Professional Documents
Culture Documents
Namdar
Namdar
222
MIXED- USE RESIDENTIAL DEVELOPMENT
PHASE I AND PHASE II
PROJECT NUMBER:
21095
222 NE 1st AVE. MIAMI, FLORIDA
LOCATION MAP ARCHITECTURE:
BEHAR FONT PARTNERS P.A.
LANDSCAPE:
WITKIN HULTS + PARTNERS
CLIENT INFORMATION:
STRUCTURAL:
Namdar Group
98 Cutter Mill Road Suite 284 N De Los Reyes Engineering, Inc.
Grat Neck, NY 11021
CIVIL:
GRAEF-USA, INC.
COVER SHEET
A-00
15/09/2022 08:49:57 a.
m.
©
2020 BEHAR FONT PARTNERS, P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
INDEX_
SHEET SHEET NAME REV. 1 REV. 2 REV. 3
A-00 COVER SHEET
A-0. INDEX
A-01 CONTEXT MAP
A-02 SITE PHOTOGRAPHS
A-03 AERIAL PHOTOGRAPHS
A-04 ZONING INFORMATION
A-100. GROUND FLOOR / SITE PLAN
A-101. 2ND FLOOR PLAN (PARKING)
A-102.1 2ND TO 3RD FLOOR PLAN (TYP. PARKING)
A-102. 3RD TO 5TH FLOOR PLAN (TYP. PARKING)
A-103. 6TH FLOOR PLAN (PARKING)
A-104. 7TH FLOOR PLAN (AMMENITIES)
A-105. 8TH FLOOR PLAN (POOL DECK) 4533 Ponce de Leon Boulevard
Coral Gables, Florida 33146
A-106. 9TH FLOOR TO 42ND FLOOR PLAN (TYPICAL)
TEL: (305) 740-5442 FAX: (305) 740-5443
A-107. ROOF PLAN E-MAIL: info@beharfont.com
A-108. UPPER ROOF PLAN
A-201. ELEVATIONS
A-202. ELEVATIONS
A-203. ELEVATIONS
SEAL:
A-301. OVERALL SECTION
A-302. PARKING SECTIONS
A-4.0 1-BDR-UNIT A & STUDIO
A-4.2 1-BDR-UNIT A2 & A3
A-4.5 2-BDR-UNIT B1
A-501. SITE DETAILS
A-601. AREA DIAGRAMS - FLR AREA
A-602. AREA DIAGRAMS - FLR AREA
A-603. DIAGRAMS
A-605. MANEUVERABILITY EXHIBIT
A-605.1 MANEUVERABILITY EXHIBIT
A-605.2 MANEUVERABILITY EXHIBIT
A-606. 1000ft RADIOUS TO METRO RAIL
A-801. MATERIALS BOARD
A-901 RENDERING
A-902 RENDERING
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
222 NE 1st AVE. MIAMI, FLORIDA
DATE: 09/02/2022
PROJECT NO:21095
DRAWING NAME:
9/13/2022 9:25:49 AM
INDEX
A-0.
04/06/2022 03:08:27 a.
m. BIM 360://222 NE 1 ST. AVE/21095-222 NE 1ST.AVENUE-BUILDING.rvt
SITE
CONTEXT MAP
SCALE: 12" = 1'-0"
DATE:
A-01
SEAL:
MIAMI, FLORIDA
DRAWING NAME:
Coral Gables, Florida 33146
05-05-2022
E-MAIL: info@beharfont.com
PROJECT NO:21095
4533 Ponce de Leon Boulevard
8
4
2
12
7
3
1
11
SITE LOCATION
10
SITE PHOTOGRAPHS
SITE LOCATION AEREAL PHOTO 02
9
5
DATE:
A-02
SEAL:
E-MAIL: info@beharfont.com
PROJECT NO:21095
4533 Ponce de Leon Boulevard
SITE PHOTOGRAPHS
SEAL:
SITE LOCATION NORTHWEST SITE VIEW SITE LOCATION NORTHEAST SITE VIEW
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
222 NE 1st AVE. MIAMI, FLORIDA
DATE: 09/02/2022
PROJECT NO:21095
DRAWING NAME:
12/09/2022 06:54:02 p.
AERIAL
PHOTOGRAPHS
AERIAL PHOTOGRAPHS
A-03
m.
MIAMI 21, TRANSECT ZONE T6-80
ADRESS
222 NE 1st Avenue Miami, FL 33132 50 NE 3rd Street Miami, FL. 33132 60 NE 3rd Street Miami, FL. 33132 234 NE 1st Avenue Miami, FL. 33132
Building Disposition Lot Occupation Miami 21 Zoning Code Required Provided WAIVERS / NOTES
a. Lot Area (Prededication) 5,000 SF. Min 55,006 SF
b. Lot Area(Acres) (Prededication) .11478 Min 1.2627 Acres
c. Lot Area (Post dedication) 52,235 SF
d. Lot Area (Acres) (Post Dedication) 1.199 Acres
e. Lot Width 100 FT. Min 100 FT. Min
f. Lot Coverage (post dedication)
1 - 8 Stories 80% MAX 52,235 S.F. X 0.80 = 41,788 SF MAX 41,788 SF 80%
a. Principle Front (1st Avenue) Pursuant to Article 5, Section 5.6.1 (g), the Frontage
Setbacks above the eighth floor shall not be required for
0 FT Min. above 8th Story 0'-0" Above 8th Floor
a Frontage facing a Civic Space or a Right-of-Way
seventy (70) feet or greater width.
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
required Secondary Frontage Setbacks along NE 2nd
and NE 3rd Streets from 10’ to 9’, pursuant to Article 7,
10 FT Min 9'-0" Dominant Setback Section 7.1.2.5(a)(28).
20 FT Min. above 8th story 9'-0" Above 8th Floor Waiver pursuant to Article 7, Section 7.1.2.5(a)(16)
b. Secondary Front (3rd Street) requested to permit a reduction of the Secondary
Frontage Setbacks above the 8th Story on NE 2nd and
NE 3rd Streets to nine feet (9’) for Lots having one
dimension less than 100 feet.
Bicycle Rack Minimum of 1 bike rack per unit 1,394 Bicycle Racks Required Total 1,394 Bicycle Racks
DATE: 08/01/2022
PROJECT NO:21095
DRAWING NAME:
PHASE 2 PHASE 1
29/08/2022 12:14:57 p.
ZONING
ZONING INFORMATION INFORMATION
A-04
m.
25' - 0" SETBACK /
2ND LAYER
2ND LAYER
1ST LAYER
1ST LAYER
2% SLOPE TO DRAIN, ALL STORM SOLAR REFLECTANCE REQUIREMENT:
WATER TO BE RETAINED WITHIN
THE PROPERTY LINE, NO RUN-OFF For paving materials, all paving materials used shall have a minimum solar reflectance of .72.
IS ALLOWED INTO RIGHT OF WAY,
TYP.
REFER TO PHASE 2
REFER TO PHASE 1
PLANTER, SEE LANDSCAPE
M M M ML PLAN FOR SPECIFICATIONS
L L L ML
25'-0"
12.40' N.G.V.D. 5' WIDE SLOPED LANDSCAPE
BALCONY ABOVE
25'-0" 10'-0" 15'-0" 12.07' N.G.V.D. STRIP TYP.
EXISTING STREET EXISTING STREET
25'-0"
LIGHT POLE LIGHT POLE
1.7% SLOPE
PAVED SET BACK PAVED
SIDEWALK CONCRETE
10'-0"
10'-0"
34'-11" 17'-10" 24'-10" 11'-6" 50'-1" 10'-0" 30'-4" SIDEWALK 30'-7" 25'-9 1/2" 43'-4"
EXISTING STREET COLUMN
12'-11"
LIGHT POLE SETBACK SETBACK 12.68' N.G.V.D. EXISTING STREET
PAVED 0'-0" SETBACK EL: - 1/2" = 12.68' N.G.V.D. EL: - 1/2" = 12.68' N.G.V.D. BALCONY ABOVE 25' SIGHT TRIANGLE
EL: - 1/2" = 12.66' N.G.V.D. EL: - 1/2" = 12.66' N.G.V.D. EL: - 1/2" = 12.68' N.G.V.D.
2'-11"
2'-11"
SIDEWALK LIGHT POLE SEAL:
(DOMINANT SETBACK)
20'-0"
SETBACK
BBL BBL
SETBACK
SETBACK
SETBACK
75.00 125.00
2'-11"
2'-10"
2'-10"
2'-9"
2'-9"
3'-2"
3'-2"
3'-4"
8" 3'-8"
8" 1'-10"
M )
10'-0"
L 6'
.3 BLACKFLOW PREVENTER ON A
9"
MATCHLINE
5
(3
35'-0"
CONCRETE PAD SURROUNDED BY
2'-6"
9'-11"
LOW LADSCAPE MATERIAL
10' - 0" SETBACK / 12.72' N.G.V.D. 10' - 0" SETBACK /
1ST LAYER CONCRETE 1ST LAYER
COLUMN
PAVED SIDEWALK PAVING
R 28" 73'-7" 8" 5'-1" 61'-7" 5'-1" 8" 126'-8" 8"
15'-0"
15'-0"
5' ML
MIN. SOLAR REFLECTANCE - 0" RETAIL
OF .72
31'-0"
32'-4"
12.70' N.G.V.D. 5' WIDE SLOPED RETAIL
37'-2"
37'-4"
PAVED SIDEWALK
PAVED SIDEWALK
42'-4"
EL: + 0' - 5 1/2" 12.72' N.G.V.D.
EL: - 1/2" =12.66 N.G.V.D.
28'-6"
LIGHT POLE
BALCONY ABOVE
52'-10"
TOWER 1
2'-0"
LANDSCAPE STRIP
W+M+MCHANGING
8"
TYP.
2'-8" 6 STORY
EXIT
5'-1"
6"
8" 8'-8"
BLDG.# 228-226 MEP MEP PASSAGEWAY 2% SLOPE TO DRAIN, ALL STORM
100.00
5' WIDE SLOPED WATER TO BE RETAINED WITHIN
(NOT A PART OF
1/2"
STAIR
8"
LANDSCAPE STRIP THE PROPERTY LINE, NO RUN-OFF
THIS APPLICATION)
100.00
TYP. MAIL BOXES
2'-8" 8'-9"
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
9'-8"
LIGHT POLE ELEV. 1 ELEV. 2
LOBBY
46'-1"
21'-3"
30'-3"
12.45' N.G.V.D.
25'-3"
TOWER 2
WC ROOM
8"
12.25' N.G.V.D.
ELEVATOR
SIDEWALK EL: = 12.07 N.G.V.D.
BBL
ELEV. 4
LOBBY
200.00
6"
ELEV. 3
Reception Desk
19'-0"
6"
27'-1"
0' - 0"
56'-1"
135'-7"
12.41' N.G.V.D.
ROLL UP DOOR COMMAND
19'-5"
10'-0" ROOM
10'-1"
12.45' N.G.V.D.
SETBACK
SIDEWALK
5' WIDE SLOPED
PACKAGE ROOM LANDSCAPE STRIP
8"
PAVED
2'-8"
BBL
TYP.
4"
ROLL UP DOOR
2'-0" 10'-0"
LEASING OFFICE
1/2"
33'-3"
32'-6"
ELEVATOR SETBACK
200.00
5'-4" 12.00' N.G.V.D.
LOADING AREA
3'-3"
(50.00')
10'-0"
LOBBY SETBACK
25'-2"
25'-0"
12'-5" 8" 30'-4" 2'-8" 17'-0" 8" 8'-5" 2'-8" 13'-1" 8" 5'-1" PAVED 61'-11" 1'-5" 13'-3" 1'-5" 5'-7"8" 8" 27'-4" 8" 25'-1" 6" 32'-5" 8" 5" 9'-7"
6'-11"
10'-1"
8"
185'-10"
8" 8'-11"
6"
8"
1/2"
8"
10'-6"
7'-10"
FIRE COMMAND 8" Concrete Floor Slab 11.83' N.G.V.D.
ROOM
5'-1"
19'-0"
AMAZON LOCKERS
8" 10'-3"
12.20' N.G.V.D.
54'-0"
6"
BATHROOM 1
10'-4"
ELEV. 9 ELEV. 10
RAMP UP 16.0%
SIDEWALK
PACKAGE ROOM
13'-1"
PAVED
PAVED
LEASING OFFICE LOBBY
2'-0" 13'-11"
0' - 0"
8"
10'-8"
12.25' N.G.V.D.
31'-4"
LOADING LOADING LOADING LOADING LOADING LOADING EL: 0' - 0"
(12X35) (12X35) (12X35) (12X35) (12X35) (12X35)
30'-11"
ELEV. 11 ELEV. 12 MEP
9'-8"
0' - 2 1/2"
4"
M ML
35'-2"
35'-0"
L
12'-9"
8'-8"
MAILROOM
24'-3"
MAIL BOXES
"
8"
1/2
15'-10"
10 STAIR UP DN STAIR 2
EXISTING STREET
4' -
RAMP UP 8.0%
2'-8" 8'-8"
R
DN UP
12
9'-2" 2'-0"
MAIL BOXES
8"
'-
12'-6"
0"
8"
9'-2"
R
1/2" 1/2" 1/2" PAVED
6'-1"
6'-1"
5'
EXIT "
3'-10"
3'-10"
-7 SIDEWALK
-0
SIDEWALK
2'-8"
2'-8"
1/2" 1'
"
R
11'-1" 2'-0" 57'-3" 5'-4" 24'-1" 9'-9" 12'-0" 6'-7" 12'-0" 11" 9'-5" 18'-6" 8'-10" 24'-11" 3'-2" 24'-2" 25'-0" 35'-5" 9'-8"
ENTRY
12.19' N.G.V.D.
EXIT
SIGHT SIGHT
TRIANGLE TRIANGLE
24'-0"
24'-0"
24'-0"
24'-0"
24'-0"
24'-0"
24'-0"
EXIT
CROSSWALK
12.19' N.G.V.D. RAMP
52'-5"
SIGHT
©
12'-3" 30'-5" 13'-6" 19'-9" 1'-1" 83'-1" 7'-4" 15'-0" 56'-10" 19'-10" 7'-5" 22'-7" 11'-2"
TRIANGLE SIGHT
1'-0"
1'-0"
1'-0"
1'-0"
11"
TRIANGLE
11"
11"
1/2" 1/2" 1/2" 1/2"
1/2" 1/2"
8"
8"
8"
8"
R CONCRETE COLUMN
0"
12 (10X20) (10X20) (10X20) (10X20) MAIN
'-
'-
12
0" TEL/COM ELECTRICAL DECORATIVE
20'-1"
R
1 2 3 4 5 6 12.25' N.G.V.D. GRILLE
GENERATOR ROOM FPL
21'-3"
22'-8"
23'-5"
23'-5"
22'-0"
22'-0"
12.25' N.G.V.D. 12.25' N.G.V.D. 12.25' N.G.V.D.
22'-0"
SIDEWALK
PAVED
GENERATOR
12.25' N.G.V.D.
BACKFLOW
8"
BIM 360://222 NE 1 ST. AVE/_LINK-TOWER 1-INTERIOR 1-8 LEVELS.rvt
PREVENTER
REFER TO PHASE 2
4'-9"
8"
(300.18')
8"
AREA
1'-2"
1'-2"
M
L ML
5"
8"
6"
5"
1'-3"
6"
6"
19'-9" 63'-8" 84'-2" 44'-0" 86'-0" 10'-2"
167'-7" 129'-11"
2ND LAYER
1ST LAYER
PROJECT NO:21095
10' - 0" SETBACK /
DRAWING NAME:
2ND LAYER
1ST LAYER
13/09/2022 07:12:52 p.
2ND LAYER
2ND LAYER
1ST LAYER
1ST LAYER
(100.09')
SET BACK
SETBACK
11'-9"
10'-0"
15'-0" 10'-0"
10'-0" 15'-0" 55'-11" 7'-9" 11'-6" 50'-0" 10'-1" 115'-6" 6'-7" 5'-11" 2'-7" 9'-4"
(35.01')
SET BACK SET BACK SET BACK SET BACK SETBACK
BBL BBL
20'-0"
(2) BIKE PARKING SPACES
8" 1'-9"
5" 1'-9"
8" 1'-9"
1'-9"
2'-11"1'-9"
4'-3"
')
.36
1'-10"
5'-5" 1'-10"
(35
8"
8'-0"
5'-2"
5'-2"
"
5'-0
6'-5"
" "
5'-0 5'-0
6'-0"
11'-4" 25'-3" 9'-4" PAINTED
5'-0"
10' - 0" SETBACK / (5) BIKE PARKING SPACES (10) BIKE PARKING SPACES (4) BIKE PARKING SPACES DIRECTIONAL 10' - 0" SETBACK /
1ST LAYER STRIPING 1ST LAYER
8'-2"
R
6'-7"
2
5'-0"
25 15' - 5"
'-
28'-10"
28'-10"
174 175 RAMP DOWN 5.70%
28'-5"
0" TANDEM PARKING
15'-0"
15'-0"
17'-0"
4533 Ponce de Leon Boulevard
5'-0" FD
Coral Gables, Florida 33146
6" 18'-0" 38'-2" 45'-4" 23'-0" 5'-0" 8"
"
E-MAIL: info@beharfont.com
5'-0
1
6'-8"
GUARDS TYPICAL 5'-2"
23'-0"
5'-2"
5'-9"
ON BOTH SIDES SEE (2) BIKE PARKING SPACES
DETAILS
TOWER 1
11"
178 TANDEM PARKING 179
5'-1"
5'-1"
SIDEWALK SEAL:
2'-0"
BALCONY ABOVE
5'-2"
12'-6"
35 BIKE 30 BIKE
6 STORY SPACES PAINTED
SPACES 5'-2"
8'-8"
STAIR 1 STRIPING (2) BIKE PARKING SPACES
BLDG.# 228-226 7'-7"
"
5'-0
23'-2"
25'-2"
18' - 0" THIS APPLICATION) "
5'-0
8"
10'-4"
DN
19'-2"
? ?
5'-3"
8'-8"
ROOF BELOW
42'-1"
5'-0"
(4) BIKE PARKING SPACES ELEV. 1 ELEV. 2 5'-2"
(2) BIKE PARKING SPACES
TOWER 2
1 P.S.= 8'-6"
8"
45'-6"
30'-7"
180TANDEM PARKING 181
BBL
(8) BIKE PARKING SPACES
ELEVATOR FD
5'-4"
? 3 LOBBY ?
" ELEV. ELEV. 4
5'-0
18'-8"
20'-0"
9'-2"
11'-2"
11'-2"
2'-9" 5'-0" 24'-8" 18'-0" 19'-6" 18' - 0"
1 P.S. @= 12'-0"
5'-5"
24 BIKE SPACES
? ?
5'-0"
182 ELEV. 5 ELEV. 6
18'-10"
(9) BIKE PARKING SPACES
8"
FPL. VAULT
11'-9"
BBL
5'-1" 28'-4"
12'-7"
8'-3"
"
5'-0
1'-0"
8"
7'-9"
11'-7"
109'-10"
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
1P.S. @= 8'-6"
SETBACK 5'-4" 5'-2"
16'-6"
MEP (50.00')
SETBACK (2) BIKE PARKING SPACES
7'-4"
STAIR 3 28
2'-0"
5'-0"
(164.86')
SETBACK
10'-1"
16'-2"
1 P.S. @= 12'-0"
3
1'-9"
ELEV. 8 27
166'-2"
5'-0"
ELEV. 7 25 TANDEM PARKING 5'-2"
"
2'-3"
ROOF BELOW
171'-7"
29'-7"
FD
(8) BIKE PARKING SPACES
60'-7"
LOBBY 20 9'-2"
4
ELEV. 10 (4) BIKE PARKING SPACES
5'-2"
18'-0"
184 186 188 190 192 194 196
2'-8" 8" 8'-1" 8" 2'-8" 8"
10'-7" 8" 32'-0" 8'-4" 8'-4" 85'-5" 18'-0" 23'-0" 18'-0" 18'-0" 1'-3" 18'-0" 5'-0" 23'-0" 5'-0" 8"
2'-0"
23
ELEV. 11 ELEV. 1
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
19 4 BIKE
4'-2"
RAMP UP 6.4%
11'-6"
STAIR 2
8'-8"
18' - 0"
22
DN STAIR 2
5'-2"
11'-7"
18
8 BIKE (2) BIKE PARKING SPACES
(164.93')
2ND FLOOR
2'-0"
21
MEP
8'-6"
11"3'-0" 3'-3"
8'-10"
9'-2"
9'-0"
0"
8"
4'-10"
"
'-
5'-0
3'-4"
R8
11"
5'-0"
2'-9" 5'-0" 23'-0" 34'-0" 3 P.S. @8'-6"= 25'-6" 12'-3" 1 P.S.= 8'-6" 4'-6" 2 P.S. @8'-6"= 17'-0" 4'-6" 1 P.S.= 8'-6" 9'-7" 5'-0" 7'-8" 23'-9" 58'-6" 29'-0"
(12) BIKE PARKING SPACES
11'-6"
GARAGE PARKING TO
GUARDS TYPICAL
DIRECTIONAL
BE CONTINUED AT
ON BOTH SIDES SEE
STRIPING
TWO WAY DRIVE 20' - 0" RAMP UP 3.4% DETAILS
26'-5"
TOWER 2
23'-0"
23'-0"
23'-0"
23'-0"
23'-0"
FD
STEEL CORNER
RAMP UP 3.4% EXPANSION JOINT GUARDS TYPICAL
ON BOTH SIDES SEE
11'-6"
1'-4" DETAILS 1'-4"
1'-10" 1'-10" 10"
10'-7" 8" 7'-6" 10'-4" 1 P.S. @= 8'-6" 4'-6" 2 P.S.@8'-6"= 17'-0" 4'-6" 2 P.S. @ 8'-6"= 17'-0" 4'-6" 2 P.S. @ 8'-6"= 17'-0" 2'-0" 2 P.S. @ 8'-6"= 17'-0" 4'-0" 2 P.S. @ 8'-6"= 17'-0" 4'-8" 1 P.S.= 8'-6" 8'-6" 1 P.S. @= 8'-6" 3 P.S. @= 25'-6" 1'-0" 3 P.S. @= 25'-6" 2'-1" 2 P.S. @= 17'-0" 1P.S. @= 8'-6"2'-0" 3 P.S. @ 8'-6" 25'-6" 3'-6" 8" 9'-6"
6'-6"
FD
(6) BIKE PARKING SPACES
18'-0"
13'-10"
13'-10"
18'-0"
18'-0"
18'-0"
18'-0"
18'-0"
173 172 171 170 169 168 167 166 165 164 163 162 17 16 15 14 13 12 11 10 9 8 7 6 5
EV EV EV EV EV EV EV EV EV EV EV EV
EV EV EV EV EV EV EV EV EV EV EV EV EV
6"2'-11" 3'-5"
9"
8"
8" 5'-8"
6'-2"
(300.18')
PHASE 2 PHASE 1
©
PARKING SPACES FROM 162 TO 336 PARKING SPACES FROM 1 TO 161
PHASE 1 - PARKING SCHEDULE PHASE 2 - PARKING SCHEDULE PHASE 1 - BICYCLE RACK NOTE: EV PARKING SPACES REQUIRED 20%
EV PARKING SPACES = 161 X 20% = 32.2
TYPE LEVEL QUANTITY DESCRIPTION TYPE LEVEL QUANTITY DESCRIPTION TYPE LEVEL BIKE SPACES EV PARKING - PHASE 1 PROVIDED = 33
2nd FLOOR 2nd FLOOR
2nd FLOOR 1 Bicycle Parking Space 2'-0" EV-PK 2nd FLOOR 12 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0") Bic-PK 2nd FLOOR 128 EV PARKING SPACES REQUIRED 20%
EV-PK 2nd FLOOR 13 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0") HC-PK 2nd FLOOR 1 HANDICAP PARKING (12'-0"x18'-0" Bic-PK 3rd FLOOR 136 EV PARKING SPACES = 175 X 20% = 35
BIM 360://222 NE 1 ST. AVE/_LINK-TOWER 1-INTERIOR 1-8 LEVELS.rvt
HC-PK 2nd FLOOR 1 HANDICAP PARKING (12'-0"x18'-0") REG-PK 2nd FLOOR 22 TYP. PARKING (8'-6"x18'-0") Bic-PK 4th FLOOR 136 EV PARKING - PHASE 2 PROVIDED = 36
REG-PK 2nd FLOOR 22 TYP. PARKING (8'-6"x18'-0") 3rd FLOOR Bic-PK 5th FLOOR 136
3rd FLOOR 3rd FLOOR 1 Bicycle Parking Space 2'-0" Bic-PK 6th FLOOR 136 NOTE: TANDEM PARKING
TO BE USED BY
Bic-PK 3rd FLOOR 1 Bicycle Parking Space 2'-0" Bic-PK 3rd FLOOR 2 Bicycle Parking Space 2'-0" TOTAL BICYCLE RACK SPACES 672
VALET PARKING
EV-PK 3rd FLOOR 13 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0") EV-PK 3rd FLOOR 12 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0") ONLY.
HC-PK 3rd FLOOR 1 HANDICAP PARKING (12'-0"x18'-0") HC-PK 3rd FLOOR 1 HANDICAP PARKING (12'-0"x18'-0"
REG-PK 3rd FLOOR 22 TYP. PARKING (8'-6"x18'-0") REG-PK 3rd FLOOR 22 TYP. PARKING (8'-6"x18'-0")
4th FLOOR
Bic-PK 4th FLOOR 2 Bicycle Parking Space 2'-0"
4th FLOOR
EV-PK 4th FLOOR 12 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0")
PHASE 2 - BICYCLE RACK
EV-PK 4th FLOOR 7 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0") HC-PK 4th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0"
TYPE LEVEL BIKE SPACES
HC-PK 4th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0") REG-PK 4th FLOOR 22 TYP. PARKING (8'-6"x18'-0") DATE: 08/08/2022
Bic-PK 2nd FLOOR 0
REG-PK 4th FLOOR 28 TYP. PARKING (8'-6"x18'-0") 5th FLOOR
Bic-PK 3rd FLOOR 0
5th FLOOR HC-PK 5th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0"
Bic-PK 4th FLOOR 142
PROJECT NO:21095
HC-PK 5th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0") REG-PK 5th FLOOR 34 TYP. PARKING (8'-6"x18'-0")
Bic-PK 5th FLOOR 142
REG-PK 5th FLOOR 35 TYP. PARKING (8'-6"x18'-0") 6th FLOOR DRAWING NAME:
Bic-PK 6th FLOOR 142
6th FLOOR HC-PK 6th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0"
TOTAL BICYCLE RACK SPACES 426
9/13/2022 8:09:40 AM
HC-PK 6th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0") REG-PK 6th FLOOR 34 TYP. PARKING (8'-6"x18'-0") 2nd FLOOR PLAN
REG-PK 6th FLOOR 16 TYP. PARKING (8'-6"x18'-0") TOTAL PARKING SPACES 178
TOTAL PARKING SPACES 165 2nd FLOOR PLAN (PARKING) (PARKING)
SCALE: As indicated A-101.
REFER TO PHASE 1
REFER TO PHASE 2
2ND LAYER
2ND LAYER
1ST LAYER
1ST LAYER
(100.09')
SET BACK
SETBACK
11'-9"
10'-0"
15'-0" 10'-0"
10'-0" 15'-0" 55'-11" 7'-9" 11'-6" 50'-0" 10'-1" 115'-6" 6'-7" 5'-11" 2'-7" 9'-4"
(35.01') SET BACK SET BACK SET BACK SET BACK SETBACK
20'-0"
8" 1'-10"
BBL BBL
8" 1'-10"
(2) BIKE PARKING SPACES
8" 1'-9"
5" 1'-9"
8" 1'-9"
2'-11"1'-9"
1'-9"
4'-3"
') Coral Gables, Florida 33146
.36
1'-10"
5'-5" 1'-10"
(35 TEL: (305) 740-5442 FAX: (305) 740-5443
8"
8'-0" E-MAIL: info@beharfont.com
5'-2"
5'-2"
"
5'-0
6'-5"
" "
5'-0 5'-0
6'-0"
12'-10"
11'-4" 25'-3" 9'-4"
5'-0"
10' - 0" SETBACK / (5) BIKE PARKING SPACES (10) BIKE PARKING SPACES (4) BIKE PARKING SPACES 10' - 0" SETBACK /
1ST LAYER 1ST LAYER
8'-2"
6'-7"
R 27' - 0"
5'-0"
25 18' - 0"
28'-10"
28'-10"
'- RAMP DOWN 5.70% SEAL:
29'-10"
28'-5"
174 175
15'-0"
15'-0"
2P.S. @= 17'-0"
STEEL CORNER RAMP
"
5'-0
GUARDS TYPICAL
(10) BIKE PARKING SPACES
6'-8"
37 GUARDS TYPICAL 5'-2"
23'-0"
11"
5'-0"
2'-1"
5'-1"
5'-1"
178 TANDEM PARKING 179 SIDEWALK
2'-0"
(2) BIKE PARKING SPACES
BALCONY ABOVE
6 STORY 36 PAINTED
2P.S. @= 17'-0"
SUN HOTEL DIRECTIONAL 5'-2"
20'-6"
5'-0"
8'-8"
STRIPING (2) BIKE PARKING SPACES
(89.95')
(89.94')
BLDG.# 228-226 TRASH STAIR 1
"
5'-0
DN
ROOF BELOW
5'-0"
1P.S. @= 8'-6"
ELEV. 1 ELEV. 2 5'-2"
11'-1"
(2) BIKE PARKING SPACES
31 14'-4"
TOWER 2
8"
1 P.S.= 8'-6"
45'-6"
(6) BIKE PARKING SPACES
180TANDEM PARKING 181
"
BBL
(8) BIKE PARKING SPACES
5'-0
ELEVATOR
FD
LOBBY
7'-10"
ELEV. 3 ELEV. 4
20'-0"
34 " 18' - 0"
18'-8"
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
24 BIKE SPACES
3P.S. @= 24'-7"
5'-0"
30
2P.S. @= 17'-0"
182 33
ELEV. 5 ELEV. 6
11'-6"
8"
SETBACK FPL. VAULT 5'-1" 28'-4"
BBL
8'-3"
29
32
"
5'-0
1'-0"
(8) BIKE PARKING SPACES
8"
7'-9"
109'-10"
1'-0"
1P.S. @= 8'-6"
5'-4" 5'-2"
MEP
16'-6"
7'-4"
STAIR 3 28
2'-0"
5'-0"
(164.86')
SETBACK
10'-2"
16'-2"
1 P.S. @= 12'-0"
3
1'-9"
ELEV. 8 27
166'-2"
5'-0"
ELEV. 7 25 5'-2"
TANDEM PARKING
"
2'-3"
ROOF BELOW
171'-7"
29'-7"
FD
(8) BIKE PARKING SPACES
60'-7"
4
ELEV. 10 (4) BIKE PARKING SPACES
5'-2"
2'-8" 8" 2'-8" 184 186 188 18'-0" 190 192 194 196
10'-7" 8" 32'-0" 8'-4" 8" 8'-1" 8'-4" 85'-5" 8" 18'-0" 23'-0" 18'-0" 18'-0" 1'-3" 18'-0" 5'-0" 23'-0" 5'-0" 8"
2'-0"
23
ELEV. 11 ELEV. 1
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
19 4 BIKE
4'-2"
RAMP UP 6.4%
11'-6"
STAIR 2
(4) BIKE PARKING SPACES
8'-8"
18' - 0"
22
STAIR 2 5'-2"
11'-7"
10'-9"
DN 18
8 BIKE (2) BIKE PARKING SPACES
(164.93')
SPACES 2ND FLOOR
18'-0"
11"3'-0" 3'-3"
8'-10"
9'-2"
9'-0"
8"
0"
"
4'-10"
5'-0
3'-4"
'-
11"
R8
5'-0"
9'-7" 5'-0" 7'-8" 23'-9" 58'-6" 29'-0"
2'-9" 5'-0" 23'-0" 34'-0" 3 P.S. @8'-6"= 25'-6" 12'-3" 1 P.S.= 8'-6" 4'-6" 2 P.S. @8'-6"= 17'-0" 4'-6" 1 P.S.= 8'-6"
RAMP
(12) BIKE PARKING SPACES
STEEL CORNER
11'-6"
PAINTED
GARAGE PARKING TO
GUARDS TYPICAL
DIRECTIONAL
BE CONTINUED AT
20' - 0" ON BOTH SIDES SEE
TWO WAY DRIVE RAMP UP 3.4% STRIPING
DETAILS
26'-5"
TOWER 2
23'-0"
23'-0"
23'-0"
23'-0"
23'-0"
FD
STEEL CORNER
RAMP UP 3.4% GUARDS TYPICAL
EXPANSION JOINT
11'-6"
1'-4" ON BOTH SIDES SEE
1'-4"
1'-10" 1'-10" DETAILS 10"
10'-7" 8" 7'-6" 8'-6" 1 P.S. @= 8'-6" 3 P.S. @= 25'-6" 1'-0" 3 P.S. @= 25'-6" 2'-1" 2 P.S. @= 17'-0" 1P.S. @= 8'-6"2'-0" 3 P.S. @ 8'-6" 25'-6" 3'-6" 8" 9'-6"
10'-4" 1 P.S. @= 8'-6" 4'-6" 2 P.S.@8'-6"= 17'-0" 4'-6" 2 P.S. @ 8'-6"= 17'-0" 4'-6" 2 P.S. @ 8'-6"= 17'-0" 2'-0" 2 P.S. @ 8'-6"= 17'-0" 4'-0" 2 P.S. @ 8'-6"= 17'-0" 4'-8" 1 P.S.= 8'-6"
6'-6"
FD
(6) BIKE PARKING SPACES
18'-0"
18'-0"
13'-10"
13'-10"
18'-0"
18'-0"
173 172 171 170 169 168 167 166 165 164 163 162 17 16 15 14 13 12 11 10 9 8 7 6 5
EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV
©
EV EV EV
6"2'-11" 3'-5"
9"
8"
8" 5'-8"
6'-2"
(300.18')
6"
PHASE 2 PHASE 1
REFER TO PHASE 2
DATE: 08/08/2022
PROJECT NO:21095
DRAWING NAME:
9/13/2022 8:16:14 AM
TOWER 1 - 2ND TO
TOWER 1 - 2ND TO 3RD FLOOR PLAN 3RD FLOOR PLAN
SCALE: 3/32" = 1'-0" A-102.1
10' - 0" SETBACK /
2ND LAYER
1ST LAYER
(100.09') (150.09')
25'-0"
REFER TO PHASE 2
(10.00')
10'-0" 15'-0" 15'-0" 10'-0"
SETBACK
10'-9" 2'-11" 5'-9" 6'-8" 54'-9" 19'-3" 50'-0" 10'-1" 115'-6" 7'-7" 5'-0" 2'-7"
11'-9"
(34.99')
SETBACK SETBACK SETBACK
BBL BBL
20'-0"
1'-9"
(35.01')
5'-5" 1'-10"
(3
2'-11"
2'-0"11"
5.3
') 5')
10'-0"
36 8'-0"
6'-1"
5'-2"
5'-2"
5.
(3 5'-0
"
5'-0
"
5'-0
"
5'-0"
9'-4"
11'-4" 25'-3" 9'-4"
5'-0"
10' - 0" SETBACK / (5) BIKE PARKING SPACES (10) BIKE PARKING SPACES (4) BIKE PARKING SPACES 10' - 0" SETBACK /
1ST LAYER 1ST LAYER
7'-4"
25'-0"
12'-1" 33'-11" 4'-0" 21'-10" 4'-0" 21'-4" 4'-0" 26'-3" 8"
8'-2"
7'-7"
209
209 TANDEM PARKING 210
210
15'-0"
15'-0"
26'-11"
26'-10"
4'-3"
6'-8"
37 27' - 0"
23'-0"
BIKE 18'-0" 37'-11" 7'-2" 5'-5" 27'-10" 5'-0" 23'-0" 5'-2" 4533 Ponce de Leon Boulevard
2'-1"
213 214
214 BIKE TEL: (305) 740-5442 FAX: (305) 740-5443
2'-0" 5'-1"
5'-1"
5'-2" E-MAIL: info@beharfont.com
8'-5"
6 STORY 36
SUN HOTEL 5'-2"
STAIR 1
8'-8"
BLDG.# 228-226
(89.95')
18 BIKE SPACES
86'-2"
(NOT A PART OF BIKE
"
8'-6"
8'-6"
9'-0"
STAIR 1
5'-0
(89.94')
SEAL:
8"
19'-9"
THIS APPLICATION) 71
BIKE
10'-4"
3'-1"
BIKE
ELEV. 1 ELEV. 2 5'-2"
8"
5'-0"
5'-2"
67
TOWER 2
P.S. @= 8'-6"
BIKE
13'-2"
ELEV. 3 ELEV. 4
BBL
25'-7"
215 216
(8) BIKE PARKING SPACES
53'-4"
ELEVATOR
18'-8"
70 LOBBY
BIKE BIKE
24 BIKE SPACES
ELEV. 5 ELEV. 6 5'-2"
5'-0"
66 9" 8'-10" 2'-0" 5'-0" 23'-0"
69 5'-2"
9"
18'-6" BIKE
BBL
SETBACK 10'-0"
8'-1"
65
SETBACK BIKE
68 FPL. VAULT
(8) BIKE PARKING SPACES
1'-1"
10"
109'-11"
1'-4"
5'-2"
2"
16'-6"
BIKE
7'-5"
(164.86')
MEP (50.00')
3'-9" 1'-9"
64
23' - 6"
2'-0"
5'-0"
1'-9"
16'-2"
SETBACK
15'-5"
39
ELEV. 7 ELEV. 8
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
166'-2"
5'-0"
9'-3"
5'-2"
11'-11"
63 62
171'-7"
76'-7"
29'-7"
BIKE
RAMP UP 6.4%
(164.93')
9"
7'-9" 11'-6" 11'-6" LOBBY
40
BIKE ELEV. 9 ELEV. 10
5'-0"
219
219 221
221 223
223 225
225 227
227 229
229 231
231
2'-0"
59
30'-1"
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
55
4'-2"
ELEV. 11 ELEV. 12 SPACES
(4) BIKE PARKING SPACES
BIKE
36'-0"
8'-8"
58 STAIR 2
STAIR 2 23'-0" 18'-0" 10'-3" 23'-0" 5'-2"
10'-9"
17'-10"
218 220 222 224 226 228 230
218 220 222 224 226 228 230 6 BIKE
2'-0"
57
1'-4"
SPACES
3'-0"
1'-2"
8'-6"
9'-2"
BIKE
MEP
5'-2"
"
'-0
6'-4"
2'-4"1'-1"
5'-2"
11"
9'-7" 5'-0" 7'-8"
7'-9" 23'-0" 34'-0" 3 P.S. @ 8'-6"= 25'-6" 12'-3" P.S. @= 8'-6" 4'-6" 2 P.S. @ 8'-6"= 17'-0" 4'-6" P.S. @= 8'-6" 23'-9" 27'-4" 25'-2" 6'-0" 24'-0"
(12) BIKE PARKING SPACES
27' - 0"
29'-0"
26'-5"
BIKE
23'-0"
23'-0"
23'-0"
23'-0"
23'-0"
23'-0"
23'-0"
3'-0"
(6) BIKE PARKING SPACES
EV EV EV EV EV EV EV EV EV EV EV EV EV
13'-10"
13'-10"
208 207 206 205 204 203 202 201 200 199 198 53 52 51 50 49 48 47 46 45 44 43 42 41
18'-0"
18'-0"
18'-0"
18'-0"
18'-0"
18'-0"
18'-0"
BIKE 208 207 206 205 204 203 202 201 200 199 198 197
14'-8"
EV EV EV EV EV EV EV EV EV EV EV EV
5"
8"
9"
8"
8"
4'-10"
9" 4'-10"
4'-11"
REFER TO PHASE 2
(300.18')
1'-6"
15'-0" 10'-0"
PHASE 2 PHASE 1
2ND LAYER
1ST LAYER
©
1ST LAYER
PHASE 1 - PARKING SCHEDULE PHASE 2 - PARKING SCHEDULE PHASE 1 - BICYCLE RACK NOTE: EV PARKING SPACES REQUIRED 20%
EV PARKING SPACES = 161 X 20% = 32.2
TYPE LEVEL QUANTITY DESCRIPTION TYPE LEVEL QUANTITY DESCRIPTION TYPE LEVEL BIKE SPACES EV PARKING - PHASE 1 PROVIDED = 33
2nd FLOOR 2nd FLOOR
EV PARKING SPACES REQUIRED 20%
2nd FLOOR 1 Bicycle Parking Space 2'-0" EV-PK 2nd FLOOR 12 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0") Bic-PK 2nd FLOOR 128
EV PARKING SPACES = 175 X 20% = 35
EV-PK 2nd FLOOR 13 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0") HC-PK 2nd FLOOR 1 HANDICAP PARKING (12'-0"x18'-0" Bic-PK 3rd FLOOR 136 EV PARKING - PHASE 2 PROVIDED = 36
HC-PK 2nd FLOOR 1 HANDICAP PARKING (12'-0"x18'-0") REG-PK 2nd FLOOR 22 TYP. PARKING (8'-6"x18'-0") Bic-PK 4th FLOOR 136
REG-PK 2nd FLOOR 22 TYP. PARKING (8'-6"x18'-0") 3rd FLOOR Bic-PK 5th FLOOR 136 NOTE: TANDEM PARKING
3rd FLOOR 3rd FLOOR 1 Bicycle Parking Space 2'-0" Bic-PK 6th FLOOR 136 TO BE USED BY
BIM 360://222 NE 1 ST. AVE/_LINK-TOWER 1-INTERIOR 1-8 LEVELS.rvt
Bic-PK 3rd FLOOR 1 Bicycle Parking Space 2'-0" Bic-PK 3rd FLOOR 2 Bicycle Parking Space 2'-0" TOTAL BICYCLE RACK SPACES 672 VALET PARKING
EV-PK 3rd FLOOR 13 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0") EV-PK 3rd FLOOR 12 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0") ONLY.
HC-PK 3rd FLOOR 1 HANDICAP PARKING (12'-0"x18'-0") HC-PK 3rd FLOOR 1 HANDICAP PARKING (12'-0"x18'-0"
REG-PK 3rd FLOOR 22 TYP. PARKING (8'-6"x18'-0") REG-PK 3rd FLOOR 22 TYP. PARKING (8'-6"x18'-0")
4th FLOOR 4th FLOOR
Bic-PK 4th FLOOR 2 Bicycle Parking Space 2'-0" EV-PK 4th FLOOR 12 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0") PHASE 2 - BICYCLE RACK
EV-PK 4th FLOOR 7 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0") HC-PK 4th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0"
TYPE LEVEL BIKE SPACES
HC-PK 4th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0") REG-PK 4th FLOOR 22 TYP. PARKING (8'-6"x18'-0")
REG-PK 4th FLOOR 28 TYP. PARKING (8'-6"x18'-0") 5th FLOOR
Bic-PK 2nd FLOOR 0
5th FLOOR HC-PK 5th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0"
Bic-PK 3rd FLOOR 0
HC-PK 5th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0") REG-PK 5th FLOOR 34 TYP. PARKING (8'-6"x18'-0")
Bic-PK 4th FLOOR 142 DATE: 08/08/2022
REG-PK 5th FLOOR 35 TYP. PARKING (8'-6"x18'-0") 6th FLOOR
Bic-PK 5th FLOOR 142
6th FLOOR HC-PK 6th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0"
HC-PK 6th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0") REG-PK 6th FLOOR 34 TYP. PARKING (8'-6"x18'-0")
Bic-PK 6th FLOOR 142 PROJECT NO:21095
TOTAL BICYCLE RACK SPACES 426
REG-PK 6th FLOOR 16 TYP. PARKING (8'-6"x18'-0") TOTAL PARKING SPACES 178
TOTAL PARKING SPACES 165 DRAWING NAME:
9/13/2022 8:23:33 AM
2ND LAYER
2ND LAYER
1ST LAYER
1ST LAYER
REFER TO PHASE 2
15'-0" 10'-0"
10'-0" 15'-0"
(100.09') (150.09')
(10.00')
(10.00')
2'-11" 3'-1" 9'-4" 54'-9" 7'-9" 11'-6" 60'-1" 115'-6" 10'-4" 2'-3"2'-7"
(75.07') SET BACK SET BACK
(125.10')
(35.01')
BBL BBL
')
.36
3'-1"1'-10"
2'-3"2'-11"
( 35 (3
5 .35
10'-0"
10'-0"
8'-0"
5'-11"
5'-2"
5'-2"
')
12'-10"
11'-4" 25'-3" 9'-4"
5'-8"
5'-0"
5'-0"
10' - 0" SETBACK / (5) BIKE PARKING SPACES (10) BIKE PARKING SPACES (4) BIKE PARKING SPACES 10' - 0" SETBACK /
10'-6"
1ST LAYER
10'-3"
1ST LAYER
8" 18'-0" 104'-6" 4'-3" 8"
11'-6"
4533 Ponce de Leon Boulevard
Coral Gables, Florida 33146
314 TANDEM PARKING 315
15'-0"
15'-0"
TEL: (305) 740-5442 FAX: (305) 740-5443
4'-3" FD FD E-MAIL: info@beharfont.com
2 P.S. @ 8'-6"
66.25' N.G.V.D.
11'-6"
316 317 4'-7"
2ND LAYER TANDEM PARKING 2ND LAYER
6'-8"
23'-0"
145
11'-6" SEAL:
TOWER 1
2'-1"
5'-0"
5'-0"
318 TANDEM PARKING 319 5'-2" 5'-2"
8'-10"
2 P.S. @ 8'-6" 17'-0"
4'-7"
(89.95')
(89.94')
UP
19 BIKE SPACES
STAIR 1
(4) BIKE PARKING SPACES
8'-10"
STAIR DN
UP
19'-9"
10'-4"
1 P.S. @ = 8'-6"2'-10"
DN ELEV. 1 ELEV. 2
4'-7"
5'-0"
10'-8"
TOWER 2 139
1 P.S.= 8'-6"
BBL
(8) BIKE PARKING SPACES
53'-5"
FD
LOBBY
7'-10"
13'-2"
5'-0"
18'-8"
54' - 0"
24 BIKE SPACES
ELEV. 5 ELEV. 6
12'-0"
4'-7"
5'-0"
322 138
137
FPL. VAULT
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
(8) BIKE PARKING SPACES
7'-5"
FPL. VAULT 136
5'-1"
STAIRUP3
(164.93')
18'-6"
ELEV. 7 ELEV. 8 147
166'-2"
4'-7"
5'-0"
11'-11"
TANDEM PARKING
DN 135 134
171'-7"
ELEVATOR
(8) BIKE PARKING SPACES
LOBBY
P.S. @= 8'-6"
ELEV. 9 ELEV. 10 TANDEM PARKING
(164.86')
132 133
17'-2"
148
5'-0"
324 326 328 330 332 334 336
4'-1"
8" 18'-0" 23'-0" 18'-0" 6" 9'-2" 9'-7" 17'-10" 5'-2" 11'-6" 11'-6" 4'-11"
ELEV. 11 ELEV. 12 131
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
TANDEM PARKING
23'-0"
4 BIKE
SPACES
(4) BIKE PARKING SPACES
DN
22'-0"
5 BIKE
SPACES
UP 323 325 327 329 331 333 335
129 MEP
6'-6"
LEVEL
1'-4"
4'-10"
BELOW
11"
9'-7" 5'-0" 84'-0" 35'-0" 4'-7"
7'-9" 23'-0" 34'-0" (3) P.S. @ 8'-6"= 25'-6" 12'-3" 1 P.S.= 8'-6" 4'-6" 2 P.S. @8'-6"= 17'-0" 4'-6" 1 P.S.= 8'-6"
(12) BIKE PARKING SPACES
GARAGE PARKING TO
23'-0"
BE CONTINUED AT
23'-11"
26'-5"
TOWER 2
23'-0"
23'-0"
5'-3" 8"2'-3" P.S. @= 8'-6" 5'-0" 3 P.S. @ 8'-6"= 25'-6" 3'-2" 3 P.S. @ 8'-6"= 25'-6" 2'-1" 3 P.S. @ 8'-6"= 25'-6" 2'-0" 3 P.S. @ 8'-6"= 25'-6" 3'-6" 7"
17'-11" 1 P.S.= 8'-6" 3'-4" 2 P.S. @8'-6"= 17'-0" 4'-6" 2 P.S. @8'-6"= 17'-0" 4'-6" 2 P.S. @8'-6"= 17'-0" 3'-8" 2 P.S. @8'-6"= 17'-0" 3'-7" 2 P.S. @8'-6"= 17'-0" 5'-0" 1 P.S. @ = 8'-6"
FD
6'-6"
FD
(6) BIKE PARKING SPACES
18'-0"
18'-0"
161 160 159 158 157 156 155 154 153
13'-10"
13'-10"
18'-0"
18'-0"
313 312 311 310 309 308 307 306 305 304 303 302 151 150 149
5"
5'-8"
©
REFER TO PHASE 2
PHASE 2 PHASE 1
PARKING SPACES FROM 162 TO 336 PARKING SPACES FROM 1 TO 161
PHASE 1 - PARKING SCHEDULE PHASE 2 - PARKING SCHEDULE PHASE 1 - BICYCLE RACK NOTE: EV PARKING SPACES REQUIRED 20%
EV PARKING SPACES = 161 X 20% = 32.2
TYPE LEVEL QUANTITY DESCRIPTION TYPE LEVEL QUANTITY DESCRIPTION TYPE LEVEL BIKE SPACES
EV PARKING - PHASE 1 PROVIDED = 33
2nd FLOOR 2nd FLOOR
2nd FLOOR 1 Bicycle Parking Space 2'-0" EV-PK 2nd FLOOR 12 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0") Bic-PK 2nd FLOOR 128 EV PARKING SPACES REQUIRED 20%
EV-PK 2nd FLOOR 13 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0") HC-PK 2nd FLOOR 1 HANDICAP PARKING (12'-0"x18'-0" Bic-PK 3rd FLOOR 136 EV PARKING SPACES = 175 X 20% = 35
HC-PK 2nd FLOOR 1 HANDICAP PARKING (12'-0"x18'-0") REG-PK 2nd FLOOR 22 TYP. PARKING (8'-6"x18'-0") Bic-PK 4th FLOOR 136 EV PARKING - PHASE 2 PROVIDED = 36
REG-PK 2nd FLOOR 22 TYP. PARKING (8'-6"x18'-0") 3rd FLOOR Bic-PK 5th FLOOR 136
BIM 360://222 NE 1 ST. AVE/_LINK-TOWER 1-INTERIOR 1-8 LEVELS.rvt
3rd FLOOR 3rd FLOOR 1 Bicycle Parking Space 2'-0" Bic-PK 6th FLOOR 136 NOTE: TANDEM PARKING
Bic-PK 3rd FLOOR 1 Bicycle Parking Space 2'-0" Bic-PK 3rd FLOOR 2 Bicycle Parking Space 2'-0" TOTAL BICYCLE RACK SPACES 672 TO BE USED BY
VALET PARKING
EV-PK 3rd FLOOR 13 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0") EV-PK 3rd FLOOR 12 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0")
ONLY.
HC-PK 3rd FLOOR 1 HANDICAP PARKING (12'-0"x18'-0") HC-PK 3rd FLOOR 1 HANDICAP PARKING (12'-0"x18'-0"
REG-PK 3rd FLOOR 22 TYP. PARKING (8'-6"x18'-0") REG-PK 3rd FLOOR 22 TYP. PARKING (8'-6"x18'-0")
4th FLOOR
Bic-PK 4th FLOOR 2 Bicycle Parking Space 2'-0"
4th FLOOR
EV-PK 4th FLOOR 12 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0")
PHASE 2 - BICYCLE RACK
EV-PK 4th FLOOR 7 ELECTRONIC VEHICLE PARKING WITH ADJACENT CHARGER (8'-6"x18'-0") HC-PK 4th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0" TYPE LEVEL BIKE SPACES
HC-PK 4th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0") REG-PK 4th FLOOR 22 TYP. PARKING (8'-6"x18'-0")
REG-PK 4th FLOOR 28 TYP. PARKING (8'-6"x18'-0") 5th FLOOR Bic-PK 2nd FLOOR 0
5th FLOOR HC-PK 5th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0" Bic-PK 3rd FLOOR 0
HC-PK 5th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0") REG-PK 5th FLOOR 34 TYP. PARKING (8'-6"x18'-0") Bic-PK 4th FLOOR 142 DATE: 08/08/2022
REG-PK 5th FLOOR 35 TYP. PARKING (8'-6"x18'-0") 6th FLOOR Bic-PK 5th FLOOR 142
6th FLOOR HC-PK 6th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0" Bic-PK 6th FLOOR 142 PROJECT NO:21095
HC-PK 6th FLOOR 1 HANDICAP PARKING (12'-0"x18'-0") REG-PK 6th FLOOR 34 TYP. PARKING (8'-6"x18'-0") TOTAL BICYCLE RACK SPACES 426
REG-PK 6th FLOOR 16 TYP. PARKING (8'-6"x18'-0") TOTAL PARKING SPACES 178
DRAWING NAME:
TOTAL PARKING SPACES 165
9/13/2022 8:31:33 AM
2ND LAYER
2ND LAYER
1ST LAYER
1ST LAYER
SETBACK
SETBACK
')
1'-11"3'-3"
3'-4"
.36
(35.01')
(35 (3
1'-6" 1'-6"
1'-11"
5.
1'-5"
10'-0"
35
10'-0"
')
15'-5"
25'-0"
25'-0"
12'-8"
STAFF ROOM
63' - 0" ROOM UP
23'-7"
63' - 0"
15'-0"
15'-0"
OPEN
WC RESIDENT
STORAGE RENTABLE
12'-7"
44'-3"
15'-7"
63' - 0"
TERRACE
TOWER 1 JANITOR
10'-0"
63' - 0" GAME LOUNGE
DOG WASH CLOSET 63' - 0"
63' - 0"
8'-9"
BOWLING ROOM
63' - 0"
4'-0"
6 STORY TRASH C.
SUN HOTEL STAIR 1
4'-0"
82'-9"
20'-0"
(89.95')
(89.94')
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
HEAVY DUTY STAIR
63' - 0"
WOMEN
22'-0"
14'-10"
10'-0"
MEN WC
107'-0"
PRIVATE PRIVATE
TOWER 2 MEETING MEETING
4'-0"
BUILDING ELEVATOR
BUILDING PODCAST PODCAST
(164.86')
MUSIC63'ROOM LOBBY
- 0" MANAGEMENT MAINTENACE 63' - 0" ROOM ROOM
OFFICE WORKSHOP
25'-9"
28'-6"
4'-0"
WC
27'-8"
BBL
FIRE EXIT
CORRIDOR
8'-6"
165'-8"
63' - 0"
(50.00')
SHOW
15'-5"
4'-0"
27'-9"
17'-5"
STAIR 3 ROOM # 1
63' - 0"
ELEV. 1 ELEV. 2
4'-0"
2'-0"
LOBBY 5'-4" 9'-8" 4'-10" 9'-9" 6'-3" 10'-0" 8'-8" 15'-10" 14'-10" 63' - 0"
(164.93')
OFFICES
9'-0"
19'-9"
ELEV. 3 63' - 0" ELEV. 4 63' - 0"
SHOW
ROOM # 2
63' - 0"
12'-6"
ELEV. 5 ELEV. 6
4'-0"
MOVIE ROOM
63' - 0" BUILDING
MAINTENACE CONFERENCE
MEN WC WOMEN WC WORKSHOP
10'-0"
63' - 0" OFFICE ROOM
STAIR STAIR 2 63' - 0"
9'-0"
63' - 0"
BOWLING ROOM 63' - 0"
63' - 0"
OFFICE
4'-0"
5'-10"
OFFICE
OFFICE
GOLF OFFICE
9'-0"
SIMULATOR OFFICE
HEAVY DUTY
ROOM LOBBY
63' - 0" 63' - 0" LAUNDRY ROOM
63' - 0" OFFICE
POOL ABOVE
BUILDING
6'-0"
35'-4"
GOLF
63' - 0"
MOVIE ROOM SIMULATOR OFFICE OFFICE
63' - 0" ROOM
©
BUILDING 63' - 0"
12'-11"
FD
BATHROOM 2
TERRACE 10'-2"
11'-2"
63' - 0" SETBACK
SETBACK
STAFF ROOM TERRACE
13'-5"
19'-7"
19'-7"
BIM 360://222 NE 1 ST. AVE/_LINK-TOWER 1-INTERIOR 1-8 LEVELS.rvt
(300.18')
15'-9" 2'-0" 8'-0" 3'-6" 8'-0" 2'-0" 8'-0" 3'-6" 8'-0" 2'-0" 8'-0" 3'-6" 8'-0" 2'-0" 8'-0" 3'-4" 8'-0" 1'-8" 8'-0" 2'-11" 8'-0" 3'-10" 23'-0" 44'-0" 26'-8" 14'-10" 2'-7" 8'-0" 7'-8" 8'-1" 2'-8" 16'-2" 9'-6"
193'-0" 26'-8" 59'-5"
280'-2"
15'-0" 10'-0"
10'-0" 15'-0"
25'-0" 25'-0"
2ND LAYER
2ND LAYER
1ST LAYER
1ST LAYER
PROJECT NO:21095
SOLAR REGLECTANCE VALUE OF 0.72 OR A THREE YEAR SCALE: 3/32" = 1'-0" A-104.
m.
2ND LAYER
2ND LAYER
1ST LAYER
1ST LAYER
(10.00')
TOP OF PARAPET 67' - 10"
(10.00')
BALCONY ABOVE BALCONY ABOVE
56'-7" 30'-0" 20'-0" 11'-8" 91'-6" 15'-5"
SEAL:
SETBACK SETBACK
(34.99')
2'-6"2'-8" 12'-11" 3'-11" 9'-0" 4'-0" 9'-0" 7'-1" 7'-11" 9'-6" 20'-4" 50'-1" 10'-0" 9'-5" 11'-8" 3'-8" 8'-0" 5'-3" 8'-0" 4'-0" 8'-0" 5'-10" 8'-0" 4'-0" 8'-0" 5'-4" 8'-0" 4'-0" 8'-0" 3'-6" 15'-5" 2'-0"
SET BACK
BBL BBL
SET BACK
(75.07') (125.10')
1'-11"
3'-3"
3'-3"
3'-4"
3'-8"
4'-8"
1'-6" 1'-6"
2'-0"
6')
10'-0"
10'-0"
.3
1'-11"
5
(3
(3
5.
35
2'-9"
8'-1"
')
10' - 0" SETBACK / 10' - 0" SETBACK /
15'-2"
15'-5"
25'-0"
25'-0"
12'-9"
10'-9"
DN
TOP OF PARAPET 67' - 10" TOP OF PARAPET 67' - 10" TOP OF PARAPET 67' - 10"
15'-0"
15'-0"
OPEN TO
48" HEIGHT POOL SAFETY
13'-6"
3'-2"
BARRIER BELOW
FITNESS BALCONY ABOVE
7'-3"
GYM 75' - 4"
12'-6"
8'-0"
2ND LAYER 75' - 4" 2ND LAYER
BALCONY ABOVE
TOP OF PARAPET 67' - 10" COVERED
GAME LOUNGE
TOWER 1 TERRACE
10'-0"
8'-4"
PHONE ROOM
GAME LOUNGE
7'-8"
75' - 4"
TERRACE 75' - 4"
8'-9"
(89.95')
BELOW
(89.94')
4'-0"
6 STORY TRASH C.
SUN HOTEL
8'-0"
4'-0"
7'-8"
STAIR (NOT A PART OF STAIR 1 BALCONY ABOVE
82'-9"
20'-0"
THIS APPLICATION)
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
75' - 4" LIBRARY/ POKER
14'-10"
ELEV. 1 ELEV. 2
13'-8"
75' - 4"
48" HEIGHT POOL SAFETY
14'-3"
BARRIER
ARCADE ZONE COWORKING
W.N.
107'-0"
LOUNGE
75' - 4"
TOWER 2 ELEVATOR CORRIDOR
10'-0"
LOBBY W.N.
8'-11"
11'-9"
BBL
4'-0"
MEN/WOMEN WC
75' - 4"
SINTHETIC TURF ELEV. 5 ELEV. 6
28'-10"
BBQ AREA
12'-7"
1'-11"
LAWN OUTDOOR MOVIE
75' - 5"
11'-9"
75' - 3 1/2"
FD W.N.
FD
8'-0"
BBL
FPL. VAULT
75' - 4"
2'-0"
LOBBY W.N.
8'-6"
75' - 4"
165'-8"
8'-0"
4'-0"
SETBACK
27'-9"
17'-5"
8'-0"
BALCONY ABOVE ELEV. 7 ELEV. 8 73'-5" FOUNTAIN
ELEVATOR
(164.93')
5'-4" 9'-7" 4'-11" 9'-9" 6'-3" 9'-9" 8'-11" 15'-9" 3'-1" 11'-6" 75' - 4"
COWORKING LOBBY
9'-0"
3'-9"
CORRIDOR FD
2'-0"
FD
LOUNGE 75' - 4"
75' - 4" ELEV. 9 ELEV. 10
WOMEN WC MEN WC
8'-1"
SUN POOL DECK
12'-6"
SWIMING POOL
ELEV. 11 ELEV. 12 W+M CHANGING
5'-11"
75' - 4"
STAIR 2
TERRACE
8'-1"
STAIR
9'-0"
3'-11"
RM BALCONY ABOVE GYM
75' - 4"
5'-10"
75' - 4"
COVERED FD FD
8'-0"
GAME LOUNGE TERRACE
15'-5" 76'-0" 9" 43'-4" 7" 12'-9" 18'-3" 22'-6" 18'-9" 9'-9" 10" 26'-9" 32'-6"
7'-5"
AREA
6" OF
WATER
6'-0"
©
OPEN TO TYPICAL SUN CHAISES 75' - 4"
12'-11"
BELOW AREA
20'-0"
FD FD FD
0" 4'-1"
FD
10'-0"
SET BACK
11'-2" TERRACE CABANA AREA
SET BACK BELOW BALCONY ABOVE TOP OF PARAPET 67' - 10"
FD
FD FD
FD
FD
TERRACE
13'-5"
BELOW
19'-7"
TOP OF PARAPET 67' - 10"
BIM 360://222 NE 1 ST. AVE/_LINK-TOWER 1-INTERIOR 1-8 LEVELS.rvt
BALCONY ABOVE
PHASE 2 PHASE 1
(300.18')
15'-9" 4'-3" 5'-9" 3'-6" 8'-0" 2'-0" 8'-0" 3'-6" 8'-0" 2'-0" 8'-0" 3'-6" 8'-0" 2'-0" 8'-0" 3'-4" 8'-0" 1'-8" 8'-0" 2'-11" 8'-0" 3'-11" 10'-3" 2'-6" 13'-0" 2'-7" 8'-0" 7'-8" 8'-1" 2'-8" 13'-1" 2'-7"
136'-11" 8" 12'-0" 44'-4" 25'-8" 60'-1" 10'-0"
280'-2"
15'-0" 10'-0"
10'-0" 15'-0" TOP OF PARAPET 67' - 10" TOP OF PARAPET 78' - 10" TOP OF PARAPET 67' - 10" TOP OF PARAPET 67' - 10"
TOP OF PARAPET 66' - 6"
25'-0" 25'-0"
DATE: 08/08/2022
PROJECT NO:21095
2ND LAYER
1ST LAYER
2ND LAYER
1ST LAYER
NOTE:
THERMOPLASTIC MEMBRANE ROOFING SYSTEM DRAWING NAME:
(JM TPO -60MIL, 20 YEAR NDL. WARRANTIES) ON
13/09/2022 07:13:15 p.
2ND LAYER
2ND LAYER
1ST LAYER
1ST LAYER
UNIT A4 STUDIO STUDIO UNIT A STUDIO
25'-0" 1 BEDROOM / 1 BEDROOM / 1 BEDROOM / 1 BEDROOM / 1 BEDROOM /
1 BATHROOM 1 BATHROOM 1 BATHROOM 1 BATHROOM 1 BATHROOM 25'-0"
3'-8" 2'-8" 51'-11" 1'-11" 30'-0" 50'-0" 19'-5" 2'-8" 21'-1" 14'-10" 14'-10" 21'-6" 14'-10" 24'-0" 4'-10" 2'-0"
SETBACK SETBACK BBL
SETBACK
SETBACK
5'-3" SETBACK
BBL
3'-3"
3'-4"
3'-4"
2'-6" 5'-4"
10'-0"
10'-0"
2'-7"
25'-0"
4'-10"
DW
DW
10' - 0" SETBACK / 10' - 0" SETBACK /
1ST LAYER 15'-0" 1ST LAYER
25'-0"
21'-5"
UNIT B
21'-2"
24'-1"
UNIT A4 UNIT A4
SH.
15'-0"
15'-0"
4533 Ponce de Leon Boulevard
AHU
AHU
AHU
AHU 2 BEDROOMS/ Coral Gables, Florida 33146
24'-9"
AHU
1 BEDROOM / TEL: (305) 740-5442 FAX: (305) 740-5443
AHU
11'-2" 2 BATHROOMS
TERRACE 1 BEDROOM / E-MAIL: info@beharfont.com
1 BATHROOM SETBACK
28'-7"
DW
25' - 0" SETBACK / BELOW 1 BATHROOM 25' - 0" SETBACK /
DW
DW
DW
2ND LAYER DW 2ND LAYER
1'-7"
13'-9"
SEAL:
58'-0"
14'-10"
AHU
14'-10"
(NOT A PART OF AHU
25'-4"
DW
THIS APPLICATION)
14'-1"
AHU
DW
1 BEDROOM /
14'-10"
107'-2"
1 BEDROOM /
3'-10"
1 BATHROOM
13'-8"
AHU
21'-6"
ELEVATOR UNIT A
AHU
AHU
ELEVATOR ELEVATOR
LOBBY
21'-6"
13'-9"
25'-11"
1 BATHROOM 1 BATHROOM
AHU
DW
" 1 BEDROOM / 1 BEDROOM /
DW
STUDIO 1 5 3'-9
1 BATHROOM 1 BATHROOM
AHU
FPL VAULT
UNIT A
21'-6"
1 BEDROOM /
STUDIO 1
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
1 BATHROOM
21'-6"
1 BEDROOM /
UNIT A
AHU
1 BEDROOM /
STUDIO 4 STUDIO A 1 BATHROOM
DW
27'-10"
15'-2"
AHU
145'-3"
145'-4"
1 BATHROOM 1 BEDROOM / DW
SETBACK
1 BEDROOM /
STUDIO 3
20'-4"
1 BATHROOM 1 BATHROOM
73'-4" 82'-1"
21'-6"
LOBBY DW
UNIT A
AHU
AHU
STUDIO 3
21'-6"
15'-1"
1 BEDROOM /
AHU
UNIT A 1 BEDROOM / 1 BATHROOM
1 BEDROOM /
UNIT A4 1 BATHROOM
1 BATHROOM DW
1 BEDROOM /
AHU
DW 1 BATHROOM
14'-10"
AHU
AHU
STUDIO
12'-0"
AHU
SWIMING POOL
14'-10"
81'-1"
AHU BELOW 1 BEDROOM /
DW
DW
STUDIO DW 1 BATHROOM
DW
1 BEDROOM /
STUDIO DW
DW
1 BATHROOM AHU
1 BEDROOM / STUDIO
15'-1"
14'-10"
AHU DW
TRASH ROOM HALLWAY 1 BATHROOM AHU
AHU
AHU DW 1 BEDROOM /
1 BATHROOM
AHU
DW
DW
DW
29'-11"
DW
DW
AHU
AHU
AHU
AHU AHU
UNIT B UNIT A4
21'-3"
20'-9"
TERRACE
SH.
2 BEDROOMS/
BELOW
UNIT A4 1 BEDROOM / UNIT A4
2 BATHROOMS 1 BATHROOM
1 BEDROOM /
DW
1 BEDROOM /
DW
1 BATHROOM 1 BATHROOM
4'-1"
2'-6"
2'-6"
82'-0"
19'-7"
19'-6"
BELOW
©
10'-0" 15'-0" 15'-0" 10'-0"
25'-0" UNIT A1 UNIT A UNIT A UNIT A1
TOWER 2 TOWER 1 25'-0"
2ND LAYER
2ND LAYER
1ST LAYER
1ST LAYER
UNIT TYP. FLOOR
BIM 360://222 NE 1 ST. AVE/_LINK-TOWER 1-INTERIOR 9-42 LEVELS.rvt
DATE: 09/02/2022
NOTE: PROJECT NO:21-091
THERMOPLASTIC MEMBRANE ROOFING SYSTEM
(JM TPO-60MIL, 2. YEAR NDL. WARRANTIES) ON DRAWING NAME:
INSULATING LIGHTWEIGHT CONCRETE (R-19
EQUAL OR GREATER) OVER STRUCT. CONC.
SLAB (TYP) COLOR WHITE, HIGH ALBEDO WITH 9TH FLOOR TO 42ND
9/12/2022 11:19:06 PM
2ND LAYER
2ND LAYER
1ST LAYER
1ST LAYER
IMPACT RESISTANT PROVIDE WATERPROOFING
DUCTWORK SEE MECH DWGS
STOREFRONT SYSTEM W/ LIGHT MEMBRANE AT CONCRETE
IMPACT RESISTANT WINDOW W/ FOR REQUERIMENTS
GRAY LAMINATED GLASS, SEE EYEBROWS
10'-0" 15'-0" LIGHT GRAY LAMINATED GLASS, GLAZING SCHEDULE 15'-0" 10'-0"
SEE GLAZING SCHEDULE
DEDICATION
DEDICATION
BALCONY BELOW TOP OF PARAPET 424' - 0"
10'-0"
10'-0"
BALCONY BELOW 118'-8" 2'-0"
4533 Ponce de Leon Boulevard
56'-6" 30'-0" 50'-0" 20'-0" 11'-9" 91'-5" 15'-6" Coral Gables, Florida 33146
SETBACK
BBL SETBACK SETBACK TEL: (305) 740-5442 FAX: (305) 740-5443
3'-4"
3'-4"
3'-7"
E-MAIL: info@beharfont.com
1'-0"
10'-0"
10'-0"
10'-0"
1'-5"
2'-11"
4'-5"
10' - 0" SETBACK / 10' - 0" SETBACK /
15'-3"
11'-5"
1ST LAYER 1ST LAYER
15'-6"
25'-0"
15'-0"
15'-0"
15'-0"
30'-9"
ROOF DRAIN
37'-10"
PACU-3 11
36'-9"
14'-3"
25' - 0" SETBACK / 25' - 0" SETBACK /
2ND LAYER PRE FINISHED METAL TRASH 2ND LAYER
CHUTE VENTED CAP. AS PER
BALCONY BELOW
TOP OF PARAPET 418' - 5" MANUFACTURER
10'-5"
SPECIFICATIONS
53'-9"
SPF-R-1 AC/ UNITS. SEE MECH. DWGS
58'-0"
FOR REQUERIMENTS
TOWER 2
AIRFLOW
SHAFT FOR
FORCED AC AC/ UNITS. SEE MECH. DWGS
5'-8"
IMPACT RESISTANT EQUIPMENT FOR REQUERIMENTS
STOREFRONT SYSTEM W/ LIGHT
GRAY LAMINATED GLASS, SEE 1'-4" 45'-11" 4'-1" 4'-9"
GLAZING SCHEDULE
TOP OF PARAPET 407' - 8" STAIR 1
14'-1"
14'-1"
64'-9"
ROOF DRAIN
20'-6"
ROOF DRAIN
107'-1"
77'-1"
5'-9" 8'-2" 3'-4"
4'-3"
ROOF AREA DUCTWORK SEE MECH DWGS IMPACT RESISTANT
FOR REQUERIMENTS STOREFRONT SYSTEM W/ LIGHT
IMPACT RESISTANT
10"
GRAY LAMINATED GLASS, SEE
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
60'-0"
STOREFRONT SYSTEM W/ LIGHT ROOF DRAIN GLAZING SCHEDULE
GRAY LAMINATED GLASS, SEE TOP OF PARAPET 421' - 0"
27'-5"
27'-5"
GLAZING SCHEDULE BALCONY BELOW
56'-1"
TOP OF PARAPET 407' - 8"
AC/ UNITS. SEE MECH. DWGS
IMPACT RESISTANT BALCONY BELOW FOR REQUERIMENTS
'.
ROOF DRAIN ROOF DRAIN 54 STOREFRONT SYSTEM W/ LIGHT
GRAY LAMINATED GLASS, SEE
BALCONY BELOW
GLAZING SCHEDULE MACHINE ROOM
FPL. VAULT 418' - 8"
BLEOW
30'-10" 31'-0" 2'-9"
165'-9"
TOP OF PARAPET 424' - 0"
MACHINE ROOM
418' - 0" FPL VAULT PACU-2
10" 5'-0" IMPACT RESISTANT
27'-9"
3'-0" 3'-0"
GLAZING SCHEDULE REFER TO LOUVER SCHEDULE
1'-4"
FOR SPECS.
BALCONY BELOW 73'-5"
3'-3" 10"
70'-3" 3'-2"
18'-7"
3'-1"
TOP OF PARAPET 424' - 0" BOILER ROOM ROOF AREA
AC/ UNITS. SEE MECH. DWGS 418' - 0" 418' - 1"
107'-0"
FOR REQUERIMENTS
1'-10"
IMPACT RESISTANT
IMPACT RESISTANT SLIDING
35'-8"
STOREFRONT SYSTEM W/ LIGHT
GLASS DOOR W/ LIGHT GRAY GRAY LAMINATED GLASS, SEE
ROOF DRAIN LAMINATED GLASS, SEE GLAZING SCHEDULE
ROOF DRAIN
GLAZING SCHEDULE
1'-10"
86'-8"
9'-0"
STAIR 2 BALCONY BELOW BALCONY BELOW
73'-1"
63'-8" 73'-5"
59'-11"
14'-3"
56'-10"
AC/ UNITS. SEE MECH. DWGS
FOR REQUERIMENTS
ROOF AREA
418' - 4"
3'-0" 3'-0"
10" 5'-0"
PACU-2 TOP OF PARAPET 421' - 0"
32'-3"
PUMP ROOM
418' - 0" AC/ UNITS. SEE MECH. DWGS
IMPACT RESISTANT FOR REQUERIMENTS
STOREFRONT SYSTEM W/ LIGHT
ROOF DRAIN GRAY LAMINATED GLASS, SEE
IMPACT RESISTANT WINDOW W/ ROOF DRAIN
15'-0"
LIGHT GRAY LAMINATED GLASS, GLAZING SCHEDULE ROOF DRAIN
SEE GLAZING SCHEDULE
6'-3"
10" 2'-11"
10"
10'-0" 10'-0"
©
SETBACK AC/ UNITS. SEE MECH. DWGS IMPACT RESISTANT SLIDING BALCONY BELOW SETBACK
BALCONY BELOW
FOR REQUERIMENTS GLASS DOOR W/ LIGHT GRAY
19'-6"
LAMINATED GLASS, SEE TOP OF PARAPET 421' - 0"
GLAZING SCHEDULE
IMPACT RESISTANT
STOREFRONT SYSTEM W/ LIGHT
GRAY LAMINATED GLASS, SEE
GLAZING SCHEDULE
25'-0"
TOWER 2 TOWER 1 25'-0"
BIM 360://222 NE 1 ST. AVE/_LINK-TOWER 1-INTERIOR 9-42 LEVELS.rvt
PHASE 2 PHASE 1
2ND LAYER
2ND LAYER
1ST LAYER
1ST LAYER
DATE: 09/02/2022
NOTE: PROJECT NO:21-091
THERMOPLASTIC MEMBRANE ROOFING SYSTEM
(JM TPO-60MIL, 2. YEAR NDL. WARRANTIES) ON DRAWING NAME:
INSULATING LIGHTWEIGHT CONCRETE (R-19
EQUAL OR GREATER) OVER STRUCT. CONC.
SLAB (TYP) COLOR WHITE, HIGH ALBEDO WITH ROOF PLAN
12/09/2022 07:09:42 p.
2ND LAYER
1ST LAYER
1ST LAYER
IMPACT RESISTANT WINDOW W/ IMPACT RESISTANT
LIGHT GRAY LAMINATED GLASS, STOREFRONT SYSTEM W/ LIGHT
10'-0" 15'-0" GRAY LAMINATED GLASS, SEE 15'-0" 10'-0"
SEE GLAZING SCHEDULE
GLAZING SCHEDULE
DEDICATION
DUCTWORK SEE MECH DWGS
DEDICATION
FOR REQUERIMENTS
10'-0"
118'-7" 2'-0"
1'-0"
4533 Ponce de Leon Boulevard
10'-0"
10'-0"
10'-0"
3'-1"
TEL: (305) 740-5442 FAX: (305) 740-5443
E-MAIL: info@beharfont.com
10' - 0" SETBACK / 10' - 0" SETBACK /
11'-5"
1ST LAYER 1ST LAYER
15'-6"
25'-0"
15'-0"
15'-0"
15'-0"
GLAZING SCHEDULE
SEAL:
AC/ UNITS. SEE MECH. DWGS
TOWER 1
30'-8"
37'-10"
36'-9"
FOR REQUERIMENTS
14'-3"
25' - 0" SETBACK / 25' - 0" SETBACK /
2ND LAYER 2ND LAYER
PRE FINISHED METAL TRASH
AC/ UNITS. SEE MECH. DWGS CHUTE VENTED CAP. AS PER
10'-5"
FOR REQUERIMENTS MANUFACTURER
53'-9"
SPECIFICATIONS AC/ UNITS. SEE MECH. DWGS
58'-0"
TOWER 2 FOR REQUERIMENTS
AIRFLOW
IMPACT RESISTANT ROOF BELOW
STOREFRONT SYSTEM W/ LIGHT 418' - 2"
GRAY LAMINATED GLASS, SEE TOP OF PARAPET 434' - 0"
5'-8"
GLAZING SCHEDULE
ROOF TOP
14'-1"
14'-1"
429' - 5"
20'-6"
107'-1"
77'-1"
IMPACT RESISTANT 5'-9" 8'-2" 3'-4"
STOREFRONT SYSTEM W/ LIGHT
4'-3"
GRAY LAMINATED GLASS, SEE
GLAZING SCHEDULE ROOF
BELOW
9"
418' - 2"
42'-0"
ROOF BELOW
27'-5"
27'-5"
418' - 4" IMPACT RESISTANT
56'-1"
ROOF TOP STOREFRONT SYSTEM W/ LIGHT
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
TOP OF PARAPET 434' - 0" GRAY LAMINATED GLASS, SEE
433' - 4"
'. GLAZING SCHEDULE
54
97'-1"
166'-8"
165'-8"
AC/ UNITS. SEE MECH. DWGS
FOR REQUERIMENTS
10" 5'-0" IMPACT RESISTANT
STOREFRONT SYSTEM W/ LIGHT
27'-9"
3'-1"
TOP OF PARAPET 434' - 0"
107'-1"
438' - 0"
IMPACT RESISTANT WINDOW W/
LIGHT GRAY LAMINATED GLASS,
35'-8"
SEE GLAZING SCHEDULE TOP OF PARAPET 439' - 1"
AIRFLOW
81'-5"
ROOF BELOW
418' - 4"
73'-1"
TOP OF PARAPET 434' - 0"
59'-11"
IMPACT RESISTANT
56'-10"
STOREFRONT SYSTEM W/ LIGHT
GRAY LAMINATED GLASS, SEE
GLAZING SCHEDULE
ROOF TOP
433' - 4"
10" 5'-0"
35'-2"
AC/ UNITS. SEE MECH. DWGS
32'-3"
FOR REQUERIMENTS
1'-0"
10"
10"
19'-6"
IMPACT RESISTANT GLAZING SCHEDULE
©
STOREFRONT SYSTEM W/ LIGHT
GRAY LAMINATED GLASS, SEE
GLAZING SCHEDULE
25'-0"
TOWER 2 TOWER 1 25'-0"
2ND LAYER
2ND LAYER
1ST LAYER
BIM 360://222 NE 1 ST. AVE/_LINK-TOWER 1-INTERIOR 9-42 LEVELS.rvt
1ST LAYER
DATE: 09/02/2022
NOTE: PROJECT NO:21-091
THERMOPLASTIC MEMBRANE ROOFING SYSTEM
(JM TPO-60MIL, 2. YEAR NDL. WARRANTIES) ON DRAWING NAME:
INSULATING LIGHTWEIGHT CONCRETE (R-19
EQUAL OR GREATER) OVER STRUCT. CONC.
SLAB (TYP) COLOR WHITE, HIGH ALBEDO WITH UPPER ROOF PLAN
12/09/2022 07:09:46 p.
TOP BUILDING
432' - 0" P.B.P.
424' - 1" P.B.P. IMPACT RESISTANT 448' - 0"
15'-0"
STOREFRONT SYSTEM W/ LIGHT
GRAY LAMINATED GLASS, SEE
GLAZING SCHEDULE ROOF
433' - 0"
15'-0"
IMPACT RESISTANT
ALUMINUM MESH RAILING STOREFRONT SYSTEM W/ LIGHT
LINE RAIL ALUMINUM MESH ROOF ACCESS
GRAY LAMINATED GLASS, SEE
GRILL BALCONY RAILING 44" 418' - 0"
10'-4"
GLAZING SCHEDULE
ABOVE FINISH FLOOR, SEE
DETAIL 42nd FLOOR
407' - 8"
9'-8"
4533 Ponce de Leon Boulevard
41st FLOOR Coral Gables, Florida 33146
398' - 0" TEL: (305) 740-5442 FAX: (305) 740-5443
9'-8"
E-MAIL: info@beharfont.com
LINE RAIL ALUMINUM MESH 40th FLOOR
GRILL BALCONY RAILING 44" 388' - 4"
ABOVE FINISH FLOOR, SEE
19'-4"
DETAIL 39th FLOOR
378' - 8"
9'-8"
37th FLOOR
359' - 4"
9'-8"
36th FLOOR
349' - 8"
9'-8"
35th FLOOR
IMPACT RESISTANT 340' - 0"
9'-8"
STOREFRONT SYSTEM W/ LIGHT
GRAY LAMINATED GLASS, SEE 34th FLOOR
GLAZING SCHEDULE 330' - 4"
9'-8"
33th FLOOR
320' - 8"
9'-8"
LINE RAIL ALUMINUM MESH 32th FLOOR
IMPACT RESISTANT WINDOW/SLIDING GLASS DOOR GRILL BALCONY RAILING 44" 311' - 0"
9'-8"
ABOVE FINISH FLOOR, SEE
W/LIGHT GRAY LAMINATED GLASS DETAIL 31th FLOOR
301' - 4"
9'-8"
30th FLOOR
291' - 8"
9'-8"
29th FLOOR
282' - 0"
9'-8"
IMPACT RESISTANT 28th FLOOR
STOREFRONT SYSTEM W/ LIGHT 272' - 4"
9'-8"
GRAY LAMINATED GLASS, SEE
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
262' - 8"
9'-8"
MAX. HEIGTH FROM SIDEWALK AVERAGE ELEVATION
26th FLOOR
253' - 0"
9'-8"
25th FLOOR
243' - 4"
9'-8"
24th FLOOR
233' - 8"
9'-8"
448'-0"
5376"
23th FLOOR
224' - 0"
9'-8"
433'-2"
22th FLOOR
214' - 4"
9'-8"
21th FLOOR
204' - 8"
9'-8"
3/4" STUCCO FINISH
20th FLOOR
195' - 0"
9'-8"
19th FLOOR
185' - 4"
9'-8"
9'-8"
PAINTED 5/8" SMOOTH STUCCO 17th FLOOR
FINISH OVER 8" CBS / CONC 166' - 0"
9'-8"
WALL / SLAB; PAINT BY SHERWIN
WILLIAMS 16th FLOOR
156' - 4"
9'-8"
15th FLOOR
146' - 8"
9'-8"
14th FLOOR
137' - 0"
9'-8"
13th FLOOR
127' - 4"
9'-8"
LINE RAIL ALUMINUM MESH
GRILL BALCONY RAILING 44" 12th FLOOR
ABOVE FINISH FLOOR, SEE 117' - 8"
9'-8"
DETAIL
11th FLOOR
108' - 0"
9'-8"
10th FLOOR
98' - 4"
9'-8"
3/4" GRAY STUCCO IMPACT RESISTANT
IMPACT RESISTANT 9th FLOOR
STOREFRONT SYSTEM W/ LIGHT STOREFRONT SYSTEM W/ LIGHT 88' - 8"
13'-4"
GRAY LAMINATED GLASS, SEE GRAY LAMINATED GLASS, SEE
GLAZING SCHEDULE GLAZING SCHEDULE
8th FLOOR
75' - 4"
12'-4"
TOP OF PARAPET 67' - 10" P.B.P. TOP OF PARAPET 67' - 10" P.B.P.
7th FLOOR
63' - 0"
9'-0"
9'-0"
ALUMINUM IN 8”X 8“ W/ 2”
KINETIC SCREEN IN A POLISHED 5th FLOOR
SPACING.
©
ALUMINUM IN 8”X 8“ W/ 2” 45' - 0"
9'-0"
SPACING.
4th FLOOR
36' - 0"
9'-0"
3rd FLOOR
IMPACT RESISTANT 5'-0"
27' - 0"
9'-0"
STOREFRONT SYSTEM W/ LIGHT
GRAY LAMINATED GLASS, SEE 2nd FLOOR
GLAZING SCHEDULE 18' - 0"
18'-0"
5'-0"
GROUND FLOOR
0' - 0"
EL:0'-5 1/2"= 12.70 N.G.V.D.
3/4" STUCCO SCORE LINES
AVERAGE SIDEWALK ELEVATIONS
+12.25' N.G.V.D.
MIAMI SUN HOTEL KINETIC SCREEN IN A POLISHED EL:-0'-1/2"=12.66' N.G.V.D.
PAINTED 5/8" SMOOTH STUCCO IMPACT RESISTANT
KINETIC SCREEN IN A POLISHED ALUMINUM IN 8”X 8“ W/ 2”
BIM 360://222 NE 1 ST. AVE/_LINK-TOWER 1- ELEVATION.rvt
ELEVATIONS
ELEVATIONS
A-201.
m.
15'-0"
15'-0"
FOR REQUERIMENTS
ALUMINUM MESH RAILING ROOF ROOF
433' - 0" IMPACT RESISTANT 433' - 0"
IMPACT RESISTANT STOREFRONT SYSTEM W/ LIGHT
15'-0"
15'-0"
TOP OF PARAPET 424' - 0" P.B.P. STOREFRONT SYSTEM W/ LIGHT GRAY LAMINATED GLASS, SEE
GRAY LAMINATED GLASS, SEE GLAZING SCHEDULE
GLAZING SCHEDULE ROOF ACCESS ROOF ACCESS
IMPACT RESISTANT
418' - 0" 418' - 0" 4533 Ponce de Leon Boulevard
10'-4"
10'-4"
STOREFRONT SYSTEM W/ LIGHT Coral Gables, Florida 33146
GRAY LAMINATED GLASS, SEE TEL: (305) 740-5442 FAX: (305) 740-5443
GLAZING SCHEDULE 42nd FLOOR 42nd FLOOR
407' - 8" 407' - 8" E-MAIL: info@beharfont.com
9'-8"
9'-8"
41st FLOOR 41st FLOOR
398' - 0" 398' - 0"
9'-8"
9'-8"
40th FLOOR 40th FLOOR
388' - 4" 388' - 4"
9'-8"
9'-8"
LINE RAIL ALUMINUM MESH SEAL:
39th FLOOR GRILL BALCONY RAILING 44" 39th FLOOR
378' - 8" ABOVE FINISH FLOOR, SEE 378' - 8"
9'-8"
9'-8"
DETAIL
38th FLOOR 38th FLOOR
369' - 0" 369' - 0"
9'-8"
9'-8"
37th FLOOR PAINTED 5/8" SMOOTH STUCCO 37th FLOOR
359' - 4" FINISH OVER 8" CBS / CONC 359' - 4"
9'-8"
9'-8"
WALL / SLAB; PAINT BY SHERWIN
PAINTED 5/8" SMOOTH STUCCO 36th FLOOR WILLIAMS 36th FLOOR
FINISH OVER 8" CBS / CONC 349' - 8" 349' - 8"
9'-8"
9'-8"
WALL / SLAB; PAINT BY SHERWIN
WILLIAMS 35th FLOOR 35th FLOOR
340' - 0" 340' - 0"
9'-8"
9'-8"
34th FLOOR 34th FLOOR
330' - 4" 330' - 4"
9'-8"
9'-8"
IMPACT RESISTANT WINDOW/SLIDING GLASS DOOR LINE RAIL ALUMINUM MESH 33th FLOOR 33th FLOOR
W/LIGHT GRAY LAMINATED GLASS GRILL BALCONY RAILING 44" 320' - 8" 320' - 8"
9'-8"
9'-8"
ABOVE FINISH FLOOR, SEE
DETAIL 32th FLOOR 32th FLOOR
311' - 0" 311' - 0"
9'-8"
9'-8"
31th FLOOR LINE RAIL ALUMINUM MESH 31th FLOOR
301' - 4" GRILL BALCONY RAILING 44" 301' - 4"
9'-8"
9'-8"
IMPACT RESISTANT ABOVE FINISH FLOOR, SEE
STOREFRONT SYSTEM W/ LIGHT 30th FLOOR DETAIL 30th FLOOR
GRAY LAMINATED GLASS, SEE 291' - 8" 291' - 8"
9'-8"
9'-8"
GLAZING SCHEDULE
29th FLOOR 29th FLOOR
282' - 0" 282' - 0"
9'-8"
9'-8"
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
28th FLOOR 28th FLOOR
9'-8"
9'-8"
27th FLOOR 27th FLOOR
262' - 8" 262' - 8"
9'-8"
9'-8"
26th FLOOR 26th FLOOR
253' - 0" 253' - 0"
9'-8"
9'-8"
LINE RAIL ALUMINUM MESH 25th FLOOR IMPACT RESISTANT 25th FLOOR
GRILL BALCONY RAILING 44" 243' - 4" STOREFRONT SYSTEM W/ LIGHT 243' - 4"
9'-8"
9'-8"
ABOVE FINISH FLOOR, SEE GRAY LAMINATED GLASS, SEE IMPACT RESISTANT
DETAIL 24th FLOOR GLAZING SCHEDULE STOREFRONT SYSTEM W/ LIGHT24th FLOOR
233' - 8" GRAY LAMINATED GLASS, SEE 233' - 8"
9'-8"
9'-8"
GLAZING SCHEDULE
448'-0"
448'-0"
23th FLOOR 23th FLOOR
224' - 0" 224' - 0"
9'-8"
9'-8"
22th FLOOR 22th FLOOR
3/4" STUCCO FINISH 214' - 4" 214' - 4"
9'-8"
9'-8"
PAINTED 5/8" SMOOTH STUCCO
21th FLOOR FINISH OVER 8" CBS / CONC 21th FLOOR
204' - 8" WALL / SLAB; PAINT BY SHERWIN 204' - 8"
9'-8"
9'-8"
WILLIAMS
20th FLOOR 20th FLOOR
9'-8"
9'-8"
19th FLOOR PAINTED 5/8" SMOOTH STUCCO 19th FLOOR
185' - 4" FINISH OVER 8" CBS / CONC 185' - 4"
9'-8"
9'-8"
WALL / SLAB; PAINT BY SHERWIN
18th FLOOR WILLIAMS 18th FLOOR
175' - 8" 175' - 8"
9'-8"
9'-8"
17th FLOOR 17th FLOOR
166' - 0" 166' - 0"
9'-8"
9'-8"
16th FLOOR 16th FLOOR
156' - 4" 156' - 4"
9'-8"
9'-8"
PAINTED 5/8" SMOOTH STUCCO 15th FLOOR 15th FLOOR
FINISH OVER 8" CBS / CONC 146' - 8" 146' - 8"
9'-8"
9'-8"
WALL / SLAB; PAINT BY SHERWIN
WILLIAMS 14th FLOOR LINE RAIL ALUMINUM MESH LINE RAIL ALUMINUM MESH 14th FLOOR
137' - 0" GRILL BALCONY RAILING 44" GRILL BALCONY RAILING 44" 137' - 0"
9'-8"
9'-8"
ABOVE FINISH FLOOR, SEE ABOVE FINISH FLOOR, SEE
13th FLOOR DETAIL DETAIL 13th FLOOR
127' - 4" 127' - 4"
9'-8"
9'-8"
LINE RAIL ALUMINUM MESH LINE RAIL ALUMINUM MESH 12th FLOOR 12th FLOOR
GRILL BALCONY RAILING 44" GRILL BALCONY RAILING 44" 117' - 8" 117' - 8"
9'-8"
9'-8"
ABOVE FINISH FLOOR, SEE ABOVE FINISH FLOOR, SEE
DETAIL IMPACT RESISTANT
DETAIL 11th FLOOR 11th FLOOR
3/4" GRAY STUCCO 108' - 0" STOREFRONT SYSTEM W/ LIGHT 108' - 0"
9'-8"
9'-8"
GRAY LAMINATED GLASS, SEE
IMPACT RESISTANT GLAZING SCHEDULE
10th FLOOR 10th FLOOR
STOREFRONT SYSTEM W/ LIGHT 98' - 4" 98' - 4"
9'-8"
9'-8"
GRAY LAMINATED GLASS, SEE
GLAZING SCHEDULE 9th FLOOR LAMINATED GLASS LINE RAIL ALUMINUM ANODIZED LOUVER, 9th FLOOR
88' - 8" FRAMELESS 44" ABOVE FINISH REFER TO LOUVER SCHEDULE 88' - 8"
13'-4"
13'-4"
FLOOR, SEE DETAIL FOR SPECS.
LAMINATED GLASS LINE RAIL TOP OF PARAPET 78' - 10"
FRAMELESS 44" ABOVE FINISH 8th FLOOR 8th FLOOR
FLOOR, SEE DETAIL 75' - 4" 75' - 4"
12'-4"
TOP OF PARAPET 67' - 10" TOP OF PARAPET 67' - 10" TOP OF PARAPET 67' - 10"
7th FLOOR 7th FLOOR
63' - 0" 63' - 0"
©
9'-0"
9'-0"
PARKING GARAGE TOWER 2 KINETIC SCREEN IN A POLISHED
6th FLOOR KINETIC SCREEN IN A POLISHED 6th FLOOR
ALUMINUM IN 8”X 8“ W/ 2”
54' - 0" ALUMINUM IN 8”X 8“ W/ 2” 54' - 0"
9'-0"
9'-0"
SPACING.
SPACING.
PARKING GARAGE TOWER 2 5th FLOOR 5th FLOOR
45' - 0" 45' - 0"
9'-0"
9'-0"
PARKING GARAGE TOWER 2 4th FLOOR 4th FLOOR
MIAMI SUN HOTEL 36' - 0" 36' - 0"
9'-0"
9'-0"
PARKING GARAGE TOWER 2 3rd FLOOR 3rd FLOOR
5'-0" 27' - 0" 5'-0" 27' - 0"
9'-0"
9'-0"
PARKING GARAGE TOWER 2 ALUMINUM ANODIZED LOUVER,
2nd FLOOR REFER TO LOUVER SCHEDULE 2nd FLOOR
18' - 0" 18' - 0"
FOR SPECS.
18'-0"
18'-0"
3/4" STUCCO SCORE LINES GARAGE
GRADE ELEVATION EXIT &
ENTRY
GRADE ELEVATION MEP DRIVEWAY GROUND FLOOR GROUND FLOOR
EL: +0'-"=12.25' N.G.V.D.
BIM 360://222 NE 1 ST. AVE/_LINK-TOWER 1- ELEVATION.rvt
PAINTED 5/8" SMOOTH STUCCO IMPACT RESISTANT KINETIC SCREEN IN A POLISHED AVERAGE SIDEWALK ELEVATIONS
PAINTED 5/8" SMOOTH STUCCO N.G.V.D. +12.25'
FINISH OVER 8" CBS / CONC STOREFRONT SYSTEM W/ LIGHT ALUMINUM IN 8”X 8“ W/ 2” EL: -0'-0 1/2"=12.21' N.G.V.D.
FINISH OVER 8" CBS / CONC
TOOLED STUCCO SCORELINE WALL / SLAB; PAINT BY SHERWIN GRAY LAMINATED GLASS, SEE SPACING.
WALL / SLAB; PAINT BY SHERWIN EL: -3-1/2"=12.91' N.G.V.D.
WILLIAMS WILLIAMS GLAZING SCHEDULE
ELEVATIONS
ELEVATIONS
A-202.
m.
15'-0"
AC/ UNITS. SEE MECH. DWGS
STOREFRONT SYSTEM W/ LIGHT HEIGHT OF STRUCTURE +443.92'
ALUMINUM MESH RAILING FOR REQUERIMENTS
GRAY LAMINATED GLASS, SEE
GLAZING SCHEDULE ROOF
IMPACT RESISTANT 433' - 0"
15'-0"
STOREFRONT SYSTEM W/ LIGHT
GRAY LAMINATED GLASS, SEE
GLAZING SCHEDULE
ROOF ACCESS
4533 Ponce de Leon Boulevard
418' - 0"
10'-4"
Coral Gables, Florida 33146
TEL: (305) 740-5442 FAX: (305) 740-5443
42nd FLOOR E-MAIL: info@beharfont.com
407' - 8"
9'-8"
41st FLOOR
398' - 0"
9'-8"
PAINTED 5/8" SMOOTH STUCCO 40th FLOOR
FINISH OVER 8" CBS / CONC 388' - 4" SEAL:
9'-8"
WALL / SLAB; PAINT BY SHERWIN
WILLIAMS 39th FLOOR
378' - 8"
9'-8"
38th FLOOR
369' - 0"
9'-8"
37th FLOOR
359' - 4"
9'-8"
PAINTED 5/8" SMOOTH STUCCO 36th FLOOR
FINISH OVER 8" CBS / CONC 349' - 8"
9'-8"
WALL / SLAB; PAINT BY SHERWIN
WILLIAMS 35th FLOOR
340' - 0"
9'-8"
LINE RAIL ALUMINUM MESH LINE RAIL ALUMINUM MESH 34th FLOOR
GRILL BALCONY RAILING 44" GRILL BALCONY RAILING 44" 330' - 4"
9'-8"
IMPACT RESISTANT WINDOW/SLIDING GLASS DOOR ABOVE FINISH FLOOR, SEE ABOVE FINISH FLOOR, SEE
W/LIGHT GRAY LAMINATED GLASS DETAIL DETAIL 33th FLOOR
320' - 8"
9'-8"
IMPACT RESISTANT 32th FLOOR
STOREFRONT SYSTEM W/ LIGHT 311' - 0"
9'-8"
GRAY LAMINATED GLASS, SEE
GLAZING SCHEDULE 31th FLOOR
301' - 4"
9'-8"
IMPACT RESISTANT 30th FLOOR
STOREFRONT SYSTEM W/ LIGHT 291' - 8"
9'-8"
GRAY LAMINATED GLASS, SEE
GLAZING SCHEDULE 29th FLOOR
282' - 0"
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
9'-8"
28th FLOOR
272' - 4"
9'-8"
27th FLOOR
262' - 8"
9'-8"
MAX. HEIGTH FROM SIDEWALK AVERAGE ELEVATION
9'-8"
25th FLOOR
243' - 4"
9'-8"
24th FLOOR
233' - 8"
9'-8"
448'-0 1/2"
448'-0"
23th FLOOR
224' - 0"
9'-8"
3/4" STUCCO FINISH 22th FLOOR
214' - 4"
9'-8"
21th FLOOR
204' - 8"
9'-8"
9'-8"
19th FLOOR
185' - 4"
9'-8"
18th FLOOR
175' - 8"
9'-8"
PAINTED 5/8" SMOOTH STUCCO 17th FLOOR
FINISH OVER 8" CBS / CONC 166' - 0"
9'-8"
WALL / SLAB; PAINT BY SHERWIN
PAINTED 5/8" SMOOTH STUCCO WILLIAMS 16th FLOOR
FINISH OVER 8" CBS / CONC 156' - 4"
9'-8"
WALL / SLAB; PAINT BY SHERWIN
WILLIAMS 15th FLOOR
146' - 8"
9'-8"
LINE RAIL ALUMINUM MESH 14th FLOOR
GRILL BALCONY RAILING 44" 137' - 0"
9'-8"
ABOVE FINISH FLOOR, SEE
DETAIL 13th FLOOR
LINE RAIL ALUMINUM MESH 127' - 4"
9'-8"
GRILL BALCONY RAILING 44"
ABOVE FINISH FLOOR, SEE
12th FLOOR
DETAIL IMPACT RESISTANT 117' - 8"
9'-8"
STOREFRONT SYSTEM W/ LIGHT
GRAY LAMINATED GLASS, SEE 11th FLOOR
3/4" GRAY STUCCO GLAZING SCHEDULE 108' - 0"
9'-8"
10th FLOOR
98' - 4"
9'-8"
9th FLOOR
IMPACT RESISTANT 88' - 8"
TOP OF PARAPET 78' - 10"
13'-4"
STOREFRONT SYSTEM W/ LIGHT
GRAY LAMINATED GLASS, SEE
GLAZING SCHEDULE 8th FLOOR
75' - 4"
©
63' - 0"
9'-0"
GARAGE OPENING
6th FLOOR
54' - 0"
9'-0"
KINETIC SCREEN IN A POLISHED GARAGE OPENING
ALUMINUM IN 8”X 8“ W/ 2” 5th FLOOR
SPACING. 45' - 0"
9'-0"
GARAGE OPENING
4th FLOOR
36' - 0"
9'-0"
GARAGE OPENING
9'-0"
GARAGE OPENING
2nd FLOOR
18' - 0"
18'-0"
3/4" STUCCO SCORE LINES
GARAGE OPENING
GROUND FLOOR
BIM 360://222 NE 1 ST. AVE/_LINK-TOWER 1- ELEVATION.rvt
0' - 0"
EL: 0'-0"=12.25'
N.G.V.D.
AVERAGE SIDEWALK ELEVATIONS
PAINTED 5/8" SMOOTH STUCCO PAINTED 5/8" SMOOTH STUCCO PAINTED 5/8" SMOOTH STUCCO KINETIC SCREEN IN A POLISHED
FINISH OVER 8" CBS / CONC FINISH OVER 8" CBS / CONC FINISH OVER 8" CBS / CONC ALUMINUM IN 8”X 8“ W/ 2” N.G.V.D.
EL: -0'-0 1/2"=12.21' +11.75'
N.G.V.D.
WALL / SLAB; PAINT BY SHERWIN WALL / SLAB; PAINT BY SHERWIN WALL / SLAB; PAINT BY SHERWIN SPACING.
WILLIAMS WILLIAMS WILLIAMS
DATE: 09/02/2022
WEST ELEVATION
1 SCALE: 3/64" = 1'-0" PROJECT NO:21-091
DRAWING NAME:
12/09/2022 05:01:05 p.
ELEVATIONS
ELEVATIONS
A-203.
m.
15'-0"
MACHINE
ROOF ACCESS
ROOM
418' - 0"
ELEVATOR
10'-4"
HALLWAY HALLWAY
LOBBY
42nd FLOOR
407' - 8"
9'-8"
UNIT A ELE. 7 ELE. 8 STUDIO 3 UNIT A
41st FLOOR
398' - 0"
19'-4"
40th FLOOR
388' - 4"
9'-8"
HALLWAY ELEVATOR
38th FLOOR LOBBY
369' - 0"
9'-8"
UNIT A ELE. 7 ELE. 8 STUDIO 3 UNIT A
37th FLOOR
359' - 4"
HALLWAY
9'-8"
HALLWAY ELEVATOR 4533 Ponce de Leon Boulevard
36th FLOOR LOBBY Coral Gables, Florida 33146
349' - 8" TEL: (305) 740-5442 FAX: (305) 740-5443
E-MAIL: info@beharfont.com
9'-8"
UNIT A ELE. 7 ELE. 8 STUDIO 3 UNIT A
35th FLOOR
340' - 0"
HALLWAY
9'-8"
HALLWAY ELEVATOR
34th FLOOR LOBBY
330' - 4" SEAL:
9'-8"
UNIT A ELE. 7 ELE. 8 STUDIO 3 UNIT A
33rd FLOOR
320' - 8"
ELEVATOR HALLWAY
9'-8"
HALLWAY LOBBY
32nd FLOOR
311' - 0"
9'-8"
UNIT A ELE. 7 ELE. 8 STUDIO 3 UNIT A
31st FLOOR
301' - 4"
HALLWAY
9'-8"
HALLWAY ELEVATOR
30th FLOOR LOBBY
291' - 8"
9'-8"
UNIT A ELE. 7 ELE. 8 STUDIO 3 UNIT A
29th FLOOR
282' - 0"
9'-8" ELEVATOR HALLWAY
HALLWAY
28th FLOOR
LOBBY
272' - 4"
9'-8"
HALLWAY ELEVATOR
26th FLOOR LOBBY
253' - 0"
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
9'-8"
HALLWAY LOBBY
24th FLOOR
233' - 8"
9'-8"
HALLWAY ELEVATOR
433'-0"
HALLWAY
20th FLOOR
LOBBY
195' - 0"
9'-8"
HALLWAY ELEVATOR
18th FLOOR LOBBY
175' - 8"
9'-8"
HALLWAY ELEVATOR
16th FLOOR LOBBY
156' - 4"
9'-8"
HALLWAY ELEVATOR
14th FLOOR LOBBY
137' - 0"
9'-8"
HALLWAY ELEVATOR
12nd FLOOR LOBBY
117' - 8"
9'-8"
ELEVATOR
10th FLOOR LOBBY
98' - 4"
©
13'-4"
ELE. 7 ELE. 8
8th FLOOR PLAN
75' - 4"
12'-4"
ELEVATOR
CORRIDOR CORRIDOR
7th FLOOR PLAN
LOBBY
63' - 0"
PARKING GARAGE PARKING GARAGE PARKING GARAGE
9'-0"
PARKING GARAGE
LOBBY
BIM 360://222 NE 1 ST. AVE/_LINK-TOWER 1-INTERIOR 1-8 LEVELS.rvt
5th FLOOR
45' - 0"
PARKING GARAGE ELE. 7 ELE. 8 PARKING GARAGE PARKING GARAGE
9'-0"
PARKING GARAGE
4th FLOOR
36' - 0"
PARKING GARAGE ELEVATOR PARKING GARAGE PARKING GARAGE
9'-0"
PARKING GARAGE
3rd FLOOR
LOBBY
27' - 0"
PARKING GARAGE ELE. 7 ELE. 8 PARKING GARAGE PARKING GARAGE
9'-0"
PARKING GARAGE
2nd FLOOR
18' - 0"
DATE: 08/08/2022
18'-6"
OVERALL SECTION
OVERALL SECTION
SCALE: 1/16" = 1'-0" A-301.
10' - 0" SETBACK /
12'-4"
KIDS/PARTY BUILDING SEAL:
6.4% BOWLING ROOM
ROOM UNDER POOL STORAGE/MEP
7th FLOOR
63' - 0"
9'-0"
36' - 0"
9'-0"
27' - 0" PARKING GARAGE
PARKING GARAGE 6.4% 5th FLOOR
45' - 0"
47' - 0"
9'-0"
6.4%
PARKING GARAGE
75'-4"
PARKING GARAGE 6.4% 4th FLOOR
36' - 0"
9'-0"
15' - 5" 38' - 0" PARKING GARAGE
PARKING GARAGE 6.4% 3rd FLOOR
6.4% 27' - 0"
8.0%
9'-0"
PARKING GARAGE
2nd FLOOR
29' - 0" PARKING GARAGE 18' - 0"
MAIN
18'-0"
0' - 5 3/4"
16.0% ELECTRICAL
16.0 20' - 0" RETAIL TRASH ROOM
BOH ROOM
% GROUND FLOOR
0' - 0"
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
-0' - 0 3/4"
1 PARKING SECTION
A-302. 1/16" = 1'-0"
3 PARKING SECTION
A-302.
6.4%
45' - 0"
RENTABLE
27' - 0" PARTY ROOM GAME LOUNGE BOWLING ROOM 7th FLOOR
63' - 0"
9'-0"
9'-0"
18' - 0"
©
PARKING GARAGE PARKING GARAGE 5th FLOOR
45' - 0"
9'-0"
PARKING GARAGE PARKING GARAGE 4th FLOOR
36' - 0"
5.7%
63'-0"
9'-0"
PARKING GARAGE PARKING GARAGE 3rd FLOOR
27' - 0"
16.0%
9'-0"
15' - 5"
0' - 5 3/4"
18'-0"
BIM 360://222 NE 1 ST. AVE/_LINK-TOWER 1-INTERIOR 1-8 LEVELS.rvt
RETAIL
GROUND FLOOR
0' - 0"
-0' - 0 1/2"
DATE: 08/08/2022
2 PARKING SECTION 1 PROJECT NO:21095
A-302. 1/16" = 1'-0"
DRAWING NAME:
9/12/2022 11:17:14 PM
PARKING SECTIONS
3' - 0"
3' - 0"
LIGHT SCONCE BALCONY
BALCONY
ABOVE MIRROR
8"
BEDROOM
BEDROOM
3' - 2"
LIVING/ DINING
4533 Ponce de Leon Boulevard
ROOM
12' - 3"
Coral Gables, Florida 33146
11' - 7"
TEL: (305) 740-5442 FAX: (305) 740-5443
Range E-MAIL: info@beharfont.com
Hood
LIVING/ DINING
7' - 6"
1' - 6"
25' - 10"
4"
4"
1' - 2"
2' - 10"
4"
CLOSET
CLOSET
4' - 6"
4"
3' - 0"
10' - 11" 3' - 0" 3' - 2" 3' - 0"
W/D CL 4" 4"
W/D CL
4"
4"
REF DW STF 3' - 0"
2' - 0" 15' - 8"
2' - 11"
4" AHU
AHU CL AHU CL
3' - 0"
4"
KITCHEN
DETAIL KITCHEN 1BDR TYP. KITCHEN
8
9' - 1"
SCALE: 1/2" = 1'-0" 12' - 7" 8' - 2"
BATHROOM 4" BATHROOM
5' - 9"
DW
DW
REF. REF.
LIGHT SCONCE
ABOVE MIRROR
1BDR TYP. PERSPECTIVE 1BDR TYP. REFLECTED CEILING PLAN 1BDR TYP. FLOOR PLAN
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
(540 SF )
3 SCALE: 2 SCALE: 1/4" = 1'-0" 1 SCALE: 1/4" = 1'-0"
1 BEDROOM
1 BATHROOM
1' - 0"
KS-1 STAINLESS STEEL, UNDERCOUNTER, SINGLE RESIDENTIAL MOEN G20193B MOEN 1/2" 1/2" 1/2" 1/2"
MIAMI, FLORIDA
222 NE 1st AVE.
COMPARTMENT SINK. FURNISH WITH SINGLE 7864
HOLE, SINGLE HANDLE, PULL DOWN, 1.5 GPM,
2' - 6"
DETAIL KITCHEN STUDIO 6' - 0" ADA FAUCET
1' - 6"
9 SCALE: 1/2" = 1'-0"
LIGHT SCONCE
ABOVE MIRROR 14' - 10"
TV DETAIL
7 SCALE: 1/2" = 1'-0"
3' - 0"
3' - 0"
3' - 0"
BALCONY
BALCONY
8"
8"
Shelving
LED Light
TV Wall
14' - 2"
Bracket
13' - 6"
14' - 4"
©
BEDROOM
D:\RESPALDO FORMATEO\DOCUMENTOS\FernandoPino\280322\RVT\040622\Nueva carpeta (2)\21095 222 NE 1ST.AVE UNIT.rvt
25' - 11"
4"
4"
AHU CL AHU CL
AHU
LED Light CLOSET
6' - 2"
2' - 8"
CLOSET
6"
5' - 10" 3' - 0" 4' - 8"
3' - 0"
KITCHEN W/D CL 4" 6"
4"
4"
Shelving.
DW
DW
BATHROOM KITCHEN
BATHROOM
1' - 0"
SH.
5' - 7"
5' - 7"
3' - 0"
REF.
REF.
2' - 0"
DATE: 09-07-22
DETAIL STUDIO TYP. PERSPECTIVE STUDIO TYP. REFLECTED CEILING PLAN STUDIO TYP. FLOOR PLAN (370 SF )
A-4.0
24" DEEP CABINETS
ABOVE FRIDGE,
TYP.
3' - 0"
3' - 0"
3' - 0"
LIGHT SCONCE
BALCONY
BALCONY
ABOVE MIRROR
8"
8"
BEDROOM
10' - 7"
13' - 7"
LIVING/ DINING
LIVING/ DINING BEDROOM ROOM 4533 Ponce de Leon Boulevard
Coral Gables, Florida 33146
ROOM
10' - 2" 10' - 1" TEL: (305) 740-5442 FAX: (305) 740-5443
4" E-MAIL: info@beharfont.com
4"
2' - 0"
10' - 2" 4" 3' - 11" 5' - 10"
4"
25' - 9"
CLOSET
CLOSET
4"
4"
SEAL:
BATHROOM
BATHROOM 10' - 2" 9' - 7"
5' - 7"
5' - 7"
4"
KITCHEN
7"
DW
KITCHEN
DW
W/D CL
3' AHU
AHU CL
REF.
- 0"
AHU CL
REF.
REFLECTED CEILING PLAN. UNIT A2 FLOOR PLAN UNIT A2 (540 SF )
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
SCALE: 1/4" = 1'-0" 1 BEDROOM
1 BATHROOM
1' - 0"
2' - 6"
6' - 0"
1' - 6"
MIAMI, FLORIDA
222 NE 1st AVE.
ELEVATION INTERIOR KITCHEN. TV DETAIL.
4 SCALE: 1/2" = 1'-0" 8 SCALE: 1/2" = 1'-0"
10' - 2"
11' - 10" 10' - 2"
4"
BEDROOM
16' - 2"
BEDROOM
4"
5' - 0"
ROOM CLOSET ROOM
©
4"
D:\RESPALDO FORMATEO\DOCUMENTOS\FernandoPino\280322\RVT\040622\Nueva carpeta (2)\21095 222 NE 1ST.AVE UNIT.rvt
28' - 9"
4"
4"
4"
3' - 2"
BATHROOM BATHROOM
SH.
5' - 6"
2' - 9" 11' - 10" 10' - 3"
4"
8" 4"
BALCONY
2' - 3"
CL
BALCONY
KITCHEN
7"
4"
4' - 0"
FOYER 2' - 9" 23' - 0" FOYER
KITCHEN
4' - 0"
4"
4"
2' - 9" 11' - 2" 3' - 0" 3' - 0"
3' - 0"
REF.
3' - 0"
8" DW 6" 4" 6"
REF. W/D CL
DW AHU CL AHU
DATE: 09-07-22
AHU CL
PROJECT NO:20060
DRAWING NAME:
PERSPECTIVE. UNIT A3. REFLECTED CEILING PLAN. UNIT A3 FLOOR PLAN UNIT A3. (540 SF )
5 7
9/7/2022 10:19:21 PM
8"
10' - 11"
14' - 0"
14' - 5"
BEDROOM 1 4"
BEDROOM 1
4"
LIVING/ DINING/ LIVING/ DINING/
21' - 5"
21' - 5"
KITCHEN ROOM SH. KITCHEN ROOM
CLOSET
CLOSET 4533 Ponce de Leon Boulevard
Coral Gables, Florida 33146
8' - 2"
LIGHT SCONCE TEL: (305) 740-5442 FAX: (305) 740-5443
ABOVE MIRROR E-MAIL: info@beharfont.com
BATHROOM 1
BATHROOM 1
5' - 4" 4" 3' - 0" 4" 4' - 11" 15' - 8"
4"
SEAL:
4"
3' - 7"
FOYER
REF.
FOYER REF.
DW DW
7"
4"
4"
COSET
CLOSET
CLOSET
2' - 0"
COSET
3' - 0"
3' - 9" 5' - 8" 3' - 2" 3' - 0" 2' - 0" 10' - 9" 3' - 0"
W/D CL 4" 4"
BEDROOM 2 4" 4" 4" 8"
BALCONY
W/D CL
4"
BALCONY
BATHROOM 2
4"
LIGHT SCONCE
10' - 5"
BEDROOM 2
3' - 6"
ABOVE MIRROR BATHROOM 2
8' - 0"
4"
AHU CL CLOSET
CLOSET
3' - 2"
3' - 0"
6" AHU 4" 4"
Range
Hood
7' - 6"
1' - 6"
SINK
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
2 FLOOR PLAN UNIT B.1 (933 SF )
1
2' - 10"
REF DW STF
TV
1' - 0"
MIAMI, FLORIDA
222 NE 1st AVE.
2' - 6"
6' - 0"
1' - 6"
TV DETAIL...
4 SCALE: 1/2" = 1'-0"
DATE: 09-07-22
PROJECT NO:20060
DRAWING NAME:
9/7/2022 10:20:01 PM
18"
PARKING BY
DISABLED APPROVED HANDICAP SIGN
2'-6"
TOW AWAY ZONE
& FINE TO BLACK ON No Step
$250.00
REFLECTIVE WHITE
8'-6"
8" Wide Conc. Edger Location Layout COUNTY STANDARD DETAIL R-18.1 PAINT
Slope
6" 2'-6"
3'
7'-0"
6"
Vapor Barrier Compacted Subgrade WHEEL STOP 12" TRAFFIC PAINT PAINT
Compacted Fill 20"
12"
Notes: PARKING SET IN EPOXY 4533 Ponce de Leon Boulevard
SURFACE FINISH GRADE
1-Provide Continuous Trowed Concrete Containment Edge W/ 1 #5 Cont. (Hidden Coral Gables, Florida 33146
Below Grade) At All Paver Borders Without Concrete Curbs Or Which Do Not Abutt TEL: (305) 740-5442 FAX: (305) 740-5443
Against The Building Or Sidewalks SEE SITE PLAN 12' 5' E-MAIL: info@beharfont.com
4" BLUE WHEN ADJACENT SPACE
2-Slope Shall Not Exceed 2% IS FOR HANDICAP PARKING.
1'-6"
DRIVE 4" WHITE IF NON-HANDICAP.
SEAL:
18"ø
Typ. Pavers Pavement Detail PRECAST CONCRETE WHEELSTOP HANDICAP SIGN DETAIL @ PARKING HANDICAP & STANDARD PARKING DETAIL
4 SCALE: 3/4" = 1'-0" 3 SCALE: 1" = 1'-0" 2 SCALE: 1 1/2" = 1'-0" 1 SCALE: 1 1/2" = 1'-0"
6" RADIUS
2'-0"
4" TYP
1'-0"
2'-0"
1'-9"
2'-
1'-0"
0"
6'-0"
R
R=
4'-
0"R
8"
2'-
6"
1'-
0"
R=
1'-0" 3'-9" 4'-9"
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
" TYP
1'-0 REVERSE ARROWS
CL OF PARKING FOR OPPOSITE
DIRECTION OF
SPACE 1'-0" FLOW
NOTES :
8" ALL PAVEMENT MARKING SHALL BE REFLECTORIZED THERMOPLASTIC, EXCEPT
FOR PARKING STALL LINES WICH AREA PERMITTED TO BE FDOT APPROVED PAINT.
ALL REGULATORY SIGNS SHALL BE MADE OF HIGH INTENSITY REFLECTIVE
MATERIALS ( 3M DIAMOND GRADE OR EQUIVALENT ) AND SHALL CONFORM TO THE
USDOT MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES AND BROWARD COUNTY
PAVEMENT LOGO PER FDOT INDEX No. TRAFFIC ENGINEERING STANDARDS.
17346. SIZE 3 OR 5 FEET IN HEIGHT AND
BLUE IN COLOR
DATE: 08/08/2022
PROJECT NO:21095
DRAWING NAME:
SITE DETAILS
9/8/2022 9:01:39 PM
SITE DETAILS
SCALE: As indicated A-501
TOWER 1 - FLR AREA TOWER 2 - FLR AREA FLR AREA SUMMARY
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
TRASH
TRASH ROOM
STAIR 1 CHUTE
STAIR 1 STAIR 1
BLDG. # 228-226 STAIR 1 BLDG. # 228-226
(NOT A PART OF (NOT A PART OF
THIS APPLICATION) THIS APPLICATION)
ELEV. 2 ELEV. 3
ELEV. 1 ELEV. 1
ELEV. 4
ELEV. 3 ELEV. 2 ELEV. 4
ELEV. 5 ELEV. 6 ELEVATOR
ELEVATOR LOBBY
STAIR 3 STAIR 3
LOBBY FPL.
ELEVATOR MEP ELEVATOR VAULT
FPL. 24242 SF MEP 24242 SF
LOBBY LOBBY
VAULT
ELEV. 7
ELEV. ELEV.
ELEV. 9 10 STAIR 2 ELEV. 9 10
ELEV.
19011 SF ELEV. ELEV. STAIR 2
12
11 19011 SF 12
FD FD
©
FD
? ?
ELEV. 5 ELEV. 6
? ?
FPL. ELEVATOR FPL. ELEVATOR
VAULT LOBBY VAULT LOBBY
ELEVATOR
MEP
ELEVATOR
MEP 24242 SF
LOBBY LOBBY
STAIR 3 STAIR 3
24242 SF ELEV. 7 ELEV. 8
19011 SF ELEV. ELEV.
ELEV. 9 10 ELEV. 9
10
ELEV.
ELEV. ELEV.
11 ELEV. 12
11
12
STAIR 2 19011 SF STAIR 2
MEP
MEP MEP
BIM 360://222 NE 1 ST. AVE/21095-222 NE 1ST.AVENUE-BUILDING.rvt
FD
FD
AREA DIAGRAMS -
SCALE: 1/32" = 1'-0" SCALE: 1/32" = 1'-0"
FLR AREA
AREA DIAGRAMS - FLR AREA
A-601.
m.
59'-2" 120'-9"
STAFF
UNIT ROOM
UNIT UNIT
A4 A4 A4 STUDIOSTUDIO UNIT A STUDIO UNIT B WC RESIDENT
STORAGE
DOG
60'-1"
STUDIO BLDG. # 228-226 STAIR 1 BLDG. # 228-226 BLDG. # 228-226
STUDIO WASH
(NOT A PART OF TRASH (NOT A PART OF (NOT A PART OF
STAIR 1 HEAVY STAIR 1
. ROOM STUDIO
STAIR 1 THIS APPLICATION) UNIT STUDIO
THIS APPLICATION) STAIR 1 DUTY STAIR THIS APPLICATION)
STUDIO A4 ELEV. 1 ELEV. 3 LAUNDRY
107'-2"
4 ? ? ? ?
STUDIO ROOM
STUDIO BUILDING
1 MUSIC
3 UNIT A ? MANAGEMENT
FD ROOM
UNIT A ELEV. 2 ELEV. 4 13717 SF ? ? OFFICE ? ?
56'-2" PODCAST
STUDIO FD ? ROOM
FD FD
3 FPL. ELEVATOR FPL. ELEVATOR WC FPL. ELEVATOR
167'-2"
167'-2"
VAULT LOBBY UNIT A VAULT LOBBY VAULT LOBBY
0"
ELEVATOR 11484 SF ELEVATOR FPL.
UNIT A '- LOBBY MEP
54 LOBBY VAULT
STUDIO STAIR 3
73'-4" 3
14686 SF ELEV. 2 ELEV. 1 ELEV. 2
ELEV. 1 22118 SF
14676 SF UNIT A ELEV. 9 FD
ELEV.
CORRIDOR
STUDIO ELEV. ELEV. 9 10 4533 Ponce de Leon Boulevard
UNIT A 15453 SF Coral Gables, Florida 33146
107'-0"
3 10
ELEV. ELEV. ELEV.
STUDIO MOVIE 11 12 MENWOMEN BUILDING TEL: (305) 740-5442 FAX: (305) 740-5443
STUDIOSTUDIO UNIT 12
1
4 A A4
STAIR 2 STUDIO ROOM WC WC BOWLING MAINTENACE E-MAIL: info@beharfont.com
STUDIO STAIR 2 STAIR ROOM WORKSHOP STAIR 2
FD
60'-0"
STUDIO STUDIO
MEP STAIR 2 GOLF LOBBY
SIMULATOR BUILDING
UNIT B ROOM
UNIT UNIT UNIT UNIT STORAGE/MEP
UNIT SEAL:
A1 UNIT A UNIT A A1 A4 A4 A4 FD FD FD
FD KIDS/PARTY
ROOM FD
FD FD FD
137'-0" 60'-2"
645 SF 712 SF
REF.
1BR 581AHU
SF 402 SH.990 SF Name Count Area
AHU
AHU
AHU
DW
DW
SF 2BR 1 990 SF
DW
DW
673 SF SF SF DW
AHU SF
DW AHU 1BR 1 693 SF
400AHU
SF 402
WD WD
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
DW DW 1BR 1 685 SF
685 SF
DW
REF.
AHU
DW AHU S2
DW
REF.
AHU
400
AHUSF 402 SF
STU DW
WD
WD
DW
A
1BR
REF.
561 SF DW A 1 582 SF
REF.
REF.
DW 402
AHU SF WD
STU 1BR S2 S4 A 1 582 SF
DW
AHU
A
AHU
1BR WD
S1 1 408 SF
401 SF
AHU DW
DW
STU STU STU 1BR S1 S2 1 402 SF
DW 582 SF
DW
AHU
AHU
401 SF A S2 1 402 SF
561 SF
WD
1BR S1 AHU
S2 1 402 SF
REF.
DW
400
DWAHU
WD
SF
WD
DW S2 1 402 SF
AHU
776 SF
REF.
SF SF S2
WD
400 SF
DW
AHU
DW
STU
WD
DW
DW
DW
S2 1 402 SF
408 SF
REF.
REF. REF.
S1 AHU
AHU
AHU DW S2
AHU
AHU
DW
DW
S1 1 401 SF
AHU
REF.
REF.
REF. REF.
DW
DW
AHU
DW
REF.DW
DW AHU
AHU DW
WD
WD
B SH. SH.
1BR
1BR S2 1 401 SF
2ND LAYER
1ST LAYER
1ST LAYER
56'-8" 118'-8"
BLDG. # 228-226
(NOT A PART OF
THIS APPLICATION)
167'-2"
'
14,471 S.F.
53
TOWER II AREA
15,866 S.F.
60'-0"
BIM 360://222 NE 1 ST. AVE/21095-222 NE 1ST.AVENUE-BUILDING.rvt
137'-0" 60'-2"
PHASE 2 PHASE 1
10' - 0" SETBACK /
DATE: 09/02/2022
2ND LAYER
2ND LAYER
1ST LAYER
1ST LAYER
PROJECT NO:21095
DRAWING NAME:
12/09/2022 06:57:23 p.
AREA DIAGRAMS -
DIAGRAM FLOOR PLATE AREA DIAGRAMS - FLR AREA FLR AREA
2 SCALE: 1/32" = 1'-0" A-602.
m.
OPEN SPACE 7585 SF OPEN SPACE
AREA AREA
6 STORY 6 STORY
SUN HOTEL SUN HOTEL
SEAL:
OPEN SPACE
AREA
44005 SF
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
PHASE 2 PHASE 1 PHASE 2 PHASE 1
Area Schedule (OPEN SPACE
LOT COVERAGE= 41,788 SF 80% AREA)
LOT COVERAGE DIAGRAM OPEN SPACE DIAGRAM NAME AREA
2 SCALE: 1" = 20'-0" 1 SCALE: 1" = 20'-0"
OPEN SPACE AREA
OPEN SPACE 7585 SF
10' - 0" SETBACK /
2ND LAYER
1ST LAYER
1ST LAYER
100'-1" 150'-0"
1ST LAYER
10' - 0" SETBACK / 6,591 S.F. 10' - 0" SETBACK /
1ST LAYER 1ST LAYER
2ND LAYER COMMERCIAL AREA
9,168 S.F. 6 STORY 5,115 S.F.
25' - 0" SETBACK / 25' - 0" SETBACK / COMMERCIAL AREA
2ND LAYER 2ND LAYER SUN HOTEL
6 STORY 2,869 S.F.
SUN HOTEL
BLDG. # 228-226
BLDG. # 228-226
(NOT A PART OF
(NOT A PART OF
THIS APPLICATION)
THIS APPLICATION)
min. 50%
MIN 50%
189'-11" 5,057 S.F.
189'-11"
©
BIM 360://222 NE 1 ST. AVE/21095-222 NE 1ST.AVENUE-BUILDING.rvt
DATE: 09/02/2022
25' - 0" SETBACK /
PROJECT NO:21095
1ST LAYER
1ST LAYER
2ND LAYER
2ND LAYER
DIAGRAMS
NAME AREA
DIAGRAMS
1ST AND 2ND LAYER DIAGRAM 1ST LAYER 6,591 SF
A-603.
m.
DW
DW
15'-3"
UNIT A4 1 BEDROOM/ 1 BATHROOM 136 TOWER I STUDIO 400 SF
15'-4"
STUDIO 645 SF 712 SF
24'-6"
UNIT B 2 BEDROOM/ 2 BATHROOM 34 TOWER I STUDIO 400 SF
22'-7"
27'-0"
1 BEDROOM/ 1 1 BEDROOM/ 1
27'-0"
581 SF 402 SF 990 SF
27'-0"
402 SF
27'-0"
402 SF SH.
27'-0"
673 SF
24'-2"
27'-10"
AHU
TOWER I: 680 TOWER I STUDIO 1 400 SF
AHU
AHU
BATHROOM BATHROOM AHU
AHU
AHU
TOWER I STUDIO 3 401 SF 1 BEDROOM/ 1
DW
DW
DW
DW
STUDIO 1 BEDROOM/ 1 BATHROOM 136 TOWER I STUDIO 3 401 SF BATHROOM DW
26'-10"
STUDIO 1 1 BEDROOM/ 1 BATHROOM 34 TOWER I STUDIO 4 401 SF
STUDIO DW
11'-2"
AHU
990 SF
13'-9"
STUDIO 3 1 BEDROOM/ 1 BATHROOM 68 TOWER I UNIT A 641 SF
14'-10"
AHU AHU
DW AHU
STUDIO 4 1 BEDROOM/ 1 BATHROOM 34 TOWER I UNIT A 641 SF 400 400 SF AHU 27'-0"
26'-0"SF
STUDIO A 1 BEDROOM/ 1 BATHROOM 34 TOWER I UNIT A 641 SF DW DW 1 BEDROOM/ 1 UNIT A4 27'-0"
STUDIO
14'-10"
AHU
UNIT A 1 BEDROOM/ 1 BATHROOM 170 TOWER I UNIT A 641 SF STUDIO 26'-0" DW BATHROOM AHU
25'-7"
DW
AHU
DW
1 BEDROOM/ 1 685 SF 402 SF
14'-10"
26'-11"
4533 Ponce de Leon Boulevard
UNIT A1 1 BEDROOM/ 1 BATHROOM 68 TOWER I UNIT A4 485 SF 400 AHU
SF
26'-11"
Coral Gables, Florida 33146
BATHROOM DW 1 BEDROOM/ 1
UNIT A4 1 BEDROOM/ 1 BATHROOM 136 TOWER I UNIT A4 485 SF 1 BEDROOM/ 1 401 SF TEL: (305) 740-5442 FAX: (305) 740-5443
17'-9"
402 SF DW BATHROOM
UNIT B 2 BEDROOM/ 2 BATHROOM
TOWER II: 714
34 TOWER I
TOWER I
UNIT A4
UNIT A4
485 SF
485 SF
BATHROOM
26'-0"
26'-8" STUDIO 3 E-MAIL: info@beharfont.com
13'-8"
19'-6" 14'-10" 18'-5"
6'-
10'-3"
21'-6"
AHU
0"
582 SF
TOWER I UNIT B 990 SF 1 BEDROOM/ 1 UNIT A
AHU
AHU
400 SF 27'-0"
UNITS SUMMARY TOWER II STUDIO 400 SF UNIT A 561 SF
DW
DW
BATHROOM STUDIO 4
TOWER II STUDIO 400 SF 26'-8"
STUDIO 4 1 BEDROOM/ 1
11'-3"
SEAL:
13'-9"
PHASE UNITS QUANTITY
TOWER II STUDIO 400 SF 1 BEDROOM/ 1 400
AHU SF STUDIO 3 1 BEDROOM/ 1 27'-0"
BATHROOM
TOWER I 680
TOWER II STUDIO 400 SF BATHROOM
DW
DW BATHROOM 1 BEDROOM/ 1 STUDIO 1
AHU
21'-6"
1 BEDROOM/ 1 BATHROOM
UNIT A
11'-0"
TOWER II STUDIO 1 400 SF
166'-7"
TOWER II 714 BATHROOM 1 BEDROOM/ 1
TOWER II STUDIO 3 400 SF 561 SF 582 SF
TOTAL BATHROOM
UNIT A
165'-7"
AHU
1394
UNITS TOWER II STUDIO 3 400 SF
STUDIO 1 STUDIO A 26'-11" 1 BEDROOM/ 1
151'-4"
150'-2"
10'-6"
TOWER II STUDIO 4 400 SF DW BATHROOM
16'-0"
AHU
TOWER II STUDIO A 400 SF 1 BEDROOM/ 1
26'-0"
1 BEDROOM/ 1 1 BEDROOM/ 1 STUDIO 3 401 SF DW
10'-2"
21'-6"
TOWER II UNIT A 641 SF 1 BEDROOM/ 1 DW 582 SF
AHU
AHU
BATHROOM 401 SF
TOWER II UNIT A 641 SF
UNIT A4 1 BEDROOM/ 1
15'-1"
561 SF 17'-5" 17'-2" 20'-7"
TOWER II UNIT A 641 SF UNIT A 14'-10"
AHU 27'-0" BATHROOM
11'-4"
26'-11"
TOWER II
TOWER II
UNIT A
UNIT A1
641 SF
516 SF 1 BEDROOM/ 1
DW 400 SF 400 SF 400 SF 1 BEDROOM/ 1 STUDIO 3
AHU
27'-4"
27'-5"
27'-4"
DW BATHROOM
STUDIO
AHU
26'-0" AHU SF
BATHROOM
22'-8"
776 SF 402
14'-10"
AHU
TOWER II UNIT A1 516 SF 1 BEDROOM/ 1
14'-10"
TOWER II UNIT A4 761 SF 400AHU
SF 27'-0"
BATHROOM
DW
DW
DW
DW
TOWER II UNIT A4 761 SF DW DW
1 BEDROOM/ 1
408 SF BATHROOM
7'-9"
14'-10"
TOWER II UNIT A4 761 SF
STUDIO 402 SF
15'-11"
26'-0" AHU DW
AHU
AHU
TOWER II UNIT A4 761 SF AHU
AHU
DW 27'-0" 27'-0"
7'-8"
TOWER II UNIT B 940 SF
AHU
STUDIO 1 BEDROOM/ 1
DW
DW
TOTAL UNIT AREA PER FLOOR: 41 21718 SF DW 27'-0" 27'-0"
BATHROOM
DW DW
AHU
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
AHU
STUDIO
AHU
542 SF 568 SF 568 SF 516 SF 761 SF
33'-5"
940 SF
21'-9"
1 BEDROOM/ 1
26'-4"
AHU AHU
23'-2"
690 SF 680 SF
26'-4"
26'-4"
26'-4"
BATHROOM
UNIT A4 UNIT A4
23'-8"
SH.
1 BEDROOM/ 1
BATHROOM
DW
DW
27'-5" 21'-6" 10'-5" 11'-1" 11'-2" 10'-4" 21'-0" 23'-11" 1 BEDROOM/ 1 1 BEDROOM/ 1 30'-0" 30'-0"
BATHROOM BATHROOM
DATE: 09/02/2022
PROJECT NO:21095
15/09/2022 03:31:58 p.
DRAWING NAME:
MANEUVERABILITY
UNIT AREA PLAN EXHIBIT
m.
A-604
-6.3
N
O
C
O
P
I
E
S
,
R
E
P
R
O
D
U
C
T
I
O
N
S
,
T
R
A
N
S
M
I
S
S
I
O
N
S
O
R
E
L
E
C
T
R
O
N
I
C
M
A
N
I
P
U
L
A
T
I
O
N
O
F
A
N
Y
P
O
R
T
I
O
N
O
F
T
H
E
S
E
D
R
A
W
I
N
G
S
I
N
W
H
O
L
E
O
R
I
N
P
A
R
T
A
R
E
T
O
B
E
M
A
D
E
W
I
T
H
O
U
T
T
H
E
E
X
P
R
E
S
S
W
R
I
T
T
E
N
P
E
R
M
I
S
S
I
O
N
O
F
B
E
H
A
R
F
O
N
T
&
P
A
R
T
N
E
R
S
,
P
.
A
.
A
L
L
D
E
S
I
G
N
S
I
N
D
I
C
A
T
E
D
I
N
T
H
E
S
E
D
R
A
W
I
N
G
S
A
R
E
P
R
O
P
E
R
T
Y
O
F
B
E
H
A
R
F
O
N
T
&
P
A
R
T
N
E
R
S
,
P
.
A
.
A
L
L
C
O
P
Y
R
I
G
H
T
S
R
E
S
E
R
V
E
D
C
2
0
2
0
.
T
H
E
S
E
P
L
A
N
S
A
R
E
F
O
R
B
U
I
L
D
I
N
G
D
E
P
A
R
T
M
E
N
T
R
E
V
I
E
W
O
N
L
Y
T
H
E
Y
A
R
E
N
O
T
T
O
B
E
C
O
N
S
T
R
U
E
D
A
S
C
O
N
S
T
R
U
C
T
I
O
N
D
O
C
U
M
E
N
T
S
U
N
T
I
L
A
L
L
B
U
I
L
D
I
N
G
D
E
P
A
R
T
M
E
N
T
A
P
P
R
O
V
A
L
S
A
R
E
O
B
T
A
I
N
E
D
.
( )
NE 1ST AVENUE (SECONDARY STREET) NE 1ST AVENUE (SECONDARY STREET)
SU-30
I nc. A l l ri g hts reserved.
SU-30
SU-30
(c) 2 0 2 2 Trans oft S ol uti ons,
(c) 2 0 2 2 Trans oft S ol uti ons,
I nc. A l l ri g hts reserved.
SU-30
(c) 20 22 T ran soft So u I c. A l l rig hts res erved .
l tio ns , n
SU-30
SU-30 SU-30
SU-30 SU-30 SU-30
(c) 202 2 Tran soft S ol uti o ns, I n c. A l l ri ght s rese rved.
AASHTOAASHTO
2018 (US)
2018 (US) AASHTO 2018 (US) (c) 202 2 Tran soft S ol uti o ns, I n c. A l l ri ght s rese rved. (c) 202 2 Tran soft S ol uti o ns, I n c. A l l ri ght s rese rved.
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
SOUTHBOUND ENTRANCE - USE ONLY LOADING BERTHS 7 10 11 NORTHBOUND ENTRANCE - USE ONLY LOADING BERTH 8, 9, 12
2 SCALE: 1" = 30'-0" 1 SCALE: 1" = 30'-0"
P I c
n.
A l l
ir ght s r s
e er v ed.
( c) 2022Tr ans oft Sol ut io ns ,
P I c
n.
A l l
ir ght s r s
e er v ed.
AASHTO 2018
2018 (US)
Tr Tr
2
202 ans
(US) AASHTO
AASHTO
ofo
ans
2018
2018
AASHTO(US)
utu o
t f tSolSol
(US) (US)
2018
ons
it ins . AAl l l ri rght
c nc.
, ,I In i g ere rv v
s es
h ts s r re ed.
ed. ( c) 2022Tr ans oft Sol ut o
i ns , I n
c. A l l ri ght s (r c)
e
s er 2022
v ed. Tr ans oft Sol ut o
i ns , I n
c. A l l ri ght s r e
s er v ed.
( c) 202
AASHTO 2018AASHTO
(US)
o f t Solu t i ons , I nc. A l l
AASHTO
AASHTO 2018 (US) 2018
AASHTO
(US)
AASHTO
2018 (US)
2018 (US) AASHTO
AASHTO 2018 2018 (US)
(US)
P
( c) 2022Tr ans oft Sol ut io ns , I n
c. A l l ir ght s r s
e er v ed.
P
( c) 2022Tr ans oft Sol ut io ns , I n
c. A l l ir ght s r s
e er v ed.
P
( c) 2022Tr ans oft Sol ut io ns , I n
c. A l l ir ght s r s
e er v ed.
P
( c) 2022Tr ans oft Sol ut io ns , I n
c. A l l ir ght s r s
e er v ed.
P
( c) 2022Tr ans oft Sol ut io ns , I n
c. A l l ir ght s r s
e er v ed.
©
AASHTO 2018 (US)
AASHTO 2018 (US)
e r v ed.
e r v ed.
e r v ed.
e r v ed.
e r v ed.
e r v ed.
( c) 2022Tr ans oft Sol ut io ns ,
g t s r es
e r v ed.
e r v ed.
e r v ed.
g t s r es
e r v ed.
( c) 2022Tr ans oft Sol ut io ns ,
g t s r es
g t s r es
g t s r es
g t s r es
g t s r es
g t s r es
g t s r es
P
e r v ed.
P
g t s r es
ri h
g t s r es
g t s r es
P
g t s r es
P
ri h
P
P
P
ri h
P
g t s r es
P
o f t Solu t i ons , I nc. A l l r i h
ri h
ri h
ri h
ri h
ri h
o f t Solu t i ons , I nc. A l l
ri h
ri h
ri h
P
o f t Solu t i ons , I nc. A l l
n.
I c
n.
n.
I c
I c
I c
I c
I c
A l l
n.
n.
n.
n.
n.
A l l
A l l
I c
n.
A l l
A l l
A l l
A l l
A l l
I c
ir ght s r s
n.
A l l
2 Tr ans
ir ght s r s
ir ght s r s
2 Tr ans
A l l
ir ght s r s
ir ght s r s
ir ght s r s
ir ght s r s
ir ght s r s
2 Tr ans
2 Tr ans
2 Tr ans
2 Tr ans
2 Tr ans
2 Tr ans
2 Tr ans
ir ght s r s
2 Tr ans
( c) 202
2 Tr ans
2 Tr ans
e er v ed.
2 Tr ans
e er v ed.
( c) 202
e er v ed.
ir ght s r s
( c) 202
2 Tr ans
( c) 202
e er v ed.
( c) 202
e er v ed.
( c) 202
e er v ed.
( c) 202
e er v ed.
( c) 202
e er v ed.
( c) 202
( c) 202
( c) 202
( c) 202
e er v ed.
( c) 202
( c) 202
e er v ed.
P I c
n.
A l l
ir ght s r s
e er v ed.
e r v ed.
g t s r es
P ri h o f t Solu t i ons , I nc. A l l
2 Tr ans
( c) 202
BIM 360://222 NE 1 ST. AVE/21095-222 NE 1ST.AVENUE-BUILDING.rvt
GROUND FLOOR LOADING VAN (INGRESS) GROUND FLOOR LOADING VAN (EGRESS)
4 SCALE: 1" = 30'-0" 3 SCALE: 1" = 30'-0"
DATE: 09/02/2022
PROJECT NO:21095
DRAWING NAME:
15/09/2022 08:50:02 a.
MANEUVERABILITY
EXHIBIT
MANEUVERABILITY EXHIBIT
A-605.1
m.
12/09/2022 06:58:59 p.
m. BIM 360://222 NE 1 ST. AVE/21095-222 NE 1ST.AVENUE-BUILDING.rvt
2
AASHTO 2018 (US)
e er v ed.
ri ght s r s A l l n.
I c i ns ,
( c) 2022Tr ans oft Sol ut o
( c) 202 2 Tra ns
o ft o
Sl uti ons , I nc. Al l
ri h
g t s re s e rv ed.
( c) 202 2 Tra ns oft So
l ut i n
os , n
I c . lAl g
ri h t s r es e rv ed.
AASHTO 2018 (US)
In c . A
I c
r h t s r es e v
l l ig
n . A l l ir ght s r s
r ed.
e er v ed.
( c) 202 2 Tra ns oft So
l ut i nos ,
( c) 2022Tr ans oft Sol ut io ns ,
P
P
P AASHTO
AASHTO 2018
2018 (US)
(US)
NE 1ST AVENUE (SECONDARY STREET)
ir ght s r s
e er v ed. A l l I c
n. ( c) 2022Tr ans oft Sol ut io ns ,
P P
3
SCALE: 1" = 30'-0"
3rd FLOOR
( c) 202
2 Tr ans
o f t Solu t i ons , I nc. A l l ri h
g t s r es
e r v ed.
P
( c) 202
2 Tr ans
o f t Solu t i ons , I nc. A l l ri h
g t s r es
e r v ed.
P AASHTO 2018 (US)
AASHTO 2018 (US)
(c)
2022
T ran
soft
So lu
tio ns
, In c.
A l l rig
hts reserve
d.
BLDG. # 228-226
(NOT A PART OF
THIS APPLICATION)
NE 1ST AVENUE (SECONDARY STREET)
MANEUVERABILITY EXHIBIT
SCALE: 1" = 30'-0"
l tio ns , n
(c) 20 22 T ran soft So u I c. A l l rig hts res erve d.
EXHIBIT
A-605.
SEAL:
MANEUVERABILITY
E-MAIL: info@beharfont.com
PROJECT NO:21095
4533 Ponce de Leon Boulevard
R 100
0' - 0"
05-05-2022
1000ft RADIOUS TO
E-MAIL: info@beharfont.com
PROJECT NO:21095
4533 Ponce de Leon Boulevard
SEAL:
P.A. THE DESIGN AND DRAWINGS FOR THIS PROJECT ARE PROPERTY OF THIS ARCHITECT AND ARE PROTECTED UNDER THE COPYRIGHT PROTECTION ACT.
ARCHITECTURAL METAL SCREEN ARCHITECTURAL METAL CLADDING
MATERIALS BOARD
MATERIALS BOARD
A-801.
m.
13/09/2022 11:24:18 a.
m. BIM 360://222 NE 1 ST. AVE/21095-222 NE 1ST.AVENUE-BUILDING.rvt
RENDERING
DATE:
A-901
901
RENDERING
SEAL:
E-MAIL: info@beharfont.com
PROJECT NO:21095
4533 Ponce de Leon Boulevard
RENDERING
DATE:
A-901
RENDERING
SEAL:
E-MAIL: info@beharfont.com
PROJECT NO:21095
4533 Ponce de Leon Boulevard
RENDERING
DATE:
A-902
RENDERING
SEAL:
E-MAIL: info@beharfont.com
PROJECT NO:21095
4533 Ponce de Leon Boulevard
2ND LAYER
2ND LAYER
1ST LAYER
1ST LAYER
L-2 LANDSCAPE PLAN - LVL 8
300'-0"
L-3 LANDSCAPE PLAN DETAILS
RELOCATED EXISTING LIGHT POLE SHOWN FOR 1
COORDINATION PURPOSES ONLY. REFER ENG. DRAWINGS
NE 1st AVENUE (PRIMARY STREET)
CL
FOR FINAL LOCATIONS & PHOTOMETRIC. TYP LANDSCAPE LEGEND Information Required to be Permanently Affixed to Plan
25' SIGHT
5'-0" TYP.
5'-0" TYP.
ML
20'-0" TYP. TRIANGLE TYP.
Transect Zone: T6-8-O Total Net Lot Area 1.199 acres 52,235 s.f.
25' SIGHT CONCRETE
TRIANGLE TYP. SIDEWALK TYP.
5'-0" TYP.
OPEN SPACE REQUIRED PROVIDED
5'-0" TYP.
SIDEWALK SIDEWALK
10' - 0" SETBACK / 10' - 0" SETBACK /
1ST LAYER 1ST LAYER
A. Square Feet of open space required, as indicated on site plan:
10 % = _________
52,235 s.f. x _____
Net lot area = ________ 5,224 s.f. 5,224 s.f 7,843 s.f
PD TF CA CE PD
www.witkindesign.com
103 TF
IC CG LAWN AREA CALCULATION
CE 100
11 36
4 CE
MD
9 4 A. Square feet of landscaped open space required by Miami 21
TREES
NE 3rd STREET (SECONDARY STREET)
20'-5" TYP.
20'-9" TYP.
A. Number of trees required per net lot acre, less existing number of trees
meeting minimum requirements =
22
= _______ 1.199
trees x ______net lot acres 27 24
No. trees planted on upper levels (25% of required trees) 3
SIDEWALK
199'-10"
200'-0"
B. % Palms Allowed: No. trees provided x 30% = 8 12 ©2020 WITKIN HULTS + PARTNERS
THE DESIGN AND DRAWINGS HEREIN ARE THE
INTELLECTUAL PROPERTY OF THIS
C. % Natives Required: No. trees provided x 30% = 8 34 LANDSCAPE ARCHITECT AND ARE PROTECTED
UNDER THE COPYRIGHT PROTECTION ACT
FM
46
PD F. Street trees located directly beneath power lines
DEVELOPMENT
UP
1 N/A linear feet along street / 25 =
(maximum average spacing of 25' o.c.):_______ N/A N/A
PD
1 G. Total Trees Required A + E + F = 49 49
FM
MIAMI, FL
PASEO PAVING TYP. 10' PEDESTRIAN
SIGHT TRIANGLE A. No. of shrubs required = No. trees required x 10 490 490+
10' PEDESTRIAN
SIGHT TRIANGLE TYP.
B. % of native shrubs required: No. shrubs provided x 30% = 147 147+
TYP.
C. % Drought tolerant and low maintenance required: 98 98+
FM Number of shrubs provided x 20%=
47 FM
PD 43
SIDEWALK
SIDEWALK
1 PD SEE LANDSCAPE LIST
IC
13 1
Project:
1 2
PLANT SCHEDULE
ML
ML
TF
CL
CL
176
300'-0" TREES CODE QTY BOTANICAL / COMMON NAME SIZE CONTAINER NATIVE NOTES
Conocarpus erectus
CE 14 16` HT. X 6` SPR. 4" DBH MIN. F.G. Y -
LANDSCAPE PLAN NORTH 2
TREE MITIGATION
Green Buttonwood
Ilex cassine
TOTAL DBH REMOVED = 239" IC 24 16` O.A. HT. 4" DBH MIN. F.G. Y -
Scale: 1" = 20'-0" TOTAL PALMS REMOVED = 0
Dahoon Holly
Required Mitigation per Chapter 17.6.1.1. PALM TREES CODE QTY BOTANICAL / COMMON NAME SIZE CONTAINER NATIVE NOTES
80- 2" DBH, 12' Ht. Trees OR
40- 4" DBH, 16' Ht. Trees Phoenix dactylifera 'Medjool'
PD 8 10" MIN. DBH 10` C.T MIN. F.G.
Medjool Date Palm
Provided Mitigation: SHRUB AREAS CODE QTY BOTANICAL / COMMON NAME SIZE CONTAINER NATIVE NOTES
(40) 16' Ht. 4" DBH Trees
Clusia guttifera
CG 74 24" HT. X 24" SPR. / 24" O.C. 7 GAL. Y -
Small Leaf Clusia
Seal:
Monstera deliciosa
MD 74 24" HT. X 24" SPR. / 36" O.C. 3 GAL. N -
Swiss Cheese Plant
Tripsacum floridanum
TF 567 24" HT. X 24" SPR / 24" O.C. 3 GAL. Y
Darf Fakahatchee Grass
GROUND COVERS CODE QTY BOTANICAL / COMMON NAME SIZE CONTAINER NATIVE NOTES
Z:\2022\Mixed Use\222 N.E. 1ST. AVE 2022-0016\SPA\2022.08.31 Rev\222 N.E. 1ST.AVE_LS_GF.dwg Sep 15, 2022
NOTES:
1. THIS LANDSCAPE PLAN WAS PREPARED USING THE PRINCIPLES OF FLORIDA FRIENDLY LANDSCAPING IN ORDER TO REDUCE THE AMOUNT Drawing: LANDSCAPE PLAN
OF WATER REQUIRED.
2. HYDROZONES WILL BE ILLUSTRATED ON THE IRRIGATION PLANS . Date: 02/14/2022
3. NATIVE OR NATURALIZED PLANT MATERIAL WERE CHOSEN SPECIFICALLY TO REDUCE WATERING NEEDS.
4. IRRIGATION WILL BE PROVIDED AT TIME OF PERMIT Scale: See Left
Drawn by: JT
Sheet No.: