Professional Documents
Culture Documents
Boka Polaris
Boka Polaris
SHEET
BOKA POLARIS
MULTI-ROLE DIVING SUPPORT VESSEL &
OFFSHORE CONSTRUCTION VESSEL
Fuel oil 1,327 m3 (abt.) Main machinery divided into two separate spaces each capable
of independent operation in event of fire/flooding etc. and
Potable water 464 m3 (abt.)
located clear of assumed side damage.
Ballast water 1,900 m3 (abt.)
Switchboards in two compartments also clear of regulation side
Lubricating oil 16 m3
damage area. Each main propulsion thruster and each tunnel
Stability tanks 1,118 m3 thruster is located in its own separate watertight compartment.
ACCOMMODATION
A third emergency control centre is located well above the free-
Wheelhouse and accommodation fully air conditioned. board deck, and inboard of regulation damage areas and
surrounded by fire-proof boundaries.
Total berths 104
Single 20
DYNAMIC POSITIONING SYSTEMS
Double 42
DP system comprises two main control systems within the wheel-
Hospital 1 Berth house with further independent control computer position within
The information contained in this data sheet is for guidance purposes only and may be subject to changes. © Boskalis. All rights reserved.
References 3 x DGPS
HELIDECK
Fanbeam
Load capability Cleaned for EC225 (11.0 t) 2 x Taut wire
2 x HIPAP 502
D value 19.5 m
Three gyro compasses
Heli-reception and full emergency equipment. Three wind sensors
Three motion reference units
MOONPOOLS
DECK MACHINERY
SIDE VIEW
Boskalis
PO Box 43
3350 AA Papendrecht
01 — 2021
The Netherlands
T +31 78 69 69 000
offshore.energy@boskalis.com
www.boskalis.com/offshore