Gasket Mapping Update - 070922
Gasket Mapping Update - 070922
For
Measurement
Rework Hopper
Evap 2nd Level
3rd Level, 4th Level
D3 AHU Room
Dense Phase Room
5th & 6Th Level Evap Room
7th & 8th Level
DP1 2nd Level yes 0
DP2 2nd Level yes 0
D1 Kitchen Stork yes 8
D2 Niro CIP yes 14
Evap1 - Steam Supply yes 2
Evap1 - Product Line yes 5
Evap1 - CIP Return & Drain Line yes 0
Evap1 - Condenser, Separator, Vacuum yes 4
Evap1 - THE yes 0
Evap1 - Water Supply Line yes 2
Evap2 - CIP return and drain line yes 1
Evap2 - Water Supply Line yes 0
Evap2 - Condensate & vacuum line yes 2
D1/D2
Evap2 -THE yes 0
Evap2 -Product Line yes 6
D1 2nd Level yes 8
D1 3rd Level yes 6
D1 4th Level yes 7
D1 5th Level yes 10
D1 6th Level yes 2
D1 7th Level yes 7
D2 3rd Level yes 4
D2 4th Level yes 8
D2 5th Level yes 0
D2 6th Level yes 1
D2 7th Level yes 26
Powder Handling System
D1/D2/D3
All Silos
ALCIP
Compunding Tank
WP1 Processing
Eductor
Fat Blend
CIP Kitchen
Eductor Room/Mezzanine Room
WP2
Compunding Area/Processing
WP2 Fat Blend Room/Oil Farm
Macro Staging Area
Dumping Area
Waste Handling Area
PL1 Filling Room and 2nd Level
PL8 Filling & Packaging
PL3 Filling
PL3 Packaging Equipment
PL3 Withdrawal Lines and 2nd Level Separator to Gassing YES 10
PL4 Withdrawal Lines and 2nd Level YES 4
PL2 Filling & Packaging
Packaging P1 Silo Top
PL4 Silo Top
Silos and Silo Bottom
All Withdrawal Lines
PL4 Filling
PL4 Packaging Equipment
PL7 Filling and Packaging
PL5 Filling & Packaging
Total for Measurement 137
Total for Deletion 18
For AREA OWNER
Deletion
J. Rosales
L. Villaganas
1
0
0
0
0
5
0
0
A.Dar
0
2
0
0
0
0
0
0
0
0
0
0
4
D. Bicomong
5
0
0
0
0
E. Reganit
ETCandaza
EZTadeo
F. Saminal
F. Saminal
R. Espallardo
Mico Pimentel
N.Pabilona
0
1 J.Peralta
T. De Vera
B. Bernardo
A. Perez
G. Zabala