MAHARASHTRA METRO RAIL CORPORATION

LIMITED
(A Joint Venture of Govt. of India & Govt. of Maharashtra)

PROJECT: -NAGPURMETRORAILPROJECT

NARI ROAD STATION

WATER TANK DESIGN

Submitted–08.04.2021

PREPAREDBY:

MahendraRajConsultantsPvt.Ltd.
EniaArchitects| MahendraRajConsultants| Worxpace|Aeon
Consortium
CONTENT

S.No. Description PageNo Remarks


1 Introduction 03 -03
2 Plan and Sections 04- 06
3 Wall design and Crack width check 07-12
4 Slab design 13-16
5 STAAD Input Details 17 - 19
6 STAAD Output Details (BMD, SFD and 20 - 25
Deflection)
7 Beam Design 26 - 32
8 Column Design 33 - 35
INTRODUCTION

Reach-2 on Nagpur Metro Station comprises of eight stations viz. Zero Mile, Sitaburdi, Nari Road,
Automotive Square, Indora Chowk, Kadvi Chowk, Kasturchand Park and Gaddi Godam Station. The
stations namely Nari Road, Automotive Square, Indora Chowk, Kadvi Chowk and Gaddi Godam Station
have a central viaduct carrying the metro line and two Entry Exit buildings on left and right hand side of
the central viaduct.

The following document deals with the analysis and design of the Water Tank resting on ground in
Entry Exit on Left hand side of central viaduct of Nari Road (NAR) Station.

3
PLAN AND SECTION

4
5
6
WALL DESIGN AND CRACK WIDTH CHECK

7
NAR MAHENDRA RAJ CONSULTANTS 04-02-2021

Design of WATER TANK TW1a


Concrete M 35 Steel Fe 500

Thickness of Wall = 300 mm


Height (a) = 3500 mm
Length (b) = 9000 mm
Clear Cover = 40 mm
Effective depth (d) = 254 mm
(As per Table 3 IS 3370 Part 4)
Moment Coeff for Wall Top Free, Bottom and Vertical Edges Fixed

b/a = 2.57

y=0 y=b/4 y=b/2


x/a Mx My Mx My Mx My
0 0.000 0.026 0.000 0.008 0.000 -0.043
1/4 0.008 0.030 0.000 0.009 -0.009 -0.062
1/2 0.027 0.039 0.009 0.018 -0.010 -0.075
3/4 0.029 0.014 0.018 0.018 -0.018 -0.057
1 -0.090 -0.020 -0.066 -0.010 0.000 0.000

3 3
Moment Formula = Coeff. * 1 Ton/m * a

Horizontal Direction
Max Horz Moment (My) Coeff. (Sag.) = -0.075 (Water face)
Muy (sagging) = -3.228 Mton-m per meter wall run
pt (req.) = 0.18 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Horizontal Steel Provided = T 12 @ c/c 200 mm
pt (prov.) 0.22 % (Water face)
Max Horz Moment (My) Coeff. (Hog.) = 0.039 (Away from water face)
Muy (hogging) = 1.678 Mton-m per meter wall run
pt (req.) = 0.09 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Horizontal Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Away from water face)

Vertical Direction
Max Vert Moment (Mx) Coeff. (Sag.) = -0.090 (Water face)
Mux (sagging) = -3.840 Mton-m per meter wall run
pt (req.) = 0.21 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Vertical Steel Provided = T 12 @ c/c 200 mm
pt (prov.) 0.22 % (Water face)
Max Vert Moment (Mx) Coeff. (Hog.) = 0.029 (Away from water face)
Mux (hogging) = 1.237 Mton-m per meter wall run
pt (req.) = 0.07 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Vertical Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Away from water face)

8
NAR MAHENDRA RAJ CONSULTANTS 04-02-2021

Design of WATER TANK TW1b


Concrete M 35 Steel Fe 500

Thickness of Wall = 300 mm


Height (a) = 3500 mm
Length (b) = 4900 mm
Clear Cover = 40 mm
Effective depth (d) = 255 mm
(As per Table 3 IS 3370 Part 4)
Moment Coeff for Wall Top Free, Bottom and Vertical Edges Fixed

b/a = 1.40

y=0 y=b/4 y=b/2


x/a Mx My Mx My Mx My
0 0.000 0.019 0.000 0.004 0.000 -0.036
1/4 0.007 0.017 0.003 0.006 -0.008 -0.041
1/2 0.017 0.016 0.010 0.008 -0.008 -0.042
3/4 0.005 0.016 0.005 0.006 0.010 -0.026
1 -0.054 -0.010 -0.036 -0.007 -0.010 0.000

3 3
Moment Formula = Coeff. * 1 Ton/m * a

Horizontal Direction
Max Horz Moment (My) Coeff. (Sag.) = -0.042 (Water face)
Muy (sagging) = -1.792 Mton-m per meter wall run
pt (req.) = 0.10 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Horizontal Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Water face)
Max Horz Moment (My) Coeff. (Hog.) = 0.019 (Away from water face)
Muy (hogging) = 0.797 Mton-m per meter wall run
pt (req.) = 0.04 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Horizontal Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Away from water face)

Vertical Direction
Max Vert Moment (Mx) Coeff. (Sag.) = -0.054 (Water face)
Mux (sagging) = -2.324 Mton-m per meter wall run
pt (req.) = 0.13 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Vertical Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Water face)
Max Vert Moment (Mx) Coeff. (Hog.) = 0.017 (Away from water face)
Mux (hogging) = 0.729 Mton-m per meter wall run
pt (req.) = 0.04 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Vertical Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Away from water face)

9
NAR MAHENDRA RAJ CONSULTANTS 04-02-2021

Design of WATER TANK TW2a


Concrete M 35 Steel Fe 500

Thickness of Wall = 300 mm


Height (a) = 3850 mm
Length (b) = 2150 mm
Clear Cover = 40 mm
Effective depth (d) = 255 mm
(As per Table 3 IS 3370 Part 4)
Moment Coeff for Wall Top Free, Bottom and Vertical Edges Fixed

b/a = 0.56

y=0 y=b/4 y=b/2


x/a Mx My Mx My Mx My
0 0.000 0.002 0.000 0.000 0.000 -0.003
1/4 0.000 0.006 0.000 0.001 -0.001 -0.006
1/2 0.003 0.007 0.001 0.001 -0.002 -0.011
3/4 0.005 0.006 0.001 0.001 -0.001 -0.008
1 -0.017 -0.003 -0.010 -0.002 0.000 0.000

3 3
Moment Formula = Coeff. * 1 Ton/m * a

Horizontal Direction
Max Horz Moment (My) Coeff. (Sag.) = -0.011 (Water face)
Muy (sagging) = -0.620 Mton-m per meter wall run
pt (req.) = 0.03 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Horizontal Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Water face)
Max Horz Moment (My) Coeff. (Hog.) = 0.007 (Away from water face)
Muy (hogging) = 0.396 Mton-m per meter wall run
pt (req.) = 0.02 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Horizontal Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Away from water face)

Vertical Direction
Max Vert Moment (Mx) Coeff. (Sag.) = -0.017 (Water face)
Mux (sagging) = -0.976 Mton-m per meter wall run
pt (req.) = 0.05 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Vertical Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Water face)
Max Vert Moment (Mx) Coeff. (Hog.) = 0.005 (Away from water face)
Mux (hogging) = 0.268 Mton-m per meter wall run
pt (req.) = 0.01 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Vertical Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Away from water face)

10
NAR MAHENDRA RAJ CONSULTANTS 04-02-2021

Design of WATER TANK TW2b


Concrete M 35 Steel Fe 500

Thickness of Wall = 300 mm


Height (a) = 3850 mm
Length (b) = 2400 mm
Clear Cover = 40 mm
Effective depth (d) = 255 mm
(As per Table 3 IS 3370 Part 4)
Moment Coeff for Wall Top Free, Bottom and Vertical Edges Fixed

b/a = 0.62

y=0 y=b/4 y=b/2


x/a Mx My Mx My Mx My
0 0.000 0.000 0.000 0.000 0.000 -0.001
1/4 -0.003 0.005 -0.003 0.000 -0.002 -0.006
1/2 0.001 0.010 0.000 0.002 -0.004 -0.017
3/4 0.011 -0.031 0.005 0.002 -0.018 -0.014
1 -0.017 -0.004 -0.008 -0.003 0.009 0.000

3 3
Moment Formula = Coeff. * 1 Ton/m * a

Horizontal Direction
Max Horz Moment (My) Coeff. (Sag.) = -0.031 (Water face)
Muy (sagging) = -1.746 Mton-m per meter wall run
pt (req.) = 0.09 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Horizontal Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Water face)
Max Horz Moment (My) Coeff. (Hog.) = 0.010 (Away from water face)
Muy (hogging) = 0.570 Mton-m per meter wall run
pt (req.) = 0.03 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Horizontal Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Away from water face)

Vertical Direction
Max Vert Moment (Mx) Coeff. (Sag.) = -0.018 (Water face)
Mux (sagging) = -1.002 Mton-m per meter wall run
pt (req.) = 0.05 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Vertical Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Water face)
Max Vert Moment (Mx) Coeff. (Hog.) = 0.011 (Away from water face)
Mux (hogging) = 0.628 Mton-m per meter wall run
pt (req.) = 0.03 % 0.5*fck/fy(1-SQRT(1-4.6*Mu/fck*bd2))
Vertical Steel Provided = T 10 @ c/c 200 mm
pt (prov.) 0.15 % (Away from water face)

11
CRACK WIDTH (WORKING STRESS METHOD) - CRACKED SECTION ANALYSIS

2
Fck 35 N/mm σcbc 11.50 N/mm2
Moment at working (Mw) 40 kNm 40000000 Nmm m 8.12
Tension force working = N = 0 kN 0 deff 254.00 mm
Breadth(b) mm 1000 spacing s 100.00 mm2
Depth(D) mm 300 Es 200000 N/mm2
clearcover mm 40 pt 0.45 %
Ast provided mm2 1150 fy 500.00 N/mm2
Age at loading (creep coeffient) 1 Ec 29580.40
largest Bars in first layer dia . 12 mm
nos. 10
clear side cover to tension steel 40 mm
eff side cover 46 mm
Cmin 40 mm
Distance at which crackwidth is to be calculated (a) 300 mm
form the compression flange
effective cover (d') 46 mm
Allowable tensile stress in steel 0.55 Mpa
(long term)
Converged D-x 224.24
Assume x 75.76 mm d-x 178.24

fct 0.691943 Mpa Error in x 0.00 TOL 0.1


fsm 93.07376 Mpa Next x value 75.76
fc 4.873694 Mpa
x 75.75206 mm

acr 58.03124
Єm 0.000585
Wcr 0.088 mm

12
SLAB DESIGN

13
By DP MAHENDRA RAJ CONSULTANTS Project: NAGPUR METRO
Date 02-05-21 Doc No.:
Client :
Chd Subject : SLAB
Date Job No Nar Office Dept CV Sh of Rev No R0
DESIGN OF BOTTOM SLAB (UNDER WATER TANK)
CASE 1
Short span S= 2.000 mts
Long span L= 9.00 mts
Assumed slab thickness t= 0.300 mts
Grade of concrete fck= 35 N/mm^2
Grade of reinforcement fy= 500 N/mm^2

Type of panel Two adjacent sides discontinuous

Loads
9.00 mts
Self weight of slab w1= 7.50 kN/m^2
Floor finish 100 mm thk wpc w2= 2.40 kN/m^2
Water load w3= 40.00 kN/m^2
Structural Load w4= 40.00 kN/m^2 2.00 mts

Ratio of long span to short span R= 4.5 One Way Slab


Design Load with load factor of 1.5 Wu= 134.85 kN/m^2

Design
Coeff BM k pt Ast Dia Spacing
Short span direction
Negative moment at continuous edge 0.083 44.95 0.62 0.15 392 12 288
Positive moment at midspan 0.125 67.43 0.93 0.22 595 12 190
.
Long span direction
Negative moment at continuous edge 0 0.00 0.00 0.00 360.0 12 314
Positive moment at midspan 0 0.00 0.00 0.00 360.0 12 314

Minimum effective depth reqd dre= 118.15 mm


Clear cover to any reinforcement c= 25 mm
Minimum effective depth provided dpr= 257 mm greater than 'min. eff depth reqd'. Hence ok
Minimum reinforcement Amin= 360 mm^2

Deflection check

Reinf provided at midspan along short direction 565.49 mm^2 Dia 12 at 200 mm
Stress in reinforcement fs= 305.191962 N/mm^2
Percentage of reinforcement provided pt= 0.2102181 %
Modification factor as per fig 4 of IS:456-2000 MF= 1.27488101

Type of slab for deflection check Continuous


Basic span to effective depth ratio 26
Minimum effective depth reqd from deflection criteria 60.34 mm
Effective depth provided 269 mm greater than 'min. eff depth reqd'. Hence ok

14
By DP MAHENDRA RAJ CONSULTANTS Project: NAGPUR METRO
Date 02-05-21 Doc No.:
Client :
Chd Subject : SLAB
Date Job No Nar Office Dept CV Sh of Rev No R0
DESIGN OF BOTTOM SLAB (UNDER PUMP ROOM)
CASE 1
Short span S= 5.000 mts
Long span L= 7.00 mts
Assumed slab thickness t= 0.350 mts
Grade of concrete fck= 35 N/mm^2
Grade of reinforcement fy= 500 N/mm^2

Type of panel One long edge discontinuous

Loads
7.00 mts
Self weight of slab w1= 8.75 kN/m^2
Floor finish 100 mm thk wpc w2= 2.40 kN/m^2
Water load w3= 0.00 kN/m^2
False Ceiling w4= 0.00 kN/m^2 5.00 mts

Ratio of long span to short span R= 1.4 Two Way Slab


Design Load with load factor of 1.5 Wu= 16.73 kN/m^2

Design
Coeff BM k pt Ast Dia Spacing
Short span direction
Negative moment at continuous edge 0.063 26.34 0.26 0.06 420 12 269
Positive moment at midspan 0.047 19.65 0.19 0.04 420 12 269
.
Long span direction
Negative moment at continuous edge 0.037 15.47 0.15 0.04 420.0 12 269
Positive moment at midspan 0.028 11.71 0.12 0.03 420.0 12 269

Minimum effective depth reqd dre= 73.85 mm


Clear cover to any reinforcement c= 25 mm
Minimum effective depth provided dpr= 307 mm greater than 'min. eff depth reqd'. Hence ok
Minimum reinforcement Amin= 420 mm^2

Deflection check

Reinf provided at midspan along short direction 565.49 mm^2 Dia 12 at 200 mm
Stress in reinforcement fs= 215.38969 N/mm^2
Percentage of reinforcement provided pt= 0.17726855 %
Modification factor as per fig 4 of IS:456-2000 MF= 2

Type of slab for deflection check Continuous


Basic span to effective depth ratio 26
Minimum effective depth reqd from deflection criteria 96.15 mm
Effective depth provided 319 mm greater than 'min. eff depth reqd'. Hence ok

15
By AY MAHENDRA RAJ CONSULTANTS Project: NAGPUR METRO
Date 04-08-21 Doc No.:
Client :
Chd Subject : Top Slab
Date Job No NAR Office Dept CV Sh of Rev No R0
DESIGN OF TOP SLAB
CASE 1
Short span S= 3.500 mts
Long span L= 4.65 mts
Assumed slab thickness t= 0.150 mts
Grade of concrete fck= 35 N/mm^2
Grade of reinforcement fy= 500 N/mm^2

Type of panel One long edge discontinuous

Loads
4.65 mts
Self weight of slab w1= 3.75 kN/m^2
Floor finish 100 mm thk wpc w2= 2.50 kN/m^2
Live load w3= 2.00 kN/m^2
False Ceiling w4= 0.00 kN/m^2 3.50 mts

Ratio of long span to short span R= 1.35 Two Way Slab


Design Load with load factor of 1.5 Wu= 12.38 kN/m^2

Design
Coeff BM k pt Ast Dia Spacing
Short span direction
Negative moment at continuous edge 0.060 9.10 0.63 0.15 180 10 436
Positive moment at midspan 0.046 6.97 0.48 0.11 180 10 436
.
Long span direction
Negative moment at continuous edge 0.037 5.61 0.39 0.09 180.0 10 436
Positive moment at midspan 0.028 4.24 0.35 0.08 180.0 10 436

Minimum effective depth reqd dre= 43.40 mm


Clear cover to any reinforcement c= 25 mm
Minimum effective depth provided dpr= 110 mm greater than 'min. eff depth reqd'. Hence ok
Minimum reinforcement Amin= 180 mm^2

Deflection check

Reinf provided at midspan along short direction 392.70 mm^2 Dia 10 at 200 mm
Stress in reinforcement fs= 132.926208 N/mm^2
Percentage of reinforcement provided pt= 0.32724923 %
Modification factor as per fig 4 of IS:456-2000 MF= 2

Type of slab for deflection check Continuous


Basic span to effective depth ratio 26
Minimum effective depth reqd from deflection criteria 67.31 mm
Effective depth provided 120 mm greater than 'min. eff depth reqd'. Hence ok

16
STAAD INPUT DETAILS

17
18
19
STAAD OUTPUT DETAILS
BMD, SFD AND DEFLECTION

20
21
22
23
24
25
BEAM DESIGN

26
MAHENDRA RAJ CONSULTANTS
Project : Nagpur Metro Rail Project
Beam Design

Station : Nari Road Station


Structure : Pump Room Roof
Beam No : B1,B2,B4,B5

Beam details : Calculation :


Fck 35 Xu max(mm) = 180.32
Fy 500 d'/d = 0.1
b (mm) 200 Fsc = 412
D (mm) 450
cover (mm) 40
d( mm) 392
Mu lim 143.06
Ast min 133.28 (Ordinary)

Moments Top Bottom


Mu (L) (kN.m) 10 0
Mu (M) (kN.m) 0 30
Mu (R ) (kN.m) 60 0

Shear Force Unit KN


Vu (L) 50
Vu (R) 50

Description Top Bottom


L M R L M R
Mu (kN.m) 10 0 60 0 30 0
Singly/Doubly Singly Singly Singly Singly Singly Singly
Mu-Mu lim (
kN.m) 0.0 0.0 0.0 0.0 0.0 0.0
Pt 0.1 0.0 0.5 0.0 0.2 0.0
Ast(1) mm2 133.3 0.0 376.3 0.0 180.3 0.0
Asc mm2 0.0 0.0 0.0 0.0 0.0 0.0
Ast2 mm2 0.0 0.0 0.0 0.0 0.0 0.0
Ast 133.3 0.0 376.3 0.0 180.3 0.0

27
MAHENDRA RAJ CONSULTANTS
Project : Nagpur Metro Rail Project
Beam Design

Station : Nari Road Station


Structure : Pump Room Roof
Beam No : B1,B2,B4,B5

Reinforcement Provided Detail :


L M R
Bottom Bars Bottom Bars Bottom Bars
Layer 1 Layer 2 Layer 3 Layer 1 Layer 2 Layer 3 Layer 1 Layer 2 Layer 3
Dia of Bar 16 0 0 16 0 0 16 0 0
No of Bars 2 0 0 2 0 0 2 0 0
Area of Bars 402.12 0 0 402.12 0 0 402.12 0 0
Total Area 402.12 402.12 402.12
0.51
Top Bars Top Bars Top Bars
Dia of Bar 16 0 0 16 0 0 16 0 0
No of Bars 2 0 0 2 0 0 2 0 0
Area of Bars 402.12 0 0 402.12 0 0 402.12 0 0
Total Area 402.12 402.12 402.12
Pt provided 0.51 0.51

Shear Reinforcement Calculation :

L R
Vu (kN) 50.0 50.0
Tv =Vu/bd 0.6 0.6
Tc 0.5 0.5 Stirrups Provided details :
Tc bd 40.0 40.0 Dia Area No of legs Asv
Vus 10.0 10.0 10 78.54 2 157
Sv 294.0 294.0
Sv Provided 150.0 150.0

28
MAHENDRA RAJ CONSULTANTS
Project : Nagpur Metro Rail Project
Beam Design

Station : Nari Road Station


Structure : Pump Room Roof
Beam No : B3

Beam details : Calculation :


Fck 35 Xu max(mm) = 195.96
Fy 500 d'/d = 0.09
b (mm) 300 Fsc = 414.4
D (mm) 500
cover (mm) 40
d( mm) 426
Mu lim 253.43
Ast min 217.26 (Ordinary)

Moments Top Bottom


Mu (L) (kN.m) 100 0
Mu (M) (kN.m) 0 150
Mu (R ) (kN.m) 100 0

Shear Force Unit KN


Vu (L) 120
Vu (R) 120

Description Top Bottom


L M R L M R
Mu (kN.m) 100 0 100 0 150 0
Singly/Doubly Singly Singly Singly Singly Singly Singly
Mu-Mu lim (
kN.m) 0.0 0.0 0.0 0.0 0.0 0.0
Pt 0.5 0.0 0.5 0.0 0.7 0.0
Ast(1) mm2 575.1 0.0 575.1 0.0 894.6 0.0
Asc mm2 0.0 0.0 0.0 0.0 0.0 0.0
Ast2 mm2 0.0 0.0 0.0 0.0 0.0 0.0
Ast 575.1 0.0 575.1 0.0 894.6 0.0

29
MAHENDRA RAJ CONSULTANTS
Project : Nagpur Metro Rail Project
Beam Design

Station : Nari Road Station


Structure : Pump Room Roof
Beam No : B3

Reinforcement Provided Detail :


L M R
Bottom Bars Bottom Bars Bottom Bars
Layer 1 Layer 2 Layer 3 Layer 1 Layer 2 Layer 3 Layer 1 Layer 2 Layer 3
Dia of Bar 16 16 0 16 16 0 16 16 0
No of Bars 3 0 0 3 2 0 3 0 0
Area of Bars 603.18 0 0 603.18 402.12 0 603.18 0 0
Total Area 603.18 1005.3 603.18
0.79
Top Bars Top Bars Top Bars
Dia of Bar 16 16 0 16 0 0 16 20 0
No of Bars 3 0 0 3 0 0 3 0 0
Area of Bars 603.18 0 0 603.18 0 0 603.18 0 0
Total Area 603.18 603.18 603.18
Pt provided 0.47 0.47

Shear Reinforcement Calculation :

L R
Vu (kN) 120.0 120.0
Tv =Vu/bd 0.9 0.9
Tc 0.5 0.5 Stirrups Provided details :
Tc bd 62.6 62.6 Dia Area No of legs Asv
Vus 57.4 57.4 10 78.54 2 157
Sv 300.0 300.0
Sv Provided 200.0 200.0

30
MAHENDRA RAJ CONSULTANTS
Project : Nagpur Metro Rail Project
Beam Design

Station : Nari Road Station


Structure : Pump Room Roof
Beam No : B6

Beam details : Calculation :


Fck 35 Xu max(mm) = 195.96
Fy 500 d'/d = 0.09
b (mm) 300 Fsc = 414.4
D (mm) 500
cover (mm) 40
d( mm) 426
Mu lim 253.43
Ast min 217.26 (Ordinary)

Moments Top Bottom


Mu (L) (kN.m) 170 0
Mu (M) (kN.m) 0 60
Mu (R ) (kN.m) 170 0

Shear Force Unit KN


Vu (L) 105
Vu (R) 50

Description Top Bottom


L M R L M R
Mu (kN.m) 170 0 170 0 60 0
Singly/Doubly Singly Singly Singly Singly Singly Singly
Mu-Mu lim (
kN.m) 0.0 0.0 0.0 0.0 0.0 0.0
Pt 0.8 0.0 0.8 0.0 0.3 0.0
Ast(1) mm2 1035.2 0.0 1035.2 0.0 332.3 0.0
Asc mm2 0.0 0.0 0.0 0.0 0.0 0.0
Ast2 mm2 0.0 0.0 0.0 0.0 0.0 0.0
Ast 1035.2 0.0 1035.2 0.0 332.3 0.0

31
MAHENDRA RAJ CONSULTANTS
Project : Nagpur Metro Rail Project
Beam Design

Station : Nari Road Station


Structure : Pump Room Roof
Beam No : B6

Reinforcement Provided Detail :


L M R
Bottom Bars Bottom Bars Bottom Bars
Layer 1 Layer 2 Layer 3 Layer 1 Layer 2 Layer 3 Layer 1 Layer 2 Layer 3
Dia of Bar 16 16 0 16 16 0 16 16 0
No of Bars 3 0 0 3 0 0 3 0 0
Area of Bars 603.18 0 0 603.18 0 0 603.18 0 0
Total Area 603.18 603.18 603.18
0.47
Top Bars Top Bars Top Bars
Dia of Bar 25 16 0 25 0 0 25 20 0
No of Bars 2 1 0 3 0 0 3 0 0
Area of Bars 981.74 201.06 0 1472.6 0 0 1472.6 0 0
Total Area 1182.8 1472.61 1472.61
Pt provided 0.93 1.15

Shear Reinforcement Calculation :

L R
Vu (kN) 105.0 50.0
Tv =Vu/bd 0.8 0.4
Tc 0.7 0.7 Stirrups Provided details :
Tc bd 83.1 89.5 Dia Area No of legs Asv
Vus 21.9 -39.5 10 78.54 2 157
Sv 300.0 300.0
Sv Provided 200.0 200.0

32
COLUMN DESIGN

33
MAHENDRA RAJ CONSULTANTS PVT LTD.

SITABURDI STATION
COLUMN MEMBER: SC1 Subject: Design of column
Date: 08-04-2021

Z
Design of Unbraced column
Y Y ZD
Member Properties
Z
UNSUPPORTED LENGTH OF COLUMN ABOUT Z 3850 mm YD
UNSUPPORTED LENGTH OF COLUMN ABOUT Y 3850 mm
WIDTH OF COLUMN SECTION (YD) 300 mm
DEPTH OF COLUMN SECTION (ZD) 450 mm
EFFECTIVE LENGTH FACTOR FOR BENDING ABOUT Z 1.000 >=1.2
EFFECTIVE LENGTH FACTOR FOR BENDING ABOUT Y 1.000 >=1.2
CLEAR COVER TO SEC. REINFORCEMENT 40 mm >=30, for moderate exposure condition
BAR DIA (stirrup) 8 mm >=6mm
BAR DIA (main steel) 16 mm >=12mm
EFFECTIVE COVER 56.00 mm
Forces (factored) Unfactored Forces
Axial force 188.00 KN 18.8 Tons
Moment about Major axis (Mz) 30.00 KN-m 3 T-m
Moment about Minor axis (My) 2.00 KN-m 0.2 T-m

MATERIAL PROPERTIES
CONCRETE M 35
STEEL Fy 500
CALCULATION OF AXIAL LOAD AT BALANCE POINT (Pb)
PERCENTAGE STEEL p 1.2 >=0.8
p/fck 0.034
d'/D 0.187 2 1 for two face reinforcement
(k1)z 0.184 2 for four face reinforcement
(k2)z 0.028
d'/b 0.124
(k1)y 0.196
(k2)y 0.203
Puz 2704.10 KN
(Pb)z 873.90 KN
(Pb)y 958.75 KN

Axis about which minimum eccentricity moment is to be considered 3 Enter 1 for about major Axis (Z)
2 for about minor Axis (Y)
3 for about both the Axis
CALCULATION OF TOTAL DESIGN FORCES (KN-m)

DESIGN AXIAL LOAD ON COLUMN (KN) 188.00


About Z About Y

INITIAL MOMENTS 30.000 2.000


MIN. ECCENTRICITY (mm) 20.000 22.700
MOMENTS DUE TO MIN. ECCENTICITY 3.760 4.268
SLENDERNESS RATIOS 12.833 8.556 Long column about major axis(Z)
MOMENTS DUE TO SLENDERNESS EFFECTS 4.644 0.000
MOMENT REDUCTION FACTORS 1.000 1.000
ADDITIONAL MOMENTS 4.644 0.000

34
MAHENDRA RAJ CONSULTANTS PVT LTD.

SITABURDI STATION
COLUMN MEMBER: SC1 Subject: Design of column
Date: 08-04-2021

CHECK FOR ADEQUACY OF SECTION


Pu/Puz 0.070
p/fck 0.034
Pu/fckbD 0.040
d'/D 0.187 Muz1/fckbD2 0.06
Muz1 85.05 Muz/Muz1 0.407
2
d'/b 0.124 Muy1/fckDb 0.06
Muy1 127.575 Muy/Muy1 0.033
αn 1.000
(Muz/Muz1)αn 0.407
(Muy/Muy1)αn 0.033
(Muz/Muz1)αn+(Muy/Muy1)αn 0.441
<1.0, SAFE
AREA OF STEEL REQUIRED= 1608.4992 mm^2 Spacing of stirrups
Provide 8 Y 16 1608.4992 mm^2 16*db 256
0 Y 12 0 mm^2
1608.4992
1.19 % b 450 <=300
Provide Y 8 150 c/c