CIVIL ENGINEERING DEPARTMENT
DCC10032 — CIVIL ENGINEERING MATERIALS
DIPLOMA IN CIVIL ENGINEERING, SESSION: 1 2021/2022
NAME :
REGISTRATIONNO. :
Topic:
T2__:Concrete Works At The Construction Site [PLO10/ CLo2:A2)
13: Reinforced Concrete [PLO10/CLO2:A2]
TS :Timber {PLO10/ CLo2:A2]
DIRECTION: Answer all question
In Malaysia, the construction industry has lagged behind compared with other industries in
improving the quality which Is main contributor to the economy of country. It faces a lot of problem such
as high fragmentation, instability, lack of material standards, poor quality and low productivity. The
project quality is the key to success and the quality level of a project reflects the level of technology and
‘management (Jiang, 2010). Low and Peh (1996) states that the quality of construction work is dependent
toa large extend on the attitudes of the contractors and consultants. Hence, the quality of the products
is adversely affected if the parties to the contract do not carry out their duties properly.
It is very importance to have a good coordination flow and improved teamwork to achieve the
project quality objectives. Construction offers much more variability; each project represents a unique
formula of design, location, personnel, materials, weather, cost, and time. Idoro (2010) indicate that the
quality of the project in the construction environment are influence by standard of workmanship,
assessment by the client on the quality of construction materials, level of defective works and
maintenance costs of the project.
Based on the statement above, you are responsible to discuss in your team and selects a
complete project of any appropriate building construction. You can work in group and please ensure to
complete your task as the information given for your guideline:
No. Task
1._| Report any defection and issues of the selected building either for their
‘element structure or major structure that might be related with the
materials and methods used for the construction
2 _| Select the new idea, technique or process to solve the problems/issues for
the task No.1Discuss the principles that must be apply by the engineer, site supervisor and
contractor to ensure quality of the project construction and compliance with
standards and regulation relating to the construction industry and for
matters connected
Perform all your information and facts from a few reliable sources
for example local authorities, expertise, private/government sector and
consultant
Present all your ideas in the class within 5 to 7 minutes by individually in
your group using appropriate method
Prepared by:
)
Jabatan Kejuruteraan Awam
DCC10032 Course Coordinator Head BiSgrane OF CNH Bigineeringeee matin noua patna peste | oto sea sysous
peoteyomtspoceetoans | mopas peter pam te ee
‘Tovancu Rnworigeseg | odpautaahdariganiang [Tera t aie /aomimo| || Halas Mt seR0
apse anyfunronenerersenzozianuo] unecneraiaonste pe | ya cmasostonuon
alae aune neu eemonidianba Was DY Seer
ssiaumusiepueiousn | wns tuseunepueyouon | srmamubepuiomen | crete iamsg
mong sogpentrefon 2K | vounangeonsumujojnojpen9 | wamegseoronny em ungon | Joe SS ere
‘somos yeu pant smo pon ‘rina pana ‘mos ho ponent
‘yen newany wuAeHICg
amy veer 4
ove
“ig pedong
corns prea sn,
seungssrmsecpenbups | wopenouut
sunt
wepemuion =
“sms
sonora rhve pny |
Su no ot muaey on a pen ta Bee Ag aBn a RoHe peanue anotin a (
Tana wv Bs So epee Te worsens a A as