
TJ A. FLORES
ARCHITECTURAL DESIGN
+ CONSULTANCY
UNIT R-2, GF VITRIOLO BUILDING, DR. B. REYES ST.,
DISTRICT 1, CAUAYAN CITY, ISABELA 3305
MOBILE No.: +(63) 917 594 4150
EMAIL: tjaflores@yahoo.com / tjafloresadc@gmail.com
DROP OFF
H
(OPD)
3000
Drawings and specifications and other contract documents duly signed, stamped or
UNIT
sealed, as instruments of service are the intellectual property and documents of the
6983
G
architect, wether the object for which they are made is executed or not. It shall be
unlawful for any person to duplicate or make copies of said documents for use in the
RESPIRATORY
UNIT
repetition of and for other projects or buildings, wether executed partly or whole,
3000
3000
UNIT
without the written consent of the architect or author of the said documents.
DESIGN CONSULTANT
F
3000
2000
LOCKER
RESPIRATORY
TOI.
UNIT
RESPIRATORY RESPIRATORY
UNIT
6000
HOUSEKEEPING
RESPIRATORY
UNIT
CONSULTANT
DEPARTMENT
3000
UNIT
5058
PLACE: T.I.N. No.:
E
ENGINEER
PIPE CHASE
33016
3000
RESPIRATORY RESPIRATORY
6000
UNIT
RESPIRATORY
3959
UNIT
UNIT
3000
1500
P.T.R. No.:1934 VALIDITY: 12-29-2017
D
TOI.
PLACE: SAN FERNANDO PAMPANGA T.I.N. No.: 123-199-330
P.W.D
3000
TOI.
3064
EQUALIZATION
PROJECT NAME
TANK
CADAVER
HOLDING
FEMALE
PROPOSED CONSTRUCTION OF
TOI.
LEVEL 2 HOSPITAL
AERATION
2936
TANK
(CITIMED OF ILAGAN)
PROPERTY&
7500
MALE
TOI.
SUPPLY
ROOM
6000
AERATION
TANK
PROJECT LOCATION
3000
CHUTE
CHUTE
GARB.
LINEN
UTILITY
ROOM
ROOM
EE
SLUDGE
CONTACT
TANK
TANK
B
STAIRCASE
3016
3016
2999
OWNER
SERVICE
RAMP
DR. EMMANUEL "JON" B. AÑES
A
12
11
10
9
8
7
6
5
4
1
3
REMARKS:
SANITARY LINE SYSTEM
01 LOWERGROUND FLOOR PLAN CEHECKED BY:
AR. TJ A. FLORES
SHEET No.:
P 02 SCALE: 1:150 METERS
P-2
CADD BY:
KDTALAUE
DATE: PLUMBING
08-23-17 PLANS/WORKS