VBo architects + engineers ARCHITECTURAL SHEETS

VBo architects + engineers


A: Unit 5 2/F TSP Building, KM 30 National Road E: info@vboae.com
Tunasan, Muntinlupa City, Philippines www.vboae.com
T : 279717395

Project:
Location:
STATUS
SHEET NO. SHEET CONTENTS DRAWN BY DATE DUE SCALE REMARKS
25% 50% 75% 100%

COVER PAGE
A-000 Perspectives, Vicinity Map, Location Plan
Table of Contents, Site Development Plan
Architectural Notes, Legends & Index

FLOOR PLANS
A-101 Ground Floor Plan
Second Floor Plan

ELEVATIONS
A-201 Front Elevation
Rear Elevation
Left Elevation
Right Elevation

SECTIONS
A-301 Section 1

FLOOR PATTERN, POWER & AUX LAYOUT


A-401 Ground Floor FPPA
Second Floor FPPA

REFLECTED CEILING PLANS


A-501 Ground Floor RCP
Second Floor RCP

BAY SECTIONS
A-601 Bay Section 1

DOOR AND WINDOW SCHEDULE


A-701 Schedule of Doors & Windows
Door, Window Details (Frames, Jambs, Casings)

STAIRS & RAILING DETAILS


A-801 Stair & Railing Detail

T&B DETAILS
A-811 T&B Blow Ups

KITCHEN DETAILS
A-821 Kitchen Blow up

MISCELLANEOUS DETAILS
A-901 Miscellaneaous Details
Floor Terminations and Baseboard Details
Covelight Details
Mounting Height Details
VBo architects + engineers STRUCTURAL SHEETS

VBo architects + engineers


A: Unit 5 2/F TSP Building, KM 30 National Road E: info@vboae.com
Tunasan, Muntinlupa City, Philippines www.vboae.com
T : 279717395

Project:
Location:
STATUS
SHEET NO. SHEET CONTENTS DRAWN BY DATE DUE SCALE REMARKS
25% 50% 75% 100%

COVER PAGE
S-01 General Notes, Standards and References
Basic Design Loads
Materials

FOUNDATION PLAN
S-02 Foundation Plan

FRAMING PLAN
S-03 Ground Floor Framing Plan
Second Floor Framing Plan

SCHEDULE OF FOOTING TIE BEAMS


S-04 Schedule of Footing Tie Beams
Footing Tie Beam Elevation

SCHEDULE OF COLUMNS
S-05 Schedule of Columns
Typical Column Elevation

SCHEDULE OF STIFFENER COLUMNS


S-06 Schedule of Stiffener Columns

SCHEDULE OF REINFORCED CONCRETE GIRDERS


S-07 Schedule of Reinforced Concrete Girders

SCHEDULE OF REINFORCED CONCRETE BEAMS


S-08 Schedule of Reinforced Concrete Beams

SPOT DETAILS
S-09 Spot Detail 1

MISCELLANEOUS DETAILS
S-10 Miscellaneous Details
VBo architects + engineers ELECTRICAL SHEETS

VBo architects + engineers


A: Unit 5 2/F TSP Building, KM 30 National Road E: info@vboae.com
Tunasan, Muntinlupa City, Philippines www.vboae.com
T : 279717395

Project:
Location:
STATUS
SHEET NO. SHEET CONTENTS DRAWN BY DATE DUE SCALE REMARKS
25% 50% 75% 100%

COVER PAGE
EE-1 General Notes, Load Schedule
Short Circuit Calculation, Voltage Drop Calculation
Design Analysis

LIGHTING LAYOUT
EE-2 Ground Floor Lighting Layout
Second Floor Lighting Layout

POWER AND AUXILIARY LAYOUT


EE-3 Ground Floor Power and Auxiliary Layout
Second Floor Power and Auxiliary Layout
VBo architects + engineers PLUMBING SHEETS

VBo architects + engineers


A: Unit 5 2/F TSP Building, KM 30 National Road E: info@vboae.com
Tunasan, Muntinlupa City, Philippines www.vboae.com
T : 279717395

Project:
Location:
STATUS
SHEET NO. SHEET CONTENTS DRAWN BY DATE DUE SCALE REMARKS
25% 50% 75% 100%

COVER PAGE
P-1 General Notes, Legends
Material Specifications

WATE LINE LAYOUT


P-2 Ground Floor Water Line Layout
Second Floor Water Line Layout

WASTE LINE LAYOUT


P-3 Ground Floor Waste Line Layout
Second Floor Waste Line Layout

ROUGHING IN OF TOILETS
P-4 Roughing in of Toilets

MISCELLANEOUS DETAILS
P-5 Miscellaneaous Details
VBo architects + engineers MECHANICAL SHEETS

VBo architects + engineers


A: Unit 5 2/F TSP Building, KM 30 National Road E: info@vboae.com
Tunasan, Muntinlupa City, Philippines www.vboae.com
T : 279717395

Project:
Location:
STATUS
SHEET NO. SHEET CONTENTS DRAWN BY DATE DUE SCALE REMARKS
25% 50% 75% 100%

COVER PAGE
M-01 Equipment Schedule
Notes on Piping Installation

MECHANICAL VENTILATION LAYOUT


M-02 Ground Floor Mechanical Ventilation Layout
Second Floor Mechanical Ventilation Layout

MISCELLANEOUS DETAILS
M-04 Miscellaneous Details