A PRELIMINARIES
G MSB, SSB
H DBs
I HV Cables
J LV Cables
K FR Cables
L Termination
M Branch Cables
N Busduct
O Lighting Ftg
P a) Compount Ltg
b) Pole
X Provisional Sum
AZIZUL
Project: Date:
PIC Name: Location:
Item Description Documentation Coordination Installation Remark
A PRELIMINARIES
B PA Rack
C CCTV Rack
D Monitor PC
E
F Barrier Gate
(Include loop detector)
G TEL Rack
H Cable support
I Tel cable
J CCTV cable
K PA cable
L Termination
M Tray
N Ladder
O Speaker Ftg
P CCTV Ftg
Q Card Access