Plumbing Final
Plumbing Final
doors
2.1
0.9
1.89 2 2 2 15.12 25 0.6048 1.25
facia
5.54
5.54
4.996
4.996
8.4
8.4
46.36
CARPENTRY WORKS
44.98
PLYWOOD 16.00 pcs
CEILING JOIST 225.00 bd.ft
CEMENT PLASTER FINISH
MAIN WALL
Length height #sets # faces AREA
7.00 2.60 1.00 1.00
7.00
9.00
3.00
GROUND
Length height #sets # faces
- 0.20 1.00 1.00
-
-
3.00
-
2.00
LESS WINDOWS
Length height #sets # faces
0.70 1.177 4.00 (2.00) (6.59)
0.70 1.177 8.00 (1.00) (6.59)
LESS DOORS
Length height #sets # faces
0.90 2.10 2.00 (2.00) (7.56)
82.56
MASONRY WORKS
MAIN WALL
length height # sets AREA
5.00 0.40 1.00
5.00 0.20
3.00 2.60
3.00 (0.25)
APEX
length height # sets
3.00 1.20 1.00 3.60
ALLEY
length height # sets
3.00 0.20 1.00
1.20 0.20
1.20
5.40 0.40 -
RAMP
length height # sets
2.00 0.20 0.50
2.00
-
4.00 0.20 -
SEPTIC VAULT
length height # sets
1.00 1.50 1.00
1.00
2.40
2.40
LESS WINDOWS #
length height # sets
1.80 1.200 (2.00) (4.32)
1.20 1.200 (2.00) (2.88)
LESS DOORS #
length height # sets 0.4 28 11.2
0.90 2.10 (1.00) (1.89)
41.71
STRUCTURAL CONCRETE
FOOTING
width length depth # sets
0.80 0.80 0.25 4.00 0.64
COLUMN
width length depth # sets
0.15 0.40 1.10 4.00
(0.25)
0.20
2.60
(0.25)
COLUMN APEX
width length depth # sets
0.15 0.40 1.50 -
BEAM
width length depth # sets
0.15 5.00 0.25 1.00
5.00
3.00
3.00
SLOPING BEAM
width length depth # sets
0.10 2.77 0.20 4.00 0.22
FLOORING SLAB
width length depth # sets
5.00 3.00 0.075 1.00 1.13
1.20 3.00 0.075 -
WALL FOOTING
width length depth # sets
0.30 5.00 0.15 1.00
5.00
3.00
3.00
RAMP
width length depth # sets
1.20 2.00 0.075 -
SEPTIC VAULT
width length depth # sets
1.00 2.40 0.10 1.00
1.00 2.40 0.08 1.00
4.12
REINFORCING STEEL BARS
1.100917 1.090909 1.071429
FOOTING 16mm 12mm 10mm TIE WIRE
Length #pcs # sets kg/m
F-1 0.90 10.00 4.00 0.888 31.97 5.60
COLUMN
Length #pcs # sets kg/m
C-1 0.20
1.10 1.6
0.20 6 6
2.60 8 4.4
0.05
4.15 76.8 1.6
4.15 6.00 4.00 0.888 88.44 237.60 121.1904 1.578 0
TIES 1.1
Length #pcs # sets kg/m 6 #VALUE!
0.80 15.00 4.00 1 1.1
0.30 18.00 20
LINTEL BEAM
Length #pcs # sets kg/m
5.40 4.00 1.00
5.40
3.40
3.40
SEPTIC VAULT
WALL FOOTING
Length #pcs # sets kg/m
5.00 2.00 1.00
5.00
3.00
3.00
TIES
0.30 16.00
(1.60)
DOWELS
Perimeter Spacing # pcs Length kg/m
VERTICALS 5.00 0.60 8.00 0.20
5.00 0.60 8.00 0.40
3.00 0.60 4.00 0.20
3.00 0.60 4.00 2.60
DOWELS
Perimeter Spacing # pcs Length kg/m
HORIZONTALS 0.40 0.60 5.00
0.20 5.00
2.60 3.00
(0.25) 3.00
#VALUE!
6.666667
6.666667
6.666667
BACKFILL
area main
inside
Length Width Depth # Sets Volume
5.00 3.00 0.125 1.00 1.88
5.00 1.20 0.125 1.00 -
cr
2.00 1.80 0.10 2.00 -
1.88
ramp
1.8 0.5
1.8
1.5
5.1 0.5 2.55
gross 2.55
window #
wid hgt
0.7 1.177 10 8.239
doors
2.1 0.9 2 3.78
2.1 0.6 1 1.26
13.279
net -10.729
septic
wid hght
1 1.5
1
2.4
2.4
6.8
6.8 1.5 10.2
-0.529
Excav
Footing
width length depth # Volume
0.80 0.80 1.10 4.00 2.82
Wall footing
width length depth
0.30 5.00 0.60
5.00
3.00
3.00
(3.20)
septc tnk
width depth height
1.00 2.40 1.40
5.12
BACK-UP COMPUTATION
Construction of 1-Storey, 1 CL.Rm. School Building at Coliling NHS,Coliling,San Carlos City, Pangasinan
Q = ALL Q = ALL
Q = ALL Q = ALL
PREPARED BY:
PERT / CPM
#REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF!
404 (a.1) Reinforcing Steel for Column Footing & WF 2,103.41 kgs 119,547.94 #REF!
#REF! #REF! 75
1010 Door 426.72 sq.m 20,475.28 #REF!
#REF!
SPL1 Personal Protective Equipments (PPE) 480.00 Mandays/proj. - #REF!
#REF!
Spl. 1 Railings #REF! SQ.M. - #REF!
#REF! #REF! 50
#REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF! #REF! #REF! #REF! #REF! 25
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
PROJECT TITLE: Construction of Technical and Vocational-Livelihood Laboratory Building at Speaker Eugenio Perez National Agricultural School
San Carlos City, Pangasinan
Contract Duration 90 C.D.
Princeton Integrated School: An Innovative Green Engineer Design
ITEM TOTAL INDIRECT
DESCRIPTION QUANTITY UNIT MARK-UP IN % TOTAL MARK-UP
NO. TOTAL DIRECT COST VAT COST TOTAL COST (pesos) UNIT COST (pesos)
OCM CP TOTAL (%) VALUE (pesos)
(1) (2) (3) (4) (5) (6) (7) (8) (9) ( 10 ) ( 11 ) ( 12 ) ( 13 )
803(a) Structure Excavation (common earth) 26.15 cu.m. 7,686.63 12% 10% 22% 1,691.06 468.88 2,159.94 9,846.57 376.57
804 (a) Backfilling of excavated materials 12.10 cu.m. 428.87 12% 10% 22% 94.35 26.16 120.51 549.39 45.42
804 (b) Embankment (Backfilling & Tampering) 59.02 cu.m. 21,563.65 12% 10% 22% 4,744.00 1,315.38 6,059.39 27,623.04 468.03
1000 (a) Soil Poisoning 191.25 SQ.M 10,906.01 12% 10% 22% 2,399.32 665.27 3,064.59 13,970.59 73.05
404 (a.1) Reinforcing Steel for Column Footing & WF 2,103.41 kgs 93,323.92 12% 10% 22% 20,531.26 5,692.76 26,224.02 119,547.94 56.84
900 (a.1) Reinforce Concrete Column Footing & FTB 15.85 cu.m. 48,111.92 12% 10% 22% 10,584.62 2,934.83 13,519.45 61,631.37 3,887.45
404 (a.2) Reinforcing Steel for Column 1,829.42 kgs 81,438.88 12% 10% 22% 17,916.55 4,967.77 22,884.32 104,323.20 57.03
900 (a.2) Reinforce Concrete for Column 6.98 cu.m. 57,113.49 12% 10% 22% 12,564.97 3,483.92 16,048.89 73,162.38 10,477.96
404 (a.3) Reinforcing Steel for Beam 1,894.92 kgs 84,355.04 12% 10% 22% 18,558.11 5,145.66 23,703.77 108,058.80 57.03
900 (a.3) Reinforce Concrete for Beam 6.79 cu.m. 52,048.72 12% 10% 22% 11,450.72 3,174.97 14,625.69 66,674.41 9,821.31
404 (a.4) Reinforcing Steel for Slab on fill 2,644.35 klgs. 115,906.76 12% 10% 22% 25,499.49 7,070.31 32,569.80 148,476.57 56.15
900e Reinforce Concrete Slab on Fill 803.65 cu.m. 2,399,157.18 12% 10% 22% 527,814.58 146,348.59 674,163.17 3,073,320.34 3,824.20
506(1) Masonry Works (CHB) 7,418.65 sq.m 3,858,089.85 12% 10% 22% 848,779.77 235,343.48 1,084,123.25 4,942,213.09 666.19
1010 Door 426.72 sq.m 15,983.83 12% 10% 22% 3,516.44 975.01 4,491.46 20,475.28 47.98
1018 Ceramic Tiles 15.80 sq.m 17,049.64 12% 10% 22% 3,750.92 1,040.03 4,790.95 21,840.58 1,382.32
1002 Plumbing Works All L.S. 890,335.80 12% 10% 22% 195,873.88 54,310.48 250,184.36 1,140,520.16 979,369.38
1006 Steel Window 816.48 SQ.M 119,097.60 12% 10% 22% 26,201.47 7,264.95 33,466.43 152,564.03 186.86
1010 (a) Door Frames & Accessories 214.00 SETS 10,568.62 12% 10% 22% 2,325.10 644.69 2,969.78 13,538.40 63.26
1027 Cement Plaster Finish 14,957.06 sq.m 2,438,800.59 12% 10% 22% 536,536.13 148,766.84 685,302.96 3,124,103.55 208.87
403 (a) Steel Trusses #REF! kgs #REF! 12% 10% 22% #REF! #REF! #REF! #REF! #REF!
1003 Carpentry & Joinery Works 226.65 SQ.M. 102,467.39 12% 10% 22% 22,542.83 6,250.51 28,793.34 131,260.73 579.13
1013 Roofing Works 240.36 sq.m 168,133.30 12% 10% 22% 36,989.32 10,256.13 47,245.46 215,378.75 896.06
1032a-2 Wooden Painting 476.78 SQ.M 39,568.67 12% 10% 22% 8,705.11 2,413.69 11,118.80 50,687.47 106.31
1032a-1 Masonry Painting 59,828.24 SQ.M 2,516,808.39 12% 10% 22% 553,697.85 153,525.31 707,223.16 3,224,031.55 53.76
1100 Conduit Boxes & Fittings 144.00 L.M. 12,403.78 12% 10% 22% 2,728.83 756.63 3,485.46 15,889.25 110.34
1101 Wires & Wiring Devices 640.00 L.M. 57,240.75 12% 10% 22% 12,592.96 3,491.69 16,084.65 73,325.40 114.57
1102a Lighting Fixtures 21.00 SETS 40,750.02 12% 10% 22% 8,965.00 2,485.75 11,450.76 52,200.78 2,485.75
1102 Panel Boards & Cabinets 1.00 set 11,595.24 12% 10% 22% 2,550.95 707.31 3,258.26 14,853.50 14,853.50
Spl. 1 Railings #REF! SQ.M. #REF! 12% 10% 22% #REF! #REF! #REF! #REF! #REF!
Spl.2 Occupational Safety & Health All LS #REF! 0% 10% 10% #REF! #REF! #REF! #REF! #REF!
Spl 3 Project Billboard 1.00 each 7,796.31 0% 10% 10% 779.63 428.80 1,208.43 9,004.74 9,004.74
TWO MILLION FIVE HUNDRED EIGHTY SEVEN THOUSAND PESOS ONLY #REF! #REF! TOTAL: #REF!
Q = ALL Q = ALL
LESS DOORS
D1 0.90 2.10 178.00 2.00 (672.84)
D2 0.70 2.10 36.00 2.00 (105.84)
TOTAL 14,957.06 SQ.M
QUANTITY QUANTITY
1 1
TOTAL 1.00 SETS
SPL-1 Railings
LENGTH WIDTH QUANTITY QUANTITY
38mm dia. G.I. Pipe 9.00 22.00 198.00 L.M.
Accordion Dr. #REF! 2.90 #REF! SQ.M.
TOTAL #REF! SQ.M.
Q = ALL Q = ALL
Q = 1 EACH Q = 1 EACH
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Pangasinan IV District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Area Equipment Compound
Sta. Barbara, Pangasinan
16-Feb-16
INDIVIDUAL PROGRAM OF WORK
Name of Project : Construction of Technical and Vocational-
Livelihood Laboratory Building at Speaker
Eugenio Perez National Agricultural School
Location : San Carlos City, Pangasinan Issued Obligated Authority :
Project Category : School Building Calendar Days to Complete : 90 CD
Appropriation : P2,600,000.00 Desirable Starting Date : Upon Approval
Source of Fund : Net Length :
% OF
DESCRIPTION OF WORK TO BE DONE EQUIPMENT/Nos.
TOTAL
APPROVED:
MARIETA B. MENDOZA
Distric Engineer
CONCURRED:
TOTAL ITEM
ITEM NO. DESCRIPTION %TOTAL UNIT QUANTITY UNIT COST TOTAL UNIT COST
COST
file:///conversion/tmp/activity_task_scratch/621623912.xls
BREAKDOWN OF ESTIMATE EXPENDITURE TOTAL AMOUNT
(%) (PESOS)
ESTIMATE COST:
a) DIRECT COST -
1. Mobilization / Demobilization
2. Materials #REF! -
2.1 Supply/ Delivery
2.2 Testing of Materials
3. Labor ( Including fringe benefit) #REF! -
4. Equipment Expenses #REF! -
5. Well Development
CONTINGENCIES/ RESERVES
#REF! #REF!
This is to certify that the Preliminary Engineering has been conducted for the
Construction of 1-Storey 2CL.RM. School Building at Olea NHS , located at Olea,
Malasiqui, Pangasinan.
This certification was initiated to conform with the implementing rules and
regulations of R.A. 9184.
Noted:
MARIETA B. MENDOZA
OIC- District Engineer
UNIT PRICED ANALYSIS
Item No. 803(a)
Structure Excavation (common earth) QUANTITY 26.15 cu.m.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: 0.7500 cu.m / hour
MATERIAL COST
Sub- Total -
unit cost -
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
Output rate:
LABOR COST
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 293.97
PREPARED BY: 12% of total DC OCM 35.28
10% of total DC CP 29.40
5% of (total DC+OCM+CP) VAT 17.93
Total Direct & Indirect Unit Cost 376.57
Total Direct & Indirect Cost 9,846.57
DETAILED ESTIMATES
Item No. 803(b)
Structure Excavation (sand) QUANTITY 100.00 cu.m.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: 1.2926 cu.m / hour
MATERIAL COST
Sub- Total -
unit cost -
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
Output rate:
LABOR COST
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost
PREPARED BY: 12% of total DC OCM -
10% of total DC CP -
12% of (total DC+OCM+CP) VAT -
Total Direct & Indirect Unit Cost -
Total Direct & Indirect Cost -
DETAILED ESTIMATES
Item No. 803(c)
Structure Excavation (clay) QUANTITY 100.00 cu.m.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: 2.5940 cu.m / hour
MATERIAL COST
Sub- Total -
unit cost -
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
Output rate:
LABOR COST
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost
PREPARED BY: 12% of total DC OCM -
10% of total DC CP -
12% of (total DC+OCM+CP) VAT -
Total Direct & Indirect Unit Cost -
Total Direct & Indirect Cost -
DETAILED ESTIMATES
Item No. 803(d)
Structure Excavation (rock) QUANTITY 1.00 cu.m.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: 0.3225 cu.m / hour
MATERIAL COST
Sub- Total -
unit cost -
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
Output rate:
LABOR COST
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost
PREPARED BY: 12% of total DC OCM -
10% of total DC CP -
12% of (total DC+OCM+CP) VAT -
Total Direct & Indirect Unit Cost -
Total Direct & Indirect Cost -
UNIT PRICED ANALYSIS
Item No. 804 (a)
Backfilling of excavated materials QUANTITY 12.10 cu.m.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: 3.1125 cu.m / hour
MATERIAL COST
Sub- Total -
unit cost -
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
Output rate:
LABOR COST
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 35.46
PREPARED BY: 12% of total DC OCM 4.25
10% of total DC CP 3.55
5% of (total DC+OCM+CP) VAT 2.16
Total Direct & Indirect Unit Cost 45.42
Total Direct & Indirect Cost 549.39
UNIT PRICED ANALYSIS
Item No. 804 (b)
Embankment (Backfilling & Tampering) QUANTITY 59.02 cu.m.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: 5.3289 cu.m / hour
River mix (plus 10% loose volume) 65.00 cu.m 300.00 19,500.00
MATERIAL COST
Output rate:
Output rate:
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 57.02
PREPARED BY: 12% of total DC OCM 6.84
10% of total DC CP 5.70
5% of (total DC+OCM+CP) VAT 3.48
Total Direct & Indirect Unit Cost 73.05
Total Direct & Indirect Cost 13,970.59
UNIT PRICED ANALYSIS
Item No. 404 (a.1)
Reinforcing Steel for Column Footing & WF QUANTITY 2,103.41 kgs
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: fabrication = 25.5000 kgs / hour
placing = 35.9025 kgs / hour
MATERIAL COST
Output rate:
Output rate:
Output rate:
Output rate:
Output rate:
Output rate:
Output rate:
Output rate:
Output rate:
Output rate:
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 520.05
PREPARED BY: 12% of total DC OCM 62.41
10% of total DC CP 52.01
5% of (total DC+OCM+CP) VAT 31.72
Total Direct & Indirect Unit Cost 666.19
Total Direct & Indirect Cost 4,942,213.09
UNIT PRICED ANALYSIS
Item No. 1010
Door QUANTITY 426.72 sq.m
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: 0.4652 sq.m / hour
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 37.46
PREPARED BY: 12% of total DC OCM 4.49
10% of total DC CP 3.75
5% of (total DC+OCM+CP) VAT 2.28
Total Direct & Indirect Unit Cost 47.98
Total Direct & Indirect Cost 20,475.28
DETAILED UNIT PRICE ANALYSIS
Item No. 1018
Ceramic Tiles QUANTITY 15.80 sq.m
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: Laying glazed tiles = 1.1200 sq.m / hour
Laying unglazed tiles = 0.7800 sq.m / hour
MATERIAL COST
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 890,335.80
10% of total DC CP 89,033.58
Total Direct & Indirect Unit Cost 979,369.38
Total Direct & Indirect Cost 979,369.38
UNIT PRICED ANALYSIS
Item No. 1006
Steel Window QUANTITY 816.48 SQ.M
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: 1.0125 sq.m. / hour
Sub- Total -
unit cost -
Direct Unit Cost 145.87
PREPARED BY: 12% of total DC OCM 17.50
10% of total DC CP 14.59
5% of (total DC+OCM+CP) VAT 8.90
Total Direct & Indirect Unit Cost 186.86
Total Direct & Indirect Cost 152,564.03
UNIT PRICED ANALYSIS
Item No. 1010 (a)
Door Frames & Accessories QUANTITY 214.00 SETS
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: 6.6682 set / hour
Output rate:
None
Sub- Total -
unit cost -
Direct Unit Cost 49.39
PREPARED BY: 12% of total DC OCM 5.93
10% of total DC CP 4.94
5% of (total DC+OCM+CP) VAT 3.01
Total Direct & Indirect Unit Cost 63.26
Total Direct & Indirect Cost 13,538.40
UNIT PRICED ANALYSIS
Item No. 1027
Cement Plaster Finish QUANTITY 14,957.06 sq.m
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: CHB Plastering= 2.3750 sq.m / hour
MATERIAL COST
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 163.05
PREPARED BY: 12% of total DC OCM 19.57
10% of total DC CP 16.31
5% of (total DC+OCM+CP) VAT 9.95
Total Direct & Indirect Unit Cost 208.87
Total Direct & Indirect Cost 3,124,103.55
UNIT PRICED ANALYSIS
Item No. 1003
Carpentry & Joinery Works QUANTITY 63.00 sq.m
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: Frame Works = 2.5500 sq.m / hour
Plywood Installation = 3.4000 sq.m / hour
MATERIAL COST
Sub- Total
unit cost -
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
Output rate:
Skilled Laborer (carpenter) 4.00 30.26 47.62 5,763.92
LABOR COST
Sub- Total
unit cost -
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
EQUIPMENT COST
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost -
PREPARED BY: 12% of total DC OCM -
10% of total DC CP -
12% of (total DC+OCM+CP) VAT -
Total Direct & Indirect Unit Cost -
Total Direct & Indirect Cost -
UNIT PRICED ANALYSIS
Item No. 403 (a)
Steel Trusses QUANTITY #REF! kgs
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: fabrication = 85.0000 kgs / hour
erection/Installation = 0.2000 kgs / hour
painting = 12.7500 L.M/ hour
Output rate:
Output rate:
Skilled Laborer (carpenter) 5.00 87.10 47.62 20,738.51
LABOR COST
Output rate:
Sub- Total -
unit cost -
Direct Unit Cost 452.10
PREPARED BY: 12% of total DC OCM 54.25
10% of total DC CP 45.21
5% of (total DC+OCM+CP) VAT 27.58
Total Direct & Indirect Unit Cost 579.13
Total Direct & Indirect Cost 131,260.73
UNIT PRICED ANALYSIS
Item No. 1013
Roofing Works QUANTITY 240.36 sq.m
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: fabrication = 34.0000 sq.m. / hour
erection/Installation = 0.2000 kgs / hour
Output rate:
Glazing Putty -
Flat Wall Enamel (Primer) 19.87 gals. 480.00 9,535.60
Enamel Quick Dry 19.87 gals. 500.00 9,932.92
Paint Thinner 3.00 gals. 240.00 720.00
Assorted Tintin Color (Enamel) 10.00 ltr. 150.00 1,500.00
Misc. wall putty, punching compound etc. All L.S. 4,000.00 4000.00
Output rate:
Output rate:
Sub- Total
unit cost -
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
Output rate:
LABOR COST
Sub- Total
unit cost -
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
EQUIPMENT COST
Output rate:
Sub- Total
unit cost -
Direct Unit Cost -
PREPARED BY: 12% of total DC OCM -
10% of total DC CP -
12% of (total DC+OCM+CP) VAT -
Total Direct & Indirect Unit Cost -
Total Direct & Indirect Cost -
UNIT PRICED ANALYSIS
Item No. 1100
Conduit Boxes & Fittings QUANTITY 144.00 L.M.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: fabrication = 3.5000 lm./ hour ###
wt pe
PVC Pipe 12.50mm DIA. 3.0 meters 80.00 pcs. 69.00 5,520.00
RSC Pipe 25mm DIA. 3.0 mtrs. 3.00 pcs. 834.00 2,502.00
Locknuts and Bushing 12.50mm DIA. 30.00 pcs. 6.00 180.00
PVC - ELBOW - 12.50mm DIA. 30.00 pcs. 12.00 360.00
MATERIAL COST
Output rate:
None
Sub- Total -
unit cost -
Direct Unit Cost 86.14
PREPARED BY: 12% of total DC OCM 10.34
10% of total DC CP 8.61
5% of (total DC+OCM+CP) VAT 5.25
Total Direct & Indirect Unit Cost 110.34
Total Direct & Indirect Cost 15,889.25
UNIT PRICED ANALYSIS
Item No. 1101
Wires & Wiring Devices QUANTITY 640.00 L.M.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: fabrication = 37.5000 lm. / hour
Output rate:
None -
Sub- Total -
unit cost -
Direct Unit Cost 89.44
PREPARED BY: 12% of total DC OCM 10.73
10% of total DC CP 8.94
5% of (total DC+OCM+CP) VAT 5.46
Total Direct & Indirect Unit Cost 114.57
Total Direct & Indirect Cost 73,325.40
UNIT PRICED ANALYSIS
Item No. 1102a
Lighting Fixtures QUANTITY 21.00 SETS
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: fabrication = 1.0000 ckt. / hour
Output rate:
None -
Sub- Total -
unit cost -
Direct Unit Cost 1,940.48
PREPARED BY: 12% of total DC OCM 232.86
10% of total DC CP 194.05
5% of (total DC+OCM+CP) VAT 118.37
Total Direct & Indirect Unit Cost 2,485.75
Total Direct & Indirect Cost 52,200.78
UNIT PRICED ANALYSIS
Item No. 1102
Panel Boards & Cabinets QUANTITY 1.00 set
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: fabrication = 0.5000 set / hour
-
MATERIAL COST
-
Panelboard & Cabinets BOLT ON 15 HOLES
1.00 set 3,500.00 3,500.00
Circuit Breaker Bolt-on type 40 amp. 8.00 set 400.00 3,200.00
Circuit Breaker Bolt-on type 20 amp. 7.00 set 400.00 2,800.00
MAIN Circuit Breaker Plug In type 250 amp. 1.00 set 2,000.00 2,000.00
Output rate:
None
Sub- Total -
unit cost -
Direct Unit Cost 11,595.24
PREPARED BY: 12% of total DC OCM 1,391.43
10% of total DC CP 1,159.52
5% of (total DC+OCM+CP) VAT 707.31
Total Direct & Indirect Unit Cost 14,853.50
Total Direct & Indirect Cost 14,853.50
UNIT PRICED ANALYSIS
Item No. SPL1
Personal Protective Equipments (PPE) QUANTITY 480.00 Mandays/proj.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
MATERIAL COST
Sub- Total
unit cost
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
Output rate:
LABOR COST
None
2.00 - -
Sub- Total -
unit cost -
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
EQUIPMENT COST
Output rate:
None
Sub- Total -
unit cost -
Direct Unit Cost -
PREPARED BY: 0% of total DC OCM -
10% of total DC CP -
12% of (total DC+OCM+CP) VAT -
Total Direct & Indirect Unit Cost -
Total Direct & Indirect Cost -
UNIT PRICED ANALYSIS
Item No. SPL2
Safety Health Officer QUANTITY #REF! hrs./proj.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
None
MATERIAL COST
Sub- Total -
unit cost #REF!
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
LABOR COST
Sub- Total
unit cost #REF!
DESCRIPTION NO HOURS RATE(Pesos) TOTAL(Pesos)
EQUIPMENT COST
None
Sub- Total -
unit cost #REF!
Direct Unit Cost #REF!
PREPARED BY: 0% of total DC OCM #REF!
10% of total DC CP #REF!
12% of (total DC+OCM+CP) VAT #REF!
Total Direct & Indirect Unit Cost #REF!
Total Direct & Indirect Cost #REF!
DETAILED UNIT PRICE ANALYSIS
Item No. Spl. 1
Railings QUANTITY #REF! SQ.M.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Output rate: installation = 0.7500 L.M / hour
MATERIAL COST
Output rate:
2,000.00
Total Direct Cost #REF!
PREPARED BY: 0% of total DC OCM #REF!
10% of total DC CP #REF!
5% of (total DC+OCM+CP) VAT #REF!
Total Item Cost #REF!
Adjusted Unit Cost #REF!
DETAILED ESTIMATES
Item No. Spl 3
Project Billboard QUANTITY 1.00 each
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Assumed Output/day 1.00 gal./man-day
DPWH BILLBOARD
Tarpaulin 32.00 sq.m. 30.00 960.00
Ordinary Plywood 1/4 1.00 pcs. 315.00 315.00
Coco Lumber 2 x 3 x 12 12.00 bd.ft. 28.00 336.00
MATERIAL COST
COA BILLBOARD
Tarpaulin 64.00 sq.m. 30.00 1,920.00
Ordinary Plywood 1/4 2.00 pcs. 315.00 630.00
Coco Lumber 2 x 3 x 12 24.00 bd.ft. 28.00 672.00
Coco Lumber 2 x 2 x 12 32.00 bd.ft. 28.00 896.00
Assorted CWN 4.00 kgs. 70.00 280.00
Sub- Total
unit cost -
Direct Unit Cost 7,796.31
PREPARED BY: 0% of total DC OCM -
10% of total DC CP 779.63
5% of (total DC+OCM+CP) VAT 428.80
Total Direct & Indirect Unit Cost 9,004.74
Total Direct & Indirect Cost 9,004.74
DETAILED ESTIMATES
Item No. 1100
Electrical Works QUANTITY All L.S.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Assumed Output/day
Sub- Total
unit cost -
DESCRIPTION NO DAYS RATE(Pesos) TOTAL(Pesos)
Assumed Output/day - -
Sub- Total
unit cost -
DESCRIPTION NO DAYS RATE(Pesos) TOTAL(Pesos)
Assumed Output/day - -
EQUIPMENT COST
Sub- Total -
unit cost -
Direct Unit Cost -
PREPARED BY: 12% of total DC OCM -
12% of total DC CP -
12% of (total DC+OCM+CP) VAT -
Total Direct & Indirect Unit Cost -
Total Direct & Indirect Cost -
DETAILED ESTIMATES
Item No. Spl.5
Steel Gate & Perimeter Fences QUANTITY All L.S.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Assumed Output/day
Sub- Total
unit cost -
DESCRIPTION NO DAYS RATE(Pesos) TOTAL(Pesos)
Assumed Output/day - -
Note:
Labor includes repair & installation of old fences.
Sub- Total -
unit cost -
DESCRIPTION NO DAYS RATE(Pesos) TOTAL(Pesos)
Assumed Output/day - -
Sub- Total
unit cost -
Direct Unit Cost -
PREPARED BY: 12% of total DC OCM -
12% of total DC CP -
12% of (total DC+OCM+CP) VAT -
Total Direct & Indirect Unit Cost -
Total Direct & Indirect Cost -
Department of Public Works and Highways (DPWH)
Contract ID : 12AJ0017
Contract Name : Completion of Multi-Purpose Building at Buenlag 1st & Manabong Sur, Bayambang, Pangasinan, Construction of 2-Cl at
Arenas NHS, Ambayat 2nd, Bayambang, Pangasinan, Construction of 1-Cl at Bogaoan E/S, San Carlos City and Completion
of Multi-Purpose Building (Gym) at Brgy. Coliling & Brgy. Quintong, San Carlos City, Pangasinan (CLUSTER I)
MATERIALS COST
Flourescent Lighting Fixtures (40 watts) with box type housing ………………………… 650.00 / sets
Lighting Fixture (CFL 20 A) 150.00 / sets
Bulb Receptacles 45.00 / pcs.
Light Switch 1 way 2 gang 140.00 / pc.
Light Switch 1 way 1 gang 140.00 / pc.
Copper Wire #3.50mm2 TW 26.00 / mtrs.
Electrical Tape 40.00 / roll
PVC Pipe Flexible 1/2"dia. 15.00 / mtrs.
PVC Coupling PNS 14,1/2" dia. 10.00 / pcs.
PVC Pipe PNS 14,1/2"dia. 70.00 / pcs.
PVC Pipe PNS 14 1"dia. 140.00 / pcs.
PVC Adapter PNS 14,1/2"dia. 15.00 / pcs.
Entrance cap # 1/2"Ø 65.00 / pcs,
Junction Box (Deep tape w/ Cover) 30.00 / pcs.
Utility Box (Deep tape) ………………………… 25.00 / pcs.
PVC Pipe Flexible 1/2"dia. ………………………… 15.00 / mtrs.
1 set enclosed Panel box w/ 30 AT 2,450.00 / set
main Breaker and 2-20 AT Branch
Convenience outlet/w plate 150.00 / pcs.
EQUIPMENT RENTALS
Description Rentals
Plate Compactor ………………………… 610.00
Bar Cutter (manually operated) ………………………… 350.00
Concrete Mixer (1-Bagger) ………………………… 1,390.00
Concrete Vibrator ………………………… 510.00
Water truck (1000 gal) ………………………… 7,750.00
Welding machine ………………………… 500.00
Cutting Outfit w/ complete accessories ………………………… 150.00
Demountable Beam w/ Ropes ………………………… 700.00
Electric Drill ………………………… 100.00
Riveter ………………………… 100.00
Angle Grinder ………………………… 100.00
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 12AJ0030
Contract Name: Completion of Hospital at Bayambang District Hospital and Construction of Multi-Purpose Bldg. (Daycare) at
Brgy. Sanlibo, Bayamabang, Pangasinan, Improvement of Multi-Purpose Bldg at Doyong NHS, Construction of
Multi-Purpose Bldg. at Bureau of Jail Management and Penology, Construction of Multi-Purpose Pavement at
Brgys. Sapinit, Polo and Turac, San Carlos City, Pangasinan (CLUSTER VI)
Contract Location: Bayambang & San Carlos City, Pangasinan
DETAILED ESTIMATES
Construction of 1-Storey, 1 CL.Rm. School Building at Coliling NHS,Coliling,San Carlos City, Pangasinan
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 4 2.00 530.00 4,240.00
Semi-skilled Laborer (Leadman) 2 2.00 350.00 1,400.00
Unskilled Laborer 0 2.00 290.00 -
Sub-total 5,640.00
Sub-total 111,247.32
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 3 1.00 530.00 1,590.00
Skilled Laborer (Steelman) 2 1.00 400.00 800.00
Unskilled Laborer 0 1.00 290.00 -
Sub-total 2,390.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 3 1.00 350.00 1,050.00
Sub-total 1,050.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland Cement, 40 kgs 4,054.00 bags 220.00 891,880.00
Washed Sand 213.40 cu. m. 500.00 106,700.00
3/4" Crushed Gravel 427.00 cu. m. 600.00 256,200.00
Gravel fill 4.00 cu. m. 450.00 1,800.00
Forms All LS 5,000.00 5,000.00
Sub-total 1,261,580.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 0 4.00 530.00 -
Skilled Laborer (Mason/Carpenter) 0 4.00 400.00 -
Unskilled Laborer 0 4.00 290.00 -
Sub-total -
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete Mixer (1-Bagger) 1 4.00 1,390.00 5,560.00
Minor tools (10% of Labor) 0.00
Sub-total 5,560.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Marine Plywood 1/4" x 4' x 8' 1.00 pcs. 355.00 355.00
Ceiling joists (Nailers/Hangers) 6.00 bd. Ft. 75.00 450.00
Assorted CWN 35.00 kgs. 70.00 2,450.00
Sub-total 3,255.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 0 12.00 530.00 -
Skilled Laborer (Carpenter) 0 12.00 400.00 -
Unskilled Laborer 0 12.00 290.00 -
Sub-total -
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Scaffoldings LS All 3,000.00 3,000.00
Sub-total 3,000.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
0.00 0.00 0.00 1,850.00 -
#REF! #REF! #REF! 920.00 #REF!
#REF! #REF! #REF! 6,500.00 #REF!
0.00 0.00 0.00 2,850.00 -
#REF! #REF! #REF! 75.00 #REF!
#REF! #REF! #REF! 450.00 #REF!
#REF! #REF! #REF! 35.00 #REF!
MAIN Circuit Breaker Plug In type 250 amp. 1.00 set 70.00 70.00
0.00 0.00 0.00 1,000.00 1,000.00
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 0 0.00 530.00 -
Skilled Laborer (Carpenter) 0 0.00 400.00 -
Unskilled Laborer 0 0.00 290.00 -
Sub-total -
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Electric drill 1 0.00 100.00 -
Minor tools (10% of Labor) -
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Flourescent Lighting Fixtures (40 watts) with box
type housing 1.00 pcs. 650.00 650.00
Compact flourescent lamp 1.00 pcs. 150.00 150.00
Porcelain socket # 4"Ø 1.00 pcs. 45.00 45.00
Light Switch 1 way 3 gang - pcs. 140.00 -
Light Switch 1 way 2 gang - pcs. 140.00 -
Light Switch 1 way 1 gang 2.00 pcs. 140.00 280.00
PVC Coupling PNS 14,1/2" dia. 15.00 pcs. 15.00 225.00
PVC Pipe PNS 14,1/2"dia. 30.00 pcs. 70.00 2,100.00
PVC Pipe PNS 14,1"dia. 1.00 pcs. 140.00 140.00
PVC Adapter PNS 14,1/2"dia. 1.00 pcs. 15.00 15.00
Entrance cap # 1/2"Ø 1.00 pcs, 65.00 65.00
Junction Box (Deep tape w/ Cover) 17.00 pcs. 30.00 510.00
Copper Wire #3.50mm2 TW 350.00 mtrs 26.00 9,100.00
Electrical Tape 3.00 pcs. 40.00 120.00
Utility Box (Deep tape) 20.00 pcs. 25.00 500.00
PVC Pipe Flexible 1/2"dia. 80.00 mtrs 15.00 1,200.00
Ligthing Panel Air circuit breaker 1.00 set 2,450.00 2,450.00
Miscellaneous materials 500.00 500.00
Sub-total 18,050.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 5.00 530.00 2,650.00
Skilled Laborer (Electrician) 1 5.00 400.00 2,000.00
Unskilled Laborer 1 5.00 290.00 1,450.00
Sub-total 6,100.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Wall Fan 4.00 sets 6,750.00 27,000.00
Equipment for Fire Alarm Bell / with accessories 1.00 sets 80.00 80.00
0 0.00 0 25.00 -
0 0.00 0 125.00 -
0 0.00 0 125.00 -
0 0.00 0 110.00 -
0 0.00 0 60.00 -
0 0.00 0 290.00 -
0 0.00 0 580.00 -
0 0.00 0 290.00 -
0 0.00 0 185.00 -
DESCRIPTION NO HOURS 500.00 500.00
Sub-total 27,580.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 0 0.00 530.00 -
Skilled Laborer (Plumber) 0 0.00 400.00 -
Unskilled Laborer 0 0.00 290.00 -
Sub-total -
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
0 #REF! 0 10.00 #REF!
Safety Helmet #REF! Man-Days 220.00 #REF!
Safety Gloves #REF! Man-Days 500.00 #REF!
Safety Shoes #REF! Man-Days 52.00 #REF!
0 25.00 0 55.00 1,375.00
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 0 #DIV/0! 530.00 #DIV/0!
Skilled Laborer (Mason) NO #DIV/0! 400.00 #DIV/0!
Unskilled Laborer 0 #DIV/0! 290.00 #DIV/0!
Sub-total #DIV/0!
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Output rate: 1 #DIV/0! 1,390.00 #DIV/0!
Minor tools (10% of Labor) #DIV/0!
Sub-total #DIV/0!
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland Cement, 40 kgs #VALUE! bags 220.00 #VALUE!
Washed Sand #VALUE! cu.m 500.00 #VALUE!
Sub-total #VALUE!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 0 #REF! 530.00 #REF!
Skilled Laborer (Mason) 0 #REF! 400.00 #REF!
Unskilled Laborer NO #REF! 290.00 #REF!
Sub-total #REF!
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Scaffoldings 1 lot 2,500.00 2,500.00
Sub-total 2,500.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
0.00 198.00 l.m. 220.00 43,560.00
0.00 0.00 0 250.00 -
DESCRIPTION NO HOURS 180.00 #VALUE!
#REF!
#REF! #REF! #REF! 430.00 #REF!
#REF! #REF! #REF! 80.00 #REF!
Miscellaneous #REF! #REF! 500.00 500.00
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 0 0.00 530.00 -
Skilled Laborer (Tinsmithman) 0 0.00 400.00 -
Unskilled Laborer 0 0.00 290.00 -
Sub-total -
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Electric Drill 0 0.00 100.00 -
Riveter 0 0.00 100.00 -
Scaffoldings 1 lot 2,500.00 2,500.00
Sub-total 2,500.00
A. MATERIALS
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Safety Gears All LS 5,000.00 5,000.00
Signages, Barricades & Medicines All LS 8,000.00 8,000.00
Sub-total 13,000.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
First Aider 1.00 6.00 290.00 1,740.00
Part time Safety Practitioner 1.00 4.00 530.00 2,120.00
Sub-total 3,860.00
Construction of 1-Storey, 1 CL.Rm. School Building at Coliling NHS,Coliling,San Carlos City, Pangasinan
Item No. Description Amount
804 (a) Backfilling of excavated materials 7,740.07
404 (a.1) Reinforcing Steel for Column Footing & WF 118,906.11
1010 Door 1,301,962.39
1102 Panel Boards & Cabinets 68,410.68
SPL1 Personal Protective Equipments (PPE) #REF!
0 0 -
SPL2 Safety Health Officer #REF!
Spl. 1 Railings #REF!
#REF! #REF! #VALUE!
#REF! #REF! #REF!
#REF! #REF! #VALUE!
One Million One Hundred Ninety Three Thousand Four Hundred Three & 23/100 pesos.
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 12AJ0030
Contract Name: Completion of Hospital at Bayambang District Hospital and Construction of Multi-Purpose Bldg. (Daycare) at Brgy. Sanlibo, Bayamabang,
Pangasinan, Improvement of Multi-Purpose Bldg at Doyong NHS, Construction of Multi-Purpose Bldg. at Bureau of Jail Management and
Penology, Construction of Multi-Purpose Pavement at Brgys. Sapinit, Polo and Turac, San Carlos City, Pangasinan (CLUSTER VI)
BILL OF QUANTITIES
Part No. Part Description:
Construction of 1-Storey, 1 CL.Rm. School Building at Coliling NHS,Coliling,San Carlos City, Pangasinan
(Columns (1), (2), (3) and (4) are to be filled up by the
Procuring Entity) (Column (5) and (6) to be filled up by the Bidder)
Pay Item no. Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
twenty six thousand sixteen & 42/100 twenty six thousand sixteen & 42/100
#REF! #REF! LS All
pesos pesos
In figures: In figures:
Php #REF! Php #REF!
In words: Pesos In words: Pesos
twenty one thousand nine hundred eighty twenty one thousand nine hundred eighty
#REF! #REF! LS All
& 99/100 pesos & 99/100 pesos
In figures: In figures:
Php #VALUE! Php #VALUE!
TOTAL AMOUNT IN WORDS
One Million One Hundred Ninety Three Thousand Four Hundred Three & 23/100 pesos.
Php #REF!
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
Submitted By:
GEORGE T. LI
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
STATEMENT OF WORK ACCOMPLISHED
as of August 25, 2012
Construction of 1-Storey, 1 CL.Rm. School Building at Coliling NHS,Coliling,San Carlos City, Pangasinan
APPROVED QUANTITY TOTAL VALUE OF WORK ACCOMP
ITEM NO. DESCRIPTION UNIT TOTAL QTY: UNIT COST ITEM COST % Wt.
PREVIOUS THIS BILLING TO DATE PREVIOUS THIS BILLING TO DATE (%)
804 (a) Backfilling of excavated materials cu.m. 12.10 639.68 7,740.07 #REF! 10.75 10.75 6,876.51 6,876.51 #REF!
404 (a.1) Reinforcing Steel for Column Footing & WF kgs 2,103.41 56.53 118,906.11 #REF! 178.78 178.78 10,106.46 10,106.46 #REF!
1010 Door sq.m 426.72 3,051.09 1,301,962.39 #REF! 3.65 3.65 11,136.49 11,136.49 #REF!
1102 Panel Boards & Cabinets set 1.00 68,410.68 68,410.68 #REF! - - - - #REF!
SPL1 Personal Protective Equipments (PPE) Mandays/proj. 480.00 #REF! #REF! #REF! - - #REF! #REF! #REF!
0 0 L.S. All - - #REF! 0.20 0.20 - - #REF!
SPL2 Safety Health Officer hrs./proj. #REF! #REF! #REF! #REF! - - #REF! #REF! #REF!
Spl. 1 Railings SQ.M. #REF! #REF! #REF! #REF! 279.72 279.72 #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #VALUE! #VALUE! #VALUE! - - #VALUE! #VALUE! #VALUE!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! - - #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #VALUE! #VALUE! #VALUE! 0.27 0.27 #VALUE! #VALUE! #VALUE!
By:
KENWOOD CONSTRUCTION ENTERPRISES ISADORA D. PORTUGUEZ ELDRED M. MISLANG BLESILDA P. ESTRADA ALEX S. MAIQUEZ
Contractor Architech II Project Engineer II OIC-Chief Planning & Design Section. OIC-Chief MQC Section
Q = ALL Q = ALL
Q = ALL Q = ALL
Q = ALL Q = ALL
Q = ALL Q = ALL
Q = ALL Q = ALL
STATEMENT OF WORK ACCOMPLISHED
as of August 25, 2012
By:
KENWOOD CONSTRUCTION ENTERPRISES ISADORA D. PORTUGUEZ ELDRED M. MISLANG BLESILDA P. ESTRADA ALEX S. MAIQUEZ
Contractor Architech II Project Engineer II OIC-Chief Planning & Design Se OIC-Chief MQC Section
Construction of 1-Storey, 1 CL.Rm. School Building at Coliling NHS,Coliling,San Carlos City, Pangasinan
APPROVED QUANTITY TOTAL VALUE OF WORK ACCOMP
ITEM NO. DESCRIPTION UNIT TOTAL QTY: UNIT COST ITEM COST % Wt.
PREVIOUS THIS BILLING TO DATE PREVIOUS THIS BILLING TO DATE (%)
804 (a) Backfilling of excavated materials cu.m. 12.10 639.68 7,740.07 #REF! 10.75 1.35 12.10 6,180.07 1,560.00 7,740.07 #REF!
404 (a.1) Reinforcing Steel for Column Footing & WF kgs 2,103.41 56.53 118,906.11 #REF! 178.78 1,924.63 2,103.41 15,248.15 103,657.96 118,906.11 #REF!
1010 Door sq.m 426.72 3,051.09 1,301,962.39 #REF! 3.65 423.07 426.72 22,039.07 1,279,923.32 1,301,962.39 #REF!
1102 Panel Boards & Cabinets set 1.00 68,410.68 68,410.68 #REF! 1.00 1.00 68,410.68 68,410.68 #REF!
SPL1 Personal Protective Equipments (PPE) Mandays/proj. 480.00 #REF! #REF! #REF! 1.00 1.00 #REF! #REF! #REF!
0 0 L.S. All - - #REF! 0.20 0.80 1.00 10,225.62 (10,225.62) - #REF!
SPL2 Safety Health Officer hrs./proj. #REF! #REF! #REF! #REF! 1.00 1.00 #REF! #REF! #REF!
Spl. 1 Railings SQ.M. #REF! #REF! #REF! #REF! 279.72 #REF! #REF! 269,211.70 #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #VALUE! #VALUE! #VALUE! #REF! #REF! #VALUE! #VALUE! #VALUE!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! 1.00 1.00 #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #VALUE! #VALUE! #VALUE! 0.27 0.73 1.00 5,934.87 #VALUE! #VALUE! #VALUE!
By:
KENWOOD CONSTRUCTION ENTERPRISES ISADORA D. PORTUGUEZ ELDRED M. MISLANG BLESILDA P. ESTRADA ALEX S. MAIQUEZ
Contractor Architech II Project Engineer II OIC-Chief Planning & Design Section. OIC-Chief MQC Section
By:
KENWOOD CONSTRUCTION ENTERPRISES ISADORA D. PORTUGUEZ ELDRED M. MISLANG BLESILDA P. ESTRADA ALEX S. MAIQUEZ
Contractor Architech II Project Engineer II OIC-Chief Planning & Design Secti OIC-Chief MQC Section
MATERIALS COST
Flourescent Lighting Fixtures (40 watts) with box type housing ………………………… 650.00 / sets
Lighting Fixture (CFL 20 A) 150.00 / sets
Bulb Receptacles 45.00 / pcs.
Light Switch 1 way 2 gang 140.00 / pc.
Light Switch 1 way 1 gang 140.00 / pc.
Copper Wire #3.50mm2 TW 26.00 / mtrs.
Electrical Tape 40.00 / roll
PVC Pipe Flexible 1/2"dia. 15.00 / mtrs.
PVC Coupling PNS 14,1/2" dia. 10.00 / pcs.
PVC Pipe PNS 14,1/2"dia. 70.00 / pcs.
PVC Pipe PNS 14 1"dia. 140.00 / pcs.
PVC Adapter PNS 14,1/2"dia. 15.00 / pcs.
Entrance cap # 1/2"Ø 65.00 / pcs,
Junction Box (Deep tape w/ Cover) 30.00 / pcs.
Utility Box (Deep tape) ………………………… 25.00 / pcs.
PVC Pipe Flexible 1/2"dia. ………………………… 15.00 / mtrs.
1 set enclosed Panel box w/ 30 AT 2,450.00 / set
main Breaker and 2-20 AT Branch
Convenience outlet/w plate 150.00 / pcs.
EQUIPMENT RENTALS
Description Rentals
Plate Compactor ………………………… 610.00
Bar Cutter (manually operated) ………………………… 350.00
Concrete Mixer (1-Bagger) ………………………… 1,390.00
Concrete Vibrator ………………………… 510.00
Water truck (1000 gal) ………………………… 7,750.00
Welding machine ………………………… 500.00
Cutting Outfit w/ complete accessories ………………………… 150.00
Demountable Beam w/ Ropes ………………………… 700.00
Electric Drill ………………………… 100.00
Riveter ………………………… 100.00
Angle Grinder ………………………… 100.00
Submitted By:
ROADTECH CONSTRUCTION
Name of the Bidder
KENNETH C. TAN
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 12AJ0030
Contract Name: Completion of Hospital at Bayambang District Hospital and Construction of Multi-Purpose Bldg. (Daycare) at Brgy.
Sanlibo, Bayamabang, Pangasinan, Improvement of Multi-Purpose Bldg at Doyong NHS, Construction of Multi-Purpose
Bldg. at Bureau of Jail Management and Penology, Construction of Multi-Purpose Pavement at Brgys. Sapinit, Polo and
Turac, San Carlos City, Pangasinan (CLUSTER VI)
Contract Location: Bayambang & San Carlos City, Pangasinan
DETAILED ESTIMATES
Construction of 1-Storey, 1 CL.Rm. School Building at Coliling NHS,Coliling,San Carlos City, Pangasinan
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 4 2.00 540.00 4,320.00
Semi-skilled Laborer (Leadman) 2 2.00 350.00 1,400.00
Unskilled Laborer 0 2.00 280.00 -
Sub-total 5,720.00
Sub-total 117,625.55
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 3 1.00 540.00 1,620.00
Skilled Laborer (Steelman) 2 1.00 400.00 800.00
Unskilled Laborer 0 1.00 280.00 -
Sub-total 2,420.00
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Bar Cutter 3 1.00 350.00 1,050.00
Sub-total 1,050.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland Cement, 40 kgs 4,054.00 bags 225.00 912,150.00
Washed Sand 213.40 cu. m. 480.00 102,432.00
3/4" Crushed Gravel 427.00 cu. m. 580.00 247,660.00
Gravel fill 4.00 cu. m. 450.00 1,800.00
Forms All LS 5,000.00 5,000.00
Sub-total 1,269,042.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 0 4.00 540.00 -
Skilled Laborer (Mason/Carpenter) 0 4.00 400.00 -
Unskilled Laborer 0 4.00 280.00 -
Sub-total -
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Concrete Mixer (1-Bagger) 1 4.00 1,390.00 5,560.00
Minor tools (10% of Labor) 0.00
Sub-total 5,560.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Marine Plywood 1/4" x 4' x 8' 1.00 pcs. 355.00 355.00
Ceiling joists (Nailers/Hangers) 6.00 bd. Ft. 75.00 450.00
Assorted CWN 35.00 kgs. 70.00 2,450.00
Sub-total 3,255.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 0 12.00 540.00 -
Skilled Laborer (Carpenter) 0 12.00 400.00 -
Unskilled Laborer 0 12.00 280.00 -
Sub-total -
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Scaffoldings LS All 3,000.00 3,000.00
Sub-total 3,000.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
0.00 0.00 0.00 1,850.00 -
#REF! #REF! #REF! 920.00 #REF!
#REF! #REF! #REF! 6,500.00 #REF!
0.00 0.00 0.00 2,850.00 -
#REF! #REF! #REF! 75.00 #REF!
#REF! #REF! #REF! 450.00 #REF!
#REF! #REF! #REF! 35.00 #REF!
MAIN Circuit Breaker Plug In type 250 amp. 1.00 set 70.00 70.00
0.00 0.00 0.00 1,000.00 1,000.00
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 0 0.00 540.00 -
Skilled Laborer (Carpenter) 0 0.00 400.00 -
Unskilled Laborer 0 0.00 280.00 -
Sub-total -
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Electric drill 1 0.00 100.00 -
Minor tools (10% of Labor) -
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Flourescent Lighting Fixtures (40 watts) with box type
housing 1.00 pcs. 650.00 650.00
Compact flourescent lamp 1.00 pcs. 150.00 150.00
Porcelain socket # 4"Ø 1.00 pcs. 45.00 45.00
Light Switch 1 way 3 gang - pcs. 140.00 -
Light Switch 1 way 2 gang - pcs. 140.00 -
Light Switch 1 way 1 gang 2.00 pcs. 140.00 280.00
PVC Coupling PNS 14,1/2" dia. 15.00 pcs. 15.00 225.00
PVC Pipe PNS 14,1/2"dia. 30.00 pcs. 70.00 2,100.00
PVC Pipe PNS 14,1"dia. 1.00 pcs. 140.00 140.00
PVC Adapter PNS 14,1/2"dia. 1.00 pcs. 15.00 15.00
Entrance cap # 1/2"Ø 1.00 pcs, 65.00 65.00
Junction Box (Deep tape w/ Cover) 17.00 pcs. 30.00 510.00
Copper Wire #3.50mm2 TW 350.00 mtrs 26.00 9,100.00
Electrical Tape 3.00 pcs. 40.00 120.00
Utility Box (Deep tape) 20.00 pcs. 25.00 500.00
PVC Pipe Flexible 1/2"dia. 80.00 mtrs 15.00 1,200.00
Ligthing Panel Air circuit breaker 1.00 set 2,450.00 2,450.00
Miscellaneous materials 500.00 500.00
Sub-total 18,050.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 1 5.00 540.00 2,700.00
Skilled Laborer (Electrician) 1 5.00 400.00 2,000.00
Unskilled Laborer 1 5.00 280.00 1,400.00
Sub-total 6,100.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Wall Fan 4.00 sets 6,750.00 27,000.00
Equipment for Fire Alarm Bell / with accessories 1.00 sets 80.00 80.00
0 0.00 0 25.00 -
0 0.00 0 125.00 -
0 0.00 0 125.00 -
0 0.00 0 110.00 -
0 0.00 0 60.00 -
0 0.00 0 290.00 -
0 0.00 0 580.00 -
0 0.00 0 290.00 -
0 0.00 0 185.00 -
DESCRIPTION NO HOURS 500.00 500.00
Sub-total 27,580.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 0 0.00 540.00 -
Skilled Laborer (Plumber) 0 0.00 400.00 -
Unskilled Laborer 0 0.00 280.00 -
Sub-total -
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Sub-total -
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
0 #REF! 0 10.00 #REF!
Safety Helmet #REF! Man-Days 225.00 #REF!
Safety Gloves #REF! Man-Days 480.00 #REF!
Safety Shoes #REF! Man-Days 55.00 #REF!
0 25.00 0 57.00 1,425.00
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 0 #DIV/0! 540.00 #DIV/0!
Skilled Laborer (Mason) NO #DIV/0! 400.00 #DIV/0!
Unskilled Laborer 0 #DIV/0! 280.00 #DIV/0!
Sub-total #DIV/0!
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Output rate: 1 #DIV/0! 1,390.00 #DIV/0!
Minor tools (10% of Labor) #DIV/0!
Sub-total #DIV/0!
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Portland Cement, 40 kgs #VALUE! bags 225.00 #VALUE!
Washed Sand #VALUE! cu.m 480.00 #VALUE!
Sub-total #VALUE!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 0 #REF! 540.00 #REF!
Skilled Laborer (Mason) 0 #REF! 400.00 #REF!
Unskilled Laborer NO #REF! 280.00 #REF!
Sub-total #REF!
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Scaffoldings 1 lot 2,500.00 2,500.00
Sub-total 2,500.00
A. MATERIALS:
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
0.00 198.00 l.m. 220.00 43,560.00
0.00 0.00 0 250.00 -
DESCRIPTION NO HOURS 180.00 #VALUE!
#REF!
#REF! #REF! #REF! 430.00 #REF!
#REF! #REF! #REF! 80.00 #REF!
Miscellaneous #REF! #REF! 500.00 500.00
Sub-total #REF!
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
Construction Foreman 0 0.00 540.00 -
Skilled Laborer (Tinsmithman) 0 0.00 400.00 -
Unskilled Laborer 0 0.00 280.00 -
Sub-total -
C. EQUIPMENT COST
DESCRIPTION NO. DAYS RATE TOTAL
Electric Drill 0 0.00 100.00 -
Riveter 0 0.00 100.00 -
Scaffoldings 1 lot 2,500.00 2,500.00
Sub-total 2,500.00
A. MATERIALS
DESCRIPTION QTY UNIT UNIT PRICE TOTAL
Safety Gears All LS 5,000.00 5,000.00
Signages, Barricades & Medicines All LS 8,000.00 8,000.00
Sub-total 13,000.00
B. LABOR
DESCRIPTION NO. DAYS RATE TOTAL
First Aider 1.00 6.00 280.00 1,680.00
Part time Safety Practitioner 1.00 4.00 540.00 2,160.00
Sub-total 3,840.00
Construction of 1-Storey, 1 CL.Rm. School Building at Coliling NHS,Coliling,San Carlos City, Pangasinan
Item No. Description Amount
804 (a) Backfilling of excavated materials 7,889.42
404 (a.1) Reinforcing Steel for Column Footing & WF 124,702.08
1010 Door 1,309,634.68
1102 Panel Boards & Cabinets 68,836.26
SPL1 Personal Protective Equipments (PPE) #REF!
0 0 -
SPL2 Safety Health Officer #REF!
Spl. 1 Railings #REF!
#REF! #REF! #VALUE!
#REF! #REF! #REF!
#REF! #REF! #VALUE!
One Million One Hundred Ninety Five Thousand One Hundred Ninety Eight & 76/100 pesos.
Submitted By:
ROADTECH CONSTRUCTION
Name of the Bidder
KENNETH C. TAN
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
Department of Public Works and Highways (DPWH)
Contract ID : 12AJ0030
Contract Name: Completion of Hospital at Bayambang District Hospital and Construction of Multi-Purpose Bldg. (Daycare) at Brgy. Sanlibo, Bayamabang,
Pangasinan, Improvement of Multi-Purpose Bldg at Doyong NHS, Construction of Multi-Purpose Bldg. at Bureau of Jail Management and
Penology, Construction of Multi-Purpose Pavement at Brgys. Sapinit, Polo and Turac, San Carlos City, Pangasinan (CLUSTER VI)
BILL OF QUANTITIES
Part No. Part Description:
Construction of 1-Storey, 1 CL.Rm. School Building at Coliling NHS,Coliling,San Carlos City, Pangasinan
(Columns (1), (2), (3) and (4) are to be filled up by the
Procuring Entity) (Column (5) and (6) to be filled up by the Bidder)
Pay Item no. Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
twenty six thousand fifty five & 66/100 twenty six thousand fifty five & 66/100
#REF! #REF! LS All
pesos pesos
In figures: In figures:
Php #REF! Php #REF!
In words: Pesos In words: Pesos
twenty two thousand fourteen & 14/100 twenty two thousand fourteen & 14/100
#REF! #REF! LS All
pesos pesos
In figures: In figures:
Php #VALUE! Php #VALUE!
TOTAL AMOUNT IN WORDS
One Million One Hundred Ninety Five Thousand One Hundred Ninety Eight & 76/100 pesos.
Php #REF!
Submitted By:
ROADTECH CONSTRUCTION
Name of the Bidder
KENNETH C. TAN
(Name & Signature of the duly Authorized Bidder's Representative)
Submitted By:
ROADTECH CONSTRUCTION
Name of the Bidder
KENNETH C. TAN
(Name & Signature of the duly Authorized Bidder's Representative)
MANAGER
(Position of the duly Authorized Bidder's Representative)
DETAILED ESTIMATES
Item No. Spl.4
Steel Gate & Perimeter Fences QUANTITY All L.S.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
Assumed Output/day
MATERIAL COST
Note:
Labor includes repair & installation of old fences.
12 1.00 12
Sub- Total 1,493.27
DESCRIPTION NO DAYS RATE(Pesos) TOTAL(Pesos)
Electric Drill 1 1.00 85.00 85.00
EQUIPMENT COST
Sub- Total -
DESCRIPTION NO DAYS RATE(Pesos) TOTAL(Pesos)
Construction Foreman 1.00 1.00 524.36 524.36
Semi-skilled Laborer (Leadman) 1.00 1.00 351.21 351.21
Unskilled Laborer 3.00 1.00 293.96 881.88
LABOAR COST
Sub- Total -
Total Direct Cost 1,757.45
PREPARED BY: 12% of total DC OCM 210.89
12% of total DC CP 210.89
12% of (total DC+OCM+CP) VAT 261.51
Total Item Cost 2,440.75
Adjusted Unit Cost #VALUE!
DETAILED ESTIMATES
Item No. 104
Structure Backfill QUANTITY #VALUE! cu.m.
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
River mix #VALUE! cu.m. 300.00 #VALUE!
MATERIAL COST
Sub- Total -
Total Direct Cost #VALUE!
PREPARED BY: 12% of total DC OCM #VALUE!
12% of total DC CP #VALUE!
12% of (total DC+OCM+CP) VAT #VALUE!
Total Item Cost #VALUE!
Adjusted Unit Cost #VALUE!
DETAILED ESTIMATES
Item No. 409
Structural Steel QUANTITY All L.S
DESCRIPTION QUANTITY UNIT U- PRICE(P) TOTAL(Pesos)
C-Rafter 46mmx150mm (1.20mm) 7.00 pcs. 1,060.00 7,420.00
C-Purlins 44mm x 75mm (1.0mm) 12.00 pcs. 455.00 5,460.00
Facia Board 50mm x 250mm (0.98mm) 5.00 pcs. 1,000.00 5,000.00
Anchor Bolt, 12mmØ x 150mm 12.00 pcs. 100.00 1,200.00
Anchor Bolt, 12mmØ x 100mm 12.00 pcs. 70.00 840.00
Base Plate 150mm x 150mm x 4mm 2.00 pcs. 150.00 300.00
MATERIAL COST
Pre-painted ready made ridge roll (0.40mm) 3.00 pcs. 475.00 1,425.00
Pre-painted ready made Flashing (0.40mm) 7.00 pcs. 475.00 3,325.00
Pre-painted ready made Gutter (0.40mm) 3.00 pcs. 475.00 1,425.00
Tekscrew 350.00 pcs. 1.85 647.50
Miscellaneous (sealant, blind revits, etc.,) All LS 300.00 300.00
56,666.50
DESCRIPTION NO DAYS RATE TOTAL(Pesos)
Construction Foreman 1.00 1.00 524.36 524.36
Skilled Laborer (Tinsmithman) 1.00 1.00 380.99 380.99
LABOR COST