Design of Water Tank (Nari Road)
Design of Water Tank (Nari Road)
LIMITED
(A Joint Venture of Govt. of India & Govt. of Maharashtra)
PROJECT: -NAGPURMETRORAILPROJECT
Submitted–08.04.2021
PREPAREDBY:
MahendraRajConsultantsPvt.Ltd.
EniaArchitects| MahendraRajConsultants| Worxpace|Aeon
Consortium
CONTENT
Reach-2 on Nagpur Metro Station comprises of eight stations viz. Zero Mile, Sitaburdi, Nari Road,
Automotive Square, Indora Chowk, Kadvi Chowk, Kasturchand Park and Gaddi Godam Station. The
stations namely Nari Road, Automotive Square, Indora Chowk, Kadvi Chowk and Gaddi Godam Station
have a central viaduct carrying the metro line and two Entry Exit buildings on left and right hand side of
the central viaduct.
The following document deals with the analysis and design of the Water Tank resting on ground in
Entry Exit on Left hand side of central viaduct of Nari Road (NAR) Station.
3
PLAN AND SECTION
4
5
6
WALL DESIGN AND CRACK WIDTH CHECK
7
NAR MAHENDRA RAJ CONSULTANTS 04-02-2021
b/a = 2.57
3 3
Moment Formula = Coeff. * 1 Ton/m * a
Horizontal Direction
Max Horz Moment (My) Coeff. (Sag.) = -0.075 (Water face)
Muy (sagging) = -3.228 Mton-m per meter wall run
pt (req.) = 0.18 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Horizontal Steel Provided = T 12 @ c/c 200 mm
pt (prov.) 0.22 % (Water face)
Max Horz Moment (My) Coeff. (Hog.) = 0.039 (Away from water face)
Muy (hogging) = 1.678 Mton-m per meter wall run
pt (req.) = 0.09 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Horizontal Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Away from water face)
Vertical Direction
Max Vert Moment (Mx) Coeff. (Sag.) = -0.090 (Water face)
Mux (sagging) = -3.840 Mton-m per meter wall run
pt (req.) = 0.21 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Vertical Steel Provided = T 12 @ c/c 200 mm
pt (prov.) 0.22 % (Water face)
Max Vert Moment (Mx) Coeff. (Hog.) = 0.029 (Away from water face)
Mux (hogging) = 1.237 Mton-m per meter wall run
pt (req.) = 0.07 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Vertical Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Away from water face)
8
NAR MAHENDRA RAJ CONSULTANTS 04-02-2021
b/a = 1.40
3 3
Moment Formula = Coeff. * 1 Ton/m * a
Horizontal Direction
Max Horz Moment (My) Coeff. (Sag.) = -0.042 (Water face)
Muy (sagging) = -1.792 Mton-m per meter wall run
pt (req.) = 0.10 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Horizontal Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Water face)
Max Horz Moment (My) Coeff. (Hog.) = 0.019 (Away from water face)
Muy (hogging) = 0.797 Mton-m per meter wall run
pt (req.) = 0.04 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Horizontal Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Away from water face)
Vertical Direction
Max Vert Moment (Mx) Coeff. (Sag.) = -0.054 (Water face)
Mux (sagging) = -2.324 Mton-m per meter wall run
pt (req.) = 0.13 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Vertical Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Water face)
Max Vert Moment (Mx) Coeff. (Hog.) = 0.017 (Away from water face)
Mux (hogging) = 0.729 Mton-m per meter wall run
pt (req.) = 0.04 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Vertical Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Away from water face)
9
NAR MAHENDRA RAJ CONSULTANTS 04-02-2021
b/a = 0.56
3 3
Moment Formula = Coeff. * 1 Ton/m * a
Horizontal Direction
Max Horz Moment (My) Coeff. (Sag.) = -0.011 (Water face)
Muy (sagging) = -0.620 Mton-m per meter wall run
pt (req.) = 0.03 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Horizontal Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Water face)
Max Horz Moment (My) Coeff. (Hog.) = 0.007 (Away from water face)
Muy (hogging) = 0.396 Mton-m per meter wall run
pt (req.) = 0.02 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Horizontal Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Away from water face)
Vertical Direction
Max Vert Moment (Mx) Coeff. (Sag.) = -0.017 (Water face)
Mux (sagging) = -0.976 Mton-m per meter wall run
pt (req.) = 0.05 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Vertical Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Water face)
Max Vert Moment (Mx) Coeff. (Hog.) = 0.005 (Away from water face)
Mux (hogging) = 0.268 Mton-m per meter wall run
pt (req.) = 0.01 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Vertical Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Away from water face)
10
NAR MAHENDRA RAJ CONSULTANTS 04-02-2021
b/a = 0.62
3 3
Moment Formula = Coeff. * 1 Ton/m * a
Horizontal Direction
Max Horz Moment (My) Coeff. (Sag.) = -0.031 (Water face)
Muy (sagging) = -1.746 Mton-m per meter wall run
pt (req.) = 0.09 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Horizontal Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Water face)
Max Horz Moment (My) Coeff. (Hog.) = 0.010 (Away from water face)
Muy (hogging) = 0.570 Mton-m per meter wall run
pt (req.) = 0.03 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Horizontal Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Away from water face)
Vertical Direction
Max Vert Moment (Mx) Coeff. (Sag.) = -0.018 (Water face)
Mux (sagging) = -1.002 Mton-m per meter wall run
pt (req.) = 0.05 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Vertical Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Water face)
Max Vert Moment (Mx) Coeff. (Hog.) = 0.011 (Away from water face)
Mux (hogging) = 0.628 Mton-m per meter wall run
pt (req.) = 0.03 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Vertical Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Away from water face)
11
CRACK WIDTH (WORKING STRESS METHOD) - CRACKED SECTION ANALYSIS
2
Fck 35 N/mm σcbc 11.50 N/mm2
Moment at working (Mw) 40 kNm 40000000 Nmm m 8.12
Tension force working = N = 0 kN 0 deff 254.00 mm
Breadth(b) mm 1000 spacing s 100.00 mm2
Depth(D) mm 300 Es 200000 N/mm2
clearcover mm 40 pt 0.45 %
Ast provided mm2 1150 fy 500.00 N/mm2
Age at loading (creep coeffient) 1 Ec 29580.40
largest Bars in first layer dia . 12 mm
nos. 10
clear side cover to tension steel 40 mm
eff side cover 46 mm
Cmin 40 mm
Distance at which crackwidth is to be calculated (a) 300 mm
form the compression flange
effective cover (d') 46 mm
Allowable tensile stress in steel 0.55 Mpa
(long term)
Converged D-x 224.24
Assume x 75.76 mm d-x 178.24
acr 58.03124
Єm 0.000585
Wcr 0.088 mm
12
SLAB DESIGN
13
By DP MAHENDRA RAJ CONSULTANTS Project: NAGPUR METRO
Date 02-05-21 Doc No.:
Client :
Chd Subject : SLAB
Date Job No Nar Office Dept CV Sh of Rev No R0
DESIGN OF BOTTOM SLAB (UNDER WATER TANK)
CASE 1
Short span S= 2.000 mts
Long span L= 9.00 mts
Assumed slab thickness t= 0.300 mts
Grade of concrete fck= 35 N/mm^2
Grade of reinforcement fy= 500 N/mm^2
Loads
9.00 mts
Self weight of slab w1= 7.50 kN/m^2
Floor finish 100 mm thk wpc w2= 2.40 kN/m^2
Water load w3= 40.00 kN/m^2
Structural Load w4= 40.00 kN/m^2 2.00 mts
Design
Coeff BM k pt Ast Dia Spacing
Short span direction
Negative moment at continuous edge 0.083 44.95 0.62 0.15 392 12 288
Positive moment at midspan 0.125 67.43 0.93 0.22 595 12 190
.
Long span direction
Negative moment at continuous edge 0 0.00 0.00 0.00 360.0 12 314
Positive moment at midspan 0 0.00 0.00 0.00 360.0 12 314
Deflection check
Reinf provided at midspan along short direction 565.49 mm^2 Dia 12 at 200 mm
Stress in reinforcement fs= 305.191962 N/mm^2
Percentage of reinforcement provided pt= 0.2102181 %
Modification factor as per fig 4 of IS:456-2000 MF= 1.27488101
14
By DP MAHENDRA RAJ CONSULTANTS Project: NAGPUR METRO
Date 02-05-21 Doc No.:
Client :
Chd Subject : SLAB
Date Job No Nar Office Dept CV Sh of Rev No R0
DESIGN OF BOTTOM SLAB (UNDER PUMP ROOM)
CASE 1
Short span S= 5.000 mts
Long span L= 7.00 mts
Assumed slab thickness t= 0.350 mts
Grade of concrete fck= 35 N/mm^2
Grade of reinforcement fy= 500 N/mm^2
Loads
7.00 mts
Self weight of slab w1= 8.75 kN/m^2
Floor finish 100 mm thk wpc w2= 2.40 kN/m^2
Water load w3= 0.00 kN/m^2
False Ceiling w4= 0.00 kN/m^2 5.00 mts
Design
Coeff BM k pt Ast Dia Spacing
Short span direction
Negative moment at continuous edge 0.063 26.34 0.26 0.06 420 12 269
Positive moment at midspan 0.047 19.65 0.19 0.04 420 12 269
.
Long span direction
Negative moment at continuous edge 0.037 15.47 0.15 0.04 420.0 12 269
Positive moment at midspan 0.028 11.71 0.12 0.03 420.0 12 269
Deflection check
Reinf provided at midspan along short direction 565.49 mm^2 Dia 12 at 200 mm
Stress in reinforcement fs= 215.38969 N/mm^2
Percentage of reinforcement provided pt= 0.17726855 %
Modification factor as per fig 4 of IS:456-2000 MF= 2
15
By AY MAHENDRA RAJ CONSULTANTS Project: NAGPUR METRO
Date 04-08-21 Doc No.:
Client :
Chd Subject : Top Slab
Date Job No NAR Office Dept CV Sh of Rev No R0
DESIGN OF TOP SLAB
CASE 1
Short span S= 3.500 mts
Long span L= 4.65 mts
Assumed slab thickness t= 0.150 mts
Grade of concrete fck= 35 N/mm^2
Grade of reinforcement fy= 500 N/mm^2
Loads
4.65 mts
Self weight of slab w1= 3.75 kN/m^2
Floor finish 100 mm thk wpc w2= 2.50 kN/m^2
Live load w3= 2.00 kN/m^2
False Ceiling w4= 0.00 kN/m^2 3.50 mts
Design
Coeff BM k pt Ast Dia Spacing
Short span direction
Negative moment at continuous edge 0.060 9.10 0.63 0.15 180 10 436
Positive moment at midspan 0.046 6.97 0.48 0.11 180 10 436
.
Long span direction
Negative moment at continuous edge 0.037 5.61 0.39 0.09 180.0 10 436
Positive moment at midspan 0.028 4.24 0.35 0.08 180.0 10 436
Deflection check
Reinf provided at midspan along short direction 392.70 mm^2 Dia 10 at 200 mm
Stress in reinforcement fs= 132.926208 N/mm^2
Percentage of reinforcement provided pt= 0.32724923 %
Modification factor as per fig 4 of IS:456-2000 MF= 2
16
STAAD INPUT DETAILS
17
18
19
STAAD OUTPUT DETAILS
BMD, SFD AND DEFLECTION
20
21
22
23
24
25
BEAM DESIGN
26
MAHENDRA RAJ CONSULTANTS
Project : Nagpur Metro Rail Project
Beam Design
27
MAHENDRA RAJ CONSULTANTS
Project : Nagpur Metro Rail Project
Beam Design
L R
Vu (kN) 50.0 50.0
Tv =Vu/bd 0.6 0.6
Tc 0.5 0.5 Stirrups Provided details :
Tc bd 40.0 40.0 Dia Area No of legs Asv
Vus 10.0 10.0 10 78.54 2 157
Sv 294.0 294.0
Sv Provided 150.0 150.0
28
MAHENDRA RAJ CONSULTANTS
Project : Nagpur Metro Rail Project
Beam Design
29
MAHENDRA RAJ CONSULTANTS
Project : Nagpur Metro Rail Project
Beam Design
L R
Vu (kN) 120.0 120.0
Tv =Vu/bd 0.9 0.9
Tc 0.5 0.5 Stirrups Provided details :
Tc bd 62.6 62.6 Dia Area No of legs Asv
Vus 57.4 57.4 10 78.54 2 157
Sv 300.0 300.0
Sv Provided 200.0 200.0
30
MAHENDRA RAJ CONSULTANTS
Project : Nagpur Metro Rail Project
Beam Design
31
MAHENDRA RAJ CONSULTANTS
Project : Nagpur Metro Rail Project
Beam Design
L R
Vu (kN) 105.0 50.0
Tv =Vu/bd 0.8 0.4
Tc 0.7 0.7 Stirrups Provided details :
Tc bd 83.1 89.5 Dia Area No of legs Asv
Vus 21.9 -39.5 10 78.54 2 157
Sv 300.0 300.0
Sv Provided 200.0 200.0
32
COLUMN DESIGN
33
MAHENDRA RAJ CONSULTANTS PVT LTD.
SITABURDI STATION
COLUMN MEMBER: SC1 Subject: Design of column
Date: 08-04-2021
Z
Design of Unbraced column
Y Y ZD
Member Properties
Z
UNSUPPORTED LENGTH OF COLUMN ABOUT Z 3850 mm YD
UNSUPPORTED LENGTH OF COLUMN ABOUT Y 3850 mm
WIDTH OF COLUMN SECTION (YD) 300 mm
DEPTH OF COLUMN SECTION (ZD) 450 mm
EFFECTIVE LENGTH FACTOR FOR BENDING ABOUT Z 1.000 >=1.2
EFFECTIVE LENGTH FACTOR FOR BENDING ABOUT Y 1.000 >=1.2
CLEAR COVER TO SEC. REINFORCEMENT 40 mm >=30, for moderate exposure condition
BAR DIA (stirrup) 8 mm >=6mm
BAR DIA (main steel) 16 mm >=12mm
EFFECTIVE COVER 56.00 mm
Forces (factored) Unfactored Forces
Axial force 188.00 KN 18.8 Tons
Moment about Major axis (Mz) 30.00 KN-m 3 T-m
Moment about Minor axis (My) 2.00 KN-m 0.2 T-m
MATERIAL PROPERTIES
CONCRETE M 35
STEEL Fy 500
CALCULATION OF AXIAL LOAD AT BALANCE POINT (Pb)
PERCENTAGE STEEL p 1.2 >=0.8
p/fck 0.034
d'/D 0.187 2 1 for two face reinforcement
(k1)z 0.184 2 for four face reinforcement
(k2)z 0.028
d'/b 0.124
(k1)y 0.196
(k2)y 0.203
Puz 2704.10 KN
(Pb)z 873.90 KN
(Pb)y 958.75 KN
Axis about which minimum eccentricity moment is to be considered 3 Enter 1 for about major Axis (Z)
2 for about minor Axis (Y)
3 for about both the Axis
CALCULATION OF TOTAL DESIGN FORCES (KN-m)
34
MAHENDRA RAJ CONSULTANTS PVT LTD.
SITABURDI STATION
COLUMN MEMBER: SC1 Subject: Design of column
Date: 08-04-2021
35