The document contains a calculation of the surface area of various blowdown piping supports that require painting. It lists 34 items with details like mark, line size, profile size, quantity, length, surface area, and total surface area. The total calculated surface area requiring painting is 129.65 square meters. Richard had asked Ahmed if the required coating quantity was calculated to finalize pricing with MCSC. Ahmed provided the surface area calculation as requested.
The document contains a calculation of the surface area of various blowdown piping supports that require painting. It lists 34 items with details like mark, line size, profile size, quantity, length, surface area, and total surface area. The total calculated surface area requiring painting is 129.65 square meters. Richard had asked Ahmed if the required coating quantity was calculated to finalize pricing with MCSC. Ahmed provided the surface area calculation as requested.
The document contains a calculation of the surface area of various blowdown piping supports that require painting. It lists 34 items with details like mark, line size, profile size, quantity, length, surface area, and total surface area. The total calculated surface area requiring painting is 129.65 square meters. Richard had asked Ahmed if the required coating quantity was calculated to finalize pricing with MCSC. Ahmed provided the surface area calculation as requested.
The document contains a calculation of the surface area of various blowdown piping supports that require painting. It lists 34 items with details like mark, line size, profile size, quantity, length, surface area, and total surface area. The total calculated surface area requiring painting is 129.65 square meters. Richard had asked Ahmed if the required coating quantity was calculated to finalize pricing with MCSC. Ahmed provided the surface area calculation as requested.
Sent: 20 September 2022 12:54 To: Richard Nwachukwu-External Cc: hussainhameedali@alhassanainco.com Subject: RE: Coating of Loose Structural Members
CAUTION: This email originated from outside the organization.
T.EN's email filtering system did not identify this email as malicious however please do not click links, images or open attachments unless you recognize the sender and validate that any links appear valid. Dear Richard ,
Please find below QTY.
Surface Area Calculation For Painting of Blowdown Piping Supports
From: Richard Nwachukwu-External <richard.nwachukwu2@ttsjv.com>
Sent: 20 September 2022 12:50 To: Ahmed Zakaria <a.zakaria@alhassanainco.com> Cc: hussainhameedali@alhassanainco.com Subject: RE: Coating of Loose Structural Members 2 Have you guys calculated the required quantity? Subcontracting needs it to final the pricing with MCSC.
From: Ahmed Zakaria <a.zakaria@alhassanainco.com>
Sent: 20 September 2022 12:45 To: Richard Nwachukwu-External <richard.nwachukwu2@ttsjv.com> Cc: hussainhameedali@alhassanainco.com Subject: Coating of Loose Structural Members
CAUTION: This email originated from outside the organization.
T.EN's email filtering system did not identify this email as malicious however please do not click links, images or open attachments unless you recognize the sender and validate that any links appear valid. Dear Richard ,